Hudson Resources Inc

Published : December 07th, 2011

Reports Robust Preliminary Economic Assessment (PEA) for the Sarfartoq Rare Earth Project in Greenla

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   China | Greenland | Growth | Rare Earth | Recovery |
FOR IMMEDIATE RELEASE
December 7, 2011
Trading Symbol: TSX-V:HUD, OTCQX: HUDRF
NR2011-15

HUDSON REPORTS ROBUST PRELIMINARY ECONOMIC ASSESSMENT (PEA) FOR THE SARFARTOQ RARE EARTH PROJECT IN GREENLAND

Vancouver, BC - HUDSON RESOURCES INC. (�Hudson� or �the Company� � TSX-V: �HUD�, OTCQX: �HUDRF�) is pleased to announce the results of the Preliminary Economic Assessment (�PEA� or �Study�) completed by Wardrop, A Tetra Tech Company (Tetra Tech) on the Sarfartoq rare earth project in Greenland. This study was based solely on the NI 43-101 Mineral Resource Estimate released on January 4, 2011, which defined an inferred resource of 14.1M tonnes averaging 1.51% total rare earth oxides (TREO) for the ST1 Zone and does not incorporate 2011 drill results.

Highlights of the Study include:
  • Net Present Value of $616M at a 10% discount rate, pre-tax

  • Internal rate of return (IRR) of 31.2% and a 2.7 year payback with a 21 year mine life

  • Capital costs of $343 million which includes a contingency of $60M, for a 2,000 tonne per day open-pit mine and processing facility

  • Operating costs of $105 per tonne to produce an REO carbonate concentrate

  • Rare earth oxide prices of $32/kg were utilized, based on the three-year trailing FOB China average price as of October 2011, which were discounted by 43% to reflect the difference between rare earth carbonate concentrate and separated individual rare earth oxide prices. The price of $32/kg is a 74% discount to October 2011 FOB Spot prices

  • Annual rare earth carbonate concentrate production of 6,500 tonnes

  • The proposed metallurgical flowsheet includes bastnaesite and monazite flotation, leaching, acid bake solvent extraction and precipitation to produce a 42-45% REO carbonate product. An overall recovery rate of 64% was used for the study
James Tuer, Hudson�s President, stated, �We are very pleased with the results of the PEA which demonstrate the robust economics of the project. Having the project located adjacent to tidewater provides significant economic benefits in both capital and operating costs. Looking ahead, we expect to have an updated resource estimate completed in early 2012, which will incorporate all of the 2011 drill results which includes dozens of high-grade sections from 2.0% to 6.5% TREO. We plan to update the PEA with the results of the updated resource estimate in early 2012. As the project economics are quite sensitive to grade, we are optimistic that higher project valuations will be reported in the updated PEA.

Our plans for 2012 include the commencement of a prefeasibility study and an extensive drill program which will further delineate the high grade zones we encountered in 2011 as we well as other prospective targets that have been identified around the 32 km circumference of the Sarfartoq Carbonatite Complex. With current working capital of $12.5M, we anticipate accomplishing our entire 2012 program with our current treasury.�

The following table presents a list of the Project parameters and assumptions derived from the PEA and cash flow model.
-------------------------------------------------------------------------------------------------------------------------
MINING
Mineralized material mined 14,303,139 mt
Waste mined 140,605,204 mt
Total mined 154,908,343 mt
Strip ratio 9.83  
-------------------------------------------------------------------------------------------------------------------------
PROCESSING
Run-of-Mine Feed 2,000 t/d
Mining recovery 95 %
Mining dilution 5 %
-------------------------------------------------------------------------------------------------------------------------
RESOURCE GRADE OF TREO 1.51 %
-------------------------------------------------------------------------------------------------------------------------
RECOVERIES
Overall Recovery 64 % Base case
-------------------------------------------------------------------------------------------------------------------------
TOTAL TREO OXIDES IN CONCENTRATE 132,544 t
-------------------------------------------------------------------------------------------------------------------------
RE OXIDE PRICES (FOB CHINA)
La2O3 $41.6   3 year Average US$/kg
Ce2O3 $39.4   3 year Average US$/kg
Pr2O3 $76.9   3 year Average US$/kg
Nd2O3 $88.3   3 year Average US$/kg
Sm2O3 $37.1   3 year Average US$/kg
Eu2O3 $1,134.1   3 year Average US$/kg
Gd2O3 $53.0   3 year Average US$/kg
Tb2O3 $963.3   3 year Average US$/kg
Dy2O3 $512.0   3 year Average US$/kg
Y2O3 $54.4   3 year Average US$/kg
 
SARFARTOQ TREO DISTRIBUTION (AS PER INFERRED RESOURCE)
La2O3 21.0 %
Ce2O3 50.0 %
Pr2O3 5.8 %
Nd2O3 19.1 %
Sm2O3 1.9 %
Eu2O3 0.4 %
Gd2O3 1.4 %
Tb2O3 - %
Dy2O3 0.1 %
Y2O3 0.3 %
TREO 100.0 %
 
TREO � Calculated Contained Oxides 56.4 US$/kg
TREO � Base Case 32 US$/kg
Discount to account for REO carbonate product 43 %
-------------------------------------------------------------------------------------------------------------------------
GROSS OXIDE VALUES TREO $4,241,409,596 US$
-------------------------------------------------------------------------------------------------------------------------
EXCHANGE RATE US$/CAN$ 1.009 CAN$
-------------------------------------------------------------------------------------------------------------------------
NET REVENUE (CAN $) $4,279,582,283 CAN$
-------------------------------------------------------------------------------------------------------------------------
OPERATING COSTS (per t milled material)
Mining $35.91 CAN$/t
Processing $63.04 CAN$/t
G & A $1.75 CAN$/t
Sustaining Capital $2.68 CAN$/t
Salvage -$0.09 CAN$/t
Mine Closure and reclamation $0.14 CAN$/t
Operating Capital $1.34 CAN$/t
Supplies and Materials Transportation $0.05 CAN$/t
Material Transport from Mine to Mill (Conveying) $0.50 CAN$/t
TOTAL OPERATING COST $105.32 CAN$/t
-------------------------------------------------------------------------------------------------------------------------
CAPITAL COSTS
 
DIRECT COSTS
Site Development $38,663,000 CAN$
Site Utilities $5,978,077 CAN$
Tailings Management Facilities $3,783,400 CAN$
Open Pit Mining $24,133,000 CAN$
Material Processing Facilities $96,220,969 CAN$
Hydro metallurgical Plant $41,195,601 CAN$
Non-Process Buildings $9,885,001 CAN$
SubTotal Direct Costs $219,859,048 CAN$
 
INDIRECT COSTS
Indirect Construction Costs $12,962,500 CAN$
Owner's Costs $8,267,500 CAN$
Contingency $60,372,262 CAN$
EPCM $41,053,138 CAN$
SubTotal Indirect Costs $122,655,400 CAN$
 
TOTAL CAPITAL COST $342,514,448 CAN$
-------------------------------------------------------------------------------------------------------------------------


The financial model cash flow and net present value for various discount rates are shown below.
-------------------------------------------------------------------------------------------------------------------------
PRE-TAX CASH FLOW
Net Revenue $4,279,582,283 CAN$
Operating Cost $1,515,316,566 CAN$
Capital Costs $342,514,448 CAN$
-------------------------------------------------------------------------------------------------------------------------
TOTAL PRE-TAX CASH FLOW $2,764,265,717 CAN$
-------------------------------------------------------------------------------------------------------------------------
PAYBACK Year 3  
-------------------------------------------------------------------------------------------------------------------------
PRE-TAX & PRE FINANCE NPV @ 6% $1,038,161,293 CAN$
PRE-TAX & PRE FINANCE NPV @ 8% $797,700,033 CAN$
PRE-TAX & PRE FINANCE NPV @ 10% $616,448,196 CAN$
PRE-TAX & PRE FINANCE NPV @ 12% $477,834,034 CAN$
PRE-TAX & PRE FINANCE NPV @ 15% $325,688,225 CAN$
-------------------------------------------------------------------------------------------------------------------------
PROJECT INTERNAL RATE OF RETURN (IRR) 31.17 %
-------------------------------------------------------------------------------------------------------------------------
All $ values are in $CAN unless otherwise specified.

Proposed Mining Plan and Processing

For the Study, Tetra Tech determined that the mining operation will use a conventional open pit mining method (truck and shovel). The mine will provide mill feed at a rate of 2,000 t/d beginning the first year of the mine life. The overall mining sequence was developed in three phases: a starter pit (Phase I) and two pushback phases (Phase II and Phase III). The mine development for the mineralized material and the waste will progress using 10m high benches. The ultimate pit design for the selected pit contains 14.3 Mt of Inferred Resource. The average in situ grades over the LOM will be 1.51% TREO.

For the purpose of this evaluation, it was assumed that the Company would produce and sell a rare earth carbonate concentrate, composed of 42% to 45% rare earth oxide. To determine a price, a notional 43% discount was used on three-year trailing average prices (October 2011). This resulted in a price of $32/kg of contained rare earth oxides. The company is planning further studies, which will investigate the costs and benefits of producing a separated oxide product.

The flowsheet utilized in the PEA, while preliminary in nature, is based on assumptions from mineralogy, and incorporates recent metallurgical testwork from the Saskatchewan Research Council (SRC) which demonstrated successful extraction of rare earths utilizing acid baking and leaching. Test work showed that two hours of baking, at 220�C and approximately one tonne of acid per tonne of mineralized feed (concentrate) recovers 94% of the TREO.

Sarfartoq Project Background

Hudson�s Sarfartoq rare earth element project in Greenland has outlined a 43-101 compliant inferred resource of 14.1Mt at 1.5% TREO at the ST1 Zone. The ST1 Zone represents one of the industry�s highest ratios of neodymium and praseodymium to TREO, totaling 25%, based on the inferred resource. The ST1 Zone contains over 40 million kilograms of neodymium oxide, which is the key component in permanent magnets and the fastest growth sector of the rare earths industry. A total 16,514m over 71 holes were drilled this year. In addition, a five tonne metallurgical sample was collected from surface at ST1.

The Sarfartoq REE project is located within 20 km of tidewater and only 60 km from Greenland�s international airport. The project is owned 100% by Hudson. The Company is currently well financed with approximately $12.5 million in working capital.

According to the cautionary statement required by NI 43-101, it should be noted that this assessment is preliminary in nature as it includes inferred mineral resources that cannot be categorized as reserves at this time and as such there is no certainty that the preliminary assessment and economics will be realized. The full Study will be available at the Company�s website www.hudsonresources.ca and on SEDAR www.SEDAR.com within 45 days.

Qualifications

Ms. Joanne Robinson, P.Eng., Mr. Doug Ramsey, R.P. Bio (BC), Mr. Daniel Coley, MBA, P.Eng. and Mr. Peter Broad, P.Eng. of Tetra TEch, Toronto, Ontario, were the qualified engineers responsible for the PEA study.

Ronald G. Simpson, B.Sc., P,Geo., President of Geosim Services Inc., is an independent Qualified Person as defined by NI 43-101 and is responsible for the resource estimate on the ST1 Zone and has verified the data disclosed in this release.

Dr. Michael Druecker is a qualified person as defined by National Instrument 43-101 and reviewed the preparation of the scientific and technical information in this press release.


FOR FURTHER INFORMATION:
HUDSON RESOURCES INC:
James Tuer, Chief Executive Officer
Phone: (604) 628-5002 or (604) 688-3415
email: tuer@hudsonresources.ca

Please visit our website at www.hudsonresources.ca



To forward this Press release to someone else this link



powered by phplist v 2.10.5, � tincan ltd
Data and Statistics for these countries : China | Greenland | All
Gold and Silver Prices for these countries : China | Greenland | All

Hudson Resources Inc

EXPLORATION STAGE
CODE : HUD.V
ISIN : CA44415F1036
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Hudson Res. is a silver and gold exploration company based in Canada.

Hudson Res. holds various exploration projects in Greenland.

Its main exploration properties are GARNET LAKE in Canada and SARFARTOQ in Greenland.

Hudson Res. is listed in Canada and in United States of America. Its market capitalisation is CA$ 4.0 millions as of today (US$ 3.2 millions, € 3.0 millions).

Its stock quote reached its highest recent level on February 02, 2007 at CA$ 2.41, and its lowest recent point on June 16, 2023 at CA$ 0.03.

Hudson Res. has 134 600 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Hudson Resources Inc
4/5/2011Closes Equity Financing and Overallotment Option Exercised f...
4/1/2011. Announces Signing of Underwriting Agreement and Pricing of...
4/12/2010CLOSES $5,000,000 PRIVATE PLACEMENT
3/12/2010ANNOUNCES PRIVATE PLACEMENT
12/16/2009Confirms $1.6M Raised by Exercise of Warrants
6/16/2009 Private Placement
Nominations of Hudson Resources Inc
11/6/2012Announces Appointment of Herb Wilson to Board
5/3/2010ANNOUNCES BOARD CHANGES AND APPOINTMENT OF CFO
Project news of Hudson Resources Inc
2/19/2014s Alumina Development Program at its White Mountain Anorthos...
11/27/2013Completes Community Meetings for the White Mountain Project ...
9/19/2013Produces High Quality Alumina From Its White Mountain Anorth...
1/23/2013Reports 94% Aluminum Extraction from Initial Leaching Testwo...
9/24/2012s Rare Earth Project and Introduces New Anorthosite Project ...
12/7/2011(Sarfartoq)Reports Robust Preliminary Economic Assessment (PEA) for the...
7/12/2011(Sarfartoq)Awards Sarfartoq REE Project Environmental Impact Study
6/9/2011(Sarfartoq)Awards Sarfartoq Rare Earth Project Preliminary Economic Ass...
4/14/2011(Sarfartoq)Presents Sarfartoq REE Project to European Parliament
2/21/2011(Sarfartoq)Clarifies Continuous Disclosure Statements
8/12/2010(Sarfartoq) Drills 310M of 1.0% treo including 94M of 1,8% treo at Sarf...
5/27/2010(Sarfartoq)Provides Update on Drilling Program at Sarfartoq Rare Earth ...
11/5/2009(Sarfartoq)Drill Results Confirm High Grade Rare Earth Zones on the Gre...
9/17/2009Reports Additional High Grade Rare Earth Assays from Greenla...
9/9/2009(Sarfartoq)Commences Drilling Greenland Rare Earth Project
8/11/2009Exploration Program Delineates Three High Grade Rare Earth D...
7/23/2009(Sarfartoq)Completes first phase of Rare Earth exploration program
2/20/2009(Garnet Lake)2008 Garnet Lake Bulk Sample Results and Additional High Gra...
12/5/2008(Sarfartoq)IDENTIFIES HIGH GRADE NIOBIUM, URANIUM & TANTALUM
9/10/2008(Garnet Lake)GREENLAND DIAMOND PROJECT SEPTEMBER UPDATE
Corporate news of Hudson Resources Inc
7/26/2016HUDSON COMMENCES CONSTRUCTION AT THE WHITE MOUNTAIN ANORTHOS...
4/19/2016HUDSON SIGNS MANDATE LETTER WITH THE EUROPEAN INVESTMENT BAN...
12/16/2015HUDSON CLARIFIES AND CORRECTS DISCLOSURE
12/15/2015Hudson Clarifies and Corrects Disclosure
10/2/2015HUDSON SIGNS EXPLOITATION LICENSE AND IMPACT BENEFIT AGREEME...
9/17/2015HUDSON CLOSES SECOND TRANCHE OF EQUITY FINANCING FOR TOTAL P...
9/11/2015HUDSON AWARDED 30 YEAR MINING LICENSE FOR THE WHITE MOUNTAIN...
9/9/2015HUDSON ANNOUNCES GRANTS OF OPTIONS
9/3/2015HUDSON CLOSES EQUITY FINANCING FOR TOTAL PROCEEDS OF $4,023,...
8/20/2015HUDSON SECURES SHORT TERM BRIDGE LOAN
8/19/2015Hudson Secures Short Term Bridge Loan
8/8/2015HUDSON ANNOUNCES PRIVATE PLACEMENT
7/30/2015HUDSON SIGNS 10-YEAR GLOBAL SUPPLY AGREEMENT FOR THE WHITE M...
7/30/2015IIROC Trading Resumption - HUD
7/30/2015IIROC Trading Halt - HUD
3/30/2015HUDSON REPORTS ROBUST PRELIMINARY ECONOMIC ASSESSMENT (PEA) ...
3/30/2015Reports Robust Preliminary Economic Assessment (PEA) for Spe...
12/11/2014HUDSON PRODUCES SPECIALTY GRADE CALCINED ALUMINA USING WHITE...
7/29/2014Hudson's White Mountain Calcium Feldspar Used Successfully i...
5/2/2014Hudson Initiates Mining Application for Its White Mountain A...
4/24/2014Hudson Announces Grants of Options
8/7/2013Continues to Advance Its White Mountain Anorthosite Project ...
4/4/2013Commences Prefeasibility Study for the White Mountain Anorth...
2/12/2013Aheadoftherd Must Read - Anorthosite Has Huge Three Market P...
1/30/2013Reports Indicated Resource of 27.4 Million Tonnes for the Wh...
1/21/2013(Sarfartoq)Reports High Grade Rare Earth Assays from 2012 Drill Program...
10/12/2012Announces Grants of Options and Corporate Update
9/9/2011Drills Highest Grade Intervals to Date at its Greenland Rare...
6/6/2011Retains Brisco Capital to Provide Investor Relation Services
5/10/2011Commences 10,000M Rare Earth Drill Program in Greenland
3/10/2011ANNOUNCES PROPOSED EQUITY FINANCING
2/2/2010APPROVES 2010 FIELD PROGRAM FOR ITS RARE EARTH PROJECT IN GR...
1/26/2010ADDS JOHN MCCONNELL AS DIRECTOR
11/26/2009Hong Kong Rare Earth Conference Summary
11/5/2008CONVERTS TECK DEBT TO EQUITY
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (HUD.V)Other OTC (HUDRF)
0.030+0.00%0.025+0.00%
TSX-V
CA$ 0.030
03/19 12:13 -
0%
Prev close Open
0.030 0.030
Low High
0.030 0.030
Year l/h YTD var.
0.020 -  0.040 -25.00%
52 week l/h 52 week var.
0.020 -  0.050 -14.29%
Volume 1 month var.
338,000 -25.00%
24hGold TrendPower© : 15
Produces
Develops
Explores for Copper - Gold - Rare earth - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-14.29%
202316.67%0.080.03
2022-45.45%0.100.03
2021-80.00%0.280.06
202030.95%0.380.07
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :