Ivanhoe Mines Ltd.

Published : October 30th, 2013

reports ongoing dewatering at historic Kipushi Mine

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
IVANHOE
MINES

www.ivanhoemines.com
October 30, 2013

Ivanhoe Mines reports ongoing dewatering
at historic Kipushi Mine in D.R. Congo
now 76% complete toward initial objective
of restoring underground access
to the mine's main working level by year end




Drilling expected to begin in early 2014 to confirm and expand
Kipushi's bonanza-grade zinc and copper resources


LUMUMBASHI, DRC � Robert Friedland, Executive Chairman of Ivanhoe Mines (TSX: IVN; formerly Ivanplats, TSX: IVP), and Lars-Eric Johansson, Chief Executive Officer, announced today that the company is on track to achieve its initial objective of regaining access to the main underground working level of the historic, high-grade Kipushi Mine in the Democratic Republic of Congo (DRC) before the end of this year.

Ivanhoe Mines acquired a 68% interest in the Kipushi Mine in 2011. The mine's underground workings were extensively flooded during its previous 18 years of care-and-maintenance as a former state-owned asset.

The water level, which at its peak had reached 851 metres below surface, now has been reduced to 1,100 metres � leaving only a further 50 metres to be cleared before the main working level at 1,150 metres can be accessed and upgraded.

To date, approximately 76%of the water that had collected above the 1,150-metre level has been pumped out of the mine. This represents approximately 63% of all water throughout all levels of the mine.

Ivanhoe's initial goal is to successfully remove water down to the mine's 1,150-metre level by the end of December 2013. Ivanhoe then will be in a position to begin an aggressive underground Diamond-drilling program designed to confirm the mine's estimated, remaining high-grade resources � which were included in the September 2012 Kipushi Technical Report prepared by IMC Group Consulting -- and to seek to further expand the resources on strike and at depth.

In addition, Ivanhoe also expects to achieve its objective of dewatering to the bottom of the ramp decline, at 1,270 metres below surface, during the first quarter of 2014.

>From its start-up in 1924 as the Prince L�opold Mine, Kipushi produced a total of 6.6 million tonnes of zinc and 4.0 million tonnes of copper � from 60.0 million tonnes of ore grading 11% zinc and approximately 7% copper � until operations were halted in 1993 due to political instability. The mine also produced 278 tonnes of germanium between 1956 and 1978.

Germanium is a high-tech metal used in light-emitting diodes (LED), fibre-optic networks, infrared night vision systems and solar cell applications. The metal is currently trading at approximately US$1,850 a kilogram.

Kipushi also contains the Big Zinc, a bonanza-grade zinc deposit discovered at approximately 1,200 metres below surface in the early 1990s, shortly before the mine's closure. The Big Zinc, which remains unmined and open to depth, is accessible from existing underground workings (see accompanying graphic). Based on drilling reports by state-owned mining company La G�n�rale des Carri�res et des Mines (G�camines) multiple steeply dipping exploratory holes have intersected exceptionally high-grade zinc mineralization, grading 42% to 45% zinc, between the 1,375-levels and 1,600-metre levels elevations, with more than 60 metres to 100 metres apparent thickness.

Improved supply of electric power assisting in the dewatering effort

Mr. Johansson said that the reliability of electric power delivered to Kipushi from the state-owned power grid has been more consistent since May, greatly assisting in sustaining the dewatering effort.

"The combination of improved power supply and additional modern, high-volume pumps has resulted in lowering the mine's water level by an average of seven to eight metres a week during the past four and a half months. As the dewatering progresses, the volume of water remaining in the mine workings diminishes markedly. We are confident that we will be able to remove all the water in the mine early in 2014."

Steelwork and equipment are being progressively replaced and upgraded as the water level drops. New, large-capacity, high-pressure Ritz and Vogel pumps installed in April 2013 now have raised the pumping rate to 64,800 cubic metres per day. Additional capacity is being installed to further increase the pumping rate to a planned 81,600 cubic metres per day.

Andre Zeelie, Kipushi Project Manager, said that as the mine is progressively dewatered, the company will undertake a program to evaluate the option of injecting a Rapid Setting Polyurethane grout to permanently seal large voids/extreme water ingress and fissure grouting to significantly reduce the inflow of water into the underground workings.

Kipushi cross-section showing current water level and unmined Big Zinc Discovery


Kipushi pump layout


Important underground drilling program planned for Kipushi

The historically-mined deposit at Kipushi is comprised of high-grade copper-zinc-lead mineralization within the Kipushi Fault Zone, which has a strike length of 600 metres and previously was mined to a depth of 1,207 metres below surface. Based on drilling reports by G�camines, the Fault Zone is known to extend to at least 1,800 metres below surface.

Prior to the 1993 halt of production at Kipushi, G�camines discovered and drill-delineated the Big Zinc Deposit, an extremely high-grade, zinc-rich body. The top of the Big Zinc occurs at approximately the 1,200-metre level and G�camines' drilling confirmed that it continues down to at least the 1,640-metre level. The Big Zinc has a strike length of at least 100 metres, is 40 to 80 metres in true thickness and is open at depth.

Ivanhoe's planned 2014 drilling program is scheduled to complete approximately 100 holes totalling more than 20,000 metres. The program's primary goals are to:
  • Conduct confirmatory drilling to validate the historical resources within the Big Zinc and Fault zones to bring the historical resources to current resources under CIM standards.
  • Conduct extension drilling to test and upgrade the deeper portions, below the 1,500-metre level, of the Big Zinc and Fault zones that previously were classified as Inferred Resources.
  • Conduct exploration drilling to test areas that were not evaluated historically, such as the deeper portions of the Fault Zone and extensions to the high-grade copper mineralization of the mine's Northern Deposit.
  • Obtain large-diameter drill core from the Big Zinc for confirmatory metallurgy test work.
New underground drill holes may also provide a platform for geophysical exploration of Kipushi's deep mineral potential, leveraging the Ivanhoe Group's proprietary in-house expertise. The Kipushi deposit has never been evaluated using modern geophysical techniques.

Most of the underground infrastructure already is in place to support the drilling program. The majority of the drilling will be conducted from sites on the 1,270-level hanging-wall development drift with metallurgical samples of the Big Zinc taken as soon as the water reaches the 1,227 level. A 280-metre, step-back extension of the drift also will be driven to allow the drill crews to test the down-dip extensions of the Big Zinc and Fault zones.

Independent consultant MSA Group of South Africa has been appointed to prepare current estimate of Big Zinc resources to CIM standards following completion of the confirmation drilling program.

Mintek, South Africa's national mineral research organization, recently completed a preliminary metallurgical testwork campaign on existing drill core from the Big Zinc. Comminution testwork indicated that the material is soft and therefore easy to crush and mill. Flotation testwork indicated that the material was easily upgradable to a very high-grade concentrate composition at high zinc recoveries.

MDM Engineering Group Limited of South Africa has been retained to complete processing options studies based upon the Mintek metallurgical testwork.

Kipushi infrastructure development

Ivanhoe Mines also has been upgrading and rebuilding Kipushi's surface infrastructure to support a return to production. Recent minesite improvement projects include:
  • construction of a bonded warehouse that will be used for site storage, maintenance and repair;
  • installation of safety perimeter fencing to separate the mine's operations area from the Kipushi village;
  • completion of a dewatering sump and trench at the old open-pit area; and
  • renovation of the company offices and surface infrastructure.
Mr. Johansson said that approximately 95% of employees at the Kipushi Mine are Congolese nationals who previously had worked for G�camines when the mine was on care and maintenance.

"We have been very pleased with the quality and dedication of the former G�camines employees who have joined our mine re-development team."

About the Kipushi copper-zinc-germanium-lead and precious-metals mine

The Kipushi Mine is on the Central African Copperbelt in Katanga province, adjacent to the town of Kipushi and approximately 30 kilometres southwest of the provincial capital of Lubumbashi. Ivanhoe Mines acquired its 68% interest in the Kipushi Project in November 2011; the balance of 32% is held by G�camines.

In addition to the recorded production of copper, zinc, lead and germanium, historical G�camines mine-level plans for Kipushi also reported the presence of precious metals. However, there is no formal record of gold and silver production; the concentrate was shipped to Belgium and the recovery of precious metals remained undisclosed during the colonial era.

Historical resources estimate

IMC Group Consulting, which prepared the current Kipushi Technical Report, considers the historical estimate prepared by Techpro Mining and Metallurgy in 1997 to be the most relevant and reliable. Techpro reported the following resources:

Resource Category Tonnes Copper % Zinc %
Measured 8,899,979 2.53 9.99
Indicated 8,029,127 2.09 24.21
Total 16,929,106 2.32 16.76
Inferred 9,046,352 1.93 23.32
Included in Total:
Big Zinc Zone
     
Measured 793,086 1.16 33.52
Indicated 3,918,366 0.68 39.57
Measured & Indicated 4,711,452 0.76 38.55


IMC is of the opinion that the Techpro estimate generally is fair and reasonable for demonstrated (measured plus indicated) resources and that inferred mineral resource estimates largely represent the projection of the Kipushi Project fault zone mineralization from the 1500-metre level to the 1800-metre level.

The Historical Measured and Indicated Resources for the Big Zinc are stated only to the mine's 1500-metre level. G�camines' drilling confirmed that the Big Zinc continues down to at least the 1,640-metre level.

G�camines was principally interested in the copper content of the Kipushi deposit, not its zinc content. As a consequence, Ivanhoe considers that the density estimation factor used by G�camines to calculate resources is approximate and may be inappropriate for the estimation of zinc in high-grade, iron-poor sphalerite such as occurs in the Big Zinc, potentially understating the Big Zinc's historical resources.

A Qualified Person has not done sufficient work to classify the historical estimates as current Mineral Resources and Ivanhoe Mines is not treating such estimates as current Mineral Resources. The historical estimate was prepared in accordance with the JORC Code. Ivanhoe Mines will need to validate previous work through new drilling, sampling, assaying and other procedures to produce a mineral resource that is current for CIM purposes.

Further information relating to the historical resource estimate is included in the Kipushi Technical Report dated September 2012 prepared by IMC and available at www.sedar.com and www.ivanhoemines.com.

Qualified Person, Quality Control and Assurance

The scientific and technical information in this release has been reviewed and approved by Stephen Torr, P.Geo., Ivanhoe Mines' Vice President, Project Geology and Evaluation, a Qualified Person under the terms of National Instrument 43-101. Mr. Torr has verified the technical data disclosed in this press release.

About Ivanhoe Mines

Ivanhoe Mines with offices in Canada, the United Kingdom and South Africa, is advancing and developing its three principal projects:
  • The Kamoa copper discovery in a previously unknown extension of the Central African Copperbelt in the DRC's Province of Katanga.
  • The Platreef Discovery of platinum, palladium, nickel, copper, gold and rhodium on the Northern Limb of the Bushveld Complex in South Africa.
  • The historic, high-grade Kipushi zinc, copper and germanium mine, also on the Copperbelt in the DRC and now being dewatered and upgraded to support a future return to production of copper, zinc and other metals following a care-and-maintenance program conducted between 1993 and 2011.
Ivanhoe Mines also is evaluating other opportunities as part of its objective to become a broadly based international mining company.

Information contacts

Investors
Bill Trenaman +1.604.331.9834

Media
North America: Bob Williamson +1.604.512.4856
South Africa: Jeremy Michaels +27.11.088.4300

Website www.ivanhoemines.com

FORWARD-LOOKING STATEMENTS

Statements in this release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in the company's periodic filings with Canadian securities regulators. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may," "potential," "should" and similar expressions, are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information.

Statements in this release that constitute forward-looking statements or information include, but are not limited to: statements regarding the expectation to complete the dewatering program to the bottom of the ramp decline at 1,272 metres below surface during Q'1 2014; statements regarding the target for dewatering to the 1,150-metre level is expected by the end of December 2013; statements regarding the company plans to commence its underground drilling program in early 2014; statements regarding plans to increase the pumping rate to a planned 81,600 cubic metres per day; statements regarding the primary goals of the 2014 drilling program; statements regarding the planned 2014 program entails more than 20,000 metres of drilling in approximately 100 holes; statements regarding MSA Group being appointed to prepare an updated resource estimation of the Big Zinc Deposit; and statements regarding MDM Engineering Group being retained to prepare a study.

All such forward-looking information and statements are based on certain assumptions and analyses made by Ivanhoe Mines' management in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management believes are appropriate in the circumstances. These statements, however, are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information or statements. Important factors that could cause actual results to differ from these forward-looking statements include those described under the heading "Risk Factors" in the company's most recently filed MD&A. Readers are cautioned not to place undue reliance on forward-looking information or statements.


Click here to read the news release in PDF Format


HOME CORPORATE PROJECTS NEWS CONTACT

SUBSCRIBE |
� Copyright 2013, Ivanhoe Mines Ltd. All Rights Reserved.
Data and Statistics for these countries : Belgium | Canada | South Africa | United Kingdom | All
Gold and Silver Prices for these countries : Belgium | Canada | South Africa | United Kingdom | All

Ivanhoe Mines Ltd.

PRODUCER
CODE : IVN.TO
CUSIP : 46579N 103
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Ivanhoe Mines is a gold and copper development stage company based in Singapore.

Ivanhoe Mines produces gold, copper, iron in Australia and in Kazakhstan, develops copper and gold in Mongolia, and holds various exploration projects in Australia.

Its main assets in production are SAVAGE RIVER in Australia and BAKYRCHIK in Kazakhstan, its main asset in development is OYU TOLGOI in Mongolia and its main exploration properties are MONYWA in Myanmar and CLONCURRY in Australia.

Ivanhoe Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 16.0 billions as of today (US$ 11.7 billions, € 10.9 billions).

Its stock quote reached its lowest recent point on January 29, 2016 at CA$ 0.53, and its highest recent level on April 26, 2024 at CA$ 20.36.

Ivanhoe Mines has 785 229 952 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Ivanhoe Mines Ltd.
11/14/2018Ivanhoe Mines jumps as it finds new copper-rich area in Cong...
Annual reports of Ivanhoe Mines Ltd.
Annual Report 2007
Financings of Ivanhoe Mines Ltd.
9/23/2013announces non-brokered private placement
7/27/2012closes successful rights offering yielding US$1.8 billion i...
7/27/2012Closes Successful Rights Offering Yielding US$1.8 Billion in...
6/8/2012Files Final Prospectus for Rights Offering
5/23/2012Files Preliminary Prospectus for Rights Offering and Amends ...
4/19/2012announces agreement to proceed with a US$1.8 billion rights ...
1/18/2012Negotiates an Additional US$1.8 Billion Bridge Financing as ...
Nominations of Ivanhoe Mines Ltd.
6/29/2012shareholders appoint two new directors and approve new compa...
5/11/2012appoints new chairman and additional director
5/8/2012Appoints Four New Directors and Accepts Resignation of Three...
5/2/2012Board of Directors appoints new chief executive officer and ...
1/27/2012Expects to Maintain a Majority of Independent Directors on t...
7/14/2011Announces Appointment of Rio Tinto Executive Dan Larsen to C...
Financials of Ivanhoe Mines Ltd.
11/16/2015Announces Financial Results And Review Of Operations For The...
11/12/2013Announces Financial Results and Review of Operations for the...
5/16/2012announces financial results and review of operations for the...
3/20/2012Announces 2011 Financial Results and Review of Operations
8/16/2011Announces Financial Results and Review of Operations for the...
5/16/2011Announces Financial Results and Review of Operations for the...
3/29/2011Announces 2010 Financial Results and Review of Operations
5/15/2010Announces Financial Results and Review of Operations for the...
3/29/2008Announces 2007 Financial Results and Review of Operations
3/31/20072006 Financial Results
Project news of Ivanhoe Mines Ltd.
7/5/2016(Kamoa Copper)Excellent copper recoveries and concentrate grades confirmed...
6/20/2016June 20th, 2016 Exceptional grades and widths of mineralizat...
5/19/2016(Kamoa Copper)Kamoa Copper Project initiates major drilling program at the...
5/19/2016May 19th, 2016 Kamoa Copper Project initiates major drilling...
4/19/2016April 6th, 2016 Ivanhoe Mines announces an accelerated infil...
4/6/2016Ivanhoe Mines announces an accelerated infill drilling progr...
3/30/2016Ivanhoe Mines files NI 43-101 technical report for the indep...
1/25/2016Ivanhoe Mines’ exploration team makes major new copper disco...
1/25/2016Ivanhoe Mines’ exploration team makes major new copper disco...
1/25/2016Ivanhoe Mines’ exploration team makes major new copper disco...
9/9/2015Ivanhoe Mines, Laurentian University and the University of L...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
5/26/2015Zijin strikes deals with western miners
4/13/2015Ivanhoe Mines reports additional high-grade zinc, copper, si...
3/23/2015China-based Zijin Mining Group to acquire a 9.9% stake in Iv...
1/29/2015Ivanhoe Mines and Ivanplats expand challenge of errors and m...
1/12/2015Ivanhoe Mines backlashes report on its Platreef platinum min...
1/12/2015Ivanhoe Mines and Ivanplats challenge Globe & Mail story abo...
12/18/2013reports dewatering progress at historic Kipushi Mine in D.R....
10/30/2013reports ongoing dewatering at historic Kipushi Mine
10/16/2013reports unprecedented 90-metre intersection of 4.51 grams of...
9/9/2013to begin sinking bulk-sample shaft at its Platreef platinum-...
8/2/2012and Chalco Agree to 30-day Extension for Proportional Takeov...
4/2/2012Aluminum Corporation of China announces its intention to mak...
8/22/2011(Oyu Tolgoi)Gold and Silver to Generate up to 50% of Total Annual Revenu...
8/3/2011(Monywa)Receives Proceeds of US$103 Million from Monywa Trust
6/9/2011(Oyu Tolgoi)by Ivanhoe Mines Reports Construction of the Oyu Tolgoi Copp...
3/14/2011(Oyu Tolgoi)New copper-molybdenum-gold zone discovered on Ivanhoe Mines-...
3/3/2011(Oyu Tolgoi)Silver Production at Ivanhoe Mines' Oyu Tolgoi Project is Ex...
2/22/2011(Bakyrchik)Altynalmas Gold Announces a 50% Increase in Indicated Minera...
2/3/2011(Oyu Tolgoi)Successful Ivanhoe Mines rights offering yields US$1.18 bill...
3/12/2008(Oyu Tolgoi)Reports an Initial 760 Million Tonne Inferred Resource Estim...
3/31/2007(Oyu Tolgoi)Oyu Tolgoi Mineral Reserves and Resources March 2007
Corporate news of Ivanhoe Mines Ltd.
7/11/2016July 11th, 2016 Ivanhoe Mines receives second US$41.2 millio...
7/5/2016July 5th, 2016 Excellent copper recoveries and concentrate g...
6/24/2016June 24th, 2016 Ivanhoe Mines files NI 43-101 technical repo...
5/27/2016May 27th, 2016 Ivanhoe Mines files NI 43-101 technical repor...
5/20/2016May 19th, 2016 Ivanhoe Mines announces results of voting for...
5/19/2016May 19th, 2016 Ivanhoe Mines condemns promotion of false and...
5/12/2016May 12th, 2016 Ivanhoe Mines Announces Financial Results and...
5/2/2016May 2nd, 2016 Ivanhoe Mines announces a positive preliminary...
4/19/2016March 30th, 2016 Ivanhoe Mines files NI 43-101 technical rep...
4/19/2016March 24th, 2016 Ivanhoe Mines Issues 2015 Year-End Results ...
3/24/2016Ivanhoe Mines Issues 2015 Year-End Results And Review Of Ope...
1/27/2016Ivanhoe Mines reports Independent Mineral Resource estimate ...
1/27/2016Ivanhoe Mines reports Independent Mineral Resource estimate ...
1/27/2016Ivanhoe Mines Reports Independent Mineral Resource Estimate ...
1/25/2016Ivanhoe Mines' Exploration Team Makes Major New Copper Disco...
1/22/2016Ivanhoe Mines to release final tranche of locked-up shares
1/19/2016Ivanhoe congratulates Robert Friedland for his induction int...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
9/23/2015Ivanhoe Mines welcomes DR Congo Government's support for Iva...
9/22/2015Congo drops objections to Ivanhoe Mines' copper deal
8/31/2015Ivanhoe Mines, Fio Corporation and Chemonics International j...
8/12/2015Ivanhoe Mines Announces Financial Results and Review of Oper...
8/4/2015Ivanhoe Mines and Zijin Mining Group extend completion date ...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
4/20/2015China-based Zijin Mining Group completes private placement a...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results and Review of Ope...
3/26/2015Ivanhoe Mines appoints Livia Mahler as an independent direct...
3/24/2015CANADA STOCKS-TSX futures up as weak U.S. dollar lifts commo...
3/23/2015China-Based Zijin Mining Group to Acquire a 9.9% Stake in Iv...
3/3/2015' Exploration Team Receives the 2015 Thayer Lindsley Interna...
3/3/2015Ivanhoe Mines' Exploration Team Receives the 2015 Thayer Lin...
2/17/2015Ivanhoe Mines Reports Additional High-Grade Zinc, Copper, Si...
2/11/2015Ivanplats Is Platinum Sector's Top Performer in South Africa...
1/28/2015Ivanhoe Mines and Ivanplats Expand Challenge of Errors and M...
1/26/2015Ivanhoe Mines comments on share price
1/26/2015Ivanhoe Mines Comments on Share Price
1/16/2015Ivanhoe Mines files NI 43-101 prefeasibility study technical...
1/16/2015Ivanhoe Mines Files NI 43-101 Prefeasibility Study Technical...
1/12/2015OPEN LETTER: Ivanhoe Mines and Ivanplats Challenge Globe & M...
1/8/2015Ivanhoe Mines Releases Positive Results of Independent Pre-F...
12/9/2014Total job creation exceeds 650 following the resumption of s...
11/18/2013announces updated independent
Preliminary Economic Asses...
9/3/2013The New Ivanhoe Mines begins trading under the symbol IVN on...
8/28/2013Ivanplats changes its name to Ivanhoe Mines
8/3/2012changes name to Turquoise Hill ResourcesNew trading symbol "...
7/16/2012Rights to Cease Trading on New York Stock Exchange and NASDA...
6/27/2012"Regular Way" Trading of Ivanhoe Mines Rights Begins in the ...
6/13/2012Trading in Ivanhoe Mines Rights Begins June 14, 2012
4/25/2012Chalco and Ivanhoe Mines Note Status Of SouthGobi Resources
4/18/2012Photobook of Operations 2011
2/27/2012Altynalmas Gold Announces a Feasibility Mineral Reserve Esti...
2/22/2012CEO Robert Friedland a Keynote Speaker At International Mini...
12/13/2011receives decision in arbitration with Rio Tinto
10/3/2011Joint response from Ivanhoe Mines and Rio Tinto delivered to...
9/21/2011(Oyu Tolgoi)Challenges Unauthorized Remarks by Rio Tinto Representatives...
6/21/2011to Receive US$502 Million from Rio Tinto's Exercise of All O...
4/12/2011New Ivanhoe Mines Photobook of Operations
1/27/2011announces successful completion of rights offering
8/5/2008Australia Completes A$125 Million IPO
3/31/2008SouthGobi Energy Resources Receives Permit to Mine for the O...
8/2/2007issues clarification on Oyu Tolgoi Investment Agreement appr...
4/10/2007And Mongolian Government Reach Agreement In Principle On Dra...
3/19/2007Google Earth virtual tour of Ivanhoe's Oyu Tolgoi Copper & G...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (IVN.TO)FRANKFURT (IHM.F)
20.36+5.93%0.688+5.20%
TORONTO
CA$ 20.36
04/26 17:00 1.14
5.93%
Prev close Open
19.22 19.62
Low High
19.48 20.45
Year l/h YTD var.
12.83 -  20.36 58.69%
52 week l/h 52 week var.
9.94 -  20.36 67.02%
Volume 1 month var.
7,077,403 29.19%
24hGold TrendPower© : 34
Produces Gold - Iron
Develops Copper - Gold
Explores for Copper - Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/1/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202468.40%
202312.99%14.0110.24
20228.35%9.9810.05
202143.95%9.9910.00
202068.97%6.961.80
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :