High River Gold Reports Updated Resource and Reserve Statements



High River Gold Mines Ltd. ("High River" or the "Company") (TSX:HRG) today reported the results of the recently completed mineral reserve and resource estimates prepared for most of High River's assets located in Russia and Burkina Faso.

Technical reports compliant with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") in respect of such estimates are being currently prepared by Wardell Armstrong International ("WAI"). The company expects to file the completed reports by the end of February, 2011. The "qualified person" in charge of the preparation of the technical reports is Dr. Phil Newall, BSc (ARSM), PhD (ACSM), CEng, FIMMM, Director with WAI. Dr. Newall also supervised the preparation of this press release.

Highlights

The company announced the updated reserves and resources estimates as of November 1, 2010 for:

 
--  Berezitovy mine in Russia 
    --  1,035 kOz of proven and probable reserves 
    --  1,238 kOz of measured + indicated resources 
    --  132 kOz of inferred resources 
--  Taparko-Bouroum mine in Burkina Faso 
    --  627 kOz of proven and probable reserves 
    --  758 kOz of measured + indicated resources 
    --  186 kOz of inferred resources 
--  Bissa advanced exploration project in Burkina Faso 
    --  1,653 kOz of proven and probable reserves 
    --  2,649 kOz of measured + indicated resources 
    --  218 kOz of inferred resources

 

Note: Mineral resources are reported inclusive of any reserves.

Also, High River announced the first time resource estimates for greenfield exploration targets in Burkina Faso:

 
--  Yeou: 82 kOz of inferred resources 
--  Ankouma: 74 kOz of inferred resources 
--  Bouly: 253 kOz of inferred resources 
--  Gougre: 225 kOz of inferred resources 
--  Zinigma: 139 kOz of inferred resources

 

Background information about assets

Berezitovy mine

The gold mineralisation at the Berezitovy mine, located in the Amur Region of Russia, is related to explosive breccia within granitic gneisses which is present within a north-northwest trending and steeply southwest dipping zone of brecciated and hydrothermally altered granodiorite. In addition, gold mineralisation is associated with metasomatic alteration and quartz flooding in granitic and granodioritic rocks. The near surface oxidation zone is very shallow (5-7m deep) and mineralisation throughout is predominantly sulphides. Modern mining operations began in December 2007. The deposit is mined by conventional open pit techniques with drill and blast, and haulage utilising CAT and Belaz trucks. The mine has a throughput of approximately 1.2Mtpa, with 184t/hr through the CIP plant to a dry paste plant at a nominal average grade of 2.4g/t Au.

Taparko-Bouroum mine

The Taparko and Bouroum gold deposits, in Burkina Faso, comprise sulphide-poor quartz veins hosted by shear zones of various attitudes. Mining at Taparko mine commenced in late 2007 and currently extracts gold ore from the 3/5 open pit by conventional drill & blast with truck haulage to a comminution-gravity-CIL processing circuit. Ore has also been produced from the GT pit at Taparko and from the Bouroum project to the west. The current daily rate of excavation is approximately 4,400tpd of ore with an average of 17,000t of waste, whilst the mill feed rate is approximately 190t/hr.

Bissa deposit

The Bissa deposit in Burkina Faso represents a late stage development project with a Feasibility Study completed in 2010. This project, which comprises typical Birimian greenstone shear-hosted gold mineralization, is scheduled for open pit production, with gold recovery by CIL. Over and above the main deposit, the Bissa licence and adjacent exploration properties contain significant additional resources, and it is likely that in due course, these will be incorporated into the operation. Presently, the planned mining method for this project is open pit. The zone of mining extraction consists of several open pits dispersed along approximately 5.5km of the southwest/northeast oriented mineralised zone.

Other exploration assets in Burkina Faso

The Burkina Faso assets also include several exploration sites such as Bouly, Gougre, Zinigma, Guibare, Yeou, Ankouma, Yargo, Sakou, Yimiougou, Mane, Nounagou and Tyegana. Of those, the exploration in Yeou, Ankouma, Bouly, Gougre and Zinigma is advanced enough to generate resources.

Mineral Resource/Reserve Estimates

Mineral resources and reserves have been estimated and classified according to the CIM Standards on Mineral Resources and Reserves - Definitions and Guidelines (December 2005) (the "CIM Guidelines").

Berezitovy

The Berezitovy resource model has been derived from geostatistical studies. The key drillhole spacings for the allocation of measured resources were 40m x 40m and 80m x 80m for indicated resources. The extent of inferred resources was limited to within 60m of a diamond drillholes intersection within the modelled mineralised zone.

The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the un-mined, in-situ resources are shown in the table for three different cut-off grade levels: 0.3g/t, 0.5g/t and 0.7g/t Au.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
             Berezitovy Resource Estimate (WAI, November 1, 2010            
                    (in accordance with CIM Guidelines))                    
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                Ore Type                    Sulphide    Sulphide    Sulphide
----------------------------------------------------------------------------
           Cut Off Grade (g/t)                   0.3         0.5         0.7
----------------------------------------------------------------------------
Measured                  Tonnage (kt)        10,764      10,577       9,905
                        ----------------------------------------------------
                            Au (g/t)            2.00        2.02        2.12
                        ----------------------------------------------------
                          Metal    kg         21,492      21,412      20,999
                                --------------------------------------------
                                   oz        690,972     688,412     675,118
----------------------------------------------------------------------------
Indicated                 Tonnage (kt)        10,357      10,184       9,479
                        ----------------------------------------------------
                            Au (g/t)            1.64        1.66        1.74
                        ----------------------------------------------------
                          Metal    kg         17,008      16,933      16,502
                                --------------------------------------------
                                   oz        546,807     544,420     530,550
----------------------------------------------------------------------------
Measured + Indicated      Tonnage (kt)        21,121      20,761      19,384
                        ----------------------------------------------------
                            Au (g/t)            1.82        1.85        1.93
                        ----------------------------------------------------
                          Metal    kg         38,499      38,345      37,501
                                --------------------------------------------
                                   oz      1,237,779   1,232,832   1,205,668
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Inferred                  Tonnage (kt)         2,571       2,364       1,951
                        ----------------------------------------------------
                            Au (g/t)            1.59        1.70        1.93
                        ----------------------------------------------------
                          Metal    kg          4,098       4,009       3,766
                                --------------------------------------------
                                   oz        131,743     128,906     121,080
----------------------------------------------------------------------------
Notes:                                                                      
1. Mineral resources are not reserves until they have demonstrated economic 
viability based on a feasibility study or pre-feasibility study.            
2. Mineral resources are reported inclusive of any reserves.                
3. The contained Au represents estimated contained metal in the ground and  
has not been adjusted for metallurgical recovery.                           
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

As a continuation of mineral resource modelling of Berezitovy deposit, WAI has undertaken a pit optimisation using the Mineral Resource Block Model prepared by WAI and updated in November 2010. The model was depleted to contain only those mineral resources that have not been extracted as of November 1, 2010. WAI used NPV Scheduler(R) software for the optimisation, applying the following conceptual financial and technical parameters:

 
--  Gold Price - US$900/oz; 
--  Selling Cost - US$56/oz; 
--  Production Rate - 2Mtpa; 
--  Discount Rate - 11.2%; 
--  Dilution - 5.5%; 
--  Mining Recovery Factor - 96.6%; 
--  Mining Cost (Ore & Waste) - US$1.30/t; 
--  Processing Cost - US$12.55/t processed; 
--  Gold Recovery - 90.1%, and 
--  Final Pit Wall Angle - 55 degrees .

 

The results of the WAI pit optimisation as calculated by NPV Scheduler(R) are presented in the table below.

 
          --------------------------------------------------------
          --------------------------------------------------------
           Berezitovy Open Pit Ore Reserves (WAI, November 1, 2010
                    (in accordance with CIM Guidelines))          
          --------------------------------------------------------
          --------------------------------------------------------
                          Ore Type                        Sulphide
          --------------------------------------------------------
                     Cut Off Grade (g/t)                      0.51
          --------------------------------------------------------
          --------------------------------------------------------
          Proven                  Tonnage (kt)              10,129
                              ------------------------------------
                                    Au (g/t)                  1.98
                              ------------------------------------
                                 Metal       kg             20,105
                                         -------------------------
                                             oz            646,450
          --------------------------------------------------------
          --------------------------------------------------------
          Probable                Tonnage (kt)               6,199
                              ------------------------------------
                                    Au (g/t)                  1.95
                              ------------------------------------
                                 Metal       kg             12,085
                                         -------------------------
                                             oz            388,597
          --------------------------------------------------------
          --------------------------------------------------------
          Proven + Probable       Tonnage (kt)              16,328
                              ------------------------------------
                                    Au (g/t)                  1.97
                              ------------------------------------
                                 Metal       kg             32,190
                                         -------------------------
                                             oz          1,035,047
          --------------------------------------------------------
          --------------------------------------------------------
          Notes:                                                  
          1. Mining factors of 5.5% dilution and 96.6% mining     
          recovery applied.                                       
          2. Global density of 2.87t/m3 applied to both ore and   
          waste.                                                  
          --------------------------------------------------------
          --------------------------------------------------------

 

Taparko

The criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of indicated resources they were 20m x 20m (along-strike x down-dip). All of the modelled resources within the mineralised zone wireframes and within 50m of a composite sample have been classified as inferred.

The final block models were cut against the topographic/pit surveys dated November 1, 2010 and used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources for all Zones are shown in the table below, by rock type, for four different cut-off grade levels: 0.5, 1.0, 1.5 and 2.0g/t Au.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                Mineral Resource Estimate - Taparko All Zones               
                           (WAI, November 1, 2010                           
                    (in accordance with CIM Guidelines))                    
----------------------------------------------------------------------------
----------------------------------------------------------------------------
            Cut Off Grade                  0.5       1.0       1.5       2.0
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Measured               Tonnage (kt)          0         0         0         0
                    --------------------------------------------------------
                         Au (g/t)            0         0         0         0
                    --------------------------------------------------------
                      Metal     kg           0         0         0         0
                             -----------------------------------------------
                                oz           0         0         0         0
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Indicated              Tonnage (kt)      6,153     5,832     4,956     3,836
                    --------------------------------------------------------
                         Au (g/t)         2.86      2.98      3.28      3.72
                    --------------------------------------------------------
                      Metal     kg      17,625    17,358    16,240    14,279
                             -----------------------------------------------
                                oz     566,663   558,065   522,138   459,076
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Measured + Indicated   Tonnage (kt)      6,153     5,832     4,956     3,836
                    --------------------------------------------------------
                         Au (g/t)         2.86      2.98      3.28      3.72
                    --------------------------------------------------------
                      Metal     kg      17,625    17,358    16,240    14,279
                             -----------------------------------------------
                                oz     566,663   558,065   522,138   459,076
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Inferred               Tonnage (kt)      1,290     1,136       947       687
                    --------------------------------------------------------
                         Au (g/t)         2.30      2.50      2.75      3.13
                    --------------------------------------------------------
                      Metal     kg       2,967     2,846     2,606     2,149
                             -----------------------------------------------
                                oz      95,387    91,513    83,786    69,082
----------------------------------------------------------------------------
Notes:                                                                      
1. Mineral resources are not reserves until they have demonstrated economic 
viability based on a feasibility study or pre-feasibility study.            
2. Mineral resources are reported inclusive of any reserves.                
3. The contained Au represents estimated contained metal in the ground and  
has not been adjusted for metallurgical recovery.                           
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

As a continuation of mineral resource modelling of Taparko deposit, WAI has undertaken a pit optimisation using the Mineral Resource Block Model prepared by WAI and updated in November 2010. The model was depleted to contain only those mineral resources that have not been extracted as of November 1, 2010. WAI used NPV Scheduler(R) software for the optimisation, applying the following financial and technical parameters:

 
--  Gold Price - US$900/oz; 
--  Production Rate - 1.7Mtpa; 
--  Discount Rate - 11.2%; 
--  Dilution - 5.0%; 
--  Mining Recovery Factor - 97.0%; 
--  Mining Cost (Ore & Waste) - US$1.33/t; 
--  Processing Cost - US$15.30/t processed; 
--  Gold Recovery - 95%, and 
--  Final Pit Wall Angle - 45 degrees .

 

The results of the WAI pit optimisation for Taparko as calculated by NPV Scheduler(R) are presented in the table below.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
            Taparko Open Pit Ore Reserves (WAI, November 1, 2010            
                    (in accordance with CIM Guidelines))                    
----------------------------------------------------------------------------
----------------------------------------------------------------------------
         Open Pit (Area)                 GT       2N2K         35      Total
----------------------------------------------------------------------------
       Cut Off Grade (g/t)             0.55       0.55       0.55          -
----------------------------------------------------------------------------
Proven               Tonnage(kt)          -          -          -          -
                    --------------------------------------------------------
                       Au(g/t)            -          -          -          -
                    --------------------------------------------------------
                     Metal  kg            -          -          -          -
                          --------------------------------------------------
                            oz            -          -          -          -
----------------------------------------------------------------------------
Probable            Tonnage(kt)         643      1,517      3,962      6,122
                    --------------------------------------------------------
                       Au(g/t)         4.33       1.85       2.84       2.75
                    --------------------------------------------------------
                     Metal  kg        2,785      2,809     11,260     16,854
                          --------------------------------------------------
                            oz       89,554     90,327    362,043    541,924
----------------------------------------------------------------------------
Proven + Probable    Tonnage(kt)        643      1,517      3,962      6,122
                    --------------------------------------------------------
                       Au(g/t)         4.33       1.85       2.84       2.75
                    --------------------------------------------------------
                     Metal  kg        2,785      2,809     11,260     16,854
                          --------------------------------------------------
                            oz       89,554     90,327    362,043    541,924
----------------------------------------------------------------------------
Note: 5% dilution and 97% mining recovery applied.                          
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

Bouroum

The resource models for F12 and Welcome Stranger have been derived from the geostatistical studies. Key drillhole spacings for the allocation of indicated resources at F12 were 20m x 20m (along-strike x down-dip), inferred resources were allocated to blocks within the mineralised zone wireframes within 50m of a composite sample. All of the modelled resources at Welcome Stranger were classified as inferred due to high very short scale variability between paired holes.

The final block models were used as a basis for resource evaluation. A summary of the results for the evaluations of in-situ resources is shown in the table below for various cut-off grade levels.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
      Mineral Resource Estimate - in-situ Resources - Bouroum All Zones     
                           (WAI, November 1, 2010                           
                    (in accordance with CIM Guidelines))                    
----------------------------------------------------------------------------
----------------------------------------------------------------------------
          Cut Off Grade                 0.5        1.0        1.5        2.0
----------------------------------------------------------------------------
                        Tonnage                                             
Measured                  (kt)            0          0          0          0
                      ------------------------------------------------------
                        Au (g/t)          0          0          0          0
                      ------------------------------------------------------
                      Metal  kg           0          0          0          0
                           -------------------------------------------------
                             oz           0          0          0          0
----------------------------------------------------------------------------
                        Tonnage                                             
Indicated                 (kt)        2,364      2,217      1,836      1,326
                      ------------------------------------------------------
                        Au (g/t)       2.52       2.63       2.91       3.36
                      ------------------------------------------------------
                      Metal  kg       5,948      5,829      5,345      4,449
                           -------------------------------------------------
                             oz     191,240    187,416    171,845    143,031
----------------------------------------------------------------------------
                        Tonnage                                             
Measured + Indicated      (kt)        2,364      2,217      1,836      1,326
                      ------------------------------------------------------
                        Au (g/t)       2.52       2.63       2.91       3.36
                      ------------------------------------------------------
                      Metal  kg       5,948      5,829      5,345      4,449
                           -------------------------------------------------
                             oz     191,240    187,416    171,845    143,031
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                        Tonnage                                             
Inferred                  (kt)          856        803        731        604
                      ------------------------------------------------------
                        Au (g/t)        3.3       3.47       3.68       4.08
                      ------------------------------------------------------
                      Metal  kg       2,826      2,783      2,692      2,466
                           -------------------------------------------------
                             oz      90,831     89,490     86,565     79,289
----------------------------------------------------------------------------
Notes:                                                                      
1. Mineral resources are not reserves until they have demonstrated economic 
viability based on a feasibility study or pre-feasibility study.            
2. Mineral resources are reported inclusive of any reserves.                
3. The contained Au represents estimated contained metal in the ground and  
has not been adjusted for metallurgical recovery.                           
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

The results of the WAI pit optimisation for F12 only was calculated by NPV Scheduler(R), using the same parameters as Taparko, are presented in the table below.

 
            ----------------------------------------------------
            ----------------------------------------------------
             Open Pit Mineral Reserves for F12 (WAI, November 1,
                                     2010                       
                    (in accordance with CIM Guidelines))        
            ----------------------------------------------------
            ----------------------------------------------------
                         Open Pit (Area)                     F12
            ----------------------------------------------------
                       Cut Off Grade (g/t)                   0.9
            ----------------------------------------------------
            Proven                      Tonnage(kt)            -
                                     ---------------------------
                                          Au(g/t)              -
                                     ---------------------------
                                       Metal    kg             -
                                             -------------------
                                                oz             -
            ----------------------------------------------------
            Probable                    Tonnage(kt)          999
                                     ---------------------------
                                          Au(g/t)           2.64
                                     ---------------------------
                                       Metal    kg         2,639
                                             -------------------
                                                oz        84,855
            ----------------------------------------------------
            Proven + Probable           Tonnage(kt)          999
                                     ---------------------------
                                          Au(g/t)           2.64
                                     ---------------------------
                                       Metal    kg         2,639
                                             -------------------
                                                oz        84,855
            ----------------------------------------------------
            Notes:                                              
            1. The contained Au represents estimated contained  
            metal in the ground and has not been adjusted for   
            metallurgical recovery.                             
            ----------------------------------------------------
            ----------------------------------------------------

 

Bissa

The resources were defined using the categories that were derived from the geostatistical studies. Key drillhole spacings for the allocation of measured resources were 20m x 20m, for indicated resources they were 40m x 40m (along-strike x down-dip). All of the modelled resources, covered by 80m x 80m drillings grids, have been classified as inferred.

The final block model was used as the basis for resource evaluation. A summary of the results of the evaluation of the in-situ resources are shown in the table below, for three different cut-off grade levels: 0.5g/t, 0.8g/t and 1.1g/t.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
  Bissa Mineral Resource Estimate - Total in-situ Resources - Whole Deposit 
         (WAI, November 1, 2010 (in accordance with CIM Guidelines))        
----------------------------------------------------------------------------
----------------------------------------------------------------------------
               Cut Off Grade                       0.5        0.8        1.1
----------------------------------------------------------------------------
Measured                    Tonnage (kt)           497        493        484
                         ---------------------------------------------------
                              Au (g/t)            3.33       3.35       3.40
                         ---------------------------------------------------
                           Metal      kg         1,657      1,652      1,643
                                  ------------------------------------------
                                      oz        53,262     53,117     52,807
----------------------------------------------------------------------------
Indicated                   Tonnage (kt)        57,570     41,878     27,079
                         ---------------------------------------------------
                              Au (g/t)            1.40       1.68       2.09
                         ---------------------------------------------------
                           Metal      kg        80,730     70,348     56,535
                                  ------------------------------------------
                                      oz     2,595,518  2,261,707  1,817,606
----------------------------------------------------------------------------
Measured + Indicated        Tonnage (kt)        58,068     42,371     27,561
                         ---------------------------------------------------
                              Au (g/t)            1.42       1.70       2.11
                         ---------------------------------------------------
                           Metal      kg        82,386     71,999     58,176
                                  ------------------------------------------
                                      oz     2,648,780  2,314,824  1,870,414
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Inferred                    Tonnage (kt)         5,657      3,821      2,262
                         ---------------------------------------------------
                              Au (g/t)             1.2       1.46       1.82
                         ---------------------------------------------------
                           Metal      kg         6,768      5,577      4,118
                                  ------------------------------------------
                                      oz       217,609    179,264    132,385
----------------------------------------------------------------------------
Notes:                                                                      
1. Mineral resources are not reserves until they have demonstrated economic 
viability based on a feasibility study or pre-feasibility study.            
2. Mineral resources are reported inclusive of any reserves.                
3. The contained Au represents estimated contained metal in the ground and  
has not been adjusted for metallurgical recovery.                           
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

The metal price used for the pit optimisation was US$900/oz Au. The following technical and economical parameters were used:

 
--  Gold Price - US$900/oz; 
--  Production Rate - 3.0Mtpa; 
--  Discount Rate - 11.2%; 
--  Dilution - 6.0%; 
--  Mining Recovery Factor - 97.0%; 
--  Mining Cost (Weathered Ore) - US$2.43/t; 
--  Mining Cost (Fresh Ore) - US$3.23/t; 
--  Mining Cost (Waste) - US$1.90/t; 
--  Processing Cost (Weathered Ore) - US$13.79/t processed; 
--  Processing Cost (Fresh Ore) - US$21.22/t processed; 
--  Gold Recovery (Weathered and Fresh Ore) - 91.5%/86.5%, and 
--  Final Pit Wall Angle - Various.

 

Based on the described above open pit optimisation, WAI estimated Bissa open pit mineral reserves. Detailed results of this estimation are given in the table below.

 
     -----------------------------------------------------------------
     -----------------------------------------------------------------
           Bissa Open Pit Mineral Reserves (WAI, November 1, 2010     
                    (in accordance with CIM Guidelines))              
                             (COG = 0.62g/t Au)                       
     -----------------------------------------------------------------
     -----------------------------------------------------------------
     Ore/Rock Type                      Ore (kt)   Au (kg)    Au (g/t)
     -----------------------------------------------------------------
     Total Proven                            487     1,572        3.23
     -----------------------------------------------------------------
     Total Probable                       28,676    49,846        1.74
     -----------------------------------------------------------------
     Total Proven and Probable            29,163    51,417        1.76
     -----------------------------------------------------------------
                                                                      
     -----------------------------------------------------------------
     Weathered Proven                          -         -           -
     -----------------------------------------------------------------
     Weathered Probable                   22,729    35,896        1.58
     -----------------------------------------------------------------
     Fresh Proven                            487     1,572        3.23
     -----------------------------------------------------------------
     Fresh Probable                        5,947    13,950        2.35
     -----------------------------------------------------------------
                                                                      
     -----------------------------------------------------------------
     Weathered Proven and Probable        22,729    35,896        1.58
     -----------------------------------------------------------------
     Fresh Proven and Probable             6,434    15,521        2.41
     -----------------------------------------------------------------
     Waste                               106,621                      
     -----------------------------------------------------------------
     Notes                                                            
     1. Mining Factors of 6% dilution and 97% mining recovery applied.
     Waste is given inclusive of inferred material, which is also     
     treated as waste.                                                
     2. The contained Au represents estimated contained metal in the  
     ground and has not been adjusted for metallurgical recovery.     
     -----------------------------------------------------------------

 

Other Burkina Faso Resources

Yeou

The Yeou property is located 30km north of Bouroum deposit and has the same type of geological properties as the better-explored F12, Bissinga and Welcome Stranger. Gold mineralisation is associated with quartz veining hosted in granodiorite close to a major sheared contact (to the south) with mafic metavolcanic to gabbroic rocks. Most of the veining is parallel to the shear zone although some extensional and/or tension gash veining more or less perpendicular to the main trend, are present.

A block model was used as the basis for resource evaluation. The key drillhole spacings for the allocation of inferred resources were 40m x 50m (along-strike x down-dip). A summary of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.4g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
            Yeou Mineral Resource Estimate (WAI, November 1, 2010           
                    (in accordance with CIM Guidelines))                    
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                               Density    Au                
COG    Classification  Volume (m3)  Tonnes (t)  (t/m3) (g/t) Contained Metal
                                                            ----------------
                                                              (kg) (troy oz)
----------------------------------------------------------------------------
0.4          Inferred      426,790   1,066,052    2.50  2.39 2,550    81,980
----------------------------------------------------------------------------
1.0          Inferred      333,567     821,087    2.46  2.87 2,357    75,765
----------------------------------------------------------------------------
1.5          Inferred      211,808     523,880    2.47  3.76 1,968    63,286
----------------------------------------------------------------------------
2.0          Inferred      144,568     359,517    2.48  4.62 1,663    54,459
----------------------------------------------------------------------------
Notes:                                                                      
1. Mineral resources are not reserves until they have demonstrated economic 
viability based on a feasibility study or pre-feasibility study.            
2. Mineral resources are reported inclusive of any reserves.                
3. The contained Au represents estimated contained metal in the ground and  
has not been adjusted for metallurgical recovery.                           
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

Ankouma

The Ankouma prospect, which lies some 23km north of Bouroum, comprises a suite of mafic volcanics which have been cut by a north-northwest trending main shear zone some 800m long, as well as other sub-parallel smaller shears.

The main zone is well delineated by gold geochemistry, the sub-parallel units less so. The mineralisation also appears to be well defined by Resistivity which shows an anomalous zone larger than the known mineralised outcrop. Other trenches show variable amounts of mineralisation with some good individual assays, a similar trend to that seen in the drillholes.

A final block model was used as the basis for resource evaluation. The key drillhole spacings for the allocation of inferred resources were 40m x 40m (along-strike x down-dip). Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.5g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
 Ankouma Mineral Resource Estimate - Total in-situ Resources (WAI, November 
                                   1, 2010                                  
                    (in accordance with CIM Guidelines))                    
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                               Density    Au                
COG    Classification  Volume (m3)  Tonnes (t)  (t/m3) (g/t) Contained Metal
                                                            ----------------
                                                              (kg) (troy oz)
----------------------------------------------------------------------------
0.5          Inferred      708,507   1,815,679    2.56  1.26 2,296    73,825
----------------------------------------------------------------------------
1.0          Inferred      352,915     896,641    2.54  1.78 1,599    51,417
----------------------------------------------------------------------------
1.5          Inferred      161,162     396,308    2.46  2.37   941    30,254
----------------------------------------------------------------------------
2.0          Inferred       63,619     159,579    2.51  3.27   522    16,792
----------------------------------------------------------------------------
Notes:                                                                      
1. Mineral resources are not reserves until they have demonstrated economic 
viability based on a feasibility study or pre-feasibility study.            
2. Mineral resources are reported inclusive of any reserves.                
3. The contained Au represents estimated contained metal in the ground and  
has not been adjusted for metallurgical recovery.                           
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

Bouly

Bouly is located in the 68.56km2 Namtenga Permit to the southeast of Bissa. The bedrock comprises massive non-foliated porphyritic mafic metavolcanics, brecciated by younger porphyritic intrusive dykes and gold is associated with quartz-pyrite-chalcopyrite veinlets with potassic alteration along the vein walls.

The criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of inferred resources were 80m x 80m (along-strike x down-dip).

The final block model was used as the basis for resource evaluation. A summary of the results of the Bouly evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.3g/t, 0.6g/t, 0.8g/t and 1.0g/t Au.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
 Bouly Mineral Resource Estimate - Total in-situ Resources (WAI, November 1,
                     2010 (in accordance CIM Guidelines))                   
----------------------------------------------------------------------------
----------------------------------------------------------------------------
          Cut Off Grade                 0.3        0.6        0.8        1.0
----------------------------------------------------------------------------
Inferred         Tonnage (kt)        16,571      9,607      3,680      1,143
              --------------------------------------------------------------
                   Au (g/t)            0.68       0.82       1.02       1.35
              --------------------------------------------------------------
                Metal      kg        11,315      7,877      3,762      1,544
                       -----------------------------------------------------
                           oz       363,793    253,261    120,966     49,653
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Notes:                                                                      
1. Mineral resources are not reserves until they have demonstrated economic 
viability based on a feasibility study or pre-feasibility study.            
2. Mineral resources are reported inclusive of any reserves.                
3. The contained Au represents estimated contained metal in the ground and  
has not been adjusted for metallurgical recovery.                           
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

Gougre

The Gougre deposit lies in the Gargo permit area which is west of the Bissa project, is coincident with a resistivity and chargeability gradient and appears to lie on the contact with a mafic volcanic. Gold mineralisation is associated with a strongly magnetic silicified unit cut by limonite-filled fractures and occurs in a zone constrained by two narrow intervals of intense fracturing.

The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the table below for four different cut-off grade levels: 0.5g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Gougre Mineral Resource Estimate - Total in-situ Resources (WAI, November 1,
                                     2010                                   
                       (in accordance CIM Guidelines))                      
----------------------------------------------------------------------------
----------------------------------------------------------------------------
          Cut Off Grade                 0.5        1.0        1.5        2.0
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Inferred         Tonnage (kt)         2,930      2,726      2,223      1,538
              --------------------------------------------------------------
                   Au (g/t)            2.39       2.52       2.82       3.33
              --------------------------------------------------------------
                Metal      kg         7,002      6,869      6,269      5,122
                       -----------------------------------------------------
                           oz       225,123    220,844    201,544    164,680
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Notes:                                                                      
1. Mineral resources are not reserves until they have demonstrated economic 
viability based on a feasibility study or pre-feasibility study.            
2. Mineral resources are reported inclusive of any reserves.                
3. The contained Au represents estimated contained metal in the ground and  
has not been adjusted for metallurgical recovery.                           
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

Zinigma

Zinigma is located in the Yargo Permit, northwest of Bissa, where an 800 x 300m zone of disturbance was noted, trending approximately east-west. Individual pits are from 10 to 60m deep chasing generally narrow (less than 50cm) white quartz stringers.

The deformation zone which contains the mineralisation is hosted within felsic volcanics (schists) which are strongly weathered and show extensive kaolin, hematite and limonite in the altered zones.

The final block model was used as the basis for resource evaluation. The key drillhole spacings for the allocation of inferred resources were 66m x 55m (along-strike x down-dip). Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.5g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
 Zinigma Mineral Resource Estimate - Total in-situ Resources (WAI, November 
                                   1, 2010                                  
                       (in accordance CIM Guidelines))                      
----------------------------------------------------------------------------
----------------------------------------------------------------------------
          Cut Off Grade                 0.5        1.0        1.5        2.0
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Inferred         Tonnage (kt)         3,687      1,854        839        361
              --------------------------------------------------------------
                   Au (g/t)            1.17       1.60       2.06       2.51
              --------------------------------------------------------------
                Metal      kg         4,317      2,959      1,725        904
                       -----------------------------------------------------
                           oz       138,792     95,150     55,465     29,071
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Notes:                                                                      
1. Mineral resources are not reserves until they have demonstrated economic 
viability based on a feasibility study or pre-feasibility study.            
2. Mineral resources are reported inclusive of any reserves.                
3. The contained Au represents estimated contained metal in the ground and  
has not been adjusted for metallurgical recovery.                           
----------------------------------------------------------------------------
----------------------------------------------------------------------------

 

Data Verification

Dr. Phil Newall is a "qualified person" as defined by National Instrument 43-101 and as a qualified person completed the verification of data on which the above mineral reserve and resource estimates were based. This verification included an assessment of QA/QC data, sample preparation and assay methodologies, core recoveries, density data, data inputs, survey data and validation of historic exploration data used in the estimate. Data were validated by using field checks, statistical methods and evaluating written protocols.

High River has implemented QA/QC procedures at all projects to ensure best industry practice in sampling and analysis of the drill core samples.

The Berezitovy mine has its own dedicated onsite core storage shed and preparation facility. All sample analysis at Berezitovy is undertaken in the on-site laboratory (process plant) which is adequate for the level of prospecting work. The laboratory uses a range of Standard Reference standards supplied by Rocklabs. The standard ore sample assays 1.65ppm Au (tolerance +/- 0.08ppm Au) and the tailings sample assays 0.71ppm Au (tolerance +/- 0.03ppm Au).

At Taparko mine, core from all mineralized intersections is stored in well-organized racks at the mine. For the Bissa project, High River has a dedicated facility in the town of Kongoussi which includes core storage and sample preparation.

The primary analytical laboratory used by High River for the Taparko, Bouroum, Bissa and the other exploration projects in Burkina Faso is Abilab in Ouagadougou. It employs an established QA/QC program which operates a global quality management system that is ISO9001:2000 accredited.

None of the laboratories contracted by High River for sample analyses has any relationship to, or interest in, High River or any of its projects.

Qualified Person

Dr. Phil Newall, BSc (ARSM), PhD (ACSM), CEng, FIMMM, Director with WAI is the qualified person responsible for supervising the preparation of this press release and the scientific and technical information contained in this press release. Dr. Newall is independent of High River.

Cautionary Note

The grades presented in the above tables are not meant to imply recoverable gold. Mineral resources and reserves have been estimated and classified according to the CIM Guidelines. High River is not aware of any known environmental, permitting, legal, title, taxation, socio-economic, marketing or other relevant issues that could potentially affect the estimate of mineral resources or reserves. The mineral resources and reserves may be affected by subsequent assessments of mining, environmental, processing, permitting, taxation, socio-economic and other factors.

About High River

High River is an unhedged gold company with interests in producing mines and advanced exploration projects in Russia and Burkina Faso. Two underground mines, Zun-Holba and Irokinda, are situated in the Lake Baikal region of Russia. Two open pit gold mines, Berezitovy in Russia and Taparko-Bouroum in Burkina Faso, are also in production. Finally, High River has two advanced exploration projects with NI 43-101 compliant resource estimates, the Bissa gold project in Burkina Faso and 50% interest in the Prognoz silver project in Russia.

FORWARD-LOOKING INFORMATION

This release and subsequent oral statements made by and on behalf of the Company may contain forward-looking statements. Forward-looking information includes, but is not limited to, statements with respect to mineral reserve and resource estimates; the ability to realize estimated mineral reserves; recoveries, grades and annual production; receipt of all necessary approvals; the parameters and assumptions underlying the mineral resource and reserve estimates and the financial analysis; and gold prices. Wherever possible, words such as "intends", "expects", "scheduled", "estimates", "anticipates", "believes", and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, have been used to identify these forward-looking statements. Estimates regarding mineral resources and reserves, as outlined above and in the technical report, have been based on knowledge of company management and the knowledge and experience of third party experts. Although the forward-looking statements contained in this release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, High River cannot be certain that actual results will be consistent with these forward-looking statements. A number of factors could cause events and achievements to differ materially from the results expressed or implied in the forward-looking statements. These factors should be considered carefully and prospective investors should not place undue reliance on the forward-looking statements. Forward-looking statements necessarily involve significant known and unknown risks, assumptions and uncertainties that may cause High River's actual results, events, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Although High River has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be anticipated, estimated or intended, including those risk factors discussed in the Company's 2009 Annual Information Form. There can be no assurance that the forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, prospective investors should not place undue reliance on forward-looking statements. Any forward-looking statements are made as of the date of this release, and High River assumes no obligation to update or revise them to reflect new events or circumstances, unless otherwise required by law.

 

CONTACT INFORMATION:

High River Gold Mines Ltd.
Konstantin Sobolevskiy
CEO
011 7 495 981 0910 ext. 6676
info@hrg.ca
www.hrg.ca



Data and Statistics for these countries : Burkina Faso | Russia | All
Gold and Silver Prices for these countries : Burkina Faso | Russia | All

High River Gold Mines Ltd.

PRODUCER
CODE : HRG.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

High River Gold is a gold producing company based in Canada.

High River Gold produces gold, silver in Burkina Faso and in Russia, develops gold in Burkina Faso, and holds various exploration projects in Burkina Faso.

Its main assets in production are BURYATZOLOTO (ZUN-HOLMA), BEREZITOVY, SOMITA and IROKINDA in Russia and TAPARKO in Burkina Faso, its main asset in development is BOUROUM in Burkina Faso and its main exploration properties are NOVOPHIRSOVSKOYE and PROGNOZ in Russia and BISSA GOLD in Burkina Faso.

High River Gold is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.2 billions as of today (US$ 1.1 billions, € 882.8 millions).

Its stock quote reached its highest recent level on March 07, 2008 at CA$ 3.50, and its lowest recent point on November 14, 2008 at CA$ 0.04.

High River Gold has 840 219 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of High River Gold Mines Ltd.
2007 Annual Report
2006 Annual Report
2005 Annual Report
Financings of High River Gold Mines Ltd.
12/2/2009Closing of Private Placement
6/19/2009Announces Closing of Private Placement and Update on TSX Del...
Nominations of High River Gold Mines Ltd.
1/24/2013Announces Change to the Board of Directors
5/15/2012Announces Appointment of Chief Executive Officer and Chief F...
3/5/2012Announces Resignation of Chief Executive Officer
12/10/2009Appointment to the Board of Directors and the Audit Committe
10/21/2009 Appointment of Chief Executive Officer
9/30/2009Announces Appointment of New Board Member
Financials of High River Gold Mines Ltd.
8/14/2012Financial Results for the Second Quarter Ended June 30, 2012
5/16/2012Financial Results for the First Quarter Ended March 31, 2012
2/24/2012Announces Release of Nord Gold Financial Statements
8/15/2011Reports Second Quarter 2011 Results
8/13/2010Reports Second Quarter 2010 Results
5/13/2010Reports First Quarter 2010 Results
8/15/2009Reports Second Quarter 2009 Results
12/18/2008Reports Third Quarter 2008 Results
Project news of High River Gold Mines Ltd.
1/22/2013Announces Production Results for Q4 2012
10/11/2012Announces Production Results for Q3 2012
7/18/2012Announces Production Results for Q2 2012
4/24/2012Announces Production Results for Q1 2012
1/18/2012Announces Preliminary Production Results for 2011
7/4/2011(Bissa Gold)Announces the Granting of Mining License for Bissa Gold Proj...
2/18/2011(Prognoz)Provides an Update on the Bankruptcy Procedures of Prognoz S...
1/31/2011(Berezitovy)Reports Updated Resource and Reserve Statements
1/31/2011(Taparko)Reports Updated Resource and Reserve Statements
1/31/2011(Bouroum)Reports Updated Resource and Reserve Statements
1/31/2011(Bissa Gold)Reports Updated Resource and Reserve Statements
1/28/2011(Taparko)Announces Release of Royal Gold Security
9/11/2009(Irokinda)Reports Two Accidental Deaths at Irokinda Mine
6/22/2009(Bissa Gold)Reports Updated NI 43-101Compliant Resource Estimate for Bis...
12/4/2008(Prognoz)Advises That Closing of Prognoz Acquisition Not Extended and...
11/10/2008(Taparko)Re-Starts Mill at Taparko-Bouroum and Provides Update on Str...
9/30/2008(Prognoz)Advises That Closing of Prognoz Acquisition Transaction Has ...
3/31/2008(Taparko)2008 Technical report
7/11/2007Discovers New High Grade Gold Zone at Simkar
5/1/2007Announces New Acquisition in Southeastern Peru, Vetaspata --...
3/28/2007High Grade Gold intersected at Quintana Gold Mine, Colombia ...
Corporate news of High River Gold Mines Ltd.
3/13/2013Nord Gold N=2EV=2E and High River Gold Min
12/11/2012Acknowledges Expiry of Offer by Nord Gold
10/31/2012Mails Directors' Circular; Board Recommends Shareholders Acc...
10/22/2012Acknowledges Bid by Nordgold; Advises Shareholders to Wait f...
9/27/2012Announces Updated Reserve and Resource Estimate and Files Te...
7/31/2012Provides Update on Nord Gold Offer
7/20/2012Announces Amended and Restated AIF and Amended Technical Rep...
7/18/2012Responds to Nord Gold Press Release and Establishes Special ...
6/8/2012(Berezitovy)Files Technical Reports for Berezitovy and Burkina Faso Prop...
5/24/2012Announces Date of Annual General Meeting
4/24/2012(Berezitovy)Announces Updated Reserve and Resource Estimates for Berezit...
4/13/2012Second Default Status Report
3/31/2012Reports 2011 Results
3/28/2012First Default Status Report
3/1/2012Announces Default Pursuant to National Policy 12-203
2/24/2012(Prognoz)Provides an Update on the Bankruptcy Procedures of Prognoz S...
12/29/2011(Berezitovy)Announces Amended Q2 2011MD&A and Berezitovy Technical Repor...
9/2/2011(Prognoz)Provides an Update on the Bankruptcy Procedures of Prognoz S...
6/7/2011Reaches Settlement With Senet CC
1/24/2011Shareholders Approve Continuing to Yukon
6/8/2010Announces the Beginning of the Bankruptcy Procedures of Prog...
5/28/2010Announces Change to the Board of Directors and Inclusion in ...
4/20/2010Reports 2009 Results
4/14/2010First Default Status Report
4/1/2010Late Filing of Annual Filings and Provides Operational and F...
12/1/2009Clearance of PIF in Connection With CDN$57 Million Financi
11/3/2009Announces Change of Auditor
10/27/2009Announces Proposed $57 Million Financing
10/8/2009Change to the Board of Directors
9/23/2009 Change to the Board of Directors
9/21/2009 Resignation of Chief Executive Officer
9/15/2009Announces New Investor Relations Contact
9/1/2009Announces Resignation of VP Exploration
7/23/2009New Chief Financial Officer
7/16/2009Provides Q2/2009 Update on Operations and Financial Status
6/26/2009Mailing of Offer
6/17/2009Enters Into Support Agreement With Severstal
6/9/2009Provides Update on Improved Severstal Offer and Announces Pr...
5/22/2009Provides Update on Strategic Alternatives
5/19/2009Provides Update on Operations and Financial Status
3/6/2009Provides Update on Operations
2/2/2009Provides Update on Operations
1/2/2009Provides Update on Operations, Financial Status, and Personn...
12/14/2008Second Default Status Report
12/1/2008First Default Status Report
11/19/2008Announces Late Filing of Interim Financial Statements
9/22/2008Comments on Share Price Decline
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (HRG.TO)FRANKFURT (HRG.F)
1.39+0.72%1.03+0.49%
TORONTO
CA$ 1.39
03/14 14:56 0.010
0.72%
Prev close Open
1.38 1.40
Low High
1.39 1.40
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  1.39 -%
Volume 1 month var.
1,900 -%
24hGold TrendPower© : -8
Produces Gold
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/17/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.86+2.28%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.21+2.44%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :