Inter-Citic Reports New Drill Results From 2011 Exploration Program at Dachang
Published : February 06, 2012

Results include drill hole with interval of 16.0 metres at 2.19 GPT Gold and 4.5 metres at 4.42 GPT Gold

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   China | Diamond | Gold | Market | Recovery | Storage |

TORONTO, ONTARIO--(Marketwire - Feb. 6, 2012) - Inter-Citic Minerals Inc. (News - Market indicators)(OTCQX:ICMTF) ("Inter-Citic" or "the Company") President and CEO James Moore, is pleased to report the fourth set of drill results from 27 Diamond drill holes received from the 2011 exploration season at the Company's Dachang Gold Project.

These results are from the Acadia Zone, Placer Valley Zone and South East Area, and are new exploration aimed at further resource definition and expansion. Highlights include:

  • Drill hole CJV-1173 on the Acadia Zone ("Acadia") which reported multiple intercepts including an interval of 4.2 m with an average grade of 3.70 GPT gold, and another interval of of 4.3 m with an average grade of 2.63 GPT gold.
  • Drill hole CJV-1290 on the Acadia Zone which reported multiple intercepts including an interval of 4.5 m with an average grade of 4.42 GPT gold, and another interval of of 16.0 m with an average grade of 2.19 GPT gold.
  • Drill hole CJV-1271 on the Placer Valley Zone ("PVZ") which reported multiple intercepts including an interval of 1.8 m with an average grade of 8.20 GPT gold.

Results from additional drill holes from last year's approximately 25,000 metre drill program at Dachang have also now been received by Inter-Citic and will be released shortly.

Exploration of the Acadia Zone:

Two separate lenses of mineralization have been discovered to date on the Acadia fault system, which is located approximately 10 km northwest of the DMZ. A western lens has been defined over a 400 m strike length and has now been cut off. The eastern Acadia anomaly now has a strike length of at least 950 m defined by 40 m drill fences and remains open to the east.

Exploration of the Placer Valley Zone:

The Placer Valley Zone ("PVZ") is a series of mineralized faults off the immediate southern edge of the Dachang Main Zone. Step out drilling off the southern extent of the current resource area of the PVZ has intersected strong new mineralized structures. Although drilling in this area is early with sections still 500 m apart, these recent results indicate to the Company that new zones of mineralization exist south of the known PVZ resource area.

The Southeast Area:

Trenching 5 to 8 kilometres southeast of the original DMZ discovery discovered a complex set of gold values in soil geochem anomalies. Trenching in the area, known as the Southeast Area ("SEA"), has now defined three separate 120 degree trending fault systems. Drilling on the SEA for the first time in 2011 has consistently intersected near surface gold mineralization, with many of the drill holes reported in this release returning multiple gold intercepts.

A table of drill results reported in this release is set out below:

TABLE OF DRILL RESULTS

ACADIA ZONE            
               
DDH
Hole No.
Dip
(Degrees)
  Bearing
(Degrees)
From
(m)
To
(m)
Length
(m)
Assay
GPT Au
               
CJV-1165 -50   200 28.00 29.00 1.00 0.83
        57.50 59.00 1.50 1.48
CJV-1173 -89   20 58.60 62.80 4.20 3.70
        66.00 67.20 1.20 0.66
        216.60 217.60 1.00 0.85
        226.60 227.60 1.00 1.40
        243.50 244.50 1.00 1.89
        304.50 305.70 1.20 0.61
        316.30 317.30 1.00 0.54
        379.50 380.50 1.00 0.59
        386.90 387.90 1.00 0.65
        398.90 399.90 1.00 0.84
        428.20 429.60 1.40 2.31
        482.00 483.00 1.00 0.66
        501.40 505.70 4.30 2.63
        510.00 511.00 1.00 1.61
        560.80 561.80 1.00 1.11
CJV-1220 -50   200 29.00 33.00 4.00 2.11
        43.00 44.00 1.00 0.82
        65.00 66.50 1.50 0.86
CJV-1224 -65   20 54.00 55.00 1.00 2.02
        102.00 103.50 1.50 0.54
        165.00 168.00 3.00 1.62
        208.50 210.00 1.50 0.57
CJV-1228A -51   22 64.00 65.00 1.00 1.11
        87.00 88.00 1.00 1.08
        97.50 99.00 1.50 1.65
CJV-1258 -75   24 91.00 95.00 4.00 0.77
        133.50 136.50 3.00 0.93
CJV-1265 -50   19 20.00 22.00 2.00 0.82
        48.00 49.00 1.00 2.61
        54.00 55.20 1.20 1.33
CJV-1290 -45   22 54.90 59.40 4.50 4.42
        64.40 65.40 1.00 1.34
        69.40 85.40 16.00 2.19
        91.40 98.40 7.00 1.46
CJV-1297 -46   23.5 46.00 47.00 1.00 2.16
        102.00 103.00 1.00 0.86
CJV-1302 -45   202 73.50 75.00 1.50 1.55
CJV-1305 -71   202 65.00 66.00 1.00 1.73
               
PLACER VALLEY ZONE (PVZ)        
               
DDH
Hole No.
Dip
(Degrees)
  Bearing
(Degrees)
From
(m)
To
(m)
Length
(m)
Assay
GPT Au
               
CJV-1263 -85   22 43.15 44.65 1.50 1.31
        71.00 73.00 2.00 1.46
        82.65 84.00 1.35 2.64
        101.65 102.65 1.00 0.74
CJV-1267 -50   22 11.65 14.65 3.00 1.57
CJV-1271 -85   22 14.65 19.15 4.50 1.22
        62.10 65.30 3.20 4.00
        90.60 92.40 1.80 8.20
               
SOUTH EAST AREA (SEA)        
               
DDH
Hole No.
Dip
(Degrees)
  Bearing
(Degrees)
From
(m)
To
(m)
Length
(m)
Assay
GPT Au
               
CJV-1193 -50   20 23.50 24.50 1.00 0.58
CJV-1240 -50   22 13.15 16.15 3.00 1.34
        25.80 26.80 1.00 2.74
CJV-1254 -50   21 24.80 27.80 3.00 2.69
CJV-1256 -59   22 26.5 34.5 8.00 1.04
        64.2 65.2 1.00 1.49
        73.5 74.5 1.00 0.76
CJV-1264 -80   21 13.15 14.65 1.50 0.63
        54.60 55.60 1.00 0.64
CJV-1266 -50   22 75.30 82.30 7.00 1.63
CJV-1269 -71   21 29.10 30.10 1.00 0.85
        53.60 54.60 1.00 0.90
        96.90 105.90 9.00 1.32
CJV-1274 -50   21 24.20 25.20 1.00 0.82
        27.70 29.30 1.60 3.35
CJV-1276 -87   21 88.00 89.50 1.50 1.11
CJV-1286 -83   21.5 45.20 46.20 1.00 0.59
CJV-1293 -50   22 75.65 79.65 4.00 2.12
        87.35 89.65 2.30 1.48
CJV-1299A -70   22 67.65 68.65 1.00 1.34
        98.80 101.00 2.20 3.06
        111.30 112.30 1.00 0.84
        114.65 116.65 2.00 1.00
CJV-1308 -45   22 68.65 70.15 1.50 2.04

Assay cut-off for the above table was at 0.5 gpt Au, however, intervals were determined by geological interpretation of consistent mineralized zones. Broader intervals may include waste intervals of up to 2m. There was no evidence of nugget effect in the above results and no results were topcut. True widths for the intervals above have yet to be determined.

A location map showing drill hole locations and an overview of the areas reported above can be found on the Company's website at: http://www.inter-citic.com/maps.php. A visual representation of the location of the drill holes in this release can be seen at: http://www.corebox.net/properties/dachang/. The Company will continue to report results from its 2011 exploration program as assays are received.

Sample Methodology:

Drill core samples were taken at geologically significant intervals, typically over one metre. Core recovery was approximately 90%. The designated sample intervals were cut with a Diamond saw by qualified technicians. One half of the cut core was selected for assay with the remaining half being placed back into the core box. Care was taken to ensure that neither half of the core represents a bias with respect to the nature and mineral content of the sample. The sample interval and methodology are consistent with industry standards. Drill core samples were shipped to SGS Geochemical Laboratories ("SGS") located in Kunming and Tianjin, China for sample preparation and 50g fire assay with AA finish. SGS is the world's leading inspection, verification, testing and certification company. Analytical work is performed in accordance with recognized standards such as ASTM, ISO, JIS, and other accepted industry standards. Accuracy and precision of the results is tested through the systematic inclusion of reference samples, blank samples and duplicate samples.

Security of Samples: All of the samples collected at Dachang are stored in a restricted secure storage area. Samples are shipped by truck to Golmud and delivered to Inter-Citic's courier agent in Golmud for shipment to the various laboratories for analysis. Inter-Citic's courier agents are present at all transshipment points between Golmud and the laboratories. Exploration at Dachang was conducted with the assistance of the numerous professionals from the Qinghai Geological Survey Institute (No. 5 Institute), working in co-operation with Inter-Citic's technical team on site and supervised by Mr. Garth Pierce, Vice-President of Exploration.

Mr. Michael W. Leahey, P.Geo., the Company's internal Qualified Person under the requirements of National Instrument 43-101, has reviewed a copy of this press release.

Mr. B. Terrence Hennessey, P.Geo., of Micon International Limited is a Qualified Person under the requirements of National Instrument 43-101 and has reviewed a copy of this press release.

On Behalf of the Board:

"James J. Moore"

President & CEO

ABOUT INTER-CITIC:

Toronto-based Inter-Citic Minerals Inc. is an exploration and development company advancing its Dachang Gold Project in thePeople's Republic of China. Inter-Citic is listed on the TSX under the symbol ICI. Inter-Citic's website is www.inter-citic.com.

Investors are encouraged to review "Risk Factors" associated with the Dachang project as outlined in the Company's 2010 Financial Statements, MD&A and Annual Information Form, along with updates, available on the SEDAR website at www.sedar.com. The statements herein that are not historical facts are forward-looking statements. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed under the heading "Risk Factors" in the company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement. The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of the content of this news release.



Inter-Citic Minerals Inc.
Stephen Lautens
Vice President, Corporate Communications
(905) 479-5072
ir@inter-citic.com
www.inter-citic.com
Data and Statistics for these countries : China | All
Gold and Silver Prices for these countries : China | All

Inter-citic Minerals Inc

DEVELOPMENT STAGE
CODE : ICI.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Inter-citic Min. is a gold exploration company based in Canada.

Inter-citic Min. holds various exploration projects in China.

Its main asset in development is DACHANG in China.

Inter-citic Min. is listed in Canada and in United States of America. Its market capitalisation is CA$ 239.9 millions as of today (US$ 221.5 millions, € 160.1 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 2.50, and its lowest recent point on December 12, 2008 at CA$ 0.17.

Inter-citic Min. has 117 574 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Inter-citic Minerals Inc
10/12/2011Extends Term of Warrants
3/23/2006closes $11 million private placement financing
Project news of Inter-citic Minerals Inc
3/27/2012(Dachang)Reports Trench Results From 2011 Exploration Program at Dach...
2/28/2012(Dachang)Exploration Licenses Renewed at Inter-Citic's Dachang Gold P...
12/12/2011(Dachang)Reports Drill Results From New Gold Discoveries at Dachang
11/29/2011(Dachang)Permitting Progress at Inter-Citic's Dachang Gold Project
10/3/2011(Dachang)Announces Two New Mineralized Zones Discovered at Its Dachan...
8/8/2011(Dachang)$6.3 Million Exploration Program at Inter-Citic's Dachang Go...
3/22/2011(Dachang)Engages Company For Feasibility Study
3/2/2011(Dachang)Reports New Metallurgical Work at Dachang Exceeds Previous R...
10/28/2010(Dachang)Releases Early Drill Hole Results From Dachang Gold Project
9/15/2010(Dachang)Issues Exploration Progress Update for Its Dachang Gold Proj...
7/27/2010(Dachang)CORRECTION FROM SOURCE: Inter-Citic Releases Drill Hole Resu...
7/19/2010(Dachang)Reports Updated NI 43-101 Compliant Mineral Resource Estimat...
7/8/2010(Dachang)25,000 Metre Drill Program Underway at Inter-Citic's Dachang...
4/22/2010(Dachang)Releases Drill Hole Results from Dachang Gold Project
11/5/2006(Dachang)Receives results from 10 new drill holes
Corporate news of Inter-citic Minerals Inc
11/13/2012Announces PRC Approvals Related to Plan of Arrangement Have ...
10/29/2012Obtains Shareholder Approval for Arrangement
8/27/2012to be Acquired by Western Mining Group Co., Ltd. for C$2.05 ...
7/9/2012Responds to Trading Activity
6/19/2012(Dachang)Reports Updated NI 43-101 Compliant Mineral Resource Estimat...
2/14/2012(Dachang)Reports Drill Results from 2011 Exploration Program at Dacha...
2/6/2012(Dachang)Reports New Drill Results From 2011 Exploration Program at D...
1/10/2012(Dachang)Reports Drill Results from 2011 Exploration Program at Dacha...
12/5/2011(Dachang)First Drill Results From Inter-Citic's 2011 Exploration Prog...
7/11/2011Announces Completion of Final Tranche of C$21 Million Non-Br...
6/28/2011Announces Completion of First Tranche of C$21 Million Non-Br...
5/26/2011Announces Significant Premium Pricing of Non-Brokered Equity...
3/29/2011Shares Commence Trading on the U.S. OTCQX
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ICI.TO)Other OTC (ICMTF)
2.04+0.00%2.05+0.49%
TORONTO
CA$ 2.04
05/08 15:56 -
0%
Prev close Open
2.04 -
Low High
2.04 2.04
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.04 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -21
Produces
Develops Gold
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/16/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.95+0.11%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54+0.19%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65-1.49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.97+2.37%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.93+3.21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.26-0.67%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :