AURIZON REPORTS MINERAL RESERVE RENEWAL AND MINERAL RESOURCE UPDATE FOR CASA BERARDI MINE

 
Aurizon Mines Ltd. (TSX: ARZ; NYSE Alternext: AZK) is pleased to report a renewal in mineral reserves and an increase in the mineral resource estimate for its Casa Berardi mine, located in north western Quebec, Canada. Mineral reserves and resources as of December 31, 2008, are summarized below:


"The main objectives in 2008 were to renew mineral reserves and to increase the quality of existing mineral resources in order to eventually convert mineral resources into mineral reserves," said David Hall, President and CEO, "and we are pleased with the significant upgrade in mineral resources and replacement of mineral reserves. Our strong cash flow and new drill access in the deeper area of the West Mine will enable us to upgrade mineral resources previously drilled from surface."

Casa Berardi Mine

The Casa Berardi gold deposits are located along a five kilometre east-west mineralized corridor. They include the East and West mines, and the Principal Zone. The Casa Berardi gold deposits can be classified as an Archean sedimentary-hosted lode gold deposit. The gold mineralization is superimposed on a continuous graphitic mudrock unit corresponding to the Casa Berardi Fault plane. Gold occurs mainly south of the Casa Berardi Fault, and sometimes on both sides of the fault.

The mine has produced over 1.0 million recovered gold ounces since commencing production in 1986, including 336,000 recovered ounces since Aurizon re-commissioned production in December 2006.

Scott Wilson Roscoe Postle Associates Inc. (Scott Wilson RPA) were commissioned by Aurizon to prepare mineral reserve and mineral resource estimates on the different zones of the property, in accordance with the Standards of Disclosure for Mineral Projects as defined by N1 43-101.


Proven and Probable Mineral Reserves have been renewed as a result of:
  • Additional drilling at the East Mine crown pillar and re-assessment of the block model in the underground section above the 300 metre level have resulted in a gain of mineral reserves at the East Mine. The East Mine crown pillar represents 17% of the total reserves at Casa Berardi.
  • At the West Mine, the gain in mineral reserves from Zones 109, 117S, Lower Inter and South West, have been compensated by 2008 mine production in Zones 113 and North West, and a re-assessment of the block model in Zone 115, resulting in an overall underground reserve renewal in 2008.
  • A 16% decrease in grade is a result of the addition of low grade ore from the East Mine crown pillar and the re-assessment of the cut-off grade, due to higher gold prices.
  • Mineral reserves are estimated using an average long-term gold price of US$750 per ounce, compared to US$581 per ounce in 2007, and a US$/C$ exchange of 1:1.0. A minimum cut off grade of 4.4 grams of gold per tonne was used, based on long term operating costs and gold prices, for the underground zones; and 1.2 grams of gold per tonne for the open pit. In 2007, the minimum cut off grade was 5.1 grams of gold per tonne.
  • As the mining industry is currently experiencing gold prices that are higher than US$750 per ounce, the operations periodically mine ore that is not included in mineral reserves as the grades are lower than the minimum cut-off grades.

Reconciliation of Casa Berardi Mineral Reserves

Reconciliations between the mineral reserve estimates and the mill production averaged 99.5% for the tonnage and 105% for the grade.


Mine Plan for Mineral Reserves

  • The mine plan for the current mineral reserves totals 3.8 million tonnes of ore, grading 7.8 grams of gold per tonne, to be mined over five years (2009 to 2013) from 113 Zone, Lower Inter Zone, and six smaller West Mine zones, as well as the open pit and underground production from the East Mine.
  • Development was compiled by zone, measured from mine plans, and scheduled monthly for 2009, and quarterly thereafter. Development requirements average 20 metres per day for the next three years, and then decline rapidly, as most accesses and infrastructure will be completed.
  • Production was compiled by stope, and scheduled quarterly by zone. The majority of the production tonnage will come from the 113 and the Lower Inter zones, together making up 85% of underground reserves.






Comparison with 2007 Mineral Resources

The main variance in the mineral resource estimates between 2008 and 2007 are as follows:
  • Geological re-interpretation of mineralized zones after drilling programs (Zone 113, East Mine Crown Pillar).
  • Geological re-interpretation of mineralized zones and conversion of 2D polygonal model to 3D block model (109, 115, 117S, Principal Mine).
  • Conversion of inferred into indicated; or of indicated into measured.
  • Conversion of mineral resources into mineral reserves.
  • Conversion of mineral resources to mineral reserves after completion of pre-feasibility studies (East Mine Crown Pillar and East Mine Underground).
  • Mining depletion (Zone 113, North-West, Lower Inter).
  • Elimination of low grade resources (less than 4 grams of gold per tonne).

Outlook
Aurizon intends to utilize its strong cash flow to upgrade mineral resources to mineral reserves in order to extend and optimize the current mine plan.
In 2009, Aurizon intends to complete a feasibility study to finalize the technical parameters and related costs of mining the East mine crown pillar by open pit.
In addition, Aurizon intends to initiate a preliminary assessment report investigating the relative risks and opportunities of mining the Principal zone crown pillar by open pit.

The 810 metre level project will provide an underground access for drilling on the 118-120, 122 and the newly discovered 123 zones. Work on the one kilometre long exploration drift is progressing and two drill rigs are currently active at the western end of the drift.

Quality control

Mineral resource estimates, implementation and the quality control program are supervised by Sylvain Picard P. Eng., Principal Mine Geologist for Casa Berardi, a "qualified person" as defined by the National Instrument 43-101.

Information of a technical and scientific nature in the press release has been prepared under the supervision of Michel Gilbert, P. Eng., Vice-President of the Company, a "qualified person" under National Instrument 43-101.

Additional Information

One sketch is attached showing the mineral reserve and resource outlines at the Casa Berardi Gold Mine. Two appendices are also attached at the back of this release detailing the technical parameters used for the mineral reserve estimates (Appendix A) and the mineral resource estimates (Appendix B). All other information previously released on Casa Berardi is also available on the Aurizon website at www.aurizon.com.




About Aurizon

Aurizon is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world's most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions. Aurizon shares trade on the Toronto Stock Exchange under the symbol "ARZ" and on the NYSE Alternext (formerly the American Stock Exchange) under the symbol "AZK". Additional information on Aurizon and its properties is available on Aurizon's website at http://www.aurizon.com.

For further information, contact

AURIZON MINES LTD.
David Hall, President and C.E.O.
Telephone: 604-687-6600
Toll Free: 1-888-411-GOLD
Fax: 604-687-3932

Michel Gilbert, Vice President
Telephone: 819-874-4511
Fax: 819-874-3391
Web Site: www.aurizon.com; Email: info@aurizon.com

or

Renmark Financial Communications Inc.
2080 Rene-Levesque Blvd. West
Montreal, QC
H3H 1R6
Barry Mire: bmire@renmarkfinancial.com
Jen Power: jpower@renmarkfinancial.com
Media: Vanessa Napoli: vnapoli@renmarkfinancial.com
Tel: (514) 939-3989 Fax: (514) 939-3717


FORWARD-LOOKING STATEMENTS

This News Release contains "forward-looking statements" within the meaning of securities legislation. These forward-looking statements include, but are not limited to, statements regarding the 2009 Casa Berardi mine plan and estimates of gold production, grade and long-term average gold prices, mineral reserve and mineral resource estimates, planned work programs, strategic plans and expected outcomes. Forward-looking statements express, as at the date of this News Release, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and, except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation to update these forward-looking statements. Forward-looking statements are based on certain assumptions including those referred to in this news release and involve risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. Factors that could cause results or events to differ materially from current expectations expressed or implied by the forward-looking statements, include, but are not limited to conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold; accidents, and other risks of the mining industry; and other risks more fully described in Aurizon's Annual Information Form filed with the Securities Commissions of the provinces of British Columbia, Alberta, Manitoba, Ontario and Quebec, and in Aurizon's Annual Report on Form 40-F filed with the United States Securities and Exchange Commission. These documents are available on Sedar at www.sedar.com and on Edgar at www.sec.gov/.

CAUTIONARY NOTE TO US READERS

As a British Columbia corporation, the Company is subject to certain rules and regulations issued by the British Columbia Securities Commission ("BC Securities Commission"). The Company is required to provide detailed information regarding its properties including mineralization, drilling, sampling and analysis, security of samples and mineral resource and mineral reserve estimates. Further, the Company describes mineral resources associated with its properties utilizing terminology such as "indicated" or "inferred" which terms are recognized by Canadian regulations but are not recognized by the United States Securities and Exchange Commission ("SEC").

Cautionary Note to U.S. Investors Regarding Mineral Resources

The SEC allows mining companies, in their filings with the SEC, to disclose only those mineral deposits they can economically and legally extract or produce. The Company may use certain terms in this document, such as "mineral resources", "indicated mineral resources" and "inferred resources" that are recognized and mandated by Canadian securities regulators but are not recognized by the SEC.

This News Release uses the term "indicated" resources. U.S. readers are cautioned that while that term is recognized and required by Canadian regulations, the SEC does not recognize it. U.S. investors are cautioned not to assume that any part or all of mineral deposits in this category will ever be converted into mineral reserves.

This News Release uses the term "inferred" resources. U.S. readers are cautioned that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. U.S. investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.


APPENDIX A

Technical Parameters -- Mineral Reserve Estimate


The technical parameters for the mineral reserve estimate are as follows:
  • Mineral reserve estimations were based on 3D block models for all zones except the South West Zone; the few remaining zones that were estimated using 2D polygonal methods are not included in mineral reserves.
  • For the underground operation, the selected mining method is usually Sequential Transversal and Longitudinal Long Hole when the vein is larger than 10 metres and Longitudinal Long Hole Retreat when the vein is less than 10 metres. The stoping sequence includes cemented rockfill of the primary stoping sequence, cemented and unconsolidated rockfill for the longitudinal retreat and unconsolidated rockfill for secondary stoping sequence.
  • Stope dilution has been calculated from numerical modeling on the basis of the stability of the stope openings, ore deposit geometry and mining method. The amount of dilution was reduced for stopes of smaller dimensions on the fringes of the zone, and increased for stopes with unfavourable geometry. In addition, each stope was assigned a backfill dilution percentage based on number of walls of fill and type of mucking floor. Dilution quantities were estimated for each stope, including hanging wall/footwall sloughage, and backfill dilution, where applicable. As a result, the dilution averages 21%.
  • Extraction was estimated at 90% for primary stopes, and 95% for secondary stopes.
  • A minimum cut off grade of 4.4 grams of gold per tonne was used based on long term operating cost and gold prices for most of the underground zones in the West Mine. For the East Mine crown pillar, a minimum cut off grade of 1.2 grams of gold per tonne was used based on long term operating costs and gold prices.
  • Bulk density is different for each zone and is based on density determinations. Bulk density varies from 2.70 tonne per cubic metre (e.g. Zone 113) to 2.90 tonne per cubic metre (e.g. Principal Zones). A bulk density of 2.77 tonne per cubic metre was used for zones that have no density determinations (e.g. East Mine) and is based on historical data.
  • Mineral reserves are estimated using an average long-term gold price of US$750 per ounce and a US$/C$ exchange rate of 1:1.10.
  • Minimum underground mining widths of three metres were used.
  • West Mine mineral reserves are based on new information acquired from the definition drilling completed in 2008. During the year, three rigs were active along the 510 to 810 metre levels. Information from the definition drilling is being used to outline the precise ore stope dimensions. Footwall drifts, which are set 20 metres apart, are being used as the collar locations of the current drill program.
  • East Mine open pit reserves are contained in the crown pillar left behind by previous mining. Open pit optimization and detailed design were updated in November 2008, after an infill drilling campaign was completed. A dilution factor of 20% was applied to open pit mineralization within the pit design, and above the 1.2 grams of gold per tonne cut-off grade. It is anticipated that the East mine crown pillar open pit will have a depth of 80 metres. The zone is covered by 18 metres of silt and clay overburden. Stripping ratio is estimated at 17:1.
  • The East Mine underground reserves are based on a plan to re-establish access to old workings, and mine pillars and levels left behind during previous operations. Stope sizes are not standardized. Mining methods include longhole stoping where access can be attained for both top and bottom cuts, and cut and fill methods where only undercuts are accessible.


APPENDIX B

Technical Parameters -- Mineral Resource Estimate


The technical parameters for the mineral resource estimate are as follows:
  • Except for the Inter and South-West zones, which are 2D polygonal estimates, and for the East Mine Crown Pillar, the resource estimates of the different mineralized zones at Casa Berardi since October 2005 have been calculated by the use of block modeling grade interpolation by Scott Wilson RPA, assisted by mine staff.
  • Mineral resources are estimated using an average long-term gold price of US750 per ounce, and a US$/C$ exchange of 1:1.10, which are the same values used in 2007.
  • Grade estimation was usually carried out from 3D block solids. Drill holes as well as development samples were used for grade interpolation. Smaller zones were estimated previously by Aurizon, using 2D polygonal on longitudinal sections and have been reviewed by Scott Wilson RPA.
  • Different minimum cut off grades were used as follows:
  • 4.0 grams of gold per tonne was used based on long term operating cost and gold prices for most of the underground zones in the West Mine, for the Principal Zone and the underground East Mine.
  • 4.3 grams of gold per tonne was historically used for the Cherty and 160E Zones.
  • 3.0 grams of gold per tonne was used for small zones previously estimated by 2D polygons on longitudinal sections.
  • 1.3 grams of gold per tonne was used based on long term operating cost and gold prices for most the open pit crown pillar at the East Mine.
  • 0.8 grams of gold per tonne was used based on long term operating costs and gold prices for the crown pillar at the Principal Mine.
  • A total of 25 mineralized zones have been modeled at the Principal Zone. As the mineralized system extends towards the overburden-rock interface and the mineralized zones are close enough to each other to envisage open pit mining, the zones were modeled by using a 1.0 grams of gold per tonne threshold. The current block size is 1.25 metres north-south by 2.5 metres east-west by 5.0 metres vertical. The Principal Zone is covered by approximately 45 metres of overburden, which is composed of a thin layer of peat and thicker horizons of silt and glacial till. The host rock is of volcanic and sedimentary origin.
  • Overall pit slopes of 24� and 55� were used for the overburden and host rock, respectively.
  • Bulk density is different for each zone and is based on density determinations. Bulk density varies from 2.70 tonne per cubic metre (e.g. Zone 113) to 2.90 tonne per cubic metre (e.g. Principal Zones). A bulk density of 2.77 tonne per cubic metre was used for zones that have no density determinations (e.g. East Mine) and is based on historical data.
  • Minimum underground mining widths of two to three metres.

 


<
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Aurizon Mines Ltd

PRODUCER
CODE : ARZ.TO
ISIN : CA05155P1062
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Aurizon Mines is a gold producing company based in Canada.

Aurizon Mines holds various exploration projects in Canada.

Its main asset in production is CASA BERARDI in Canada, its main asset in development is JOANNA in Canada and its main exploration properties are DUVERNY, PATRIS, OPINACA, REX SOUTH, MARBAN MINE, KIPAWA, FAYOLLE and JOANNES in Canada.

Aurizon Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 27.5 millions as of today (US$ 21.1 millions, € 18.3 millions).

Its stock quote reached its lowest recent point on December 31, 2001 at CA$ 0.21, and its highest recent level on September 16, 2016 at CA$ 8.75.

Aurizon Mines has 63 960 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Aurizon Mines Ltd
2008 Annual Report
2007 Annual Report
2005 Annual report
Financings of Aurizon Mines Ltd
2/2/2011AURIZON ANNOUNCES US$50 MILLION REVOLVING CREDIT FACILITY
Option Grants of Aurizon Mines Ltd
8/15/2011Grant of 600,000 options at 6,38
Nominations of Aurizon Mines Ltd
1/18/2013Aurizon Appoints a Special Committee to Evaluate Offer
8/26/2011Announces Vice President, Corporate Development Resignation
8/15/2011George Paspalas Joins Aurizon as Chief Executive Officer; Da...
6/27/2011Aurizon Announces Appointment of George Paspalas as Chief Ex...
Financials of Aurizon Mines Ltd
5/15/2013Aurizon Reports First Quarter 2013 Financial Results
3/14/2013Aurizon Reports 2012 Financial Results
11/8/2012Aurizon Reports Third Quarter 2012 Financial Results
8/9/2012Aurizon Reports Second Quarter 2012 Financial Results
5/10/2012Aurizon Reports First Quarter 2012 Financial Results
3/15/2012Aurizon Reports 2011 Financial Results
8/11/2011Aurizon Reports Second Quarter 2011 Results
5/16/2011AURIZON REPORTS FIRST QUARTER 2011 RESULTS
8/14/2009reports record revenues and cash flow in second quarter 2009
5/13/2009Reports Highlights Of First Quarter 2009 Results
3/11/2009Reports 2008 Financial Results
11/6/2008Third Quarter 2008 Results
11/6/2008Reports Highlights Of Third Quarter 2008 Results
8/8/2008Reports Highlights Of Second Quarter 2008 Results
5/7/2008Reports Highlights Of First Quarter 2008 Results
3/19/2008 Reports 2007 Financial Results
Project news of Aurizon Mines Ltd
5/3/2013(Casa Berardi)Aurizon Reports Status Update on Minor Discharge at Tailings...
5/2/2013(Casa Berardi)Aurizon Reports Minor Discharge at Tailings Facility at Casa...
3/25/2013(Casa Berardi)Aurizon Reports Accident at Casa Berardi Mine
2/15/2013(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
12/12/2012New Discovery at Aurizon's Heva West Area Returns 1.7 Grams ...
9/6/2012Aurizon Mines Ltd.: New Drill Results Confirm High Grade Pot...
9/6/2012(Fayolle)Aurizon Announces an Updated Mineral Resource Estimate for F...
8/16/2012(Marban Mine)Aurizon Announces the Completion of the Marban Block Phase T...
7/30/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Confirm Continuity and...
7/20/2012(Joanna)Aurizon Files Feasibility Study of the Hosco Deposit
7/9/2012(Joanna)Aurizon Mines Ltd.: New Drill Results Expand the Heva Area a...
6/12/2012Aurizon Mines Ltd.: Marban's Phase Two Drill Program Results...
6/11/2012Aurizon Acquires Common Shares of Typhoon Exploration Inc.
6/6/2012(Joanna)Aurizon Receives Results of Feasibility Study for Joanna's H...
5/15/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
4/26/2012(Marban Mine)Aurizon Mines Ltd.: New Results at Marban Highlight Potentia...
4/20/2012(Joanna).: Higher Grade Mineralization Discovered on the Heva and Ho...
4/4/2012(Rex South)Aurizon Announces Results from the 2011 Exploration Program ...
3/1/2012(Marban Mine)Aurizon Mines Ltd.: Marban Eastern Down Dip Zone Returns 6.4...
3/1/2012(Casa Berardi)Reports Mineral Reserve Replenishment and Mineral Resource U...
9/22/2011(Marban Mine) Two New High Grade Gold Zones Discovered at Marban
9/9/2011(Casa Berardi)Aurizon Mines Ltd.: Drilling Confirms the Continuity and the...
8/31/2011(Fayolle)Aurizon Reports New High Grade Values at Fayolle
8/11/2011(Joanna)Aurizon Reports Joanna Feasibility Study Delayed, However Dr...
8/9/2011(Fayolle)Aurizon Reports Discovery of New Gold Bearing Trends Outside...
6/22/2011(Marban Mine) Deeper Drilling at Marban Reveals Added Upside With 5
6/13/2011(Joanna)Aurizon Increases the Hosco In-Pit Measured and Indicated Mi...
5/25/2011(Marban Mine)AURIZON REPORTS FURTHER RESULTS FROM MARBAN BLOCK
4/14/2011(Marban Mine)AURIZON REPORTS FURTHER DRILL RESULTS FROM MARBAN
3/13/2011(Casa Berardi)AURIZON REPORTS A 44% INCREASE IN MINERAL RESERVES FOR THE C...
2/15/2011(Rex South)AURIZON AND AZIMUT RE-EVALUATE TUNGSTEN VALUES ON THE COPPER...
1/21/2011(Marban Mine)AURIZON ANNOUNCES 9=2E06 GRAMS OF GOLD PER TONNE OVER 7=2E3 ...
1/11/2011AURIZON ANNOUNCES 2010 PRODUCTION RESULTS AND 2011 PLANS
9/1/2009Aurizon Intersects 18.9 Grams of Gold per Tonne Over 4.0 Met...
3/11/2009(Joanna) Infill Drilling Increases Mineral Resources at Joanna
2/20/2009(Casa Berardi)Reports Mineral Reserve Renewal And Mineral Resource Update ...
1/26/2009(Joanna): Grade and Thickness Confirmed Along the North Zone at Joan...
12/11/2008(Joanna)Infill Drilling Program Completed At Joanna 116 Grams Of Gol...
6/13/2008(Kipawa)Reports Additional Rare Earth And Uranium Results At Kipawa ...
5/12/2008(Joanna) Commissions Pre-Feasibility Study At Joanna
4/23/2008(Joanna) Reports Further Results From Its Joanna Property Including ...
4/2/2008(Casa Berardi)Provides Mineral Reserves And Resources Update
Corporate news of Aurizon Mines Ltd
5/30/2013Aurizon Announces Results of Hecla Arrangement Consideration...
5/28/2013Aurizon Announces Receipt of Investment Canada Act Approval
5/22/2013Aurizon Announces Change to Election Deadline to May 29, 201...
5/21/2013Aurizon Announces Extension of Election Deadline
5/10/2013Aurizon Receives Final Court Approval of Plan of Arrangement
5/9/2013Aurizon Securityholders Approve Plan of Arrangement
5/8/2013Aurizon Announces Preliminary Results of Hecla Arrangement C...
5/6/2013Aurizon Reminds Shareholders of Election Deadline
5/1/2013Aurizon Reminds Shareholders of Important Vote Deadline of M...
5/1/2013Reminds Shareholders of Important Vote Deadline of May 7, 20...
4/24/2013Announces That Leading Independent Proxy Advisory Firm Insti...
4/12/2013Aurizon Announces Special Meeting of Securityholders and Mai...
3/26/2013(Casa Berardi)Aurizon Mines Ltd.: Regular Operations Resume at Casa Berard...
3/20/2013Aurizon Comments on Expiry of Alamos Offer
3/19/2013Aurizon Responds to BCSC Decision to Cease Trade New Shareho...
3/18/2013Aurizon Reiterates Rejection of the Financially Inadequate A...
3/12/2013Aurizon Announces Hearing on New Shareholder Rights Plan
3/11/2013Aurizon Takes Steps to Ensure Equal Treatment of All Shareho...
2/15/2013(Casa Berardi)Aurizon Reports Mineral Reserve Replenishment and an Increas...
2/12/2013Aurizon Announces Hearing on Shareholder Rights Plan
2/8/2013Aurizon Mails Shareholder Rights Plan Materials
1/30/2013Aurizon Provides Update on Shareholder Rights Plan
1/15/2013Aurizon Responds to Unsolicited Offer
1/14/2013Alamos Gold Acquires Common Shares of Aurizon Mines
10/30/2012. Announces Third Quarter 2012 Conference Call & Webcast
9/7/2012Aurizon Announces an Updated Mineral Resource Estimate for t...
5/1/2012. Announces First Quarter 2012 Conference Call & Webcast
4/24/2012Aurizon Mines Ltd.: Preliminary Metallurgical Testwork at Ma...
3/31/2012Aurizon Releases Annual Disclosure Documents
3/9/2012. Announces 2011 Financial Results Conference Call & Webcast
1/11/2012Aurizon Announces Record 2011 Gold Production and 2012 Plans
12/8/2011Aurizon Grants Stock Options
12/8/2011Grants Stock Options
8/2/2011. Announces Second Quarter 2011 Conference Call & Webcast
11/30/2010Receives Award From Aemq
5/26/2010Options Azimut's Rex South Property
6/13/2008defines Gold Targets and Commences Exploration Program at Ki...
5/15/2008Andre Falzon Joins Aurizon's Board
3/15/2008deeply regrets
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ARZ.TO)FRANKFURT (AUE.F)
0.430+10.26%2.95+5.85%
TORONTO
CA$ 0.430
08/09 16:50 0.040
10.26%
Prev close Open
0.390 0.395
Low High
0.395 0.510
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.430 -%
Volume 1 month var.
274,400 -%
24hGold TrendPower© : -44
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/11/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :