Brilliant Mining Corp.

Published : August 01st, 2008

Resource and Exploration Update Lanfranchi Nickel Mine, Kambalda District of Western Australia

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Canada | Diamond | Nickel |
Brilliant Mining Corp. Suite 1440, 625 Howe St.
Vancouver BC, V6C 2T6

Toll Free: 1-888-331-2269

BMC: TSX-V

Resource and Exploration Update
Lanfranchi Nickel Mine, Kambalda District of Western Australia

Vancouver, B.C. - Brilliant Mining Corp. (BMC: TSXV) ("Brilliant" or the "Company") today reported an updated Measured, Indicated and Inferred Mineral Resource and an exploration update from its 25% owned Lanfranchi Nickel Mine, located in the world class Kambalda Nickel District of Western Australia.

Key Point Summary:

  • 3.71 Mt at 2.58% Measured and Indicated Mineral Resource for 95,516t (210.5 MLbs) of Ni metal
  • 1,62 Mt at 1.84% Inferred Resource for 29,846t (65.8 Mlbs) of Ni Metal reported at the Lanfranchi Mine as at June 30, 2008
  • 2008/09 underground exploration focused on adding to mineral resource and reserve base with Deacon down-plunge drill program to commence in September 2008
  • AU$8 million, 56,000m, 82 drill hole aggressive surface program

"The significant global resource reported at the Lanfranchi Mine reflects the future longevity of the operation" states John Williamson, CEO of Brilliant Mining "that has the potential to be increased even further through the aggressive surface and underground exploration program which we have initiated"

Lanfranchi Project � Resource Update

An updated Measured, Indicated and Inferred Mineral Resource as at 30 June 2008 for the Lanfranchi Project is reported in the following table (Table 1).

Table 1: Lanfranchi Project Estimated Mineral Resource at 30 June 2008

 

 

As at June 30 2008

As at June 30 2007

Resource

Category

Tonnes

Ni

Ni Metal

Tonnes

Ni

Ni Metal

 

 

(,000)

(%)

(tonnes)

(Mlbs)

(,000)

(%)

(tonnes)

(Mlbs)

Deacon

Indicated

1,783

2.88

51,365

113.2

1,607

3.09

49,692

109.6

 

Inferred

460

2.64

12,186

26.9

303

2.77

8,389

18.5

Helmut South

Measured

216

2.85

6,172

13.6

457

2.44

11,138

24.6

 

Indicated

38

2.58

973

2.1

 

 

 

 

Winner

Indicated

82

5.67

4,673

10.3

112

6.16

6,879

15.2

Lanfranchi

Measured

11

4.11

471

1.0

 

 

 

 

 

Indicated

67

5.79

3,887

8.6

99

3.04

3,002

6.6

 

Inferred

11

5.24

552

1.2

35

4.25

1,476

3.3

Schmitz

Indicated

75

4.55

3,412

7.5

75

4.55

3,412

7.5

 

Inferred

11

3.58

376

0.8

11

3.58

376

0.8

Martin

Indicated

44

3.88

1,722

3.8

44

3.88

1,722

3.8

 

Inferred

6

3.50

208

0.5

6

3.50

208

0.5

Cruikshank

Indicated

1,139

1.41

16,025

35.3

1,139

1.41

16,025

35.3

 

Inferred

931

1.33

12,397

27.3

931

1.33

12,397

27.3

Remnant

Indicated

253

2.69

6,816

15.0

253

2.69

6,816

15.0

 

Inferred

203

2.03

4,127

9.1

203

2.03

4,127

9.1

Total

Measured

227

2.93

6,643

14.6

457

2.44

11,138

24.6

 

Indicated

3,481

2.55

88,873

195.9

3,328

2.63

87,548

193.0

 

Inferred

1,622

1.84

29,846

65.8

1,489

1.81

26,973

59.5

Notes:
1. Resources estimated at 1.0% Ni cut-off and 1.6% cut-off for Schmitz
2. All mineralised zone interpretations were reviewed and modified where necessary by BM Geological Services Pty Ltd (BMGS) in consultation with Lanfranchi Joint Venture staff prior to resource estimation.
3. BMGS believes that the current geological models are fundamentally sound and provides an appropriate basis for mine planning and project evaluation.
4. Remnant Resources reflect ore remaining post historical mining by WMC
5. The Schmitz, Martin, Cruikshank and Remnant Resource estimates are unchanged from the Company�s 43-101 technical Report on the Lanfranchi Nickel Project dated August 2007 and filed on SEDAR
6. Additional notes detailing the Resource Estimation Parameters utilized are listed at the bottom of this press release

After production of 7,303 tonnes (16.1 MLbs) of contained Ni metal from the Lanfranchi mine in 2007/08 the measured and indicated mineral resources for the project decreased by approximately 3,170 tonnes (7.0 MLbs) of Ni metal compared to the mineral resource as at 30 June 2007.  The principal decrease in mineral resource was due to ore sourced from the Helmut South and Winner orebodies throughout the 07/08 mine production year.  A relative gain was reported in the Deacon Resource estimate from the recent detailed delineation drill program.

In 2008/09 underground exploration activities will be focused on replenishing and adding to our mineral resource and reserve base by drilling the down plunge extensions at Deacon, Helmut South, Schmitz, and Lanfranchi

Deacon Down Plunge Delineation Drill Program

The Deacon 5920 hanging wall exploration drill drive commenced during the quarter and is on schedule for a resource delineation drill program to commence in September.  The first phase of drilling will target the existing 11,500 tonne of Ni metal currently classified as an Inferred Mineral Resource at the base of the Deacon Ni channel with the intent to upgrade it to an Indicated Resource and then convert to Reserves.  This drill campaign has the potential to significantly add to mine life in the Reserve category.

The second phase of drilling will be to target a further 150m to 200m down plunge of the Inferred Resource limits with the intent to add new material into the resource base at the mine.  A high level of confidence exists for the down plunge continuation of the Deacon mineralisation as evidenced by the strong geophysical conductor identified by parallel EM drilling performed during the last quarter of 2007 (see company press release dated November 1, 2007).



Figure 1: Deacon Resource 3-D Model in Cross Section


Winner Down Plunge Extension

As part of the latest resource definition drill program, drill hole WD084 was completed to enable geophysics to test the down plunge potential of the Winner Ni channel.  The down hole EM survey produced a strong EM response indicating a high confidence level for the continuation of the Winner mineralisation an additional 25 to 30m down plunge of the interpreted resource limits.

Drilling to test this extension is planned when the Winner decline has progressed sufficiently to enable the development of a suitably positioned underground drill station.

Lanfranchi Down Plunge Extension

The latest resource definition drill program has increased the Measured and Indicated Mineral Resource at Lanfranchi by 45% or 1,356 tonnes (3.0 MLbs) of Ni metal.  The Lanfranchi Ni channel remains open to depth.

Tramways Tenements � Surface Exploration Update

The Lanfranchi Joint Venture has embarked on an aggressive surface exploration program on the Tramways Tenements host to the producing high-grade Lanfranchi Nickel Mine.  The current 82 hole 56,000 metre drill program is budgeted at AU$8 million and will test various prospective areas across the property as is shown in Fig 2.

Figure 2: Tramways Dome 2008 Surface Exploration Drill Program

Northern Dome Drill Area

An AU$2.5 million, 12,000 metre, 24 hole drill program is budgeted for the Northern Tramways Dome.  The completed program will entail infill drilling and deeper drill traverses within the high priority "channel facies" ultramafic corridor along the interpreted overturned continuation of the Winner-Schmitz and Helmut-Deacon Ni channels.  In addition, a 100 metre spaced drill fence is planned further to the west towards the projected overturned position of the main Lanfranchi orebody.

To date, 19 drill holes have been completed for a total of 5,376m of RC and 4,349m of Diamond drilling with down hole EM surveys completed in 13 of the drill holes.

Figure 3: Tramways North Dome Drill Area - 2008 Surface Exploration Drill Program

The drilling continues to provide strong evidence of the potential for the area to host a nickel sulphide discovery.  Multi-element geochemistry continues to provide support for the overturning of the ultramafic/basalt contact on the northern margin of the Tramways Dome and identification of two high priority �nickel channel facies� corridors in the projected overturned position of the Winner-Schmitz and Helmut-Deacon Ni channels. In addition, multiple high grade nickel sulphide intercepts have been identified (as previously reported on April 22, 2008).

One significant assay was received for the Northern Tramways area during the quarter, 0.25m grading 9.27% nickel, for the previously reported massive sulphide intercept in TD8043 (from 285.72m). Geophysical anomalies reported from the down hole EM surveys typically have related to either previously reported mineralisation or sediment layers. However one hole, TD8064 reported an off-hole anomaly from 420m within ultramafic that is recommended for follow-up drilling.

Lanfranchi West Drill Area

A program of surface drilling has commenced in the Ham-Edwin area focused on the down plunge extents of the Ham to Edwin Ni channel mineralisation.  To date 16 RC pre-collars (TD8067-TD8083) have been completed for a total of 6,082m.  Towards the end of the quarter Diamond drilling commenced with 6 Diamond tails (TD8067-TD8072) for 747m completed. 

The results of the drilling have been encouraging with mineralisation intersected in two holes as follows:

  • 6.35% Ni over 1.0m in TD8069 (458m); and
  • 1.84% Ni over 0.25m in TD8072 (563.35m)

Additionally, the drill results to date indicate significant variation in the basal contact topography and hence provide the environment favorable for nickel-bearing troughs or embayments. 

The drill spacing remains broad at 100m and allows ample room for an Edwin style orebody.  Down hole geophysics is pending on all holes.

Figure 4: Lanfranchi West Area - 2008 Surface Exploration Drill Program

The project is supervised by John Williamson, P.Geol., of Edmonton, Alberta. Mr. Williamson is CEO and a Director of Brilliant, and is the qualified person as defined by National Instrument 43-101.\

**Table 1 Notes:
The Deacon Mineral Resource Estimate, which is JORC-compliant, has been prepared by BM Geological Services Pty Ltd and Lanfranchi Nickel Mines personnel; and has been reconciled to the mineral resource and mineral reserve categories as set out by and adopted by the CIM Council. The estimate is based on a 3D Surpac block model utilizing a block size of 10m NS x 10m EW x 2m vertical with 5.0m x 5.0m x 1.0m sub-cells. The model comprises 107 underground Diamond drill holes for a total of 14,338m of Diamond drilling with a total of 4,898 core samples collected. All holes have been accurately located using theodolite survey instruments and down-hole "Reflex EZ Shot" survey cameras.  Grade interpolation is by Inverse Distance techniques using an oriented search ellipse based on the geometry of the mineralization. Models for validation and verification have also been completed using Ordinary Kriged interpolations. 

The tonnes and grade of the Mineral Resource estimate is the material constrained within the interpreted mineralization wireframes which were constructed on sectional interpretations at 50m centres to a 1.0% Ni cut-off grade. The Deacon resource cut-off was reduced from the previous reiteration due to the selection of a bulk mining method supporting the 0.8%Ni economic cut-off for reserves.  When present, high grade massive nickel sulphide mineralization was domained separately.

The Deacon Mineral Resource is largely classified as Indicated due to the good continuity of the mineralization, the adequate drill hole spacing and the confidence gained from QA/QC checks and data validation.  A small zone of mineralization at the extremities of the resource has been classified as Inferred due to the lack of sample support and/or poor continuity of grade and lithological controls.

The Lanfranchi Mineral Resource Estimate, which is JORC-compliant, has been prepared by BM Geological Services Pty Ltd and Lanfranchi Nickel Mines personnel; and has been reconciled to the mineral resource and mineral reserve categories as set out by and adopted by the CIM Council. The estimate is based on a 3D Surpac block model utilizing a block size of 5.0m x 5.0m x 1.0m cells. The model comprises a total of 57 Diamond holes for 7,058m of Diamond drilling and a total of 1,194 core samples collected. All holes have been accurately located using theodolite survey instruments and down-hole "Reflex EZ Shot" survey cameras. Grade interpolation is by Inverse Distance techniques using an oriented search ellipse based on the geometry of the mineralization. Models for validation and verification have also been completed using Ordinary Kriged interpolations. 

The tonnes and grade of the Mineral Resource estimate is the material constrained within the interpreted mineralization wireframes which were constructed on sectional interpretations at 10m centres to a 1.0% Ni cut-off grade.

The Lanfranchi Mineral Resource is largely classified as Measured and Indicated due to the good continuity of the mineralization, the adequate drill hole spacing and the confidence gained from QA/QC checks and data validation.  A small zone of mineralization at the extremities of the resource has been classified as Inferred due to the lack of sample support and/or poor continuity of grade and lithological controls.

The Winner Mineral Resource Estimate, which is JORC-compliant, has been prepared by BM Geological Services Pty Ltd and Lanfranchi Nickel Mines personnel; and has been reconciled to the mineral resource and mineral reserve categories as set out by and adopted by the CIM Council. The estimate is based on a 3D Surpac block model utilizing a block size of 5.0m x 2.5m x 0.5m cells. The geological framework used for the June 2008 resource estimate incorporates the mineralisation and structural model developed from new drilling as well as the previous interpretation completed in November 2007 based on 43 surface RC and Diamond drill holes. All holes have been accurately located using theodolite survey instruments and down-hole "Reflex EZ Shot" survey cameras. Variograms were calculated on multiple orientations to test for optimal grade continuity within the Winner mineralisation. The variogram that represented the highest continuity orientation was selected, which in turn also supported the geological strike of the mineralisation.  Grade interpolation was completed using Ordinary Kriging methods.

The tonnes and grade of the Mineral Resource estimate is the material constrained within the interpreted mineralization wireframes which were constructed on sectional interpretations at 10m centres to a 1.0% Ni cut-off grade as well as a second wireframe with a cut off grade of 0.7 % Ni to incorporate lower grade, disseminated marginal material identified on the edges of the orebody.

The Winner Mineral Resource is largely classified as Indicated due to the good continuity of the mineralization, the adequate drill hole spacing and the confidence gained from QA/QC checks and data validation.  A small zone of mineralization at the extremities of the resource has been classified as Inferred due to the lack of sample support and/or poor continuity of grade and lithological controls.

The Helmut South Mineral Resource Estimate, which is JORC-compliant, has been prepared by BM Geological Services Pty Ltd and Lanfranchi Nickel Mines personnel; and has been reconciled to the mineral resource and mineral reserve categories as set out by and adopted by the CIM Council. The estimate is based on a 3D Surpac block model utilizing a block size of 5m NS x 1m EW x 5m cells.  The geological framework used for the June 2008 resource estimate incorporates the mineralisation and structural model developed from new drilling as well as the previous interpretation completed in August 2007 based on 90 underground Diamond drill holes. All holes have been accurately located using theodolite survey instruments and down-hole "Reflex EZ Shot" survey cameras.  Grade interpolation is by Inverse Distance techniques using an oriented search ellipse based on the geometry of the mineralization. Models for validation and verification have also been completed using Ordinary Kriged interpolations. 

The tonnes and grade of the Mineral Resource estimate is the material constrained within the interpreted mineralization wireframes which were constructed on sectional interpretations at 10m centres to a 1.0% Ni cut-off grade.  The Helmut South Mineral Resource is largely classified as Measured due to the good continuity of the mineralization, the adequate drill hole spacing and the confidence gained from QA/QC checks and data validation.

All core samples collected have been half cored using a Diamond saw. The minimum sample size was set at 20cm and the maximum sample size was set at 1.00m.  KalAssay Laboratories in Kalgoorlie (KalAssay) have completed all assaying of the samples collected by LNM. The analytical technique employed to analyze all samples is a 4 acid digest with an ICP finish.

About Brilliant Mining Corp.

Brilliant Mining Corp. is focused on the production, development and exploration of nickel opportunities world wide. The Company currently has a 25% interest in the producing Lanfranchi Nickel Mine in Western Australia and has active nickel projects in Canada, including the Michikamau property in central Labrador. 

On behalf of the Board of Directors

"Mike Sieb"
Mike Sieb, B.Sc., MBA
President
Brilliant Mining Corp.

For further information about Brilliant Mining Corp., or this news release, please visit our website at www.brilliantmining.com, or contact:

Mike Sieb 
President
604-646-4525
mikes@brilliantmining.com
Derek Iwanaka 
Investor Relations 
604-646-4524
info@brilliantmining.com

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Certain disclosures in this release, including management's assessment of Brilliant�s plans and projects, constitute forward-looking statements that are subject to numerous risks, uncertainties and other factors relating to Brilliant's operation as a mineral exploration company that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Readers are cautioned not to place undue reliance on forward-looking statements. Brilliant expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

-
Data and Statistics for these countries : Australia | Canada | All
Gold and Silver Prices for these countries : Australia | Canada | All

Brilliant Mining Corp.

EXPLORATION STAGE
CODE : BLT.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Brilliant Mining is a nickel exploration company based in Canada.

Brilliant Mining holds various exploration projects in Canada.

Its main exploration property is MISCHIKAMAU in Canada.

Brilliant Mining is listed in Canada. Its market capitalisation is CA$ 38.1 millions as of today (US$ 30.9 millions, € 27.7 millions).

Its stock quote reached its highest recent level on January 16, 2009 at CA$ 0.56, and its lowest recent point on April 19, 2013 at CA$ 0.03.

Brilliant Mining has 149 450 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Brilliant Mining Corp.
2008 Annual Report
2007 Annual report
Financings of Brilliant Mining Corp.
4/18/2006Revises private placement terms
Project news of Brilliant Mining Corp.
10/8/2014Montana Exploration Corp. announces agreement to acquire Bri...
1/29/2009(Lanfranchi)Record Nickel Metal Production for December 2008 Quarter Lan...
1/14/2009(Lanfranchi)39% Increase of Deacon Indicated Mineral Resource to 157.4 M...
9/19/2008(Lanfranchi)Contained Nickel Reserves Increase to 146 million pounds and...
9/4/2008(Lanfranchi)450,000 Tonnes of Ore Approved for Delivery Lanfranchi Nicke...
8/1/2008(Kambalda)June Quarterly Production Update Lanfranchi Nickel Mine, Kam...
8/1/2008(Kambalda)Resource and Exploration Update Lanfranchi Nickel Mine, Kamb...
7/17/2008(Kambalda)Strong Production Growth Forecast - Lanfranchi Nickel Mine K...
4/23/2008(Lanfranchi)Record Quarterly Production – 49% Increase over December 200...
4/23/2008(Lanfranchi)7.0% Ni over 1.22m from First Hole on Northern Tramways Dome...
3/31/2008(Lanfranchi)Production Commences 18 Months After Discovery at High-Grade...
3/13/2008(Lanfranchi) Drill Program to Commence Lanfranchi Nickel Mine, Kambalda ...
1/31/2008(Lanfranchi)Record Quarterly Production?47% Increase over September Quar...
1/30/2008(Lanfranchi)Significant Conductor Identified on Northern Overturned Tram...
11/29/2007(Kambalda)5.4% Ni Delivered from Winner during First Month Production ...
10/30/2007(Kambalda)Winner Production Commenced Oct. 14?First Month Ore Deliveri...
10/29/2007(Lanfranchi)High Grade Massive Ni Sulphide Intersected on Overturned Nor...
10/4/2007Intersects Nickel Sulphide Mineralization at Michikamau Proj...
9/13/2007(Lanfranchi)High Grade Massive Ni Sulphide Zone Delineated, Lanfranchi O...
8/10/2007(Lanfranchi)Deacon Ore Reserve Economic Input Summary; Lanfranchi Nickel...
7/31/2007(Lanfranchi)June 2007 Quarterly Update
7/10/2007(Kambalda)Drilling Validates Tramways Dome Theory; 3.4% Ni over 1 Metr...
7/3/2007(Kambalda)Resource Delineation Drill Program Underway on Lanfranchi Ex...
6/25/2007(Mischikamau)Commences Exploration Program at Michikamau Ni-Cu-Co-PGE Pro...
5/29/2007(Kambalda)21,000 Tonnes (46.8 Million Lbs) Ni Metal Production Target ...
Corporate news of Brilliant Mining Corp.
4/20/2015Brilliant Announces Proposed Investment in Ram Power
4/15/2015Brilliant Announces Appointment of CFO and New Head Office
4/10/2015IIROC Trading Resumption - BLT
4/10/2015Announces Plans for A Return of Capital; Change of Business ...
4/10/2015Brilliant Announces Plans for A Return of Capital; Change of...
4/10/2015IIROC Trading Halt - BLT
4/9/2015Brilliant Receives Final Payment from Government of Equatori...
3/24/2015Brilliant Receives Third Payment from Government of Equatori...
2/26/2015IIROC Trading Resumption - BLT
2/26/2015IIROC Trading Halt - BLT
2/26/2015Brilliant Receives Second Payment from Government of Equator...
2/11/2015Brilliant Announces Cancellation of Shares
2/11/2015IIROC Trading Resumption - BLT
2/11/2015IIROC Trading Halt - BLT
2/11/2015Brilliant Provides Update on Payment From Government of Equa...
1/30/2015Brilliant Provides Update on Agreement With Government of Eq...
1/22/2015IIROC Trading Resumption - MPL; BLT
1/22/2015Brilliant Announces Agreement with the Government of Equator...
1/22/2015IIROC Trading Halt - BLT
11/25/2014Brilliant Resources and Montana Exploration Announce Termina...
10/8/2014Brilliant Announces Letter Agreement Setting Out Terms of Ac...
6/12/2014Brilliant Proceeds to Arbitration Against the Government of ...
11/19/2008Will Be Exhibiting at the San Francisco Hard Assets Conferen...
9/26/2008Will Be Exhibiting at the Toronto Resource Investment Confer...
6/23/2008TSX Venture 50 Ranks Brilliant Mining In Top 10 Mining Compa...
6/16/2008Ore Deliveries Unaffected - Lanfranchi Nickel Mine, Kambalda...
5/29/2008Retires $5 Million Convertible Debenture with Cash Payment
5/15/2008Cash Position Increases Receives $3.4 Million from Warrant E...
4/16/2008Visits Kamloops, White Rock and Victoria
1/29/2008Presents at 2008 World Outlook Financial Conference
1/15/2008Chairman s Message - Brilliant Mining 2007 Year in Review
11/1/2007Strong Conductor Down-Plunge of Deacon?Surface Drill Program...
9/24/2007Reports Significant Increase to Nickel Reserves and Resource...
8/7/2007Deacon Ore Reserve Exceeds 43,000 Tonnes of Nickel Metal; Tr...
8/1/2007Brilliant Nickel Production Un-hedged, Lanfranchi Nickel Min...
7/17/2007Quarterly Nickel Ore Deliveries Lanfranchi Nickel Mine, Kamb...
7/16/2007Commences Drilling at Michikamau Ni-Cu-Co-PGE Project: Labra...
6/20/2007Recognized as Top 10 Mining Company For 2007 TSX Venture 50 ...
3/5/2007Initial Deacon Resource Exceeds Expectations; 1,325,000 Tonn...
5/26/2006closes acquisition of Donegal Resources Pty Ltd.;…
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (BLT.V)
0.255+0.00%
TSX-V
CA$ 0.255
06/26 15:59 -
0%
Prev close Open
0.255 0.255
Low High
0.250 0.255
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.255 -1.92%
Volume 1 month var.
114,001 -1.92%
24hGold TrendPower© : -6
Produces
Develops
Explores for Cobalt - Copper - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.66-0.71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.28+0.16%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.52-1.71%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65+0.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.03-1.23%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.62-0.18%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :