VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 15, 2012) -

(All figures are in United States dollars unless otherwise stated)

Silvercorp Metals Inc. ("Silvercorp" or the "Company") (News - Market indicators)(NYSE:SVM) is pleased to report the results of an updated National Instrument ("NI") 43-101 Technical Report with an effective date of June 30, 2012, prepared by AMC Mining Consultants (Canada) Ltd. ("AMC") covering the BYP gold-lead-zinc property (the "Property" or the "BYP mine") in Hunan Province, China (the "BYP 2012 Technical Report") which will be made available for review on the SEDAR system at www.sedar.com and on the Company's website at www.silvercorp.ca in due course.

The BYP 2012 Technical Report estimates that Indicated Resources (gold zones plus lead-zinc zones) total 10.84 million tonnes averaging 2.59 grams per tonne ("g/t") gold, 1.16% lead and 2.52% zinc, and contain 292,000 ounces of gold, 187 million pounds of lead and 408 million pounds of zinc. Estimated Inferred Resources (gold zones plus lead-zinc zones) total 10.02 million tonnes averaging 1.84 g/t gold, 0.85% lead and 2.75% zinc, and contain 146,000 ounces of gold, 141 million pounds of lead and 457 million pounds of zinc.

The six authors of the BYP 2012 Technical Report all qualify as independent Qualified Persons. Four AMC Qualified Persons visited the BYP mine in February 2012, with one re-visiting in April 2012, and examined all aspects of the project. The previous publicly released Technical Report (see news release dated July 5, 2011) was dated effective June 15, 2011 (the "2011 Technical Report") and was prepared by a different author.

2012 Mineral Resources Summary

In late 2010 and early 2011, Silvercorp carried out a sampling program along drifts and crosscuts for the dual purpose of verifying previous exploration data and collecting a reliable data set for a resource update. Later in 2011, Silvercorp undertook an extensive underground exploration program comprised of tunneling, geological logging of previous and current tunnels, and channel sampling on the 252 metre ("m") Level, to further delineate the spatial distribution of the major mineralization zones and to verify, upgrade and expand known historic mineral resources. The 2011 program was mainly focused on Gold Zones 3 and 3-1 and Lead-Zinc Zones II, IV and XII at the 252m Level.

Silvercorp began a surface and underground core drilling program in March 2011. The program included 20 surface drillholes of 8,726m and 23 underground drillholes of 3,021m for a total of 11,747m on the Property. As a result of this drill program, Silvercorp upgraded the gold resource of Gold Zone 3, expanded Gold Zones 1 and 3-1 and discovered new Gold Zones 1-4 and 1-5. Drilling also re-evaluated and confirmed Zone XII as a lead-zinc-polymetallic zone and previously delineated lead-zinc zones were further defined.

During the 2011 exploration program a total of 4,950 geochemical samples, including 3,851 core samples and 1,099 channel samples, were collected on the Property.

The resource estimates for the Property were carried out by Yongwei Li, Senior Resource Geologist for Silvercorp. They were checked and verified, and the classification adjusted, by independent Qualified Person D. Nussipakynova, P.Geo of AMC, who takes responsibility for the estimates.

Table 1: Mineral Resources for Gold Zones as of December 31, 2011

Class Cut Off Grade (g/t) Tonnes (M) Au (g/t) Au Metal (K oz)
Indicated 1.0 3.51 2.59 292
Inferred 1.0 2.47 1.84 146

Table 2: Mineral Resources for Lead and Zinc Zones as of December 31, 2011

Class Cut Off Grade (%) Tonnes (M) Pb (%) Zn (%) Pb Metal (M lb) Zn Metal (M lb)
Indicated 2.0 Pb+Zn 7.33 1.16 2.52 187 408
Inferred 2.0 Pb+Zn 7.55 0.85 2.75 141 457

Notes to both Tables 1 and 2
1. CIM definitions apply
2. Mined tonnages deducted
3. Resources are rounded to nearest 10,000 tonnes
4. Cut-off grades are based on mining, processing and G & A costs of $38/t.

As discussed above, additional drilling has been carried out since the previously published resource estimate contained in the 2011 Technical Report. Tables 3 and 4 show a comparison between the BYP 2012 Technical Report (December 31, 2011 data) and the 2011 Technical Report (June 15, 2011 data). The decrease in average gold grades is attributed mainly to the 2011 Technical Report estimate being based primarily on historical data, including limited data from Silvercorp's underground sampling from pre-2011 tunnels, which related mainly to the higher grade Gold Zone 3.

Silvercorp's exploration program later in 2011 delineated additional low grade gold zones, which reduced the average resource grade while increasing the tonnage. The increase in the tonnage of Indicated lead-zinc resources in the BYP 2012 Technical Report from zero as set out in the 2011 Technical Report is due to the additional drilling undertaken in 2011. The decrease in total resources from the 2011 Technical Report is due mainly to geological reinterpretation based on the additional drilling.

Table 3: Comparison of Gold Resources at Au 1 g/t Cut-off Grade

  December 2011 June 2011
  Indicated Inferred Indicated Inferred
Tonnes (M) 3.51 2.47 2.14 2.82
Au (g/t) 2.59 1.84 3.27 2.29
Oz (k) 292 146 225 208

Table 4: Comparison of Lead- Zinc Resources at 2% Pb+Zn Cut-off Grade

  December 2011 June 2011
  Indicated Inferred Inferred
Tonnes (M) 7.33 7.55 17.57
Pb (%) 1.16 0.85 0.95
Zn (%) 2.52 2.75 2.57
Pb Metal (M lb) 187 141 366
Zn Metal (M lb) 408 457 995

If mining costs increase to around $60/t, as anticipated in Silvercorp's preliminary production plans for fiscal year 2013, gold Resources would only be marginally affected, with contained gold decreasing by around 6%. However, lead-zinc Resources would be substantially affected, with contained lead plus zinc decreasing by 40-45%.

Silvercorp has been working on a production plan and schedule and an estimate of mineral reserves, but these were not complete at the time of writing of the 2012 BYP Technical Report. However, AMC is satisfied that the mineral resources as set out in the 2012 BYP Technical Report have reasonable prospects of economic extraction and that the mine appears to be economic at current metal prices and site costs.

BYP Mine Infrastructure

There is an existing 500 tonne per day plant which is used to process both lead-zinc sulphide mineralization and gold mineralization, each treated separately in campaigns. Lead-zinc flotation uses both the lead and zinc flotation circuits to produce separate concentrates, while gold flotation uses the lead flotation circuit to produce a gold-bearing pyrite concentrate.

As set out in the 2012 BYP Technical Report, a tailings management facility ("TMF") is located in a valley approximately one kilometre ("km") southwest of the processing plant and 400m northeast of Yaposhan Village, and started operations in August 2011. It has a working volume of 245,000m3 and a currently expected life to late 2013. The life will be extended once the paste backfill plant is operational. Geochemical properties of the tailings were assessed by a single-element analysis (gold). No leaching tests have been carried out to determine the potential for metal leaching. Water used for mineral processing is treated before being discharged to the TMF. About 75% to 85% of the process water is recycled back to the mill plant for reuse.

A permanent mine waste dump, with a remaining capacity of about 21,000m3, is located on the eastern part of the mine site. Based on Silvercorp`s current development intentions, including the construction of a paste backfill plant, approximately 5,000m3 of waste rock is expected to be moved to surface during the remaining mine life.

Mine power is sourced from the Xintianpu 35/10 kilovolt ("kV") substation via a 10 kV high voltage line. There are two backup generators at site to provide power for underground ventilation, dewatering and accommodations in case of an unexpected power failure.

A paved provincial highway runs across the south margin of the Property. The processing plant, underground portal areas and tailings storage areas are connected to the provincial highway by a three km paved road. A network of gravel roads links the mine camp to the underground adits, process plant, waste dump, water supply areas and TMF.

Domestic water for the mine is pumped from a pond in the southeast part of the mine site. Silvercorp conducts routine tests and monitors for water quality to ensure the water meets safety and sanitary requirements. Water for drilling and dust suppression underground is sourced from an underground sump.

Other infrastructure includes a camp, contractor housing, surface maintenance workshop, explosives magazine, fuel farm, administration building, warehouse, concentrate storage facility and assay laboratory. An underground harmful gas monitoring system is under construction.

Permitting

The existing mining permits for the BYP project, in conjunction with safety and environmental certificates, cover all the active mining areas and provide for the right to carry out full mining and mineral processing operations.

The BYP mine is currently permitted for the extraction of lead and zinc and an application has been submitted to allow the extraction of gold. There is no known hindrance to granting of the gold extraction permit, and AMC states in the BYP 2012 Technical Report that it understands the mining / processing of gold mineralization prior to formal receipt of a permit not to be unusual in China.

Qualified Persons

P R Stephenson, P. Geo., H A Smith, P. Eng., A Riles, MAIG, M Molavi, P. Eng., D. Nussipakynova, P. Geo. and A. Ross, P. Geo. of AMC Mining Consultants (Canada) Ltd. are Qualified Persons as defined by National Instrument 43-101. All have reviewed and consented to this news release and believe it fairly and accurately represents the information in the Technical Report that supports the disclosure.

Myles Gao, P.Geo., President and Chief Operating Officer of Silvercorp, is the Qualified Person for Silvercorp under NI 43-101 and has reviewed and given consent to this news release.

About Silvercorp

Silvercorp Metals Inc. is engaged in the acquisition, exploration, development and mining of high-grade silver-related mineral properties in China and Canada. Silvercorp is the largest primary silver producer in China through the operation of the four silver-lead-zinc mines at the Ying Mining District in the Henan Province of China. Silvercorp recently acquired the XBG and XHP silver-gold-lead-zinc mines nearby the Ying Mining District in Henan Province, further consolidating the region. Silvercorp has commenced production at its second production foothold in China, the BYP gold-lead-zinc project in Hunan Province, and is currently constructing the mill and related facilities in preparation for mining at the GC silver-lead-zinc project in Guangdong Province. In Canada, Silvercorp is preparing an application for a Small Mine Permit for the Silvertip high grade silver-lead-zinc mine project in northern British Columbia to provide a further platform for growth and geographic diversification. The Company's shares are traded on the New York Stock Exchange (symbol: SVM) and Toronto Stock Exchange (symbol: SVM) and are included as a component of the S&P/TSX Composite and the S&P/TSX Global Mining Indexes.

CAUTIONARY DISCLAIMER -- FORWARD LOOKING STATEMENTS

Certain of the statements and information in this press release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. Forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; the sufficiency of the Company's capital to finance the Company's operations; estimates of the Company's revenues and capital expenditures; estimated production from the Company's mines in the Ying Mining Camp; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licences; title to properties; First Nations title claims and rights; property interests; joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company's existing operations; competition; operations and political conditions; regulatory environment in China and Canada; environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form for the year ended March 31, 2011 under the heading "Risk Factors". Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.



Silvercorp Metals Inc.
Rui Feng
Chairman & CEO
(604) 669-9397 or Toll Free 1(888) 224-1881
or
Silvercorp Metals Inc.
Jonathan Hackshaw
Investor Relations Director
(604) 669-9397 or Toll Free 1(888) 224-1881
(604) 669-9387 (FAX)
info@silvercorp.ca
www.silvercorp.ca
Data and Statistics for these countries : Canada | China | All
Gold and Silver Prices for these countries : Canada | China | All

Silvercorp Metals Inc.

PRODUCER
CODE : SVM.TO
ISIN : CA82835P1036
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Silvercorp Metals is a silver producing company based in Canada.

Silvercorp Metals produces silver, gold, lead and zinc in China, develops gold, lead, silver and zinc in China, and holds various exploration projects in Canada.

Its main assets in production are YING MINE, BYP, HPG MINE, TLP MINE and XBG in China, its main assets in development are LM MINE, GAOCHENG (GC) and SHIMENTOU (SMT) in China and its main exploration properties are NA BAO and GC in China and SILVERTIP in Canada.

Silvercorp Metals is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 758.7 millions as of today (US$ 555.2 millions, € 518.9 millions).

Its stock quote reached its lowest recent point on December 21, 2001 at CA$ 0.02, and its highest recent level on October 02, 2020 at CA$ 9.97.

Silvercorp Metals has 167 850 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Silvercorp Metals Inc.
2007 Annual Report
Financings of Silvercorp Metals Inc.
6/25/2011Announces TSX Approval Of Share Repurchase Program
7/6/2009Responds to Klondex’s Directors’ Circular and Completed Priv...
4/6/2006(Hpg Mine)arranges bought deal financing to raise $41,542,500
Option Grants of Silvercorp Metals Inc.
9/6/2012AGM Rescheduled To Friday September 28, 2012; Board Proposes...
1/11/2012Received RMB 269 Million Cash Dividend From Its Chinese Subs...
Nominations of Silvercorp Metals Inc.
9/16/2013Silvercorp - Silvercorp Announces Appointment of Senior Vice...
11/8/2012Announces Management Appointments
11/28/2011Announces New Director Appointment
Financials of Silvercorp Metals Inc.
9/22/2015Silvercorp Reports 2015 AGM Results
8/19/2015Silvercorp to Return to Single Listing Status
8/13/2015Silvercorp Reports Q1 Fiscal 2016 Financial And Operating Re...
8/13/2015Silvercorp posts 1Q profit
2/13/2014Silvercorp - Silvercorp Reports Financial and Operating Resu...
11/14/2013Silvercorp - Silvercorp Reports Financial and Operating Resu...
8/9/2013Silvercorp - Silvercorp Reports Financial and Operating Resu...
5/22/2013SilverCorp - Silvercorp Reports Financial and Operating Resu...
5/22/2013Reports Financial and Operating Results for the Fourth Quart...
2/13/2013SilverCorp - Silvercorp Reports Financial and Operating Resu...
11/14/2012SilverCorp - Silvercorp Reports Financial and Operating Resu...
11/13/2012Reports Financial and Operating Results for the Second Quart...
8/3/2012Reports Financial And Operating Results For The First Quarte...
2/8/2012Reports Revenue of $61.9 Million and Operating Cash Flow of ...
10/25/2011Receives Clear Forensic Accountants Report
8/3/2011Reports Net Income Up 82% to $25.6 Million or $0.15 Per Shar...
6/3/2011Form 40-F Available on Website
5/12/2011Reports Record Silver Production Of 5.3 Million Ounces, Rec...
5/13/2010Net Income Of $9.8 Million And Cash Flow Of $23.8 Million In...
11/9/2009Reports Net Income Of $8.9 Million And Cash Flow Of $15.9 Mi...
8/13/2009Reports Net Income of $7.5 Million ($0.05 EPS) on Record Sil...
5/14/2009Financial And Operating Results For The 4th Quarter And Fisc...
2/13/2009Announces Its Financial And Operating Results For The 3rd Qu...
11/17/2008Second Quarter Dividend - CAD$0.02
11/14/2008Announces Its Financial And Operating Results For The 2nd Qu...
5/16/2007to Report 2007 Fourth Quarter and Year End Results on June 1...
Project news of Silvercorp Metals Inc.
11/23/2015(Tlp Mine)Silvercorp Reports Newly Exposed Mineralization At The TLP M...
6/11/2013SilverCorp - Silvercorp Reports Exploration Results at the H...
6/11/2013(Hpg Mine)Reports Exploration Results at the HPG Mine, Ying Mining Dis...
6/6/2013SilverCorp - Silvercorp Reports Underground Exploration Resu...
6/4/2013SilverCorp - Silvercorp Reports Results From Its 2012 Explor...
4/15/2013SilverCorp - Silvercorp Reports Underground Diamond Drilling...
2/20/2013SilverCorp - Silvercorp Intercepts 33.29 Metres True Width G...
9/17/2012(Gc)GC Project Construction Progress Photo Album - Sep 17, 2012
8/27/2012(Tlp Mine)Intercepts High-Grade Silver-Lead-Zinc Mineralization At The...
8/16/2012(Byp)Reports Resource Update for Its BYP Mine in Hunan Province, ...
8/1/2012(Ying Mine)Reports Intercept of 10.87 Meters Grading 715 Grams per Tonn...
6/6/2012Reports Significant Gain In Measured And Indicated Mineral R...
5/18/2012Reports Record Silver Production Of 5.6 Million Ounces, Reco...
2/13/2012(Lm Mine)Reports 4.34 metre interception (true width) of 642 gram per...
1/31/2012(Gc)Announces Positive Pre-Feasibility Study for the GC Silver-L...
1/26/2012(Lm Mine)Reports Intercept of 7.39 Meters Grading 678 Grams per tonne...
1/26/2012(Lm Mine)Reports Intercept of 7.39 Meters Grading 678 Grams Per Tonne...
1/17/2012(Gc)Surface Diamond Drilling Intercepted 3.13 Meters of 432 Gram...
1/6/2012(Gc)Provides Progress Update on its GC Project in Guangdong Prov...
8/22/2011(Xbg)Acquires High Grade XBG Silver-Gold-Lead-Zinc Property in Lu...
7/7/2011(Ying Mine)Reports Resource and Reserves Update at Ying Silver-Lead-Zin...
7/6/2011(Silvertip)Reports Resources Estimate On The Silvertip Silver-Lead-Zinc...
7/5/2011(Byp)Reports Resources Estimate on the BYP Gold-Lead-Zinc Propert...
5/5/2011(Byp) Diamond Drilling Intercepts 69.5 Metres Grading 5 g/t Gold ...
2/17/2011(Silvertip)Announces Positive Preliminary Assessment For The Silvertip ...
2/3/2011(Byp)Closes Acquisition Of BYP Gold-Lead-Zinc Mine In Hunan Pro...
1/31/2011(Ying Mine)Underground Drilling Intercepts 2.0 Metres Grading 1,593 Gra...
1/21/2011(Ying Mine)Underground Drilling Intercepts 14.62 Metres Grading 363 Gra...
8/4/2010(Gaocheng (gc))Submits Mining Permit Application
7/26/2010(Ying Mine)Heavy Rain Fall Affects Operations At Ying Mining District
6/14/2010(Gaocheng (gc))Receives Environmental Permit
3/1/2010(Ying Mine)Reports Proven & Probable Reserves Estimate At Ying Mining D...
6/29/2009(Gaocheng (gc))Measured and Indicated Silver Resources Increase by 250% at ...
1/8/2009(Gaocheng (gc))Drilling Intersects High-Grade Silver Mineralization in V2 a...
12/19/2008(Lm Mine)Technical Report Completed On The TLP-LM Project, Henan Prov...
1/21/2008Discovers High Grade Polymetalic Mineralization at the Na-Ba...
2/14/2006(Ying Mine)environment assessment report for developing the Ying Silver...
Corporate news of Silvercorp Metals Inc.
7/27/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
5/26/2016Silvercorp reports 4Q loss
5/26/2016Silvercorp Reports Silver Production Of 5.0 Million Ounces, ...
12/23/2015Silvercorp Announces New Share Repurchase Program
8/20/2015Silvercorp to Return to Single Listing Status
2/19/2014Silvercorp - Silvercorp Intercepts 1.42 Metre Interval Gradi...
2/6/2014Silvercorp - Silvercorp to Release Third Quarter Fiscal 2014...
12/20/2013Silvercorp - Silvercorp Notes Regulators Allege Fraud in Act...
11/15/2013Silvercorp - Silvercorp Declares Quarterly Cash Dividend of ...
10/18/2013Silvercorp - Silvercorp Announces Senior Management and Dire...
10/18/2013Announces Senior Management and Director Changes
9/21/2013Silvercorp - Silvercorp Reports 2013 AGM Results
9/20/2013Reports 2013 AGM Results
9/12/2013Silvercorp - Silvercorp Provides Operation Update for Ying M...
9/12/2013Provides Operation Update for Ying Mining District
8/9/2013Silvercorp - Silvercorp Declares Quarterly Cash Dividend of ...
8/8/2013Declares Quarterly Cash Dividend of CAD$0.025
7/30/2013Silvercorp - Silvercorp to Release Financial and Operating R...
7/30/2013to Release Financial and Operating Results for the First Qua...
6/4/2013Reports Results From Its 2012 Exploration Program at the SGX...
5/23/2013SilverCorp - Silvercorp Declares Quarterly Cash Dividend of ...
5/6/2013to Release Audited Year-End Results for Fiscal 2013 on May 2...
5/6/2013to Release Audited Year-End Results for Fiscal 2013 on May 2...
4/15/2013Reports Underground Diamond Drilling and Tunneling Explorati...
4/3/2013SilverCorp - Silvercorp Responds to Recent Press Article Abo...
4/3/2013Responds to Recent Press Article About the Company
3/25/2013A Shareholder Class Action Was Filed But Does Not Include Ce...
3/13/2013SilverCorp - Silvercorp Provides Update Regarding Defamation...
3/13/2013Provides Update Regarding Defamation Case and Class Action
2/20/2013Intercepts 33.29 Metres True Width Grading 151 g/t Silver, 0...
2/15/2013SilverCorp - Silvercorp Issues Correction to Dividend Record...
2/14/2013SilverCorp - Silvercorp Declares Quarterly Cash Dividend of ...
2/13/2013SilverCorp - Silvercorp Provides Outlook for Fiscal 2014
2/13/2013Provides Outlook for Fiscal 2014
2/7/2013Discovers Five New High-Grade Silver Zones and Extends Known...
1/31/2013SilverCorp - Silvercorp Intercepts 18.8 Metres True Width Gr...
1/29/2013SilverCorp - Silvercorp Share Repurchase Program Approved by...
1/26/2013SilverCorp - Silvercorp: Open Letter from Chairman
1/24/2013SilverCorp - Silvercorp Responds to Class Action Lawsuits
1/24/2013Responds to Class Action Lawsuits
11/14/2012SilverCorp - Silvercorp Announces Dividend of CAD$0.025
10/29/2012to Release Results for Fiscal 2013 Second Quarter on Novembe...
10/18/2012(Gc)Reports Intercept of 2.12 Metres Grading 1,684 Grams Per Ton...
9/28/2012Reports 2012 AGM Results
9/6/2012(Gc)Reports Intercept of 3.88 Metres Grading 609 Grams Per Tonne...
8/20/2012(Lm Mine)Reports Intercept of 4.55 Metres Grading 2,196 Grams per Ton...
8/3/2012Announces First Quarter Dividend Of CAD$0.025
7/25/2012to Release First Quarter 2013 Results on August 2 and Host C...
7/5/2012(Silvertip)Reports Independent Mineral Resource Estimates on Silvertip ...
6/5/2012Reports Significant Gain in Measured and Indicated Mineral R...
5/28/2012(Ying Mine)Provides Update on Production at the Ying Mine in Henan Prov...
5/19/2012Announces Fourth Quarter Dividend Of CAD$0.025
5/17/2012Reports Record Silver Production of 5.6 Million Ounces, Reco...
4/30/2012to Announce Fourth Quarter and Year End Results & Hold Analy...
2/10/2012Announces Third Quarter Dividend Of CAD$0.025
2/9/2012Forecasts 20% Increase In Silver Production For Fiscal Year ...
1/9/2012Sues Jon R. Carnes, his EOS Holdings and Zane Heilig as “Alf...
12/30/2011to Commence Work on Resource and Reserve Updates
12/21/2011Chinese Law Enforcement Agents Open Criminal Case to Investi...
12/8/2011Fiscal 2012 Drilling Exploration Program Update
10/26/2011Statement From Chairman
9/28/2011’s 2011 China Investor Tour Pictures
9/23/2011Files Lawsuit In New York Against Stock Manipulation Scheme
9/22/2011Open Letter From Chairman - Key Points
9/15/2011Repurchases Over $31 Million Of Shares Under NCIB
9/14/2011Responds To Second Anonymous Allegation And Provides Governm...
9/12/2011On Progress To Identify The Anonymous Letter Writer And To R...
8/31/2011Repurchases In Excess Of 2 Million Shares Under Normal Cours...
8/26/2011On Normal Course Issuer Bid
8/11/2011Update on Normal Course Issuer Bid
8/4/2011Announces First Quarter Dividend Of CAD$0.02
7/25/2011to Announce First Quarter Results & Hold Analyst Conference ...
7/14/2011Reports: Record Silver Production Of 1.6 Million Ounces And ...
7/11/2011Reports 24% Year Over Year M&I Silver-Equivalent Resource Gr...
6/21/2011Announces Share Repurchase Program
6/9/2011Henan Subsidiary Ranked as the 7th Strongest Company in Luoy...
5/12/2011Announces Fourth Quarter Dividend Of Cad$0.02
4/28/2011to Announce Fourth Quarter Results & Hold Analyst Conference...
2/9/2011Announces Q3 Dividend Of CAD$0.02
8/13/2010Q1 Dividend Of CAD $0.02
8/13/2010Reports Record Silver Production for Q1 of Fiscal 2011: Sale...
7/31/2010Files Preliminary Base Shelf Prospectus
5/13/2010Declaration of Quarterly Dividend-CAD$0.02
2/22/2010to Acquire Advanced Stage Silver-Lead-Zinc Project in Britis...
2/10/2010Declaration Of Quarterly Dividend - CAD$0.02
11/25/2009to Present and Exhibit at Mines & Money London Show on Dec. ...
11/10/2009Announces Declaration Of Quarterly Dividend - CAD$0.02
11/3/2009Lists on New York Stock Exchange
10/1/2009Annual General Meeting Results
9/28/2009Reminder: Silvercorp Metals Annual General Meeting – Septemb...
8/14/2009Announces Declaration of Quarterly Dividend - CAD$0.02
7/22/2009Announces It Has Terminated Its Offer To Klondex Shareholder...
7/20/2009Announces That Its Offer To Klondex Shareholders Will Expire
6/15/2009Formally Commences Offer to Acquire All of the Outstanding S...
6/8/2009Announces its Intention to Make an Offer to Acquire Klondex ...
6/3/2009Responds to Stock Trading Activity
2/17/2009Commences Trading On NYSE Alternext US
2/13/2009 Announces Declaration Of Quarterly Dividend - Cad$0.02
3/13/2008$50 Million Exploration and Development Program Budgeted for...
2/15/2008 RECORDS $0.12 EPS FOR Q3 FISCAL 2008 ENDED DECEMBER 31, 200...
12/12/2007to Build A New 2,000 Tonne Per Day Mill For The Ying Silver ...
12/7/2007Announces Additions to its Senior Management Team
4/16/2007Signed Agreement to Participate in Constructing a New Lead S...
4/12/2007Commencement of Drill Program on the NPG Molybdenum Project ...
3/31/2006(Ying Mine)receives mining permit on Ying Silver Project, Henan, China
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (SVM.TO)NYSE (SVM)
4.52-6.61%3.31-6.76%
TORONTO
CA$ 4.52
04/26 17:00 -0.320
-6.61%
Prev close Open
4.84 4.90
Low High
4.47 4.90
Year l/h YTD var.
3.04 -  5.27 32.55%
52 week l/h 52 week var.
2.92 -  5.27 -8.50%
Volume 1 month var.
1,601,524 6.10%
24hGold TrendPower© : 28
Produces Gold - Lead - Silver - Zinc
Develops Gold - Lead - Silver - Zinc
Explores for Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/29/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202427.68%
2023-11.06%5.593.23
2022-19.92%5.412.74
2021-41.60%9.654.31
202015.47%9.9710.06
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :