Mansfield Minerals Inc.

Published : March 22nd, 2010

Results of Prefeasibility Study Announced at Lindero

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Mansfield Minerals Announces Positive Pre-Feasibility Results:

161,000 oz Average Annual Production in Years 1-5 at US$373/oz Cash Cost

 

Vancouver, British Columbia ? Mansfield Minerals Inc. (TSX.V ? MDR), March 22, 2010, Mansfield Minerals Inc. (?Mansfield? or the ?Company?) is pleased to announce the results from a National Instrument 43-101 compliant pre-feasibility study (the ?Study?) for its 100% owned Lindero gold project in Salta Province, Argentina.  The Study was completed by AMEC Americas Limited (?AMEC?) in association with American Au Ag Associates and Kappes Cassiday & Associates.  The complete Study will be filed on SEDAR and the Company's website within 45 days of the issue of this press release.  The Study contemplates conventional open pit mining operation and heap leach gold recovery. Over the initial three years of production 31.9 million tonnes of ore will be mined at an average grade of 0.81 grams/tonne containing 830,000 oz of gold.  Leach kinetics provide for the recovery of 499,700 oz/gold in years 1-3 with the remaining 83,800 oz recovered as leaching proceeds based on a 70.31% recovery.  Heap leaching over the first five years will produce an average of 161,000 ounces of gold at a cash cost of US$373 per ounce.  Highlights of the project economic estimates are summarized below.

 

Pre-tax Project Economics(1)(2)

Gold price

Net Present Value (US$ million)

IRR

Payback

($US/oz)

Discount Rate (%)

(%)

(years)

$0.0

4.0%

6.0%

8.0%

 

 

$850(3)

$237

$194

$157

25.9%

2.8

$975

$363

$305

$256

35.4%

2.2

$1,100

$490

$416

$355

44.1%

1.9

 

1.     Project economics have been reported by AMEC on a pre-tax basis.

2.     Project economics include a 3% provincial royalty.

3.     Base case project scenario.

 

The Company is planning to have tax modeling completed independently to determine the after-tax project economics. The Company will report these results as soon as they are available.

 

In reviewing the study results, Gordon Leask, P.Eng., President and CEO of Mansfield stated:

 

?I am very pleased that the pre-feasibility study has demonstrated such robust project economics.  Lindero has the potential to create significant shareholder value.  We believe the project has extremely attractive characteristics, including projected gold production of 161,000 ounces annually at cash costs of US$373 per ounce during the first five years of operation. 

 

The mine plan in the pre-feasibility study is based on measured and indicated gold resources of 2.2 million ounces of gold at a 0.20 g/t cut-off.  In parallel with project development, we are currently considering further drilling with the objective of converting a portion of the additional 750,000 ounces of gold in the inferred resource category to the measured and indicated category at a 0.20 g/t gold cut-off.

 


 

We are now focused on advancing permitting at the project and have engaged Vector Argentina S.A. to further advance the mine permitting process.  As a conventional open pit heap leach project with good accessibility and project logistics, we believe the project could be in production in less than 24 months following receipt of necessary permits and obtaining sufficient financing. 

 

We look forward to aggressively moving forward with the Lindero project.  In the coming months we will also begin assessing all project financing and partnership opportunities to maximize shareholder value.?

 


Operating Summary

 

 

 

Years 1-5

Life of Mine

 

 

Life of Mine

Annual

Annual

 

 

Total

Average

Average

Ore Production

million tonnes

101.1

10.7

10.6

Waste Production

million tonnes

90.5

13.1

9.5

Strip Ratio

(waste:ore)

0.90

0.82

0.88

Gold Head Grade

g/t

0.59

0.72

0.59

Metallurgical Recovery

%

70.31

 

 

 

 

 

 

 

Payable Gold Production1

000 oz

1,357

161

124      

 

 

 

 

 

Mining Cost2

US$/tonne

1.11

0.98

1.11

Processing Cost

US$/tonne

2.24

2.19

2.24

G&A Cost

US$/tonne

0.85

0.84

0.85

 

 

 

 

 

Cash Operating Cost

US$/oz

407

373

407

 

1.     After refining and treatment charges.

2.     Considering total material moved.

 

 

Capital Costs

 

 

 

 

 

Initial capital(3)

 US$

213 million       

Sustaining capital

 US$

15 million

 

3.     Includes a contingency of US$18 million.


 

 

 

Reserves and Resources(1)(2)(3)(4)(5) 

 

 

 

 

Cut Off

 

Average

Contained

 

Grade

 Tonnes

Grade

Gold

 

(g/t)

(000?s)

(g/t)

(M oz)

Proven Reserve

0.19

 27,929

 0.76

 0.69

Probable Reserve

0.19

 73,169

 0.52

 1.24

Proven  & Probable Reserve

0.19

101,098

0.59

1.92

 

 

 

 

 

Measured

0.20

28,400

0.76

0.70

Indicated

0.20

94,200

0.50

1.50

Measured & Indicated Resource

0.20


122,600


 
0.56

 2.20

Inferred Resource

0.20

 59,000

 0.40

 0.75

 

 

 

 

 

Measured

0.40

23,800

0.85

0.65

Indicated

0.40

48,100

0.68

1.06

Measured & Indicated Resource

0.40

 71,900

0.74

 1.71

Inferred Resource

0.40

 19,400

 0.59

 0.37

 

1.     CIM definitions were followed for estimation of Mineral Resources and Mineral Reserves.

2.     Mineral Resources were constrained within an economic open pit shell, generated using a gold price of US$890 per ounce of gold, a processing cost of $3.07 per tonne, a mining cost of $1.10, a sales cost of $12 per ounce and a  metallurgical recovery of 70%.

3.     Mineral Reserves are estimated using a cut-off grade of 0.19 g/t Au, based on a gold price of US$775 per ounce.

4.     Mineral Resources are inclusive of Mineral Reserves.

5.     Mineral resources that are not mineral reserves do not have demonstrated economic viability.

 

 

Additional Details

 

The Study projects a 9.5 year mine life with cumulative production of 1.357 million ounces of payable gold based on the National Instrument 43-101 compliant Reserve Estimate.  Ore will be mined at an annual rate of 10.8 million tonnes, and due to favourable topography the life of mine strip ratio is 0.9:1 (waste to ore).  The topography is also favourable for the location of the leach pads and waste dumps with minimal earthworks required.

 

The current life of mine metallurgical recovery is estimated at 70.31% weighted average for all domains in Reserves based on a two stage conventional crushing and grind circuit with a grind size of a -3/8 inch p80 = 7mm.  Reagent consumption is expected to be modest (cyanide consumption of 0.436 Kg/tonne and lime of 2.75 Kg/tonne).  Limestone will be sourced locally and lime produced in a calcining plant.  Recent test work utilizing high pressure grinding roll (HPGR) crushers has demonstrated the potential for gold recoveries above the estimated life of mine average recoveries of 70.3% and at potentially lower operating costs.

 

Power will be generated utilizing natural gas supplied by a 130km connection to the regional Gasoducto de la Puna gas pipeline which was built by the Salta government to encourage mining and other economic development in the Puna region.  The estimated capital cost of the natural gas connection is US$9.9 million.  Power cost is estimated at US$0.062 per kwh based on a natural gas price of US$5 per MMBTU. 


 

 

Environmental, Permitting, and Community Relations

 

The Company is advancing the permitting process with significant base line environmental monitoring and other work completed to date.  Estimates and results from the Study will be a significant input for the final permitting applications.  The Company has also focused efforts on consultation with local communities and other stakeholders to ensure that concerns are properly addressed.

 

 

Qualified Persons

 

Jay Melnyk, P.Eng., and David Thomas, P.Geo., of AMEC Americas Limited, and Thomas L. Nimsic, RPG, of American Au Ag Associates are the Qualified Persons responsible for the preparation of the Study, they are independent of Mansfield within the meaning of section 1.4. of National Instrument 43-101, and they have reviewed and approved the technical information within this news release.

 

 

On behalf of Mansfield Minerals Inc.

Gordon P. Leask, P.Eng., CEO, President and Director

 

For more information please visit our website at www.mansfieldminerals.com or contact us at
(604) 681-4462.

 

 

Caution Regarding Forward-Looking Statements

 

Neither the TSX Venture Exchange, nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.  This press release includes certain statements that may be deemed ?forward-looking statements?.  All statements in this discussion, other than statements of historical facts, that address future exploration drilling, exploration activities, anticipated metal production, internal rate of return, estimated ore grades, commencement of production estimates and projected exploration and capital expenditures (including costs and other estimates upon which such projections are based) and events or developments that the Company expects, are forward looking statements.  Although the Company believes the expectations expressed in such forward looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in forward-looking statements.  Factors that could cause actual results to differ materially from those in forward-looking statements include metal prices, exploration success, continued availability of capital and financing, and general economic, market or business conditions.  Accordingly, readers should not place undue reliance on forward-looking statements.

 

This news release and the information contained herein does not constitute an offer of securities for sale in the United States and securities may not be offered or sold in the United States absent registration or exemption from registration.

 

 

Data and Statistics for these countries : Argentina | All
Gold and Silver Prices for these countries : Argentina | All

Mansfield Minerals Inc.

DEVELOPMENT STAGE
CODE : MDR.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Mansfield Min. is a gold development stage company based in Canada.

Mansfield Min. holds various exploration projects in Argentina.

Its main asset in development is LINDERO in Argentina and its main exploration property is ARIZARO-LINDERO in Argentina.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Mansfield Minerals Inc.
5/18/2010Closes Cdn$5.175 Million Private Placement
Project news of Mansfield Minerals Inc.
11/6/2012Commences Drilling at Arizaro
6/20/2012(Lindero)Lindero Gold Deposit - Corporate Update
5/7/2010(Lindero)Lindero 43-101 Technical Report Filed
3/22/2010(Lindero)Results of Prefeasibility Study Announced at Lindero
11/9/2009(Lindero)Updated Resource Estimate for Lindero Oxide Gold Deposit
12/15/2008(Arizaro-lindero)Lindero Property Update
6/25/2008(Arizaro-lindero)Gold Resource at Lindero Increases & Corporate Spin-Out Prop...
6/2/2008(Rio Grande)DRILLING EXPANDS HIGH GRADE MINERALIZATION AT RIO GRANDE
3/26/2008(Rio Grande)Rio Grande Update
Corporate news of Mansfield Minerals Inc.
1/16/2013Name and Symbol Change to Goldrock Mines Corp TSX.V: GMR
1/8/2013Completes Drilling at Arizaro-Results from First 5 Drill Hol...
6/22/2012Haywood Securities Update June 21, 2012
4/20/2010Haywood Research Report on Mansfield
4/15/2010Announces IR Contract
11/27/2008& Pachamama Complete Spin-out
11/19/2008ANNOUNCES EXPECTED CLOSING DATE FOR SPIN-OUT
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MDR.V)Other OTC (MFMNF)
0.890+0.00%1.11+6.63%
TSX-V
CA$ 0.890
07/04 15:45 -
0%
Prev close Open
0.890 -
Low High
0.890 0.890
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.890 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -21
Produces
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 9/21/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.00-0.99%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.58+5.09%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.45-0.81%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.49+1.57%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.76-1.68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.20-0.69%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :