Oroco Resources Corp

Published : May 14th, 2012

REPORTS ON SOUTH EXTENSION DRILLING AT CERRO PRIETO

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | G Mexico | Gold | K Street | Mexico | Report |

OROCO REPORTS ON SOUTH EXTENSION DRILLING AT CERRO PRIETO

VANCOUVER, British Columbia – (May 14, 2012 - Oroco Resource Corp. (TSX-V: OCO) (�Oroco� or �the Company�) is pleased to report additional results from the 2011 and 2012 exploration and infill drill program at its Cerro Prieto Project in northern Sonora State, Mexico.

As part of this overall drill program, the Company tested the southern extension of the mineralized structure on strike from the southern boundary of the area containing the current resource, a length of 500 meters from Line 150N to Line 350S. All but one of the completed drill holes intersected intervals of gold mineralization greater than the cut-off grade used in the existing resource estimate for Cerro Prieto.
Highlights of the results include:

  1. Holes CP067 and CP068A, both drilled on line 100N (50 m south of the  boundary of the current resource estimation), intersected 10.35 m of 0.65 g/t Au and 11.2 m of 0.60 g/t Au respectively;
  2. At Line 200S, hole CP095 intersected 15.0 m of 0.50 g/t Au in one of two zones intersected;
  3. At Line 250S, hole CP097 intersected 9.00 m of 3.29 g/t Au in one zone and 12.65 m of 0.45 g/t Au in a deeper zone; and
  4. At Line 300S, hole CP098 intersected 9.15 m of 0.57 g/t Au

The drill holes were spaced to test the structure to a maximum vertical depth of 100 meters at 50 meter intervals along strike. All drill holes intersected the structure and in some cases intersected more than one mineralized zone. Full results are shown in the following table.

Cerro Prieto South Extension Drill Results


HOLE
SECTION FROM TO LENGTH AU AG PB ZN
NO.   (m) (m) (m) (g/t) (g/t) (%) (%)
                 
CP067 100N 72.50 82.85 10.35 0.650 14.2 0.25 0.86
incl   73.50 81.40 7.50 0.782 16.2 0.32 0.97
                 
CP068A 100N 35.85 47.05 11.20 0.599 15.8 0.42 0.57
incl   40.40 47.05 6.65 0.831 19.6 0.45 0.61
                 
CP069 050N 50.50 53.50 3.00 0.306 2.1 0.12 0.58
                 
CP070 0 68.00 70.50 2.50 0.314 36 0.65 0.26
                 
CP071 0 40.15 44.50 4.35 0.292 2.2 0.05 0.11
    46.25 47.80 1.55 0.201 4.4 0.05 0.09
    52.35 55.20 2.85 0.280 4.2 0.45 0.51
                 
CP072 50S 70.00 74.50 4.50 0.109 67.5 0.21 0.47
                 
CP073 100S 59.80 62.25 2.45 0.370 6.5 0.51 0.87
                 
CP074 100S 89.30 93.00 3.70 0.310 42.4 0.37 1.20
incl   89.30 90.80 1.50 0.615 8.4 0.18 0.37
    100.00 101.50 1.50 0.208 0.6 0.08 0.04
                 
CP075 150S 92.00 100.00 8.00 0.471 2.8 0.48 1.13
incl   94.50 96.00 1.50 0.958 6.4 1.13 2.48
                 
CP095 200S 55.00 59.10 4.10 0.29 2.7 0.07 0.22
    74.00 89.00 15.00 0.50 32.9 0.27 0.52
incl   84.50 89.00 4.50 0.83 99.1 0.68 1.03
                 
CP096 200S 83.00 85.40 2.40 0.79 34.6 0.21 0.58
    94.00 97.00 3.00 0.28 2.7 0.44 0.91
    106.00 110.50 4.50 0.54 1.9 0.24 1.01
    113.50 115.00 1.50 0.56 0.8 0.07 0.18
                 
CP097 250S 67.00 76.00 9.00 3.29 93.2 0.38 0.58
incl   68.50 71.50 3.00 7.32 201.0 0.36 0.72
    88.00 92.50 4.50 0.67 4.3 0.11 0.30
    109.00 121.65 12.65 0.45 2.1 0.15 0.47
                 
CP098 300S 43.40 52.55 9.15 0.57 7.20 0.07 0.26
    63.05 66.05 3.00 2.31 12.70 0.27 0.55
    105.00 106.00 1.00 0.90 3.80 0.05 0.10
                 
CP099 300S 76.00 79.00 3.00 0.30 3.6 0.14 0.39
    89.60 92.00 2.40 0.30 36.7 0.78 2.25
    132.00 133.50 1.50 0.62 0.8 0.01 0.10
    142.50 145.40 2.90 0.29 1.8 0.08 0.37
                 
CP100 350S 45.50 57.00 1.50 0.25 46.5 0.19 0.07
                 

The south end of the current proposed open pit extends south from line 150N to Line 000, however as no drilling had previously taken place south of line 150N, the Current Resource is presently estimated only as far south as Line 150N. Drill results within this area reported herein include intersections of mineralization at gold grades greater than the cut-off grade used in the Company�s previously announced resource calculation and Preliminary Economic Assessment. Previously reported surface trenching from lines 150N to 000 also include intervals of mineralization at grades greater than the cut-off, including intervals of 5.2 meters averaging 4.79 g/t Au and 21.5 g/t Ag (at 150N), 9.8 meters averaging 4.08 g/t Au and 36.2 g/t Ag (at 100N), and 6.1 meters averaging 2.05 and 9.0 Ag (at 050N).

Further south along strike, intersections from drilling at 100S to 150S and 250S to 300S are of particular interest because higher grade material was intersected under surface trenches with higher grade results (see press release March 7, 2010), including 6.0 meters averaging 1.28 g/t Au and 12.8 g/t Ag (at 100S), 4.7 meters averaging 2.36 g/t Au and 28.0 g/t Ag (at 150S), 5.5 meters averaging 4.65 g/t Au and 53.3 g/t Ag (at 272S) and 8.0 meters averaging 2.49 g/t Au and 93.4 g/t Ag (at 300S).

About Oroco

Oroco is a Canadian-based mineral exploration company with its primary focus on the accelerated development of the gold-bearing oxide zones of its Cerro Prieto Project.  The Cerro Prieto Project consists of a group of 100% owned concessions comprising over 7,000 ha in northern Sonora State, Mexico.

For further information, please contact:
Mr. Craig Dalziel, President and CEO
Oroco Resource Corp.
Tel: 604-688-6200

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


Oroco Resource Corp.
789-999 West Hastings Street | Vancouver | B.C. | V6C 2W2 | Canada
Data and Statistics for these countries : Canada | Mexico | All
Gold and Silver Prices for these countries : Canada | Mexico | All

Oroco Resources Corp

EXPLORATION STAGE
CODE : OCO.V
ISIN : CA6870331007
CUSIP : 687033 10 0
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Oroco Resources is a zinc and lead development stage company based in Canada.

Its main exploration properties are XOCHIPALA and CERRO PRIETO in Mexico.

Oroco Resources is listed in Canada. Its market capitalisation is CA$ 26.1 millions as of today (US$ 19.3 millions, € 17.2 millions).

Its stock quote reached its lowest recent point on January 01, 2016 at CA$ 0.01, and its highest recent level on June 25, 2021 at CA$ 3.66.

Oroco Resources has 77 947 405 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Oroco Resources Corp
2007 Annual Report
Financings of Oroco Resources Corp
2/5/2013CLOSES $1 MILLION NON-BROKERED PRIVATE PLACEMENT
9/11/2012Applies to Extend Term of Warrants
6/9/2011Announces Exercise of Warrants
5/25/2009RESOURCE CORP. ANNOUNCES PRIVATE PLACEMENT
Nominations of Oroco Resources Corp
4/27/2010Appointment of Chief Consulting Engineer
Project news of Oroco Resources Corp
1/27/2014(Cerro Prieto)REPORTS INITIAL PRODUCTION AT CERRO PRIETO
10/22/2012(Xochipala)Resource Corp.: Xochipala Amparo Filed
9/21/2012(Xochipala)Announces Commencement of Exploration at its Xochipala Proje...
5/14/2012(Cerro Prieto)REPORTS ON SOUTH EXTENSION DRILLING AT CERRO PRIETO
4/20/2012(Cerro Prieto)ANNOUNCES CERRO PRIETO DRILL RESULTS
1/17/2012(Cerro Prieto)ADDS TO CERRO PRIETO PROJECT
12/8/2011ANNOUNCES START OF DRILLING PROGRAMOROCO ANNOUNCES START OF ...
5/18/2011(Cerro Prieto)Secures Surface Rights for Cerro Prieto Project
1/12/2010(Cerro Prieto)Multiple High Grade Gold Drill Intercepts at Cerro Prieto.
9/30/2009(Cerro Prieto)New and Updated Drill Intercepts
9/17/2009(Cerro Prieto)Second Phase Drilling Verifies 2.0 Kilometer Mineralized Str...
8/11/2009(Cerro Prieto)High Grade Gold Sampled on Additional 900 Meter Strike Lengt...
7/21/2009(Cerro Prieto)Commences Phase Two Drilling at Cerro Prieto
5/14/2009(Cerro Prieto)Signs Property Option Agreement With Yamana Gold
1/27/2009(Cerro Prieto)REPORTS A 25.3 MILLION TONNE INDICATED RESOURCE AND 4.69 MI...
11/28/2008(Cerro Prieto)SURFACE SAMPLING EXTENDS MINERALIZED ZONE AT CERRO PRIETO AL...
9/18/2008(Cerro Prieto)COPPER AND MOLYBDENUM IN ADDITION TO AU-AG-PB-ZN MINERALIZAT...
7/31/2008(Cerro Prieto)Continues its Drilling Success
6/16/2008(Cerro Prieto)Intersects 0.214 g/t Au, 361.8 g/t Ag, 2.40% Pb And 4.76% Zn...
5/21/2008(Cerro Prieto)Initial Drill Holes Intersect Mineralized Structure at Cerro...
4/30/2008(Cerro Prieto)ANNOUNCES FIRST SAMPLING RESULTS FROM CERRO PRIETO NORTH PRO...
Corporate news of Oroco Resources Corp
12/17/2015December 15, 2015 OROCO SETTLES SONORAN LAWSUIT
12/17/2015Oroco Settles Sonoran Lawsuit
11/19/2015Oroco Agrees to Extension of Closing Date
9/29/2015September 28, 2015 OROCO NEGOTIATES PAYMENT OF GOLDGROUP MIN...
9/29/2015Oroco Negotiates Payment of Goldgroup Mining Inc. Notes
9/18/2015September 16, 2015 GOLDGROUP FAILS TO MAKE PAYMENT TO OROCO
9/17/2015Goldgroup Fails to Make Payment to Oroco
9/16/2015August 28, 2015 OROCO RECEIVES 16.5 MILLION SHARES OF GOLDGR...
8/29/2015Oroco Receives 16.5 Million Shares of Goldgroup Mining Inc.
10/2/2014Debt Assignment Agreement Closes
9/23/2014Oroco Enters Into Agreements With Goldgroup
3/31/2014Sonoran Resources LLC. Commences Legal Action
2/7/2014(Xochipala)WINS XOCHIPALA APPEAL
9/3/2013(Cerro Prieto)Announces Completion of the Sale of Cerro Prieto
8/16/2013(Cerro Prieto)and Goldgroup Extend the Closing Date for the Cerro Prieto T...
7/16/2013(Cerro Prieto)and Goldgroup Agree to an Extension of the Closing Date for ...
6/29/2013Receives Demand for Payment
6/25/2013(Cerro Prieto)Obtains Approval for Sale of Cerro Prieto to Goldgroup
6/4/2013Resource Corp.: Amparo Decision Handed Down
4/29/2013Announces Special General Meeting Date
4/10/2013(Cerro Prieto)and Goldgroup Sign Formal Sale Agreement for Cerro Prieto
1/28/2013(Cerro Prieto)SIGNS AGREEMENT TO SELL CERRO PRIETO FOR US $18 MILLION
1/28/2013(Cerro Prieto)Signs Agreement to Sell Cerro Prieto
11/9/2012(Xochipala)Increases Strike Length at Xochipala
6/27/2011(Cerro Prieto)Signs Definitive Cerro Prieto Surface Rights Agreement
6/17/2011(Cerro Prieto)Signs Indicative Term Sheet for Cerro Prieto Construction Fi...
3/15/2011Resource Corp. Announces Closing of Private Placement
3/7/2011Extends Mineralized Zone at Cerro Proeto
10/6/2009Initiation Of Phase Two Metallurgical Tests
6/25/2009Resource Compressed Timeline to Production
6/4/2009Invite for dissemination
5/13/2009General research GMBH to provide european investor...
3/8/2009ANDERSON FINANCIAL MARKETING to provide investor relations ...
11/4/2008Announces Senior Management Assignments
10/2/2008RESOURCE CORP. ADOPTS SHAREHOLDER RIGHTS PLAN
9/9/2008Announces 425 Meter Stepout to Mineralized Zone
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (OCO.V)
0.335-2.90%
TSX-V
CA$ 0.335
09/20 15:33 -0.010
-2.9%
Prev close Open
0.345 0.340
Low High
0.335 0.340
Year l/h YTD var.
0.325 -  0.700 -18.29%
52 week l/h 52 week var.
0.325 -  0.720 -51.45%
Volume 1 month var.
29,500 -10.67%
24hGold TrendPower© : -11
Produces
Develops
Explores for Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/6/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-11.84%0.710.32
2023-58.24%1.100.37
2022-55.61%2.350.61
202110.81%3.661.68
2020315.73%2.120.20
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
error

 

 

THE REQUESTED URL IS UNCORRECT

Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !