Great Panther Silver Reports Second Quarter 2013 Production
Published : July 11, 2013
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwired - July 11, 2013) - GREAT PANTHER SILVER LIMITED (News - Market indicators)(NYSE MKT:GPL) (the "Company") today reports second quarter ("Q2") production at its two wholly-owned Mexican silver mining operations, Guanajuato and Topia.

Second Quarter 2013 Operations Highlights (Compared to Second Quarter 2012)

  • Ore processed was up 28% to 67,569 tonnes;
  • Metal production increased 22% to a record 680,212 silver equivalent ounces ("Ag eq oz"), at a 60:1 silver:gold ratio;
  • Silver production rose 6% to 396,730 silver ounces ("Ag oz");
  • Gold production increased 70% to a record 3,994 gold ounces ("Au oz"); and
  • Land Use Permit for San Ignacio was received.

"We are pleased to report both record total metal production and gold production for the second quarter," stated Robert Archer, President and CEO. "Both Guanajuato and Topia rebounded from low grades in the first quarter of 2013 as a result of our ongoing focus on grade control. As we continue to concentrate on improving efficiencies at the operations, the current emphasis is on site cost reductions and maintaining strong grade control, in light of lower metal prices. Non-essential budget items have been cut, some capital expenditures have been cut or deferred, and corporate overheads have been lowered in order to conserve cash and maintain our favorable working capital position. Directors and senior management have participated in these cuts through voluntary salary deferrals. Overall, these cuts will result in lower administrative, exploration and corporate development expenditures in the second half."

"Following the addition of a new Vice President, Operations and Vice President, Safety, Health & Environment in the first quarter, we welcome two new mine-site Safety Superintendents in Q2. Our safety record has improved through the quarter, the Rayas Shaft rehabilitation is nearing completion and we are proceeding with improvements to the tailings dams at Guanajuato and Topia. Preparations for the ramp development at San Ignacio are on track, pending the approval of the Environmental Impact Assessment."

Despite an improvement in grades over the first quarter, we caution that operating margins will remain weak for the second quarter due primarily to the severe drop in silver and gold prices over the quarter. In addition, the impact of improved grades will not be substantially reflected in the margins and unit costs for the quarter as most of the concentrate sales will reflect production from the prior period at lower grades. This factor will also impact reported cash costs for the period. 

Consolidated Q2 Operations Summary Q2 2013 Q2 2012 Change Q2 2013 Q1 2013 Change
Ore processed (tonnes milled) 67,569 52,956 28% 67,569 69,540 (3)%
Silver equivalent ounce production 1 680,212 555,721 22% 680,212 607,501 12%
Silver ounce production 396,730 374,723 6% 396,730 369,624 7%
Gold ounce production 3,994 2,353 70% 3,994 3,144 27%
Lead production (tonnes) 243 244 0% 243 286 (15)%
Zinc production (tonnes) 411 351 17% 411 449 (8)%
Total underground development (m) 4,044 4,305 (6)% 4,044 4,123 (2)%
Underground Diamond drilling (m) 6,907 6,814 1% 6,907 7,540 (8)%

1 Silver equivalent ounces for 2013 were established in November 2012 using prices of US$28 per oz, US$1,680 per oz (60:1 ratio), US$0.85 per lb and US$0.85 per lb for silver, gold, lead & zinc, respectively, and applied to the recovered metal content of the concentrates that were produced by the two operations. For consistency, these prices will be used for the balance of 2013.

Guanajuato Mine Complex

For the second quarter, the Guanajuato operation processed 52,917 tonnes, up 29% compared to the same period in 2012, at ore grades of 159 grams/tonne ("g/t") Ag and 2.47g/t Au. Metal production included 236,454 Ag oz, and 3,841 Au oz, or 466,925 Ag eq oz, which represented an increase of 30% over the same period in 2012. Plant metallurgical performance remained strong, with metal recoveries of 87.2% for silver and 91.5% for gold.

Guanajuato Q2 Operations Summary Q2 2013 Q2 2012 Change Q2 2013 Q1 2013 Change
Ore processed (tonnes milled) 52,917 40,964 29% 52,917 52,545 1%
Silver equivalent ounce production 1 466,925 359,063 30% 466,925 399,417 17%
Silver ounce production 236,454 226,284 4% 236,454 222,906 6%
Gold ounce production 3,841 2,213 74% 3,841 2,942 31%
             
Ag grade (g/t) 159 189 (16)% 159 148 8%
Au grade (g/t) 2.47 1.82 36% 2.47 1.93 28%
Ag recovery (%) 87.2% 91.1% (4)% 87.2% 89.0% (2)%
Au recovery (%) 91.5% 92.3% (1)% 91.5% 90.0% 2%
Total underground development (m) 1,790 1,682 6% 1,790 1,867 (4)%
Underground Diamond drilling (m) 6,426 6,223 3% 6,426 7,134 (10)%

1 Silver equivalent ounces for 2013 were established in November 2012 using prices of US$28 per oz, US$1,680 per oz (60:1 ratio), US$0.85 per lb and US$0.85 per lb for silver, gold, lead & zinc, respectively, and applied to the recovered metal content of the concentrates that were produced by the two operations. For consistency, these prices will be used for the balance of 2013.

The lower levels of the Cata and Santa Margarita mines continued to excel in terms of production and grades. Mining at Cata demonstrated that the hanging wall veins merge with the main Veta Madre at the 510 metre level, resulting in well mineralized ore.

Gold grades increased significantly, with the most meaningful impact coming from Santa Margarita. Silver grades recently started to show notable improvements across all zones due to better grade control.

Underground development at Guanajuato consisted of 1,790 metres, up 6% compared to the same period in 2012. The development program for the quarter was focused on preparing underground access-ways, stopes for production, and defining new mineralized structures indicated by exploration drilling results.

Exploration development at Cata was focused on defining the continuity of the Veta Madre at the 525 metre level, resulting in high grade intersections and expanding the known mineralized resources.

The Santa Margarita main ramp reached the 510 metre level, from which an exploration crosscut is being developed; aiming to further define the ore structure's potential as indicated by exploration drilling. In addition, exploratory development was completed at the 490 metre level to define the Santa Margarita vein and assist the mining activities.

Exploration drilling was carried out using four underground drill rigs, guiding the mining activities with more accurate definitions of mineralized zones. For the quarter, Diamond drilling totaled 6,426 metres, up 3% compared to the same period in 2012. Exploration drilling at deep Cata between the 525 and 540 metre levels returned excellent results and demonstrated the potential for the continuity of silver-gold mineralization to depth. 

The development of the Guanajuatito main ramp was temporarily suspended to put in place the development required to support an exploration drilling program to upgrade the mineral resources between the 245 and 390 metre levels. This program will commence during the third quarter. The Guanajuatito Mine was connected underground to all the other mines in the Guanajuato Mine Complex. As a result, Guanajuatito ore production, which was previously hauled to surface via the ramp and then by truck to the Cata plant, is now being transported underground and up the Cata shaft, thereby reducing haulage costs.

The Rayas shaft is undergoing a thorough rehabilitation to improve safety and efficiency. The rehabilitation is expected to be finalized by mid third quarter. Once completed, this investment is expected to improve the transportation of personnel to their work places and increase operational efficiencies by reducing transportation times.

The Cata processing plant is being upgraded by installing a new filter press that will maximize the rate of filtration and deliver a dryer final concentrate. This will reduce concentrate loss and electricity consumption. The new filter press installation is expected to be completed by mid-third quarter. The Guanajuato tailings dam is undergoing its 13th dyke lift to increase its storage potential and is expected to be completed within the next few weeks.

Topia Mine

For the second quarter, 14,652 tonnes were processed at Topia, up 22% compared to the same period in 2012, at grades of 376g/t Ag, 0.57g/t Au, 1.79% lead ("Pb") and 3.05% zinc ("Zn"). Metal production included 160,276 Ag oz, 153 Au oz, 243 Pb tonnes, and 411 Zn tonnes, or 213,287 Ag eq oz, which is 8% up over the same period in 2012. Plant metallurgical performance was satisfactory with metal recoveries of 90.6% for silver, 57.0% for gold, 92.5% for lead, and 91.9% for zinc.

Topia Q2 Operations Summary Q2 2013 Q2 2012 Change Q2 2013 Q1 2013 Change
Ore processed (tonnes milled) 14,652 11,992 22% 14,652 16,995 (14)%
Silver equivalent ounce production 1 213,287 196,658 8% 213,287 208,084 3%
Silver ounce production 160,276 148,439 8% 160,276 146,718 9%
Gold ounce production 153 140 9% 153 202 (24)%
Lead production (tonnes) 243 244 0% 243 286 (15)%
Zinc production (tonnes) 411 351 17% 411 449 (8)%
             
Ag grade (g/t) 376 424 (11)% 376 300 25%
Au grade (g/t) 0.57 0.56 2% 0.57 0.65 (12)%
Ag recovery (%) 90.6% 90.7% 0% 90.6% 89.0% 2%
Au recovery (%) 57.0% 64.3% (11)% 57.0% 57.0% 0%
Total underground development (m) 2,254 2,623 (14)% 2,254 2,256 0%
Underground Diamond drilling (m) 481 591 (19)% 481 406 19%

1 Silver equivalent ounces for 2013 were established in November 2012 using prices of US$28 per oz, US$1,680 per oz (60:1 ratio), US$0.85 per lb and US$0.85 per lb for silver, gold, lead & zinc, respectively, and applied to the recovered metal content of the concentrates that were produced by the two operations. For consistency, these prices will be used for the balance of 2013.

The majority of the metal production during the quarter was obtained from the 1522 and Durangueno mines, followed closely by the Argentina and El Rosario mines, which showed increased production. Silver grades were lower than anticipated due to the continuous narrow vein formations resulting in higher dilution. However, a trend of increasing silver grades was noticed from month to month during the quarter due to ongoing efforts towards improving grade control.

Underground development at Topia consisted of 2,254 metres, down 14% compared to the same period in 2012. The development program for the quarter was focused on deepening main ramps at the Argentina and La Prieta mines to access new mineralized levels indicated by exploration drilling results. In addition, development was carried out to prepare sublevels, raises and stopes for production. Development reached level 4 as planned at the Argentina main ramp, whereas development of the La Prieta ramp was temporarily suspended giving priority to preparatory work for production.

Taking into account constantly changing metal prices, management continues to conduct mine by mine reviews to determine the profitability of individual mines at Topia, thereby determining where to best concentrate the mining efforts and reduce costs. To date, two of the fourteen mines have been temporarily shut down, and supplemented with increased production at other more profitable mines. 

Improvements are being made to the Topia processing plant by the installation of a cone crusher that will significantly increase the crushing capacity at the plant and reduce maintenance and electricity costs. In addition, a performance improvement analysis is being undertaken in order to further optimize the mill and flotation sections of the plant.

San Ignacio Project

The Company received approval of the Land Use permit earlier than anticipated during the second quarter and submitted a revised Environmental Impact Assessment which is expected to be approved by the end of the third quarter.

A new mine plan is being compiled for San Ignacio incorporating the latest geological resource model based on the known veins, grade ranges and elevation for commencement of mining.

An infill and extension drilling campaign is anticipated to begin in September at San Ignacio to better define the resource. In addition, mine and earthwork contractors will be selected and the installation of the water supply for the mine will be completed by the end of the third quarter.

El Horcon

A surface drill program consisting of 24 drill holes for a total of 2,156 metres was completed during the second quarter. The program was laid out along 650 metres of strike length on the Diamantillo vein and also tested various splays and nearby parallel structures and veins.

Assay results have been received and are being compiled and interpreted. A wireframe and 3D model are being constructed such that the continuity of grade and vein widths can be determined. An internal resource estimate and preliminary economic assessment will be prepared in the third quarter.

Outlook

With first half production totaling 1,287,713 silver equivalent ounces, the Company is on track to meet its guidance of 2.4 to 2.5 million silver equivalent ounces for fiscal 2013. 

As precious metals prices dropped significantly in the second quarter, the Company has heightened its focus on improving and strengthening the operational efficiency of its operations. Cash cost guidance is being reviewed and the Company will provide an update in our second quarter earnings release, expected in early August.

ABOUT GREAT PANTHER

Great Panther Silver Limited is a profitable, primary silver mining and exploration company listed on the Toronto Stock Exchange trading under the symbol GPR, and on the NYSE MKT trading under the symbol GPL. The Company's current activities are focused on the mining of precious metals from its two wholly-owned operating mines in Mexico, Topia and Guanajuato. Great Panther is also in the process of developing its San Ignacio Project and has two exploration projects, El Horcon and Santa Rosa.

For further information, please visit the Company's website at www.greatpanther.com.

This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Securities Act (Ontario) (together, "forward-looking statements"). Such forward-looking statements may include but are not limited to the Company's plans for production at its Guanajuato and Topia Mines in Mexico, exploring its other properties in Mexico, the overall economic potential of its properties, the availability of adequate financing and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or implied by such forward-looking statements to be materially different. Such factors include, among others, risks and uncertainties relating to potential political risks involving the Company's operations in a foreign jurisdiction, uncertainty of production and cost estimates and the potential for unexpected costs and expenses, physical risks inherent in mining operations, currency fluctuations, fluctuations in the price of silver, gold and base metals, completion of economic evaluations, changes in project parameters as plans continue to be refined, the inability or failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those described in the Company's Annual Information Form for the year ended December 31, 2012 and Material Change Reports filed with the Canadian Securities Administrators available at www.sedar.com, and reports on Form 40-F and Form 6-K filed with the Securities and Exchange Commission and available at www.sec.gov.



Great Panther Silver Limited
Robert Archer
Chief Executive Officer
1-888-355-1766
or
Great Panther Silver Limited
Rhonda Bennetto
Vice President Corporate Communications
1-888-355-1766
info@greatpanther.com
www.greatpanther.com
Data and Statistics for these countries : Argentina | Mexico | All
Gold and Silver Prices for these countries : Argentina | Mexico | All

Great Panther Silver Limited

PRODUCER
CODE : GPR.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Great Panther Silver is a silver producing company based in Canada.

Great Panther Silver produces silver, gold, lead and zinc in Mexico, and holds various exploration projects in Mexico.

Its main assets in production are TOPIA MINE and GUANAJUATO MINES in Mexico and its main exploration properties are MAPIMI (KM 66), SAN ANTONIO (CHIHUAHUA), SAN IGNIACIO and LA SIERRA in Mexico.

Great Panther Silver is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 181.3 millions as of today (US$ 145.0 millions, € 127.0 millions).

Its stock quote reached its highest recent level on August 29, 1997 at CA$ 9.00, and its lowest recent point on September 05, 2003 at CA$ 0.10.

Great Panther Silver has 166 370 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Great Panther Silver Limited
7/22/2009Mining in Mexico with Great Panther
7/16/2009Mining in Mexico with Great Panther
8/1/2007Jay Taylor Reaffirms his "A" Progress Rating Of Great Panthe...
6/20/2006Presentation by Sean Rahkimov
4/18/2006Corporate analysis
Annual reports of Great Panther Silver Limited
2008 Annual report
Financings of Great Panther Silver Limited
7/7/2016Great Panther Silver increases previously announced bought d...
7/6/2016arranges US$20 million bought deal financing
3/24/2011Announces $21 Million Bought Deal Financing
3/13/2011EXTINGUISHES LONG TERM DEBT
10/27/2009Announces $10 Million Equity Offering
1/24/2009GPR - GREAT PANTHER CLOSES PRIVATE PLACEMENT
4/10/2008Reprices Out-Of-The-Money Warrants And Options
1/4/2008Sees 100% Exercise Of "J" Warrants
11/30/2007100% Exercise of Great Panther "I" Warrants
Nominations of Great Panther Silver Limited
8/7/2013Appoints New Director
5/14/2013Appoints New Director and Strengthens Senior Management Team...
1/24/2013Announces Resignation of Director
4/5/2012Appoints Rhonda Bennetto as Vice President Corporate Communi...
2/6/2012Appoints Independent Chairman
10/14/2011(Guanajuato Mines)Reports Third Quarter Production and Appoints New Mine Manag...
10/14/2011(Guanajuato Mines)Reports Third Quarter Production and Appoints New Mine Manag...
5/3/2011Appoints Martin Carsky Executive Vice President & Chief Fina...
3/17/2011ADDS MINING/METALLURGICAL EXPERTISE TO BOARD
7/3/2008Appoints Former Mexican Senior Trade Commissioner As Vice Pr...
3/20/2008Appoints Financial & Metallurgical Professionals To Ad...
11/26/2007Appoints New Management at Guanajuato Mine
Financials of Great Panther Silver Limited
8/4/2016Reports Second Quarter 2016 Financial Results
7/25/2016to announce second quarter 2016 financial results on August ...
7/14/2016reports second quarter
5/5/2016First Quarter 2016 Financial Results Webcast and Conf
5/5/2016reports first quarter
11/5/2015Reports Third Quarter 2015 Financial Results
10/21/2015to Announce Third Quarter Consolidated Financial Results on ...
11/6/2013Reports Lower Costs and Improved Operating Margins for the T...
8/16/2013Second Quarter 2013 Financial Results Webcast Replay
8/7/2013Reports Second Quarter 2013 Financial Results
5/8/2013Reports First Quarter 2013 Financial Results
3/13/2013Reports Fiscal Year 2012 Financial Results
11/14/2012Postpones Release of Third Quarter 2012 Financial Results fo...
5/14/2012Reports First Quarter 2012 Financial Results
3/13/2012Reports 37% Increase in Revenues to $57.8 Million and $11.5 ...
10/14/2011Reports Third Quarter Production and Appoints New Mine Manag...
8/11/2011Reports Second Quarter Results
6/14/2011Reports Record Quarterly Net Income of $7 Million
4/18/2011REPORTS FIRST QUARTER PRODUCTION; SILVER INCREASES BY 15%, G...
4/7/2011FILES AMENDMENT TO ITS ANNUAL INFORMATION FORM WITH NO CHANG...
3/16/2011REPORTS ANNUAL NET PROFIT OF $5 MILLION
1/11/2010 Exceeds Production Target for 2009 With Record Fourth Quart...
10/22/2007Doubles Production in Third Quarter 2007
Project news of Great Panther Silver Limited
7/18/2016(Topia Mine)Resumes Full Operation
12/23/2015Great Panther Silver releases drill results for Guadalupe de...
7/9/2015Great Panther Silver updates mineral resources at Topia mine
1/14/2014Reports a 19% Increase in Metal Production in 2013
12/16/2013Announces Results of San Ignacio Surface Drilling
12/3/2013s Mineral Resource Estimates at the Guanajuato Mine Complex
10/21/2013Moves Ahead with El Horcon Project
10/8/2013Receives Final Permit for San Ignacio, Initiates Site Prepar...
1/14/2013(Topia Mine)s Mineral Resources at Topia Mine
5/9/2012s Mineral Resource Estimates at the Guanajuato Mine Complex ...
12/15/2011(Guanajuato Mines)Eliminates Backlog of Concentrate Inventory at Guanajuato an...
12/5/2011(San Igniacio)s Drilling Results for San Ignacio Property, Guanajuato; Gra...
11/30/2011(Guanajuato Mines)Confirms Continuity of Santa Margarita Gold-Silver Veins and...
10/13/2011(San Igniacio)Reports Initial Mineral Resource Estimate at San Ignacio Pro...
8/30/2011(Guanajuato Mines)Extends High Grade Silver-Gold Mineralization and Discovers ...
8/18/2011(Guanajuato Mines)Commences Shipment of Silver-Gold Concentrates From Guanajua...
7/21/2011(La Sierra)Purchases New Silver-Gold Project in Guanajuato
5/25/2011(San Igniacio)POSTPONES RESOURCE ESTIMATE FOR SAN IGNACIO MINE PROPERTY, G...
3/13/2011(Topia Mine)Increases Mineral Resources at the Topia Mine
1/27/2011(Guanajuato Mines)Extends Guanajuatito Silver-Gold Zones to Depth
7/22/2009(Topia Mine)Increases Resources At The Topia Mine
1/26/2009(Topia Mine)GPR - GREAT PANTHER REPORTS NEW HIGH GRADE SILVER ALONG THE ...
11/26/2008(Topia Mine)Samples 95 Metres Of 1,867G/T Silver, 1.00G/T Gold, 2.67% Le...
9/9/2008(Guanajuato Mines)ACQUIRES TWO NEW UNDERGROUND LOADERSTO BOOST PRODUCTION OF T...
7/14/2008(Guanajuato Mines)Produces Another Record of 436,072 Ag Eq Oz in Q2
6/3/2008(Topia Mine)Extends High Grade Argentina Veins At The Topia Mine
5/27/2008(Mapimi (km 66))Discovers Molybdenum-Rich Skarn and Carbonate Replacement St...
4/28/2008 PRODUCES FROM HIGH GRADE SILVER-GOLD ZONE AT GUANAJUATO; GR...
3/25/2008(Guanajuato Mines)Extends Strike Length Of Deep Mineralization At Guanajuato M...
2/26/2008(Topia Mine) Extends High Grade Silver-Gold To 600 Metre Depth At Guanaj...
2/20/2008(Topia Mine)Extends Silver-Gold-Lead-Zinc Veins At The Topia Mine
11/29/2007(Guanajuato Mines)Confirms Depth Continuity of High Grade Mineralization at Gu...
11/13/2007(San Antonio) Diamond Drilling Commences on the San Antonio Project, Chih...
10/30/2007(Guanajuato Mines) EXPANDS NEAR-SURFACE SILVER-GOLD ZONES AT GUANAJUATO
5/10/2007Releases Additional Drilling Results For Mapimi Silver-Lead-...
4/11/2007(Guanajuato Mines)Doubles Production At Guanajuato In First Quarter; Inc...
4/5/2007(Topia Mine)Extends Gold-rich Zones with Surface Drilling at Topia Mine
Corporate news of Great Panther Silver Limited
7/27/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
7/25/2016Great Panther Silver to announce second quarter 2016 financi...
7/15/2016Great Panther Silver Resumes Full Operation at Topia Mine
7/14/2016Great Panther Silver Reports Second Quarter 2016 Production ...
7/13/2016Great Panther Silver reports fatal accident at its Topia Min...
7/12/2016Great Panther Silver completes previously announced US$29.9 ...
7/6/2016Great Panther Silver arranges US$20 million bought deal fina...
6/23/2016Great Panther Silver reports fatality at Guanajuato
6/10/2016Great Panther Silver Reports Annual General and Special Meet...
5/5/2016Great Panther Silver reports first quarter 2016 financial re...
4/25/2016Great Panther Silver to Announce First Quarter 2016 Financia...
4/21/2016Great Panther Announces At-the-market Offering Of Up To Us$1...
4/21/2016Great Panther Silver Reports First Quarter 2016 Production R...
4/13/2016Great Panther Silver reports first quarter 2016 production r...
3/4/2016Great Panther reports 4Q loss
1/19/2016Great Panther Silver Reports 30% Increase In Metal Productio...
1/15/2016Great Panther resumes full operations at its Guanajuato Mine...
11/5/2015Great Panther Silver Reports Third Quarter 2015 Financial Re...
10/21/2015Great Panther Silver to Announce Third Quarter Consolidated ...
10/14/2015Great Panther Silver Reports Third Quarter 2015 Production R...
8/28/2015Great Panther Board Completes Review of Director Election St...
8/5/2015Great Panther Silver Reports Second Quarter 2015 Financial R...
7/30/2015Great Panther Silver to Release Second Quarter Financial Res...
7/14/2015Great Panther Silver Reports Second Quarter 2015 Production ...
7/9/2015(Topia Mine)s mineral resources at Topia mine
7/2/2015Great Panther Silver Provides Update on 2015 Drilling Progra...
4/15/2015Great Panther Silver Reports First Quarter 2015 Production R...
4/13/2015Cangold and Great Panther Silver Execute Definitive Arrangem...
4/13/2015Great Panther And Cangold Execute Definitive Arrangement Agr...
3/25/2015Why GoPro Will Trade Lower Until 'Capitulation'
3/15/2015Great Panther Silver to Acquire Cangold
3/5/2015Great Panther reports 4Q loss
3/4/2015Great Panther Silver reports fiscal year 2014 financial resu...
12/18/2013Season's Greetings from Great Panther Silver
10/10/2013Achieves Several Production Records in Third Quarter 2013
7/25/2013Announces 2013 Second Quarter Financial Results Release Date...
7/11/2013Reports Second Quarter 2013 Production
6/28/2013Reports Annual and Special Meeting Results
5/24/2013Adopts Advance Notice Policy
4/15/2013Reports First Quarter 2013 Production
3/14/2013Video Library Updates
2/5/2013Intersects High Grade Silver-Gold Mineralization and Discove...
1/16/2013Reports Improved Fourth Quarter and Fiscal 2012 Production R...
11/5/2012Announces 2012 Third Quarter Financial Results Release Date ...
10/10/2012Reports Third Quarter 2012 Production Results
9/18/2012Google Earth Virtual Tour
9/5/2012Purchases El Horcon Silver-Gold Project
8/21/2012Purchases Surface Rights for San Ignacio Project
8/2/2012Announces 2012 Second Quarter Financial Results Release Date...
7/12/2012Reports Second Quarter 2012 Production Results
6/28/2012Reports Annual and Special Meeting Results
5/8/2012Announces 2012 First Quarter Financial Results Release Date ...
4/16/2012Reports First Quarter 2012 Production
3/5/2012Announces 2011 Fourth Quarter And Year-End Financial Results...
1/17/2012Reports Improved Fourth Quarter Production
8/4/2011Announces Second Quarter 2011 Financial Results Release Date...
7/12/2011Reports Second Quarter Production
6/23/2011Set to Join the Russell Global Index
4/12/2011Closes $24 Million Bought Deal Financing
4/5/2011Receives Recognition for Corporate Social Responsibility
2/7/2011Secures US Listing on NYSE Amex
8/17/2010GPR - GREAT PANTHER SILVER REPORTS INCREASED REVENUE, EARNIN...
10/1/2009GPR - GREAT PANTHER DISCOVERS AND DEVELOPS 3 NEW ZONES AT GU...
8/14/2009Continues Production And Earnings Growth, Reduces Operating ...
7/7/2009continues record-setting growth with Q2 production
6/19/2009Signs New Sales Contracts For Topia Concentrates
2/18/2009Anticipates 20% Increase In Silver Production In 2009
12/10/2008 ANNOUNCES $2,700,000 FINANCING
11/15/2008LOWERS OPERATING COSTS TO KEEP MINES PROFITABLE
8/13/2008GPR - GREAT PANTHER ACHIEVES 488% INCREASE IN EARNING...
8/11/2008 INCREASES RESOURCES AT THE TOPIA MINE
6/23/2008Exposes Excellent Grades At Topia Ag-Pb-Zn Mine
6/3/2008Celebrates Renaissance Of 400+Year-Old Silver Mine
5/17/2008GRANTS STOCK OPTIONS
5/12/2008ANNOUNCES Q1 2008 RESULTS, ACHIEVES 55% INCREASE IN REVEN...
5/6/2008Drills 15.94 Metres @ 1,305G/T Silver And 4.60G/T Gold And D...
4/8/2008's Record Output Continues With 431,639 Ag Eq Oz In...
4/1/2008Announces Fy2007 Results, Achieves First Mining Profit...
3/19/2008Receives Upgraded Mineral Resource Estimate for La Gloria Zo...
3/8/2008ADOPTS SHAREHOLDER RIGHTS PLAN
1/28/2008SETS NEW PRODUCTION RECORDS TO END 2007
1/15/2008Provides Update On Resource Estimates
11/1/2007 COMMENCES PHASE II DRILLING PROGRAM ON MAPIMI SILVER-LEAD-Z...
9/19/2007Commences Deep Drilling Program at Guanajuato; Provides Prod...
9/14/2007OUTLINES EXPANSIVE GEOPHYSICAL ANOMALIES AND UPDATES PHASE 1...
9/12/2007Adds New COO To Management Team
8/28/2007'S FUNDS ARE SAFE
8/15/2007RELEASES Q2 RESULTS, REPORTS RECORD SALES MARGIN FROM MINING...
7/13/2007Closes $4.05 Million Convertible Loan Notes Placement
7/9/2007Discovers New Silver-Gold Zones At Guanajuato
7/4/2007To Raise $4.05 Million Through Convertible Loan Notes With T...
6/16/2007Dissident Members Abandon Lawsuit Against Cooperativa
5/28/2007Adds New Cfo To Management Team
4/30/2007Releases Results From First Year as Silver Producer
4/17/2007Confirms Grades, Completes Airborne Geophysical Survey On Ma...
4/4/2007Announces Delay in Filing Annual Financial Statements
3/1/2007UNDERGROUND DRILLING EXTENDS HIGH GRADE SILVER-GOLD-LEA...
4/4/2006Re-discovers spanish riches at Guanajuato
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (GPR.TO)FRANKFURT (G3U.F)
1.09+0.00%0.102+0.00%
TORONTO
CA$ 1.09
10/14 10:30 -
0%
Prev close Open
1.09 1.09
Low High
1.09 1.09
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  1.09 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 9
Produces Gold - Lead - Silver - Zinc
Develops
Explores for Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/27/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2022240.63%1.520.12
2021-70.64%1.470.30
202065.15%1.420.32
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.73-1.90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.98-2.49%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56-2.43%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.35-5.62%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.05-2.34%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.69-2.03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.84-1.60%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+3.03%Trend Power :