Silvercorp Reports Intercept of 2.12 Metres Grading 1,684 Grams Per Tonne Silver at the GC Project
Published : October 18, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | China | Diamond | Growth | Lead | Market | Recovery | Report | Silver | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Oct. 18, 2012) - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (News - Market indicators)(NYSE:SVM) is pleased to report results from the underground tunnelling component of its 2012 exploration program at the GC silver-lead-zinc project located in Guangdong Province, China. The GC project is in final mine development phase and is anticipated to commence initial production in early 2013.

As reported on September 6, 2012, the 2012 drilling program at the GC project intercepted numerous new mineralized veins and delineated significant new higher grade silver mineralization in some of the recently discovered vein structures such as V9W-2 and V9W-1 which run parallel to known vein structures. As a result of this success, the goals of the current exploration program have been broadened to include upgrading the defined resource of the V9W-2 vein and associated parallel vein V9W-1. The drilling has been conducted through two ramps, the main ramp and the exploration ramp. 

The main ramp is collared at an elevation of 179 metres ("m") on the southwest side of the project area and has been developed to 1,447m in length down to the 34.3m elevation as at September 30, 2012. The exploration ramp commences at the 113m elevation in the northern central area of the project and has been developed for approximately 804m which is parallel to the major mineralized veins down to the 52.6m elevation. The exploration ramp will be connected to the main shaft, which is 6m in diameter and will provide access to most mineralization veins within 250m of the shaft.

Three major crosscut tunnels, TX50-19CM, TX100-28SCM and ZX150-20CM have been developed from the two ramps on levels 50m, 100m and 150m respectively to determine the vertical extension of the mineralization zones of V9W-2. TX50-19CM has been driven southwards from the exploration ramp for 176.6m on level 50m, along exploration line 19, TX100-28SCM has been developed southwards from the exploration ramp for 164m on level 100m, along exploration line 28, and ZX150-20CM has been developed northeastwards from the main ramp for 165m on level 150m. 

Drift tunnels have been driven from the crosscut tunnels either eastwards or westwards along major mineralized structures to test the strike continuity of mineralization zones. The major crosscuts and drifts the Company has been developing are summarized in Table 1 below:

Table 1: Major Crosscuts and Drift Tunnels at the GC project

Tunnel ID Type Level
(m)
  Reference
Point
Direction Distance
Advanced
(m)
Target
Vein
Structures
TX50-19CM Crosscut 50   V12-1, 470m from portal of exploration ramp Southwest 176.6 V9, V9W-1, V9W-2
TX50-V9W-1-EYM Drift 50   TX50-19CM East 9 V9W-1
TX50-V9W-1-WYM Drift 50   TX50-19CM West 9 V9W-1
TX50-V9W-2-MY Drift 50   TX50-19CM East 49 V9W-2
TX50-V9W-2-MY-CM1S Crosscut 50   TX50-V9W-2-MY South 18 V9W-2
TX50-V9W-2-MY-CM1N Crosscut 50   TX50-V9W-2-MY North 10 V9W-2
TX100-28SCM Crosscut 100   V20-6,240m from portal of exploration ramp Southwest 164 V9, V9W-1, V9W-2
TX100-V9W-2-WYM Drift 100   TX100-28SCM West 50 V9W-2
ZX150-V9W-2-EYM Drift 150   ZX150-20CM East 242 V9W-2

As of September 30, 2012, the Company had completed 732m of access via crosscuts and drifts along the veins on levels 50m, 100m and 150m and collected 318 channel samples. The high grade mineralization of V9W-2 has been traced by tunneling for 300m along strike and has been exposed on all three levels (150m to 50m level) for about 100m vertically. Three underground drill rigs are currently testing V9W-2 and associated veins.

Table 2 below sets out the assay results of intersections with significant mineralization in crosscut and drift tunnels. The exploration program has confirmed that V9W-1 and V9W-2 are high silver zones and has expanded the knowledge of these veins beyond the data included in the current resource estimate. Highlights of selected intercepts are as follows:

  • Crosscut Tunnel TX50-19CM, driven southwards from the exploration ramp along exploration line 19 on level 50m, has intercepted:
    • 1.97m of V9W-1 grading 1,067 grams per tonne ("g/t") silver ("Ag"), 1.94% lead ("Pb"), and 6.05% zinc ("Zn"); and
    • 2.32m of vein V9W-2 grading 626 g/t Ag, 0.47% Pb and 0.83% Zn, including an interval of 0.75m grading 1,229 g/t Ag, 1.17% Pb and 1.14% Zn;
  • Drift Tunnel TX50-V9W-1EYM, driven eastwards from crosscut tunnel TX50-19CM along vein V9W-1 on level 50m, intercepted 2.60m of the vein grading 441 g/t Ag, 0.26% Pb and 3.42% Zn;
  • Drift Tunnel TX50-V9W-2WYM, driven westwards from crosscut tunnel TX50-19CM along vein V9W-2 on level 50m, has intercepted 1.55m of the vein grading 2,269 g/t Ag, 1.10% Pb and 0.71% Zn;
  • Drift Tunnel TX50-V9W-2EYM, driven eastwards from crosscut tunnel TX50-19CM along vein V9W-2 on level 50m, has intercepted 1.47m of the vein grading 1,146 g/t Ag, 0.57% Pb and 15.56% Zn on level 50m;
  • Drift Tunnel TX100-V9W-2WYM, driven westwards from crosscut tunnel TX100-28SCM along vein V9W-2 on level 100m, intercepted 1.62m of the vein grading 328 g/t Ag, 1.84% Pb and 2.99% Zn;
  • Drift Tunnel ZX150-9W-2EYM, driven eastwards from access tunnel ZX150-20CM along vein V9W-2 on level 150m, intercepted 1.22m of the vein grading 2,517g/t Ag, 2.38% Pb and 3.82% Zn on level 150m.

All intervals are reported as true widths of the mineralized vein structures.

Table 2: Selected underground tunnelling results at the GC project

Tunnel ID Reference
Point
Distance
From
Reference
(m)
True
Width
(m)
Ag
(g/t)
Pb
(%)
Zn
(%)
Mineralized
Vein
Intercepts on the West Wall of Crosscut Tunnel TX50-19CM on Level 50m
TX50-19CM V12-1, 470m from the portal of TXPD 60.8 1.40 75 0.26 0.31 V9
TX50-19CM V12-1 84.6 1.11 121 0.12 0.17 New Discovery
TX50-19CM V12-1 96.7 0.71 319 1.22 0.97 New Discovery
TX50-19CM V12-1 100.6 1.33 128 0.07 0.17 New Discovery
TX50-19CM V12-1 105.3 3.33 119 0.64 0.52 V9W-1
TX50-19CM V12-1 127.5 2.32 626 0.47 0.82 V9W-2
    Including 0.75 1,229 1.17 1.14  
Intercepts on the East Wall of Crosscut Tunnel TX50-19CM on Level 50m
TX50-19CM V12-1 99.1 1.30 75 0.08 0.43 New Discovery
TX50-19CM V12-1 106.8 1.90 1,067 1.94 6.05 V9W-1
TX50-19CM V12-1 127.7 1.87 653 0.29 0.01 V9W-2
    Including 0.97 1,181 0.45 3.47  
TX50-19CM V12-1 155.0 1.16 197 0.11 7.33 New Discovery
TX50-19CM V12-1 163.8 0.51 159 0.08 1.40 New Discovery
Intercepts of V9W-1 along Drift Tunnel TX50-V9W-1-EYM Eastwards from Crosscut Tunnel TX50-19CM on Level 50m
TX50-V9W-1EYM TX50-19CM 3.0 1.82 558 0.58 2.95 V9W-1
TX50-V9W-1EYM TX50-19CM 4.5 2.60 411 0.26 3.42 V9W-1
TX50-V9W-1EYM TX50-19CM 6.0 1.39 398 0.54 1.09 V9W-1
TX50-V9W-1EYM TX50-19CM 27.6 2.72 121 0.06 6.01 V9W-1
Intercepts of V9W-2 along Drift Tunnel TX50-V9W-2WYM westwards from Crosscut Tunnel TX50-19CM on Level 50m
TX50-V9-2WYM TX50-19CM 3.0 2.12 1,684 0.82 0.58 V9W-2
TX50-V9-2WYM TX50-19CM 9 1.46 770 0.47 0.40 V9W-2
Intercepts of V9W-2 along Drift Tunnel TX50-V9W-2EYM Eastwards from Crosscut Tunnel TX50-19CM on Level 50m
TX50-V9W-2EYM TX50-19CM 13.5 1.47 1,146 0.57 15.56 V9W-2
TX50-V9W-2EYM TX50-19CM 18.5 0.85 368 0.17 25.45 V9W-2
TX50-V9W-2EYM TX50-19CM 21.5 1.16 266 1.40 3.66 V9W-2
TX50-V9W-2EYM TX50-19CM 27.5 2.96 232 1.99 1.42 V9W-2
TX50-V9W-2EYM TX50-19CM 45.5 0.97 117 0.06 0.35 V9W-2
Intercepts along Crosscut Tunnel TX50-V9W-2EMY-CM1S Southwards from TX50-V9W-2EYM on Level 50m
TX50-V9W-2EYM-CM1S TX50-V9W-2YM 1.4 1.36 328 0.63 0.23 V9W-2
TX50-V9W-2EYM-CM1S TX50-V9W-2YM 9 1.35 171 0.27 0.27 New Discovery
Intercepts along Crosscut Tunnel TX100-28SCM Southwards from Survey Point V20-6 on Level 100m
TX100-28SCM V20-6, 240m from the portal of TXPD 59.9 1.82 143 0.30 0.70 V9W-2
Intercepts of V9W-2 along Drift Tunnel TX100-V9W-2WYM Westwards from Crosscut Tunnel TX100-28SCM on Level 100m
TX100-V9W-2WYM TX100-28SCM 2.0 1.80 142 0.99 1.13 V9W-2
TX100-V9W-2WYM TX100-28SCM 3.5 0.96 146 0.78 1.20 V9W-2
TX100-V9W-2WYM TX100-28SCM 15 1.95 79 0.53 2.75 V9W-2
TX100-V9W-2WYM TX100-28SCM 20.5 0.96 768 4.22 4.17 V9W-2
TX100-V9W-2WYM TX100-28SCM 25 1.16 746 1.59 0.75 V9W-2
TX100-V9W-2WYM TX100-28SCM 29 1.62 328 1.84 2.99 V9W-2
TX100-V9W-2WYM TX100-28SCM 32.5 2.3 106 0.49 14.40 V9W-2
Intercepts of V9W-2 along Drift Tunnel ZX150-V9W-2EYM Eastwards from crosscut tunnel ZX150-20CM on Level 150m
ZX150-V9W-2EYM ZX150-20CM 81.00 1.87 138 0.09 7.30 V9W-2
ZX150-V9W-2EYM ZX150-20CM 83.50 2.06 678 0.20 2.28 V9W-2
ZX150-V9W-2EYM ZX150-20CM 85.00 2.06 76 0.05 0.86 V9W-2
ZX150-V9W-2EYM ZX150-20CM 88.50 1.36 131 0.19 1.92 V9W-2
ZX150-V9W-2EYM ZX150-20CM 93.50 2.50 62 0.05 1.97 V9W-2
ZX150-V9W-2EYM ZX150-20CM 98.50 1.22 2,517 2.38 3.82 V9W-2
ZX150-V9W-2EYM ZX150-20CM 103.00 2.06 416 0.21 8.40 V9W-2
ZX150-V9W-2EYM ZX150-20CM 103.50 2.20 204 0.11 3.56 V9W-2
ZX150-V9W-2EYM ZX150-20CM 104.00 2.15 206 0.15 4.66 V9W-2
ZX150-V9W-2EYM ZX150-20CM 108.50 2.30 148 0.28 3.12 V9W-2
ZX150-V9W-2EYM ZX150-20CM 111.00 2.12 348 0.26 8.33 V9W-2
ZX150-V9W-2EYM ZX150-20CM 113.00 0.96 158 0.03 2.40 V9W-2
ZX150-V9W-2EYM ZX150-20CM 113.50 1.59 77 0.11 1.15 V9W-2
ZX150-V9W-2EYM ZX150-20CM 118.50 1.65 62 0.05 0.31 V9W-2
ZX150-V9W-2EYM ZX150-20CM 123.50 0.75 378 0.06 9.62 V9W-2
ZX150-V9W-2EYM ZX150-20CM 131.00 0.27 1,021 0.13 2.44 V9W-2
ZX150-V9W-2EYM ZX150-20CM 133.50 0.93 184 0.08 8.04 V9W-2
ZX150-V9W-2EYM ZX150-20CM 143.50 0.74 105 0.07 7.78 V9W-2
ZX150-V9W-2EYM ZX150-20CM 147.00 1.21 68 0.04 6.19 V9W-2
ZX150-V9W-2EYM ZX150-20CM 148.50 0.74 59 0.02 4.96 V9W-2
ZX150-V9W-2EYM ZX150-20CM 157.00 0.74 17 0.03 2.27 V9W-2
ZX150-V9W-2EYM ZX150-20CM 162.00 2.05 58 0.05 2.64 V9W-2
ZX150-V9W-2EYM ZX150-20CM 166.00 1.86 520 0.32 0.55 V9W-2
ZX150-V9W-2EYM ZX150-20CM 167.00 1.21 110 0.09 8.76 V9W-2
ZX150-V9W-2EYM ZX150-20CM 168.00 1.21 71 0.04 7.08 V9W-2
ZX150-V9W-2EYM ZX150-20CM 172.00 1.67 67 0.04 3.12 V9W-2
ZX150-V9W-2EYM ZX150-20CM 177.00 1.55 14 0.04 3.58 V9W-2
ZX150-V9W-2EYM ZX150-20CM 183.00 1.16 21 0.04 2.32 V9W-2
ZX150-V9W-2EYM ZX150-20CM 187.00 0.93 85 0.06 7.66 V9W-2
ZX150-V9W-2EYM ZX150-20CM 191.00 1.11 77 0.08 8.15 V9W-2
ZX150-V9W-2EYM ZX150-20CM 192.00 1.02 76 2.23 10.67 V9W-2
ZX150-V9W-2EYM ZX150-20CM 196.00 1.11 24 0.03 5.09 V9W-2
ZX150-V9W-2EYM ZX150-20CM 202.00 0.56 319 0.42 0.41 V9W-2
ZX150-V9W-2EYM ZX150-20CM 213.00 1.11 130 1.04 0.45 V9W-2

For the balance of 2012 the exploration program will continue to trace the strike extensions of V9W-2 on levels 50m, 100m and 150m. TX100-28SCM will be driven further south to test the previously intercepted high grade veins V13, V14 and V15 on level 100m. 

Quality Control

Channel samples are mostly cut with a Diamond saw from channels of 10cm wide, 3cm deep and 1 to 1.5 meters long. Continuous samples are collected along sample lines which run across the mineralized vein structures in both crosscut and drift tunnels. Channel samples are shipped in securely sealed bags for sample preparation and assay to ALS Chemex in Guangzhou, China (Certification ISO 9001), located approximately 180 km southeast of the GC project site.

Sample preparation consists of drying, crushing and splitting of the sample to 250 grams and then the sample is pulverized to minus 200 mesh. Silver, lead and zinc in channel samples were analyzed by aqua regia digestion and AAS finish.

The Company maintains a comprehensive quality assurance and quality control program to ensure best practice in sample preparation and analysis of the channel samples. Project geologists regularly insert certified reference materials (CRM), field duplicates and blanks to each batch of samples to monitor the sample preparation and analysis procedures at the lab. The analytical quality of the lab is further evaluated with external checks by sending about 3% of the pulp samples to higher-level labs to check for lab bias.

Data from both the Company's and the labs' QA/QC programs are timely reviewed and evaluated by project geologists.

Rujin Jiang, P. Geo., is the Qualified Person on the GC project as defined under National Instrument 43-101. He has verified the information and has reviewed and approved the contents of this news release.

About Silvercorp

Silvercorp is a low-cost silver-producing Canadian mining company with multiple mines in China which has paid a cash dividend since 2007. The Company is currently developing the GC project in southern China which it expects will become its next operating mine in early 2013. The Company's vision is to deliver shareholder value by focusing on the acquisition of small-scale projects with resource potential and self-fund the growth of those assets. For more information, please visit our website at www.silvercorp.ca.

CAUTIONARY DISCLAIMER - FORWARD LOOKING STATEMENTS

Certain of the statements and information in this press release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. Forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; the sufficiency of the Company's capital to finance the Company's operations; estimates of the Company's revenues and capital expenditures; estimated production from the Company's mines in the Ying Mining Camp; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licences; title to properties; First Nations title claims and rights; property interests; joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company's existing operations; competition; operations and political conditions; regulatory environment in China and Canada; environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form for the year ended March 31, 2012 under the heading "Risk Factors". Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. 

The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.



Silvercorp Metals Inc.
Rui Feng
Chairman & CEO
(604) 669-9397 or Toll Free: 1 (888) 224-1881
or
Silvercorp Metals Inc.
Jonathan Hackshaw
Investor Relations Director
(604) 669-9397 or Toll Free: 1 (888) 224-1881
investor@silvercorp.ca
www.silvercorp.ca
Data and Statistics for these countries : Canada | China | All
Gold and Silver Prices for these countries : Canada | China | All

Silvercorp Metals Inc.

PRODUCER
CODE : SVM.TO
ISIN : CA82835P1036
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Silvercorp Metals is a silver producing company based in Canada.

Silvercorp Metals produces silver, gold, lead and zinc in China, develops gold, lead, silver and zinc in China, and holds various exploration projects in Canada.

Its main assets in production are YING MINE, BYP, HPG MINE, TLP MINE and XBG in China, its main assets in development are LM MINE, GAOCHENG (GC) and SHIMENTOU (SMT) in China and its main exploration properties are NA BAO and GC in China and SILVERTIP in Canada.

Silvercorp Metals is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 758.7 millions as of today (US$ 555.2 millions, € 518.9 millions).

Its stock quote reached its lowest recent point on December 21, 2001 at CA$ 0.02, and its highest recent level on October 02, 2020 at CA$ 9.97.

Silvercorp Metals has 167 850 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Silvercorp Metals Inc.
2007 Annual Report
Financings of Silvercorp Metals Inc.
6/25/2011Announces TSX Approval Of Share Repurchase Program
7/6/2009Responds to Klondex’s Directors’ Circular and Completed Priv...
4/6/2006(Hpg Mine)arranges bought deal financing to raise $41,542,500
Option Grants of Silvercorp Metals Inc.
9/6/2012AGM Rescheduled To Friday September 28, 2012; Board Proposes...
1/11/2012Received RMB 269 Million Cash Dividend From Its Chinese Subs...
Nominations of Silvercorp Metals Inc.
9/16/2013Silvercorp - Silvercorp Announces Appointment of Senior Vice...
11/8/2012Announces Management Appointments
11/28/2011Announces New Director Appointment
Financials of Silvercorp Metals Inc.
9/22/2015Silvercorp Reports 2015 AGM Results
8/19/2015Silvercorp to Return to Single Listing Status
8/13/2015Silvercorp Reports Q1 Fiscal 2016 Financial And Operating Re...
8/13/2015Silvercorp posts 1Q profit
2/13/2014Silvercorp - Silvercorp Reports Financial and Operating Resu...
11/14/2013Silvercorp - Silvercorp Reports Financial and Operating Resu...
8/9/2013Silvercorp - Silvercorp Reports Financial and Operating Resu...
5/22/2013SilverCorp - Silvercorp Reports Financial and Operating Resu...
5/22/2013Reports Financial and Operating Results for the Fourth Quart...
2/13/2013SilverCorp - Silvercorp Reports Financial and Operating Resu...
11/14/2012SilverCorp - Silvercorp Reports Financial and Operating Resu...
11/13/2012Reports Financial and Operating Results for the Second Quart...
8/3/2012Reports Financial And Operating Results For The First Quarte...
2/8/2012Reports Revenue of $61.9 Million and Operating Cash Flow of ...
10/25/2011Receives Clear Forensic Accountants Report
8/3/2011Reports Net Income Up 82% to $25.6 Million or $0.15 Per Shar...
6/3/2011Form 40-F Available on Website
5/12/2011Reports Record Silver Production Of 5.3 Million Ounces, Rec...
5/13/2010Net Income Of $9.8 Million And Cash Flow Of $23.8 Million In...
11/9/2009Reports Net Income Of $8.9 Million And Cash Flow Of $15.9 Mi...
8/13/2009Reports Net Income of $7.5 Million ($0.05 EPS) on Record Sil...
5/14/2009Financial And Operating Results For The 4th Quarter And Fisc...
2/13/2009Announces Its Financial And Operating Results For The 3rd Qu...
11/17/2008Second Quarter Dividend - CAD$0.02
11/14/2008Announces Its Financial And Operating Results For The 2nd Qu...
5/16/2007to Report 2007 Fourth Quarter and Year End Results on June 1...
Project news of Silvercorp Metals Inc.
11/23/2015(Tlp Mine)Silvercorp Reports Newly Exposed Mineralization At The TLP M...
6/11/2013SilverCorp - Silvercorp Reports Exploration Results at the H...
6/11/2013(Hpg Mine)Reports Exploration Results at the HPG Mine, Ying Mining Dis...
6/6/2013SilverCorp - Silvercorp Reports Underground Exploration Resu...
6/4/2013SilverCorp - Silvercorp Reports Results From Its 2012 Explor...
4/15/2013SilverCorp - Silvercorp Reports Underground Diamond Drilling...
2/20/2013SilverCorp - Silvercorp Intercepts 33.29 Metres True Width G...
9/17/2012(Gc)GC Project Construction Progress Photo Album - Sep 17, 2012
8/27/2012(Tlp Mine)Intercepts High-Grade Silver-Lead-Zinc Mineralization At The...
8/16/2012(Byp)Reports Resource Update for Its BYP Mine in Hunan Province, ...
8/1/2012(Ying Mine)Reports Intercept of 10.87 Meters Grading 715 Grams per Tonn...
6/6/2012Reports Significant Gain In Measured And Indicated Mineral R...
5/18/2012Reports Record Silver Production Of 5.6 Million Ounces, Reco...
2/13/2012(Lm Mine)Reports 4.34 metre interception (true width) of 642 gram per...
1/31/2012(Gc)Announces Positive Pre-Feasibility Study for the GC Silver-L...
1/26/2012(Lm Mine)Reports Intercept of 7.39 Meters Grading 678 Grams per tonne...
1/26/2012(Lm Mine)Reports Intercept of 7.39 Meters Grading 678 Grams Per Tonne...
1/17/2012(Gc)Surface Diamond Drilling Intercepted 3.13 Meters of 432 Gram...
1/6/2012(Gc)Provides Progress Update on its GC Project in Guangdong Prov...
8/22/2011(Xbg)Acquires High Grade XBG Silver-Gold-Lead-Zinc Property in Lu...
7/7/2011(Ying Mine)Reports Resource and Reserves Update at Ying Silver-Lead-Zin...
7/6/2011(Silvertip)Reports Resources Estimate On The Silvertip Silver-Lead-Zinc...
7/5/2011(Byp)Reports Resources Estimate on the BYP Gold-Lead-Zinc Propert...
5/5/2011(Byp) Diamond Drilling Intercepts 69.5 Metres Grading 5 g/t Gold ...
2/17/2011(Silvertip)Announces Positive Preliminary Assessment For The Silvertip ...
2/3/2011(Byp)Closes Acquisition Of BYP Gold-Lead-Zinc Mine In Hunan Pro...
1/31/2011(Ying Mine)Underground Drilling Intercepts 2.0 Metres Grading 1,593 Gra...
1/21/2011(Ying Mine)Underground Drilling Intercepts 14.62 Metres Grading 363 Gra...
8/4/2010(Gaocheng (gc))Submits Mining Permit Application
7/26/2010(Ying Mine)Heavy Rain Fall Affects Operations At Ying Mining District
6/14/2010(Gaocheng (gc))Receives Environmental Permit
3/1/2010(Ying Mine)Reports Proven & Probable Reserves Estimate At Ying Mining D...
6/29/2009(Gaocheng (gc))Measured and Indicated Silver Resources Increase by 250% at ...
1/8/2009(Gaocheng (gc))Drilling Intersects High-Grade Silver Mineralization in V2 a...
12/19/2008(Lm Mine)Technical Report Completed On The TLP-LM Project, Henan Prov...
1/21/2008Discovers High Grade Polymetalic Mineralization at the Na-Ba...
2/14/2006(Ying Mine)environment assessment report for developing the Ying Silver...
Corporate news of Silvercorp Metals Inc.
7/27/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
5/26/2016Silvercorp reports 4Q loss
5/26/2016Silvercorp Reports Silver Production Of 5.0 Million Ounces, ...
12/23/2015Silvercorp Announces New Share Repurchase Program
8/20/2015Silvercorp to Return to Single Listing Status
2/19/2014Silvercorp - Silvercorp Intercepts 1.42 Metre Interval Gradi...
2/6/2014Silvercorp - Silvercorp to Release Third Quarter Fiscal 2014...
12/20/2013Silvercorp - Silvercorp Notes Regulators Allege Fraud in Act...
11/15/2013Silvercorp - Silvercorp Declares Quarterly Cash Dividend of ...
10/18/2013Silvercorp - Silvercorp Announces Senior Management and Dire...
10/18/2013Announces Senior Management and Director Changes
9/21/2013Silvercorp - Silvercorp Reports 2013 AGM Results
9/20/2013Reports 2013 AGM Results
9/12/2013Silvercorp - Silvercorp Provides Operation Update for Ying M...
9/12/2013Provides Operation Update for Ying Mining District
8/9/2013Silvercorp - Silvercorp Declares Quarterly Cash Dividend of ...
8/8/2013Declares Quarterly Cash Dividend of CAD$0.025
7/30/2013Silvercorp - Silvercorp to Release Financial and Operating R...
7/30/2013to Release Financial and Operating Results for the First Qua...
6/4/2013Reports Results From Its 2012 Exploration Program at the SGX...
5/23/2013SilverCorp - Silvercorp Declares Quarterly Cash Dividend of ...
5/6/2013to Release Audited Year-End Results for Fiscal 2013 on May 2...
5/6/2013to Release Audited Year-End Results for Fiscal 2013 on May 2...
4/15/2013Reports Underground Diamond Drilling and Tunneling Explorati...
4/3/2013SilverCorp - Silvercorp Responds to Recent Press Article Abo...
4/3/2013Responds to Recent Press Article About the Company
3/25/2013A Shareholder Class Action Was Filed But Does Not Include Ce...
3/13/2013SilverCorp - Silvercorp Provides Update Regarding Defamation...
3/13/2013Provides Update Regarding Defamation Case and Class Action
2/20/2013Intercepts 33.29 Metres True Width Grading 151 g/t Silver, 0...
2/15/2013SilverCorp - Silvercorp Issues Correction to Dividend Record...
2/14/2013SilverCorp - Silvercorp Declares Quarterly Cash Dividend of ...
2/13/2013SilverCorp - Silvercorp Provides Outlook for Fiscal 2014
2/13/2013Provides Outlook for Fiscal 2014
2/7/2013Discovers Five New High-Grade Silver Zones and Extends Known...
1/31/2013SilverCorp - Silvercorp Intercepts 18.8 Metres True Width Gr...
1/29/2013SilverCorp - Silvercorp Share Repurchase Program Approved by...
1/26/2013SilverCorp - Silvercorp: Open Letter from Chairman
1/24/2013SilverCorp - Silvercorp Responds to Class Action Lawsuits
1/24/2013Responds to Class Action Lawsuits
11/14/2012SilverCorp - Silvercorp Announces Dividend of CAD$0.025
10/29/2012to Release Results for Fiscal 2013 Second Quarter on Novembe...
10/18/2012(Gc)Reports Intercept of 2.12 Metres Grading 1,684 Grams Per Ton...
9/28/2012Reports 2012 AGM Results
9/6/2012(Gc)Reports Intercept of 3.88 Metres Grading 609 Grams Per Tonne...
8/20/2012(Lm Mine)Reports Intercept of 4.55 Metres Grading 2,196 Grams per Ton...
8/3/2012Announces First Quarter Dividend Of CAD$0.025
7/25/2012to Release First Quarter 2013 Results on August 2 and Host C...
7/5/2012(Silvertip)Reports Independent Mineral Resource Estimates on Silvertip ...
6/5/2012Reports Significant Gain in Measured and Indicated Mineral R...
5/28/2012(Ying Mine)Provides Update on Production at the Ying Mine in Henan Prov...
5/19/2012Announces Fourth Quarter Dividend Of CAD$0.025
5/17/2012Reports Record Silver Production of 5.6 Million Ounces, Reco...
4/30/2012to Announce Fourth Quarter and Year End Results & Hold Analy...
2/10/2012Announces Third Quarter Dividend Of CAD$0.025
2/9/2012Forecasts 20% Increase In Silver Production For Fiscal Year ...
1/9/2012Sues Jon R. Carnes, his EOS Holdings and Zane Heilig as “Alf...
12/30/2011to Commence Work on Resource and Reserve Updates
12/21/2011Chinese Law Enforcement Agents Open Criminal Case to Investi...
12/8/2011Fiscal 2012 Drilling Exploration Program Update
10/26/2011Statement From Chairman
9/28/2011’s 2011 China Investor Tour Pictures
9/23/2011Files Lawsuit In New York Against Stock Manipulation Scheme
9/22/2011Open Letter From Chairman - Key Points
9/15/2011Repurchases Over $31 Million Of Shares Under NCIB
9/14/2011Responds To Second Anonymous Allegation And Provides Governm...
9/12/2011On Progress To Identify The Anonymous Letter Writer And To R...
8/31/2011Repurchases In Excess Of 2 Million Shares Under Normal Cours...
8/26/2011On Normal Course Issuer Bid
8/11/2011Update on Normal Course Issuer Bid
8/4/2011Announces First Quarter Dividend Of CAD$0.02
7/25/2011to Announce First Quarter Results & Hold Analyst Conference ...
7/14/2011Reports: Record Silver Production Of 1.6 Million Ounces And ...
7/11/2011Reports 24% Year Over Year M&I Silver-Equivalent Resource Gr...
6/21/2011Announces Share Repurchase Program
6/9/2011Henan Subsidiary Ranked as the 7th Strongest Company in Luoy...
5/12/2011Announces Fourth Quarter Dividend Of Cad$0.02
4/28/2011to Announce Fourth Quarter Results & Hold Analyst Conference...
2/9/2011Announces Q3 Dividend Of CAD$0.02
8/13/2010Q1 Dividend Of CAD $0.02
8/13/2010Reports Record Silver Production for Q1 of Fiscal 2011: Sale...
7/31/2010Files Preliminary Base Shelf Prospectus
5/13/2010Declaration of Quarterly Dividend-CAD$0.02
2/22/2010to Acquire Advanced Stage Silver-Lead-Zinc Project in Britis...
2/10/2010Declaration Of Quarterly Dividend - CAD$0.02
11/25/2009to Present and Exhibit at Mines & Money London Show on Dec. ...
11/10/2009Announces Declaration Of Quarterly Dividend - CAD$0.02
11/3/2009Lists on New York Stock Exchange
10/1/2009Annual General Meeting Results
9/28/2009Reminder: Silvercorp Metals Annual General Meeting – Septemb...
8/14/2009Announces Declaration of Quarterly Dividend - CAD$0.02
7/22/2009Announces It Has Terminated Its Offer To Klondex Shareholder...
7/20/2009Announces That Its Offer To Klondex Shareholders Will Expire
6/15/2009Formally Commences Offer to Acquire All of the Outstanding S...
6/8/2009Announces its Intention to Make an Offer to Acquire Klondex ...
6/3/2009Responds to Stock Trading Activity
2/17/2009Commences Trading On NYSE Alternext US
2/13/2009 Announces Declaration Of Quarterly Dividend - Cad$0.02
3/13/2008$50 Million Exploration and Development Program Budgeted for...
2/15/2008 RECORDS $0.12 EPS FOR Q3 FISCAL 2008 ENDED DECEMBER 31, 200...
12/12/2007to Build A New 2,000 Tonne Per Day Mill For The Ying Silver ...
12/7/2007Announces Additions to its Senior Management Team
4/16/2007Signed Agreement to Participate in Constructing a New Lead S...
4/12/2007Commencement of Drill Program on the NPG Molybdenum Project ...
3/31/2006(Ying Mine)receives mining permit on Ying Silver Project, Henan, China
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (SVM.TO)NYSE (SVM)
4.52-6.61%3.31-6.76%
TORONTO
CA$ 4.52
04/26 17:00 -0.320
-6.61%
Prev close Open
4.84 4.90
Low High
4.47 4.90
Year l/h YTD var.
3.04 -  5.27 32.55%
52 week l/h 52 week var.
2.92 -  5.27 -8.50%
Volume 1 month var.
1,601,524 6.10%
24hGold TrendPower© : 28
Produces Gold - Lead - Silver - Zinc
Develops Gold - Lead - Silver - Zinc
Explores for Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/29/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202427.68%
2023-11.06%5.593.23
2022-19.92%5.412.74
2021-41.60%9.654.31
202015.47%9.9710.06
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :