Eagle Plains Resources Ltd.

Published : March 05th, 2010

Results from Drill Program

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Diamond | Gold | Iron | Recovery | Swift | Uranium |

 
Suite 200, 16 - 11th Ave. S. Cranbrook, BC VIC 2P1   Ph: 866 486 8673    Fax: (250) 426-6899
Email:
info@eagleplains.com or visit our Website at www.eagleplains.com
Eagle Plains/Swift Resources Announce Results from Drill Program at Iron Range Property, South-eastern British Columbia

Cranbrook, B.C., 05 March, 2010: Eagle Plains Resources Ltd. (EPL:TSX-V) and Swift Resources Inc. (TSX-V:SWR) announce results from a Diamond drilling program completed at Eagle Plains' 100% owned Iron Range project located in the Goat River area 15km NE of Creston, B.C. The drilling program was funded by Swift, who have an option to earn a 60% interest in the property by completing $3,000,000 in exploration expenditures, making $500,000 in cash payments and issuing 750,000 shares to EPL over 5 years (see EPL NR 01/12/09). A total of 580 meters in 7 Diamond drill holes was completed in December, 2009 at a cost of $400,000.

Highlights:

. Drill hole IR09-022 yielded 1.0m @ 7.53 gm/t Au and 1.1m @ 2.05 gm/t Au.
. A channel sample 30m South of 2009 drilling returned 0.70m @ 3.26 gm/t Au.
. Numerous gold and base-metal targets exist for future exploration work.

The 2009 exploration program has confirmed a southern extension of the O-Ray gold zone and substantially increased the known vertical extent above and below that of the IR08-006 high grade intersection (51.52 g/t Au and 2.39 g/t Ag over 7.00 meters, including 118.45 g/t Au over 3.00 meters). Detailed descriptions of the results from the 2009 drill program are presented below:

Hole Number From (m) To (m) Width (m)

Assay1

(Au g/t)

Duplicate Assay2
(Au g/t)
Recovery
IR09022 9.83 10.83 1.00 7.53 22.5 81%
  32.45 33.55 1.10 2.05 < 0.03 90%
IR09023 18.40 19.40 1.00 0.97 0.47 69%
  35.22 36.22 1.00 0.39 < 0.03 92%

1. Original sampling consisted of splitting and sampling � of the core; analysis consisted of 250g coarse metallic screen assay.
2. Duplicate sampling consisted of splitting and sampling � of the core; analysis consisted of 250g coarse metallic screen assay.


Drill-hole IR09-022, collared 2.5m south and vectored slightly southeast of IR08-006, yielded 7.53 gm/t Au (22.50 gm/t Au duplicate reanalysis) over 9.83-10.83m and 2.05 gm/t Au from 32.45-33.55m. The section laterally adjacent to the high gold grade zone in IR08-006 generated .08 gm/t over 1.74m from 20.20-21.94m. Holes IR09-021 and IR09-023 to IR09-026 returned no significant intercepts. These results illustrate the erratic distribution of the gold mineralization indicating the need for further evaluation of the structural controls on mineral emplacement.


Thirty-five metres south of the O-Ray zone channel sample MMIRR150 produced 3.26 gm/t Au over 0.70m. Soil sampling generated isolated anomalous gold values up to 335m south of the O-Ray occurrence. This elevated soil geochemistry ranks uppermost regionally and occurs proximal to the projected intersection of a major NE splay fault and the north trending Iron Range fault zone.


The program was carried out under the supervision of C.C. Downie, P.Geo.. F.B. Drilling of Cranbrook B.C. provided drilling services, with analytical services provided by EcoTech Laboratories Ltd., Stewart Group, of Kamloops, B.C. All of the drill core was sampled and analyzed using the ICP-AES 28 element analytical method (BICP-11). Sample analysis for gold consisted of 250 gram coarse metallic screen assay (FA-AA finish). Certified standards and blanks were inserted for QA/QC. Significant elevated gold value intercepts were re-sampled from a quarter duplicate obtained from the remaining one-half split from the original sampling.


The property consists of 22,000 ha owned 100% by Eagle Plains and has no underlying royalties or encumbrances. The claims are well-situated with respect to infrastructure. A high-pressure gas pipeline, high-voltage hydroelectric line, railway and major highway are located within property boundaries. The Iron Mountain structure has been mapped with widths of up to 150m and a strike length of over 50km. Claims held by Eagle Plains cover over 25km of the structure, with significant iron-oxide mineralization occurring over 15km. Copper and gold mineralization have been discovered along the structure during exploration, highlighting the potential for Iron Oxide Copper Gold ("IOCG") mineralized systems associated with the structure.

A map outlining pertinent details of the property may be found here:

Property History

The Iron Range deposits were originally staked in 1897 and were covered by Crown Grants held by Cominco Ltd. and the Canadian Pacific Railway. Past work on the Iron Range deposits by Cominco focused on the considerable iron oxide resource with trenching and very shallow (20m depth) Diamond drilling along the Iron Range Mountain ridge. Eagle Plains staked the current claims immediately after the Crown Grants reverted in 2000. Eagle Plains has been working on the property since acquiring the claims. Exploration work including geological mapping, geochemical surveys and a 690 line-km airborne geophysical survey were used to define targets for drill testing.

About Eagle Plains Resources

Eagle Plains continues to conduct research, acquire and explore metal projects in western Canada. In addition to holding mining royalties on various projects, the Company controls over 35 gold, base-metal and uranium projects, several with third parties including Swift Resources Inc. (TSX-V:SWR), Prize Mining Corp. (TSX-V:PRZ), Waterloo Resources Ltd. (TSX-V:WAT.P), Touchdown Capital Inc. (TSX-V: TDW), 99 Capital Corp. (TSX-V:WDG) and XO Gold Resources Ltd. (a private B.C. company). In recent years, Eagle Plains has completed option agreements with Teck Limited (TSX:TCK.B), Alexco Resource Corp. (TSX-V:AXR), Billiton Metals, Rio Algom Exploration, NovaGold Resources, Kennecott Exploration and numerous other junior exploration companies, resulting in over 53,600m (163,370') of drilling and over $28.3 million in exploration spending on its projects since 1998.

Expenditures during 2008 and 2009 on Eagle Plains' projects were approximately $7,300,000, funded by Eagle Plains and third party partners. This work resulted in approximately 6,900m of drilling and extensive ground-based exploration work and facilitated the advancement of numerous projects at various stages of development.

This news release has been reviewed and approved by Tim J. Termuende, P.Geo., hereby designated as a qualified person under National Instrument 43-101.

On behalf of the Board of Directors

Signed

"Tim J. Termuende"

President and CEO

For further information, please contact Mike Labach at
1 866 HUNT ORE (486 8673)
Email:
mgl@eagleplains.com or visit our website at http://www.eagleplains.com



Cautionary Note Regarding Forward-Looking Statements
The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

 

 
For more information please contact Mike Labach
Suite 200, 16 - 11th Ave. S. Cranbrook, BC VIC 2P1   Ph: 866 486 8673   Fax: (250) 426-6899
Email:
info@eagleplains.com or visit our Website at www.eagleplains.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Eagle Plains Resources Ltd.

PRODUCER
CODE : EPL.V
ISIN : CA2699062022
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Eagle Plains Res. is a exploration company based in Canada.

Eagle Plains Res. produces gold in Canada, and holds various exploration projects in Canada.

Its main asset in production is YELLOWJACKET in Canada and its main exploration properties are BRONCO, BLACK DIAMOND, HOT PUNCH, IRON RANGE, AB, KARIN LAKE, KULYK LAKE, WILDHORSE, IRONMIKE, PELLY MOUNTAIN, PROSPERITY, MACKENZIE VALLEY ZINC, FINEX, ZNK, TITAN, DRAGON LAKE, EAGLE LAKE, ELSIAR (LCR), ICE RIVER, ACACIA, BOOTLEG, COYOTE CREEK, HALL LAKE (CRETIN), KOKANEE CREEK, NORTH FINDLAY, SOUTH FINDLAY, FINLAY GREENLAND CREEK, KALUM, RUSTY SPRINGS, GAYNA RIVER, BOHAN and K9 in Canada.

Eagle Plains Res. is listed in Canada and in United States of America. Its market capitalisation is CA$ 9.7 millions as of today (US$ 7.0 millions, € 6.6 millions).

Its stock quote reached its highest recent level on June 02, 2006 at CA$ 1.95, and its lowest recent point on January 08, 2016 at CA$ 0.05.

Eagle Plains Res. has 84 260 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Eagle Plains Resources Ltd.
2007 Annual Report
Project news of Eagle Plains Resources Ltd.
7/11/2011(Dragon Lake)/Olympic Commence Drilling Program at Dragon Lake Gold Proje...
5/23/2011(Iron Range)(angl) Conduct Geophysical and Geochemical Surveys on th
3/29/2011(Iron Range)Providence Resources/Eagle Plains Provide Analytical Results...
3/15/2011(Finlay Greenland Creek)and MMG Announce Letter of Intent on the Findlay Property
2/15/2011(Iron Range)/Providence Add Second Drill Rig to Iron Range Project and P...
2/1/2011(Ab)Enters into Agreement with Aben Resources on Two Yukon Prope...
2/1/2011(Hit)Enters into Agreement with Aben Resources on Two Yukon Prope...
2/1/2011(Sprogge)Enters into Agreement with Aben Resources on Two Yukon Prope...
8/19/2010(Yellowjacket)Completes 100% Acquisition of Yellowjacket Gold Project
8/12/2010(Kalum)/Windstorm Commence Drilling on Kalum High Grade Gold Projec...
7/12/2010(Karin Lake)/Slater Mining Execute Option Agreement on Karin Lake REE/Ur...
6/2/2010(Wildhorse)& Partners Launch Aggressive Exploration Season with Wildhor...
5/18/2010(Iron Range)/Providence Capital Execute Option Agreement on Iron Range P...
5/3/2010(Coyote Creek)/Heemskirk Advance
4/15/2010(Elsiar (lcr))Parkside Execute Option Agreement on Elsiar Copper-Gold Porp...
3/11/2010(Wildhorse)Excelsior Execute Option Agreement on Wildhorse Gold/Copper ...
2/16/2010Copper Canyon Stakes High-Grade Gold Property - Tintina Gold...
1/13/2010(Eagle Lake)Results of Eagle Lake Uranium Project
11/17/2009(Ice River)/Waterloo Complete 2009 Fieldwork on Ice River Rare-Earth-El...
11/6/2009(Sphinx)Complete Geophysical Survey, Commence Drill Program at Sphin...
11/4/2009/Windstorm Complete Fieldwork on Kalum Gold Property, New Hi...
10/7/2009(Yellowjacket)Prize Mining Pour Gold at Yellowjacket Project, Atlin, BC
9/16/2009(Eagle Lake)Commences Fieldwork on Eagle Lake Uranium Project
8/27/2009(Yellowjacket)Yellowjacket Mine Achieves Full Commercial Production, New G...
8/26/2009(Kalum)Commence Fieldwork on Kalum Gold Property
8/19/2009(Ice River)Waterloo Commence Fieldwork at Ice River Rare Earth (REE) Pr...
7/15/2009(Yellowjacket)Prize Mining Receive Small Mines Permit for Yellowjacket Gol...
6/4/2009(Yellowjacket)Yellowjacket Completes Mill Modifications, Commences Bulk-Sa...
6/2/2009(Iron Range)Commences 2009 Follow-up on Iron Range Gold Discovery
5/13/2009(Yellowjacket)Yellowjacket Gold Project Commences Operations, Atlin, BC
2/28/2009(Yellowjacket)/Prize Mining Execute Letter of Intent to Form Joint-Venture...
1/22/2009(Blende)/Blind Creek Release Results from 2008 Drilling Program at B...
12/15/2008Diamond Drilling Results Released from Kalum Gold Project
9/9/2008(Bohan)Diamond Drilling Commences on Eagle Plains' Bohan Project
8/1/2008(Blende)Commence Drilling Program at Blende Silver/Base-Metal Deposi...
6/27/2008(Eagle Lake)Announces Craig Bay Drill Results
2/15/2008(Blende) Results from Drilling Program at Blende Silver/Base-Metal D...
11/16/2007(Sphinx Claims (crawford Bay)) Reports Results from 2007 Drilling Program on Sphinx Molyb...
10/3/2007(Titan Claims)/XO Gold Complete Option Agreement for Titan Property, Explo...
8/23/2007(North Findlay)Commences Diamond Drilling Program On Findlay Base-Metal Pro...
7/19/2007Commences Diamond Drilling Program In Bronco Discovery Area
12/31/2005(Mcquesten)2005 Technical report
Corporate news of Eagle Plains Resources Ltd.
6/29/2016Eagle Plains Completes Geological Compilation at Fisher Gold...
6/20/2016Eagle Plains Commences Fieldwork at Iron Range
6/15/2016Eagle Plains Clarifies Fisher Project Land Holdings News Rel...
6/14/2016Eagle Plains Increases Fisher Project Land Holdings- Seabee/...
5/31/2016Eagle Plains Commences Fieldwork at Vulcan
4/12/2016Eagle Plains Completes Land Consolidation in Seabee Gold Min...
4/8/2015Wildhorse
12/10/2014Santa Fe/Eagle Plains Complete Heavy Mineral Concentrate Sam...
11/24/2014Eagle Plains Announces Stornoway Participation in Orchid Pro...
10/29/2014Eagle Plains Receives Cash, Share Payments and Additional Re...
3/7/2011NovaGold and Copper Canyon Agree to Plan of Arrangement Tran...
6/10/2010Offer to Purchase
6/1/2010Updated Resource Calculation
5/27/2010RB Milestone Group Invites Eagle Plains Resources Ltd. onto ...
3/5/2010Results from Drill Program
3/2/2010Copper Canyon Announces Financing
2/12/2010/Touchdown Capital Release Analytical Results from Drill Pro...
1/18/2010/99 Capital Release Results of Baska-Eldorado REE/Uranium Pr...
12/23/2009Closes $855,600 Financing
11/25/2009Financing
11/12/2009Copper Canyon/Bling Terminate Abo Letter of Intent
9/21/2009Visit Eagle Plains Resources at the 2009 Silver Summit Confe...
8/19/2009Closes $1,881,500 Financing
8/13/2009Increases Financing
7/22/2009Announces Financing
12/18/2008Copper Canyon and Egoli Gold Amend Abo Option Agreement
9/26/2008/Waterloo Execute Option Agreement for Ice River Rare Earth ...
6/19/2008Commences Summer Field Programs
5/7/2008 Amends Terms of Strategic Alliance
4/30/20082008 SaskRocks Conference
12/3/2007 Re-prices Recent Financing
6/20/2007Commences Systematic Exploration Program In Bronco Discovery...
5/28/2007CGC Inc to Commence Drilling on Eagle Plains' Coyote Creek P...
5/9/2007Acquires Yukon Zinc Projects
4/24/2007Commences 2007 Drilling Program on Sphinx Molybdenum Project
4/10/2007/Wellstar Execute Option Agreement on Kulyk Lake Uranium Pro...
3/16/2007Receives Recent Media Coverage
2/6/2007Signs Letter of Intent with Wellstar Energy on Saskatchewan ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (EPL.V)Other OTC (EGPLF)
0.115+0.00%0.077-16.30%
TSX-V
CA$ 0.115
04/18 15:16 -
0%
Prev close Open
0.115 0.110
Low High
0.110 0.115
Year l/h YTD var.
0.105 -  0.135 -11.54%
52 week l/h 52 week var.
0.105 -  0.345 -62.30%
Volume 1 month var.
29,000 4.55%
24hGold TrendPower© : -17
Produces Gold
Develops
Explores for Copper - Gallium - Gold - Iron - Iron ore - Lead - Molybdenum - Nickel - Platinum - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-8.00%
2023-34.21%0.360.12
202211.76%0.250.15
202117.24%0.190.14
202045.00%0.180.07
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.88+2.41%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.21+2.44%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :