Richmont Mines Inc

Published : February 19th, 2015

Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow Up 689% Over 2013; Reports Fourth Quarter and Full Year 2014 Results

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow Up 689% Over 2013; Reports Fourth Quarter and Full Year 2014 Results

Richmont Mines, Inc. - Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow Up 689% Over 2013; Reports Fourth Quarter and Full Year 2014 Results

Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow Up 689% Over 2013; Reports Fourth Quarter and Full Year 2014 Results

MONTREAL, QUEBEC--(Marketwired - Feb. 19, 2015) - Richmont Mines Inc. (TSX:RIC)(NYSE MKT:RIC) ("Richmont" or the "Corporation"), announces its fourth quarter and fiscal year results for the period ended December 31, 2014. Financial results are based on International Financial Reporting Standards ("IFRS") and dollars are reported in Canadian currency, unless otherwise noted.

Highlights:

  • Full year 2014 gold sales of 94,503 ounces a significant 49% increase over 2013 levels, with annual cash cost per ounce of CAN$956 (US$866) 15% below 2013 levels; Q4 2014 gold sales of 21,666 ounces up 4% over prior year period with cash cost per ounce down 15% to CAN$981 (US$864);

  • 2014 revenues up 47% to $132.2 million; net earnings from continuing operations of $8.2 million, or $0.18 per share; notably above 2013 revenues of $90.2 million, net loss from continuing operations of ($33.2) million, or ($0.84) per share;

  • 2014 operating cash flow up 689% to $27.3 million, or $0.60 per share, compared to 2013 operating cash flow of $3.5 million, or $0.09 per share;

  • Q4 2014 revenues of $29.6 million; net earnings from continuing operations of $1.0 million, or $0.02 per share; Q4 2013 revenues were $27.8 million, and the net loss from continuing operations was ($28.7) million, or ($0.72) per share;

  • Balance sheet: cash balance at December 31, 2014 of $35.3 million, working capital of $34.8 million, and minimal long-term debt of $5.7 million; Cash balance of $67.5 million as of February 11, 2015, following closing of financing;

  • 2014 production successfully replaced: total Proven & Probable Reserves of 217,950 gold ounces grading 6.43 g/t as at December 31, 2014, versus 218,150 gold ounces grading 4.98 g/t at the end of 2013;

  • Island Gold Mine increases Proven and Probable Mineral Reserves 28% net of 2014 mining depletion;

  • Transformational development plans at Island Gold announced for 2015 to position the mine for future growth by unlocking the value of the Resource extension at depth: $27.6 million of accelerated project and exploration costs planned in addition to forecasted sustaining capital expenditures of $20.7 million;

  • New Island Gold Mine step-out exploration drill hole at depth reaffirms significant potential for expansion of the deposit along strike and at depth;

  • 2015 production forecast of 78,000 to 88,000 ounces of gold at a cash cost of CAN$935 - CAN$1,035.

Mr. Renaud Adams, President and CEO of Richmont Mines commented: "I am very pleased to be able to report that our operations exceeded production expectations in 2014, with annual gold sales that were the second highest production level in Richmont's 30+ year history. Our mines also improved their overall efficiency, which is a testament to the capability, execution and dedication of our team, and provides Richmont with a strong financial foundation to reposition our Island Gold Mine into a longer-life, higher-grade gold asset with the ability to increase both production and cash flow levels.

Richmont's operational focus in 2014 was on delivering profitable gold production. Our Island Gold Mine in Ontario met this objective, generating 45% of Richmont's annual consolidated gold sales at a cash cost per ounce that was 13% below 2013 levels. Our Quebec assets also delivered solid operational results in 2014. The Beaufor Mine maintained a strong performance momentum throughout the year, generating a notable 16% increase in processed grade and 13% decrease in cash cost per ounce of gold sold, and the Monique open-pit mine exceeding annual production expectations. With mining operations now finished at Monique, our focus in Quebec for 2015 remains squarely on generating net free cash flow from our Beaufor Mine during the year.

While 2014 was a year of preparation and transition, 2015 will be one of action and repositioning. The proceeds from our recently completed financing gives us the financial flexibility to leverage our strong cash position to execute our accelerated development plans that will reposition and unlock the significant value of our Island Gold Mine. We are holding ourselves accountable to our shareholders, employees and our other stakeholders to continue to execute our accelerated work plans on schedule, and to continue to do so, maintaining Richmont's long history of prudent financial management."

Mr. Adams concluded "On a personal note, I am very pleased to have been given the opportunity to take the helm of Richmont at such an important inflection point. Island Gold provides Richmont with the strongest organic growth profile in the Corporation's history, as it is an excellent asset with the potential to deliver long-term production growth from a mining-friendly and safe jurisdiction for many years to come. To unlock this value we have embarked on what will be a transformational year, and I look forward to working closely with our dedicated team as we continue to create long-term value for our shareholders."

Q4 2014 Results

Revenues for the fourth quarter of 2014 were $29.6 million, compared to $27.8 million in the comparable period of 2013. The year-over-year increase reflects strong results from the Quebec assets, with higher gold ounce sales at the Beaufor and Monique mines, and a 2% increase in the average realized gold price in Canadian dollars. Partially offsetting these, were lower gold ounce sales at the Island Gold Mine that stemmed from lower processed tonnage in the period as a result of fewer available mining faces following reduced levels of development in the first half of the year. This trend will improve following the initiation of accelerated short-term development work in the fourth quarter of 2014. This work is expected to reposition the mine with greater accessible ore inventory in the near-term, and efforts will be further reinforced by the $9.3 million of sustaining capital expenditures planned for Island Gold in 2015. In the fourth quarter of 2014, 21,666 ounces of gold were sold at an average price of CAN$1,361 (US$1,198), versus gold sales of 20,918 ounces at an average price of CAN$1,328 (US$1,265) in the fourth quarter of 2013.

Richmont generated net earnings of $1.0 million, or $0.02 per share, in the fourth quarter of 2014, versus a net loss from continuing operations of ($28.7) million, or ($0.72) per share, in the fourth quarter of 2013. The improved results reflect lower cost of sales in the current period that was driven by improved tonnage and recovered grades at the Quebec assets resulting in lower cash costs per ounce sold. The year-over-year improvement in net earnings similarly reflects charges in the same period of 2013 totalling $22.7 million, or $0.57 per share, that included a non-cash write-down on the W Zone Mine assets, a write-off of deferred income and mining tax assets, and a write-off of financing costs following the termination of a debt financing agreement. The year-over-year improved financial results similarly reflect a higher average realized gold sales price combined with a 4% increase in the number of gold ounces sold.

Cost of sales totalled $25.1 million in the fourth quarter of 2014, a 19% decrease from $31.0 million in the same period of 2013, largely attributable to the 15% decrease in the average cash cost per ounce of gold sold in the current period together with a 12% decrease in processed tonnage year-over-year. The improvement similarly reflects high depreciation costs at the W Zone operation in the year-ago period following a reduction in the Reserves at the mine. The average cash cost per ounce of gold sold totalled CAN$981 (US$864) in the fourth quarter of 2014 versus CAN$1,156 (US$1,102) in the year-ago period, as lower year-over-year costs at the Beaufor and Monique mines offset the higher Island Gold Mine cash cost anticipated with the onset of the Corporation's accelerated development work at the mine.

The Corporation spent $2.5 million on exploration and project evaluation efforts in the fourth quarter of 2014, versus $0.9 million in the same period of 2013. This increase primarily reflects higher exploration and project evaluation costs of the deeper Q Zone incurred at the Beaufor Mine property in the current quarter. These increases were partially offset by slightly lower costs incurred at the Island Gold Mine as activity focus was shifted from exploration to accelerated development in the period, as well as lower project evaluation expenses at the Wasamac Gold Property year-over-year. In the fourth quarter of 2014, the Corporation made a $1.2 million adjustment to the exploration tax credits of previous years. In the fourth quarter of 2013, the Corporation applied $0.1 million of tax credits.

Financial Position

At December 31, 2014, the cash balance was $35.3 million, compared with $37.9 million of cash at September 30, 2014, and $17.6 million at December 31, 2013. At December 31, 2014, Richmont Mines had working capital of $34.8 million, long-term debt of $5.7 million, and 48.3 million shares outstanding. The Corporation had a cash balance of $67.5 million as of February 11, 2015, following the successful closure of the bought financing deal that was announced in mid-January 2015.

Recent News

Mr. Renaud Adams Appointed President and CEO of Richmont

In mid-October Richmont announced the appointment of Mr. Renaud Adams to the position of President and Chief Executive Officer effective November 15, 2014. Mr. Adams has 20 years of mining experience, and most recently served as President and Chief Operating Officer at Primero Mining Corp. In prior roles, Mr. Adams served as Senior Vice-President, Americas Operations, at IAMGOLD Corporation, and held various senior positions with Cambior Inc. and Breakwater Resources Ltd. Mr. Adams holds a Bachelor of Engineering degree in Mining and Mineral Processing from Laval University. Please see the October 17, 2014 and November 17, 2014 press releases for additional details.

Favourable Island Gold Step-Out Exploration Results Announced

In September 2014, the Corporation announced that it would conduct a limited deep exploration drilling program to test part of the down plunge projection of the Island Gold deposit to the east, the first results of which were published on January 8, 2015. Highlights included results from hole GD-14-01C that had been drilled from surface. This hole intersected 19.87 g/t Au over a true width of 3.93 metres at a depth of -1,200 metres, at approximately -250 metres down plunge from the limits of the currently defined Resources, and reinforced the potential to grow the deposit both laterally and at depth. The second hole that was drilled from surface intersected two small mineralized zones at a depth of about -900 metres, the best one returned 2.43 g/t of gold over a true width of 1.5 metres. Exploration drilling in this area will continue from underground.

Richmont also announced a significant exploration program for Island Gold Mine in 2015, to test the eastern extension of the deposit at depths and targeted areas closer to surface, with the objective of increasing the number of ounces per vertical metre down to a depth of -1,000 metres, which would favourably impact development cost per ounce.

Island Gold Mine Transformational Development Plans and 2015 Corporate Guidance Announced

At the end of September 2014, the Corporation announced that Manroc had been hired to take over ramp development work to accelerate access to the deeper extension of the mine. This contracted development included extending the ramp to a depth of 660 metres by the end of 2014, and to a depth of 735 metres by the end of the contract in the second half of 2015. Concurrent with ramp development, Manroc was contracted to complete a drift on the -620 metre level of the mine to facilitate exploration/definition drilling. As of the end of 2014, the main ramp had achieved a vertical depth of -660 metres, as planned, and approximately 150 metres of the lateral drift on the -620 metre level was completed, with one drill bay already being used for definition drilling purposes.

In mid-January 2015 the Corporation provided 2015 forecasted production guidance of 78,000 - 88,000 ounces at a cash cost of CAN$935 - CAN$1,035 (US$850 - US$940), as well as additional transformational development plans for the Resource extension at the Island Gold Mine in Ontario. Specifically, 2015 development plans at Island Gold include extending the main access ramp to a minimum depth of 750 metres and the secondary eastern ramp to a minimum depth of -570 metres, and completing the in process 600 metre long exploration/definition drift to the east on the -620 metre level of the mine. Additional plans include 61,000 metres of exploration drilling to test the potential to extend the Resource to the east, as well as in some areas slightly to the west and closer to surface, 59,000 metres of definition and delineation drilling to upgrade the Inferred Resources between 500 and 1,000 metres of depth in preparation for mining in 2016, and mining and milling studies to evaluate mining and milling requirements under various possible growth scenarios. Please refer to the January 15, 2015 press release for full details.

Bought-Deal Financing Announced

On January 20, 2015 the Corporation announced that it had entered into an agreement with Macquarie Capital Markets Canada Ltd. as lead underwriter, on behalf of a syndicate of underwriters, for the issuance of 7.5 million common shares of the Corporation, on a bought-deal basis, at a price of CAN$4.00 per share for gross proceeds of CAN$30 million. The underwriters were also granted an over-allotment option to purchase up to an additional 1.125 million common shares. On January 21, 2015, Richmont announced that it had agreed to increase the size of its previously announced bought deal offering by 1.0 million shares, to 8.5 million shares in total, for gross proceeds of CAN$34 million. Including the entire over-allotment option, total gross proceeds would increase to CAN$38.5 million. Richmont plans to apply the net proceeds in their entirety toward accelerating the transformational development of the higher-grade Resource extension at its Island Gold Mine in Ontario currently underway. The bought deal financing was completed through a syndicate of underwriters lead by Macquarie Capital Markets Canada Ltd. and included CIBC World Markets Inc., National Bank Financial Inc., BMO Capital Markets, TD Securities Inc., and PI Financial Corp. in its syndicate of underwriters. Richmont received strategic advisory services from Red Cloud Mining Capital Inc. Please refer to the January 20 and January 21 2015 press releases for additional information.

Bought-Deal Financing Closed

On February 11, 2015 the Corporation announced that it had closed the previously announced bought-deal financing, subsequent to which a total of 9.625 million shares were issued, including the entire over-allotment option, at a price of CAN$4.00, generating gross proceeds of CAN$38.5 million. As of February 11, 2015, the Corporation had 57.9 million shares outstanding, and a cash balance of $67.5 million.

2014 Annual Results

Revenues for the 12 months ended December 31, 2014 totalled $132.2 million, a 47% increase over annual revenues of $90.2 million in 2013. This improvement was attributable to the 49% increase in the number of gold ounces sold during the current period, partially offset by the minimal 2% decrease in the average price of gold sold in Canadian dollars over the 12 month period. For the year 2014, a total of 94,503 ounces of gold were sold at an average price of CAN$1,396 (US$1,264), versus gold sales of 63,443 ounces in 2013 at an average price of CAN$1,419 (US$1,378).

Cost of sales totalled $111.9 million in 2014, up from $85.8 million in the year-ago period. The increase reflects 12 months of production from the Monique Mine in 2014, versus only 3 months in 2013, and higher cost per tonne at the Island Gold Mine stemming from slightly lower annual tonnage, increased levels of development, and costs associated with the short-term rental of equipment during the replacement of the primary crushing at the mill. The average cash cost per ounce of gold sold decreased 15% to CAN$956 (US$866) for 2014 from CAN$1,128 (US$1,095) in 2013, driven by improvements realized at all three of the Corporation's operating mines primarily as a result of improved grades, and subsequent gold ounce sales.

Exploration and project evaluation costs totalled $3.8 million in 2014, well below the 2013 level of $7.9 million, driven primarily by lower levels at the Island Gold Mine as work focus was shifted from exploration to development that will enable an expanded exploration program in 2015, and lower exploration and project evaluation costs at the Wasamac Gold Property. In 2014, the Corporation made a $1.2 million adjustment to exploration tax credits of previous years and applied $0.7 million of tax credits. In 2013, the Corporation applied $1.0 million of tax credits. Richmont invested $23.1 million in its assets in 2014, compared to capital expenditures of $41.9 million in 2013. The decrease reflects lower development costs at the Monique Mine after it began commercial production in the fourth quarter of 2013, lower investments in the W Zone subsequent to the second quarter decision to cease operations, and lower annual investments at the Island Gold Mine.

Richmont generated net earnings from continuing operations of $8.2 million, or $0.18 per share, in 2014 which was reduced by $1.3 million, or $0.03 per share, of severance costs paid to the Corporation's previous senior management. In 2013, Richmont generated a net loss from continuing operations of ($33.2) million, or ($0.84) per share, which includes charges totalling $22.1 million, or $0.56 per share, stemming from a non-cash write-down of the W Zone Mine assets, a write-off of deferred income and mining tax assets, and a write-off of financing costs following the termination of a debt-financing agreement. The improved results in 2014 similarly reflect a lower average production cost per ounce that was driven by improved realized grades in the Corporation's three operating mines, as well as a 49% increase in the number of gold ounces sold.

Operational Highlights

Island Gold Mine

The Island Gold Mine generated processed tonnage of 48,375 tonnes in the fourth quarter of 2014 at an average grade of 6.12 g/t, compared to fourth quarter 2013 results of 75,137 tonnes of ore at an average grade of 4.96 g/t. The decrease in the processed tonnage levels in the current period reflected that there were fewer available mining faces due to the lower levels of development in the first half of the year. Following the commencement of accelerated development in the last quarter of 2014 this trend is improving, and will continue to be further reinforced by the $9.3 million of sustaining capital expenditures planned for Island Gold in 2015. As a result of the lower tonnage levels, fourth quarter 2014 gold sales from this mine decreased to 9,052 ounces at an average price of CAN$1,354 (US$1,192) per ounce, versus gold sales of 11,565 ounces at an average price of CAN$1,331 (US$1,268) per ounce in the comparable period of 2013. Consequently, cash costs at Island Gold increased to CAN$1,307 (US$1,151) from CAN$946 (US$901) in the fourth quarter of 2013, a reflection of the lower processed tonnage as well as the previously announced additional costs associated with the rental of temporary primary crushing equipment in the quarter.

For the 12 months ended December 31, 2014, 233,202 tonnes of ore were processed at an average grade of 5.83 g/t, and 42,078 ounces of gold were sold at an average price of CAN$1,398 (US$1,266) per ounce. This compared to 2013 results, in which 244,631 tonnes of ore were processed at an average grade of 4.65 g/t, and 35,113 ounces of gold were sold at an average price of CAN$1,434 (US$1,392) per ounce. The higher year-over-year gold sales change reflect a 25% improvement in grade, partially offset by a slight 5% decrease in processed tonnage. Cash costs at Island Gold decreased year-over-year to CAN$982 (US$889) from CAN$1,124 (US$1,092) in 2013, with the improvement being driven by the higher recovered grade. This was partially offset by a higher mining cost per tonne year-over-year, which stemmed from a greater amount of development work and a lower amount of processed tonnage year-over-year, as well as the short-term rental of crushing equipment from an outside supplier.

The focus at Island Gold for 2015 will be to position the mine for future growth. Specifically, efforts will centre on defining and delineating the current Resource base below -400 metres via 44,500 metres of delineation drilling and 14,500 metres of definition drilling, testing the eastern and western potential of the current Resource base and several targeted areas closer to surface with 61,000 metres of exploration drilling, completing mining and milling studies in preparation for future growth, and making targeted investments in assets and equipment at the mine-site. Please refer to the January 15, 2015 press release for full details regarding the Corporation's 2015 accelerated development plans for the Island Gold Mine.

Richmont is targeting 2015 production of approximately 45,000 to 50,000 ounces of gold at the Island Gold Mine.

Proven and Probable Reserves at Island Gold were increased by 28%, net of 2014 mining depletion. As of December 31, 2014, total Proven and Probable Reserves at the Island Gold Mine were 183,750 gold ounces, of which 51%, or 93,750 ounces, are located in zones below -400 metres. This compared to Proven and Probable Reserves of 143,500 gold ounces at the end of December 2013. The updated Reserve estimate reflects the 16,897 metres of definition drilling and 17,702 metres of delineation drilling completed during the year, which successfully replaced Reserves that were mined during the year.

The estimated Measured and Indicated Resources of Island Gold Mine totalled 219,050 ounces of gold at December 31, 2014, which includes 154,200 ounces of gold within the lower extension below -400 metres. Measured and Indicated Resources within the Island Gold Mine infrastructure decreased from the December 31, 2013 level of 233,350 gold ounces, reflecting that some Resources were successfully reclassified as Reserves. Measured and Indicated Resources are exclusive of Reserves.

Estimated Inferred Resources were 1,002,750 ounces of gold at the end of 2014, with the extension below -400 metres encompassing 919,950 of these ounces. This compares to Inferred Resources of 1,037,350 ounces of gold at the end of 2013, which included 954,600 ounces in the deeper extension of the mine.

Gold grades of the Mineral Resources are slightly lower compared to 2013. This reflects some changes made in the kriging parameters used in the deeper extension estimation as well as a decreased of the gold assay capping levels for some of the lower parallel zones. Capping was reduced from 95 to 70 g/t Au for the B Zone and from 40 to 31 g/t Au for the D, D1 and E1E zones following a new statistical review.

The Corporation hired RPA, an independent consultant, to conduct a review of the estimated Mineral Resources for the zones below a vertical depth of -400 metres at the Island Gold Mine. RPA concluded that the estimate is reasonable, has been adequately prepared using standard industry practices, and conforms to the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves (CIM definitions) as incorporated into National Instrument 43-101 (NI 43-101).

A portion of the C Zone Resource, located between the -535 metres and -675 metres levels, have been successfully transferred into Reserves following definition drilling and development that were completed in 2014. A study comparing the Resources as of December 31, 2013 and the Resources/Reserves and mined material as of December 31, 2014 for this specific area was completed, with the results showing good reconciliation. Specifically, at the end of 2013, 286,000 tonnes at a grade of 8.3 g/t were estimated for this area. This compared very favourably to the 294,000 tonnes at a grade of 8.67 g/t at the end of 2014, with all material (including mined material) reported as a Resource with no recovery or dilution take into account. This result is for a small portion of the C Zone and, consequently, should not be extrapolated to the entire C Zone area.

Beaufor Mine

The Beaufor Mine continued its strong performance momentum into the fourth quarter of 2014, generating year-over-year increases of 7% and 32% in processed tonnage levels and average head grade, respectively, which were driven by more selective mining and tonnage originating from the M Zone of the mine. A total of 27,065 tonnes of ore were processed from the Beaufor Mine at an average grade of 6.82 g/t in the fourth quarter of 2014, compared to processed tonnage of 25,219 tonnes at an average grade of 5.15 g/t in the fourth quarter of 2013. Combined with a stronger gold recovery rate, these improvements drove gold sales of 5,839 ounces in the current period at an average realized price of CAN$1,367 (US$1,204) per ounce, compared with fourth quarter 2013 gold sales of 4,051 ounces at an average realized price of CAN$1,319 (US$1,257) per ounce. Resulting cash costs at this mine decreased 37% to CAN$935 (US$823) in the fourth quarter of 2014, from CAN$1,494 (US$1,423) in the comparable period last year.

For 2014, a total of 111,474 tonnes of ore were processed from the Beaufor Mine at an average grade of 6.84 g/t, and 24,006 ounces of gold were sold at an average price of CAN$1,399 (US$1,267). This compared to tonnage of 124,569 at an average grade of 5.88 g/t, and gold sales of 23,028 ounces at an average price of CAN$1,417 (US$1,376) in 2013. Cash costs at the Beaufor Mine for the 12 months of 2014 decreased 13% to CAN$946 (US$856) from CAN$1,082 (US$1,051) last year, driven by the improved grade resulting from a more selective mining approach.

2015 production from the Quebec assets, which includes the Beaufor and Monique mines is expected to be approximately 33,000 to 37,000 ounces of gold.

Proven and Probable Reserves at the Beaufor Mine property, which include estimated Reserves located within the W Zone and 350 Zone, decreased to 32,750 gold ounces at December 31, 2014, from 43,950 gold ounces at December 31, 2013, as 12,801 metres of definition drilling on the Beaufor Mine property in 2014 was insufficient to replace mined Reserves during the year. More than half of the Proven and Probable Reserves are contained in two zones, namely the M-M1 Zone with 48,000 tonnes at a grade of 7.32 g/t for 11,400 ounces and the 350 Zone with 28,000 tonnes at a grade of 7.34 g/t for 6,650 ounces.

Measured and Indicated Resources at the Beaufor Mine property, including those of the W Zone and 350 Zone, were essentially unchanged at 189,850 ounces of gold at the end of December 2014 versus 188,500 ounces of gold at the end of 2013, while Inferred Resources decreased to 155,600 ounces of gold versus 189,200 ounces at December 31, 2013 mainly as a result of a change in the estimation parameters for the Q Zone, which contains Inferred Resource with 240,000 tonnes at a grade of 6.96 g/t for 53,700 ounces.

Monique Mine

A total of 77,874 tonnes were processed from the open-pit Monique Mine at an average grade of 2.84 g/t in the fourth quarter of 2014. This compared to the 51,541 tonnes processed at an average grade of 1.90 g/t processed in the same period in 2013 following the commencement of commercial production on October 1, 2013. Gold sales from this mine totaled 6,775 ounces at an average price of CAN$1,366 (US$1,203) during the fourth quarter of 2014, versus gold sales of 2,976 ounces at an average price of CAN$1,328 (US$1,265) per ounce in the comparable period of 2013. Fourth quarter cash costs at Monique decreased significantly to CAN$586 (US$516) in 2014, from CAN$1,290 (US$1,230) in the same period in 2013, primarily a reflection of high cash costs in the 2013 period during which production was ramping up in the first months of commercial operation.

During the 12 months of 2014 a total of 279,884 tonnes of ore were processed at an average grade of 2.72 g/t from the Monique Mine, versus processed tonnage of 51,541 tonnes at an average grade of 1.90 g/t in 2013, which included only 3 months of commercial production. Annual gold sales from this mine totaled 23,490 ounces at an average price of CAN$1,387 (US$1,256) in the 12 months of 2014, versus gold sales of 2,976 ounces at an average price of CAN$1,328 (US$1,265) per ounce in the three months of commercial production in 2013. Annual cash costs of CAN$910 (US$824) reflect a full year of production, and compared to cash costs of CAN$1,290 (US$1,230) in the year-ago period, which included the first three months of commercial operation.

Mining activities at the Monique open-pit were completed in the last week of January 2015. Along with the ore that was generated in the first month of 2015, the on-site stockpile of over 158,000 tonnes of ore at 1.81 g/t as at the end of December 2014 will continue to be batch processed at the Corporation's Camflo Mill through to the third quarter of 2015.

W Zone Mine

A total of 37,055 tonnes of ore were processed at an average grade of 4.25 g/t from the W Zone on the Beaufor Mine property in 2014. Annual gold sales from this mine were 4,929 ounces at an average price of CAN$1,405 (US$1,272) per ounce. This compared to 23,262 tonnes at an average grade of 3.25 g/t, and gold sales of 2,326 ounces at an average price of CAN$1,328 (US$1,265) in the year-ago period. Cash costs at the operation were CAN$992 (US$899) in 2014, versus CAN$1,441 (US$1,373) in 2013, a result of the cessation of development related costs when operations were ceased in the second quarter of 2014. Following the end of mining at the W Zone in the second quarter of 2014, assets from the operation were transferred to the Corporation's Beaufor Mine and Island Gold Mine.

Camflo Mill

The Camflo Mill processed a total of 115,694 tonnes during the fourth quarter of 2014, versus 106,806 tonnes in the comparable period of 2013. For the full year, a total of 435,371 tonnes were processed at the Camflo Mill, up 37% from the 317,038 tonnes processed in 2013. This increase was attributable to the contribution of a full year of commercial production from the Monique Mine in 2014, versus only three months in the prior year. The Corporation expects to continue operating the Camflo Mill at full capacity through the third quarter of 2015, after which utilization rates are expected to decrease to approximately 30% when only ore from the Beaufor Mine will continue to be processed once the Monique stockpile has been milled. The Corporation will pursue and evaluate opportunities to fill the future unused capacity at the mill.

Renaud Adams, President and Chief Executive Officer


RICHMONT MINES - MINERAL RESERVE AND RESOURCE ESTIMATES1
December 31, 2014 December 31, 2013
Tonnes Grade Ounces Tonnes Grade Ounces
(metric) (g/t Au) contained (metric) (g/t Au) contained
Island Gold Mine
Proven Reserves2 173,000 6.25 34,700 251,500 5.95 48,100
Proven Reserves2 (below -400 m) 86,000 6.57 18,150 - - -
Probable Reserves2 290,500 5.91 55,300 393,000 6.04 76,350
Probable Reserves2 (below -400 m) 345,500 6.81 75,600 88,500 6.70 19,050
Total Proven & Probable Reserves2 895,000 6.39 183,750 733,000 6.09 143,500
Measured Resources 26,000 5.30 4,400 28,000 5.57 5,050
Indicated Resources 269,500 6.98 60,450 255,500 7.23 59,400
Indicated Resources3 (below -400 m) 438,000 10.95 154,200 456,000 11.52 168,900
Total Measured & Indicated Resources 733,500 9.29 219,050 739,500 9.81 233,350
Inferred Resources 369,500 6.97 82,800 363,000 7.09 82,750
Inferred Resources3 (below -400 m) 3,178,000 9.00 919,950 3,196,000 9.29 954,600
Total Inferred Resources 3,547,500 8.79 1,002,750 3,559,000 9.07 1,037,350
Beaufor Mine4
Proven Reserves2 53,000 7.13 12,100 82,000 5.54 14,600
Probable Reserves2 91,500 7.02 20,650 130,500 7.00 29,350
Total Proven and Probable Reserves 144,500 7.06 32,750 212,500 6.43 43,950
Measured Resources 111,500 5.30 19,000 107,500 5.50 19,000
Indicated Resources 805,500 6.60 170,850 803,500 6.56 169,500
Total Measured & Indicated Resources 917,000 6.44 189,850 911,000 6.44 188,500
Inferred Resources 743,000 6.51 155,600 906,000 6.50 189,200
Monique Mine5
Proven Reserves2 - - - 14,500 1.42 650
Probable Reserves2 14,500 3.16 1,450 401,000 2.33 30,050
Total Proven & Probable Reserves2 14,500 3.16 1,450 416,000 2.30 30,700
Indicated Resources 107,500 4.88 16,850 107,500 4.88 16,850
Wasamac Gold Property6
Measured Resources 3,124,500 2.75 276,550 3,124,500 2.75 276,550
Indicated Resources 12,127,000 2.89 1,125,700 12,127,000 2.89 1,125,700
Total Measured & Indicated Resources 15,251,500 2.86 1,402,250 15,251,500 2.86 1,402,250
Inferred Resources 18,759,000 2.66 1,605,400 18,759,000 2.66 1,605,400
Francoeur Gold Property6, 7
Measured Resources 40,000 5.89 7,600 40,000 5.89 7,600
Indicated Resources 280,000 6.55 59,000 280,000 6.55 59,000
Total Measured & Indicated Resources 320,000 6.47 66,600 320,000 6.47 66,600
Inferred Resources 18,000 7.17 4,150 18,000 7.17 4,150
TOTAL GOLD
Proven + Probable Reserves 1,054,000 6.43 217,950 1,361,500 4.98 218,150
Measured + Indicated Resources 17,329,500 3.40 1,894,600 17,329,500 3.42 1,907,550
Inferred Resources 23,067,500 3.73 2,767,900 23,242,000 3.80 2,836,100

About Richmont Mines Inc.

Richmont Mines has produced over 1.5 million ounces of gold from its operations in Quebec, Ontario and Newfoundland since beginning production. The Corporation currently produces gold from the Island Gold Mine in Ontario, and the Beaufor and Monique Mines in Quebec. The Corporation is also advancing development of the extension at depth of the Island Gold Mine in Ontario. With over 23 years of experience in gold production, exploration and development, and prudent financial management, the Corporation is well-positioned to cost-effectively build its Canadian reserve base and to successfully enter its next phase of growth. Richmont routinely posts news and other important information on its website (www.richmont-mines.com).

Forward-Looking Statements

This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words "estimate", "project", "anticipate", "expect", "intend", "believe", "hope", "may" and similar expressions, as well as "will", "shall" and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made.

The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may be set out in Richmont Mines' Annual Information Form, Annual Reports and periodic reports.

Cautionary note to US investors concerning resource estimates

Information in this press release is intended to comply with the requirements of the Toronto Stock Exchange and applicable Canadian securities legislation, which differ in certain respects with the rules and regulations promulgated under the United States Securities Exchange Act of 1934, as amended ("Exchange Act"), as promulgated by the SEC. The Reserve and Resource estimates in this press release were prepared in accordance with Regulation 43-101 adopted by the Canadian Securities Administrators. The requirements of Regulation 43-101 differ significantly from the requirements of the United States Securities and Exchange Commission (the "SEC").

U.S. Investors are urged to consider the disclosure in our annual report on Form 20-F, File No. 001-14598, as filed with the SEC under the Exchange Act, which may be obtained from us (without cost) or from the SEC's web site: http://sec.gov/edgar.shtml.

Regulation 43-101

The Mineral Reserve and Resource estimations as of December 31, 2014 and December 31, 2013 were performed by qualified persons as defined by Regulation 43-101 and were supervised by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc. Please refer to the SEDAR website (www.sedar.com) for full reports and additional corporate documentation.

A 43-101 technical report was completed for the Island Gold Mine as of December 31, 2013, and was filed on SEDAR on March 31, 2014.

The Reserve and Resource estimations of Beaufor, Island Gold and Monique mines were prepared using a gold price of US$1,200 (CAN$1,300) per ounce for 2014 and US$1,225 (CAN$1,300) per ounce for 2013.

The resource estimation of the Francoeur Mine was established at the end of 2012 using a gold price of US$1,450 (CAN$1,450) per ounce, and was prepared by qualified persons as defined by Regulation 43-101 and was supervised by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc.

The resource estimate of the Wasamac property was established at the end of 2012 using a gold price of US$1,450 (CAN$1,450) per ounce. It was performed by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc., and a qualified person as defined by Regulation 43-101.

The Monique Mine Reserve and Resource estimate as of December 31, 2013 was established using a gold price of US$1,225 (CAN$1,300) per ounce and was performed by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc., and a qualified person as defined by Regulation 43-101. A 43-101 technical report was completed for the first Reserve estimation of this property on July 1st, 2013, and was filed on SEDAR on September 13, 2013.

FINANCIAL STATEMENTS FOLLOW.

FINANCIAL DATA

(in thousands of Canadian dollars)
Three months ended Fiscal year ended
December 31, December 31, December 31, December 31,
2014 2013 2014 2013
$ $ $ $
CONTINUING OPERATIONS
Revenues 29,562 27,828 132,196 90,213
Cost of sales 25,103 31,008 111,898 85,832
GROSS PROFIT (LOSS) 4,459 (3,180 ) 20,298 4,381
OTHER EXPENSES (REVENUES)
Exploration and project evaluation 2,531 929 3,772 7,875
Administration 1,945 2,016 7,627 7,514
Loss (gain) on disposal of long-term assets 388 (13 ) 639 105
Impairment loss on W Zone Mine - 13,472 - 13,472
Other revenues (66 ) (101 ) (102 ) (154 )
4,798 16,303 11,936 28,812
OPERATING EARNINGS (LOSS) (339 ) (19,483 ) 8,362 (24,431 )
Financial expenses 28 1,189 111 1,263
Financial revenues (131 ) (83 ) (436 ) (526 )
EARNINGS (LOSS) BEFORE MINING AND INCOME TAXES
(236
)
(20,589
)
8,687

(25,168
)
MINING AND INCOME TAXES (1,276 ) 8,097 505 7,994
NET EARNINGS (LOSS) FROM CONTINUING OPERATIONS
1,040

(28,686
)
8,182

(33,162
)
NET LOSS FROM DISCONTINUED OPERATION - (389 ) - (1,098 )
NET EARNINGS (LOSS) 1,040 (29,075 ) 8,182 (34,260 )
EARNINGS (LOSS) PER SHARE
Basic earnings (loss) per share
Earnings (loss) from continuing operations 0.02 (0.72 ) 0.18 (0.84 )
Loss from discontinued operation - (0.01 ) - (0.03 )
Basic net earnings (loss) 0.02 (0.73 ) 0.18 (0.87 )
Diluted earnings (loss) per share
Earnings (loss) from continuing operations 0.02 (0.72 ) 0.18 (0.84 )
Loss from discontinued operation - (0.01 ) - (0.03 )
Diluted net earnings (loss) 0.02 (0.73 ) 0.18 (0.87 )
BASIC WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING (in thousands)
47,993

39,596

45,261

39,594
DILUTED WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING (in thousands)
48,805

39,596

45,700

39,594
(in thousands of Canadian dollars)
Three months ended Fiscal year ended
December 31, December 31, December 31, December 31,
2014 2013 2014 2013
$ $ $ $
OPERATING ACTIVITIES
Net earnings (loss) 1,040 (29,075 ) 8,182 (34,260 )
Adjustments for:
Depreciation and depletion 3,899 6,889 21,808 14,674
Impairment loss on W Zone Mine's assets - 13,472 - 13,472
Adjustment to estimated recoverable value of remaining Francoeur Mine's assets
-

-

-

867
Income and mining taxes received (paid) 5 (37 ) 1,304 (1,541 )
Interest revenues (118 ) (62 ) (409 ) (409 )
Interest and accretion expenses on long-term debt 37 44 161 66
Share-based compensation 601 717 2,008 2,521
Share-based compensation settled in cash (60 ) (725 ) (60 ) (725 )
Adjustment to closure allowance (60 ) - (60 ) -
Financing expenses - 1,165 - 1,165
Accretion expense - asset retirement obligations 28 23 111 81
Loss on disposal of long-term assets 387 93 639 193
Gain on disposal of shares of publicly-traded companies - - - (12 )
Mining and income taxes (1,276 ) 8,097 505 7,994
4,483 601 34,189 4,086
Net change in non-cash working capital items (1,425 ) 7,559 (6,910 ) (630 )
Cash flows from operating activities 3,058 8,160 27,279 3,456
INVESTING ACTIVITIES
Disposition of shares of publicly-traded companies - - - 12
Interest received 109 55 390 420
Restricted deposits 8 - (704 ) (2,737 )
Guaranteed investment certificate - - 2,650 -
Property, plant and equipment - Island Gold Mine (4,141 ) (8,285 ) (20,168 ) (27,770 )
Property, plant and equipment - Beaufor Mine (49 ) (587 ) (1,623 ) (980 )
Property, plant and equipment - W Zone Mine - (761 ) (234 ) (3,779 )
Property, plant and equipment - Monique Mine - (1,776 ) (21 ) (8,358 )
Property, plant and equipment - Other (262 ) (431 ) (1,006 ) (1,001 )
Disposition of property, plant and equipment 40 715 390 869
Cash flows used in investing activities (4,295 ) (11,070 ) (20,326 ) (43,324 )
FINANCING ACTIVITIES
Payments of asset retirement obligations (19 ) - (74 ) -
Issue of common shares 721 - 12,762 62
Common shares issue costs - - (934 ) -
Interest paid (36 ) (44 ) (160 ) (66 )
Long term debt (1,859 ) - - -
Financing expenses - (72 ) - (727 )
Payment of finance leases obligations (194 ) (603 ) (825 ) (1,660 )
Cash flows from (used in) financing activities (1,387 ) (719 ) 10,769 (2,391 )
Net change in cash (2,624 ) (3,629 ) 17,722 (42,259 )
Cash, beginning of period 37,897 21,180 17,551 59,810
Cash, end of period 35,273 17,551 35,273 17,551
Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Richmont Mines Inc

PRODUCER
CODE : RIC.TO
ISIN : CA76547T1066
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Richmont Mines is a gold producing company based in Canada.

Richmont Mines holds various exploration projects in Canada.

Its main assets in production are BEAUFOR MINE, ISLAND GOLD and EAST AMPHI MINE in Canada, its main asset in development is FRANCOEUR MINE in Canada and its main exploration properties are WASAMAC, CAMFLO MILL, MONIQUE, RENDELL-JACKMAN (HAMMERDOWN) and CRIPPLE CREEK in Canada.

Richmont Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 741.2 millions as of today (US$ 584.1 millions, € 489.6 millions).

Its stock quote reached its lowest recent point on December 06, 2013 at CA$ 1.00, and its highest recent level on November 24, 2017 at CA$ 11.72.

Richmont Mines has 63 240 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Richmont Mines Inc
1/7/2010Updates its 2010 Investor Presentation
Annual reports of Richmont Mines Inc
2008 annual report
Financings of Richmont Mines Inc
2/11/2015Closes Previously Announced Bought Deal Financing of Common ...
2/1/2012. Completes CAN$ 10 M Private Placement with Mr. Bob Buchan
6/1/2006announces closing of a bought deal of common shares
Nominations of Richmont Mines Inc
5/15/2009Announces Appointments to Board of Directors
Financials of Richmont Mines Inc
8/8/2016Reports Strong Second Quarter Financial Results; On Track to...
5/9/2013Reports First Quarter 2013 Results
2/21/2013Reports Full Year 2012 and Fourth Quarter Results
11/8/2012Reports Results for the Third Quarter of 2012
2/23/2012Reports Record Full Year 2011 and Strong Fourth Quarter Resu...
2/22/2011Reports Strong Fourth Quarter and Full Year 2010 Results
7/30/2009TR: Richmont Mines- News Release - Second Quarter 2009
2/26/2009(Island Gold)Reports Record Sales for the Fourth Quarter and Full Year 20...
1/22/2009(Beaufor Mine)Reports Gold Sales More Than Double in 2008 Fourth Quarter
1/22/2009(Island Gold)Reports Gold Sales More Than Double in 2008 Fourth Quarter
8/19/2008Second Quarter 2008 Fact Sheet
7/31/2008Reports 27.4% Increase in Revenue in the Second Quarter of 2...
5/23/2006announces re-statement and re-filing of first quarter financ...
Project news of Richmont Mines Inc
7/27/2017(Island Gold)Intersects High-Grade, Wide Mineralization in the Down Plung...
1/9/2013(Monique). Receives Mining Permit for Monique Gold Project
7/3/2012(Francoeur Mine)Announces Francoeur Mine Update
5/8/2012(Wasamac)Intercepts 6.40 g/t Au Over 52.8 Metres in Wasamac Main Zone...
3/15/2012(Wasamac).: 2012 Drilling Program at Wasamac Yields Additional Signif...
12/15/2011(Wasamac)Announces Significant Gold Resource Increase at Wasamac
8/30/2011(Wasamac)Intercepts 7.28 g/t Au Over 31.40 Metres at Wasamac; New Dri...
2/17/2011(Wasamac)Announces Resources of Over 1 Million Ounces of Gold at Its ...
1/21/2011(Francoeur Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Beaufor Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Island Gold)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
4/8/2010(Wasamac)Announces a 10,000 Metre Surface Drilling Program on Its Was...
8/7/2009NI 43-101 report on the Francoeur Gold Project
10/1/2008(Beaufor Mine)EXPLORATION DRILLING CONFIRMS MINERALIZATION AT BEAUFOR MINE...
6/8/2006(Valentine Lake (leprechaun))proceeds with earn-in requirements at Valentine Lake
5/26/2006Island gold project update information concerning East amphi...
Corporate news of Richmont Mines Inc
7/13/2016Richmont Mines Announces Details for the Second Quarter Fina...
7/12/2016Richmont Reports Strong Second Quarter Results from Island G...
7/7/2016Strategic Phase 2 Exploration Program Launched at Island Gol...
6/13/2016Richmont Mines Added to the S&P/TSX Global Mining Index and ...
6/7/2016Richmont Mines Completes CAN$31 Million Bought Deal Financin...
5/16/2016Richmont Mines Announces CAN$27 Million Bought Deal Financin...
5/12/2016Richmont Mines Announces Election of Directors
5/12/2016Richmont Mines Reports Strong First Quarter Financial Result...
5/12/2016Richmont Mines posts 1Q profit
1/12/2016Richmont Annual Production Exceeds Guidance: Island Gold Del...
12/22/2015Richmont Mines Inc.: Chairman Position to Become a Non-Execu...
12/21/2015Richmont Mines Provides Exploration Update for Island Gold
12/18/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
12/18/2015Richmont Appoints Christian Bourcier as Vice President, Oper...
12/15/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
11/5/2015Richmont Mines Reports Solid Third Quarter Financial Results...
11/5/2015Richmont Mines posts 3Q profit
10/22/2015Richmont Mines Announces Details For Third Quarter Financial...
10/21/2015Richmont Mines to Release Milling and Mining Study for Islan...
10/8/2015Richmont Reports Strong Third Quarter Production Results; Re...
9/16/2015Richmont Mines Provides an Update on the Surface Step-Out Ex...
9/15/2015Richmont Mines Strengthens Executive Team by Appointing Anne...
9/14/2015Richmont Mines Announces Inclusion in the S&P/TSX SmallCap I...
9/10/2015Deep Drilling to Commence at Richmont's Island Gold Mine to ...
8/6/2015Richmont Mines posts 2Q profit
8/6/2015Richmont Mines Reports Record Revenues for the Second Quarte...
7/14/2015Richmont Mines to Extend Beaufor Mine Life With Development ...
7/13/2015Richmont Mines Reports Record Quarterly Gold Production at I...
4/22/2015Richmont Mines Q1 Gold Production Up 23% Over 2014; 2015 Pro...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/19/2015annonce les résultats du quatrième trimestre et de l'année 2...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/11/2015annonce la clôture du financement par actions ordinaires ann...
1/21/2015Richmont Mines Announces CAN$30 Million Bought Deal Financin...
1/21/2015Canada Stocks to Watch: Husky, Eldorado, Celestica, Richmont...
1/21/2015Richmont Mines Announces Increase of Bought Deal Financing t...
1/21/2015IIROC Trade Resumption - RIC; AKG
1/20/2015IIROC Trading Halt - RIC
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
12/1/2014Ex Barrick Executives Flock to Inca One Gold
11/17/2014Mr. Renaud Adams Officially Commences as President and Chief...
10/16/2013Enters a Land and Mining Rights Agreement with Argonaut Gold
10/4/2013(Monique).: Monique Gold Project Attains Commercial Production; 43-10...
8/23/2013Closes Previously Announced Senior Credit Facility for Up to...
6/17/2013Obtains Letter of Offer for Senior Credit Facility for Up to...
4/12/2013(Island Gold).: Island Gold Deep 43-101 Report Filed on Sedar; New Drill ...
9/24/2012Announces the Immediate Retirement of CAN$10 Million Debentu...
9/10/2012(Island Gold).: New Deep Drill Results Reaffirm Promising Potential at De...
4/12/2012Gold Industry Veteran Ebe Scherkus to Join the Richmont Mine...
3/28/2012(Wasamac)Announces Results From a Preliminary Economic Assessment for...
2/10/2012(Island Gold)Promising Drill Results From Island Gold Mine Confirm Potent...
1/11/2012Gold Industry Veteran Bob Buchan Joins the Board of Director...
12/20/2011(Monique)Announces Open Pit Resources at its Monique Property
11/29/2011(Wasamac)Announces Completion of 2011 Drilling Program at Wasamac; Up...
8/24/2011(Monique)s Final Drilling Results From the Monique Project, Studies U...
8/9/2011Announces a Significant Increase in Earnings and Cash Flow f...
6/22/2011(Monique)More Positive Drill Results From Richmont's Monique Project
5/9/2011(Wasamac)Signs Option Agreement With Globex; Expands Wasamac Explorat...
4/11/2011(Monique).: Monique Work Commitment Completed; Initial Drill Results ...
3/29/2011. Confirms and Amends its Shareholder Rights Plan
4/12/2010hits 73.54 g/t Au over 7 metres on its Cripple Creek Propert...
2/25/2010Q4 and F2009 Results
2/4/2010Shareholders Elect Four New Board Members at Special Shareho...
12/16/2009 Four board nominations at Richmont Mines - Building the nex...
10/29/2009Q3 2009 Release
12/16/2008 Acquires Patricia Mining Corp.
12/3/2008 Announces Acceptance of Normal Course Issuer Bid
9/4/2008AND LKA AGREE TO EXTEND INITIAL COMMITMENT PERIOD TO COMPLET...
7/10/2008TO START DRILLING AT THE GOLDEN WONDER PROJECT
5/18/2006Focus on profitable growth
1/26/2006and Patricia Mining Corp. Announce the purchase of the remai...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (RIC.TO)AMEX (RIC)
11.72+4.27%18,900.00-0.53%
TORONTO
CA$ 11.72
11/24 16:00 0.480
4.27%
Prev close Open
11.24 12.09
Low High
11.66 12.35
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  11.72 -%
Volume 1 month var.
625,800 -%
24hGold TrendPower© : 13
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :