Richmont Mines Inc

Published : November 06th, 2014

Richmont Mines Announces Continued Strong Quarterly Revenues and Operating Cash Flows in the Third Quarter of 2014

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Richmont Mines Announces Continued Strong Quarterly Revenues and Operating Cash Flows in the Third Quarter of 2014

MONTREAL, QUEBEC--(Marketwired - Nov 6, 2014) - Richmont Mines Inc. (TSX:RIC)(NYSE MKT:RIC), ("Richmont" or the "Corporation") announces financial and operational results for its third quarter ("Q3 2014") ended September 30, 2014. Financial results are based on International Financial Reporting Standards ("IFRS") and dollars are reported in Canadian currency, unless as otherwise noted.

Highlights:

  • Mr. Renaud Adams appointed President and CEO effective November 15, 2014;
  • Q3 2014 operating cash flows of $8.5 million, or $0.18 per share, on strong revenues of $34.2 million, a 38% or $0.05 per share improvement over Q3 2013 operating cash flows of $5.0 million, or $0.13 per share, on revenues of $21.2 million;
  • Positive net free cash flow generated for the second consecutive quarter; Q3 2014 net free cash flow of $0.6 million, or $0.01 per share, compared to net free cash flow of ($1.5) million, or ($0.04) per share, in the year-ago period;
  • 2014 gold production guidance increased to 85,000 - 90,000 ounces from the previously increased guidance of 75,000 - 85,000 ounces;
  • Q3 2014 adjusted net earnings of $4.6 million, or $0.10 per share, versus Q3 2013 adjusted net loss of ($1.1) million, or ($0.03) per share, a $0.13 per share improvement; Nine month adjusted net earnings of $8.3 million, or $0.19 per share, compared to an adjusted net loss of ($4.5) million, or ($0.11) per share in the prior year period, an increase of $0.30 per share;
  • Gold sales of 24,635 ounces in Q3 2014 at an average price of $1,386 (US$1,273), a 60% increase over prior year gold sales of 15,438 ounces at an average price of $1,367 (US$1,321);
  • Cash cost per ounce decreased 14% in Q3 2014 to $876 (US$804), from $1,022 (US$984) in the same quarter last year;
  • Nine month 2014 gold sales of 72,837 ounces at an average price of $1,406 (US$1,285), a 71% increase over prior year nine month gold sales of 42,525 ounces at an average price of $1,464 (US$1,430); Cash cost per ounce decreased 15% year-over-year in the first nine months of 2014 to $948 (US$866), from $1,115 (US$1,089) last year;
  • Island Gold Mine ramp extended to a vertical depth of 635 metres; contractor hired to accelerate ongoing ramp development; 6,304 metres of definition drilling and 357 metres of exploration drilling completed in Q3 2014;
  • Cash and cash equivalents of $37.9 million, plus $0.5 million of short-term guaranteed deposit, for a total of $38.4 million, or $0.80 per share, as of September 30, 2014, and long-term debt remains low at $5.8 million;
  • A conference call will be held at 11:00 a.m. (EST) on November 6, 2014 to discuss third quarter 2014 results.

"Our operations continued their strong momentum this quarter, and we are very pleased to report that our operating team continued to deliver robust revenues and operational cash flows within the current gold price environment", commented Ms. Elaine Ellingham, the Corporation's Interim President and CEO. "These results reflect our team's continued focus on operational improvements, which resulted in us exceeding our targets. As a result, we have increased our guidance for 2014 gold production, for a second time, to a revised level of 85,000 to 90,000 ounces."

"Our strong third quarter results enabled us to further build our cash position while we continued to invest in the development of our 1.1 million ounce high-grade inferred resource at Island Gold. This is our main priority, as we see it provides the potential to increase our annual gold production. Therefore, we recently announced hiring a contractor to accelerate our ramp development and to build out the required additional underground infrastructure. We expect the ramp to reach a vertical depth of approximately 660 metres by year-end, and we expect to extract ounces from the lower zone at Island Gold before year end. At the same time, we see excellent upside potential at Island Gold as the deposit remains open along strike and at depth. As a result, we announced plans to commence additional exploration drilling to test the down plunge extension to the east of the resource between depths of 800 and 1,000 metres."

Elaine Ellingham, Interim President and CEO of Richmont Mines, concluded: "We are very pleased that Mr. Adams will be joining Richmont as President and CEO in mid-November. In addition to valuable insight and leadership experience, his 20 years of hands-on mining experience and technical background will complement our existing operating team and play an instrumental role in driving the future value of our new resource at Island Gold."

Third Quarter Results

Revenues increased 62% year-over-year in the third quarter of 2014 to $34.2 million, from $21.2 million in the third quarter of 2013, driven primarily by the 60% increase in the number of gold ounces sold. Revenues also benefited from the weaker Canadian dollar exchange rate in the current period, which resulted in a 1% increase in the average Canadian dollar selling price in the current period. A total of 24,635 ounces of gold were sold at an average price of $1,386 (US$1,273) per ounce in the current quarter, versus gold sales of 15,438 ounces and an average realized price of $1,367 (US$1,321) per ounce in the comparable period last year. The 60% increase in the number of gold ounces sold in the third quarter reflects a 40% increase in the number of gold ounces sold at the Island Gold Mine, primarily attributable to improved grades, and the addition of production from the open-pit Monique Mine in the quarter. This was partially offset by lower gold sales from the Beaufor Mine due to lower tonnage and grade, both of which were driven by the higher proportion of long-hole stope production which generally results in slightly lower tonnage.

Cost of sales, which includes operating costs, royalties and related depreciation and depletion expenses, totaled $27.9 million in the third quarter of 2014 compared to $18.7 million in the comparable period last year. This was driven by an 83% increase in processed tonnage levels in the current period, 47% of which is attributable to the addition of 82,512 tonnes from the Monique Mine. Cost per tonne on a consolidated basis decreased by 25% year-over-year, a direct result of the contribution of lower cost tonnage from the Monique Mine, which commenced production in the fourth quarter of 2013.

Exploration and project evaluation costs before depreciation and exploration tax credits totaled $0.8 million in the current quarter, versus $2.2 million in the comparable period of 2013. The year-over-year decrease is primarily attributable to lower exploration related costs at the Island Gold Mine, reflecting the redirection of capital resources toward developing the 1.1 million ounce inferred resource below the Island Gold Mine. On a segmented basis, exploration expenses excluding depreciation and exploration tax credits were approximately $0.04 million at the Island Gold Mine and $0.56 million at the Beaufor Mine, while exploration and project evaluation costs at other properties amounted to $0.2 million during the current quarter.

Excluding one-time severance costs associated with the departure of the Executive Vice-President and CFO, the Corporation generated adjusted net earnings of $4.6 million, or $0.10 per share, in the third quarter of 2014, a significant improvement over the adjusted net loss of ($1.1) million, or ($0.03) per share, generated in the third quarter of 2013. Net earnings in the third quarter of 2014 were $4.4 million, or $0.09 per share, compared to a net loss of ($1.9) million, or ($0.05) per share in the third quarter of 2013.

Operating cash flows of $8.5 million in Q3 2014, or $0.18 per share, compared to Q3 2013 operating cash flows of $5.0 million, or $0.13 per share. Third quarter net free cash flow (operating cash flows less capital expenditures) was $0.6 million, or $0.01 per share, in 2014, compared to net free cash flow of ($1.5) million, or ($0.04) per share, in the year-ago period.

Recent News and Development Updates

Mr. Renaud Adams Appointed President and CEO

On October 17, 2014, the Corporation announced the appointment of Mr. Renaud Adams to the position of President and Chief Executive Officer effective November 15, 2014. Mr. Adams has 20 years of mining experience, and most recently served as President and Chief Operating Officer at Primero Mining Corp. Prior to this, Mr. Adams served as Senior Vice-President, Americas Operations at IAMGOLD Corporation, and held various senior positions with Cambior Inc. and Breakwater Resources Ltd. Mr. Adams holds a Bachelor of Engineering degree in Mining and Mineral Processing from Laval University.

Island Gold Mine Ownership Consolidated

On August 6, 2014, Richmont announced that it had successfully completed the definitive agreement, that had been signed and announced on August 5, 2014, to acquire the outstanding 31% ownership of four patented claims on the Island Gold Mine property, thereby increasing its ownership of these claims to 100% from 69% previously. The 31% ownership held by the third party was acquired by Richmont in return for a 3% Net Smelter Return royalty payable on 100% of the mineral production from the four claims. The following advance royalty payments are part of the agreement: $1.0 million upon closing of the transaction, followed by $1.0 million each on January 3, 2015 and January 3, 2016. In the event that there is production from these claims, advance royalty payments will continue, and will decrease to $0.3 million as of January 3, 2017, and will be paid annually until such time as a total of $5.1 million has been paid in royalties (including advance royalties) to the third party, after which advance royalty payments will cease. All advance royal payments will be credited against any future NSR payments.

Island Gold Mine Development Plans Accelerated and Additional Exploration Drilling Announced

The development of the high-grade resource below Island Gold continued to advance as planned in the third quarter of 2014. The ramp was extended by 133 metres and reached a vertical depth of 635 metres at September 30, 2014, while 134 metres of additional lateral development were completed during the three month period. In conjunction with this work, the Corporation completed a total of 6,304 metres of definition drilling and 357 metres of exploration drilling of the depth extension at Island Gold during the period.

In mid-September, the Corporation announced plans to begin additional exploration drilling from surface to test part of the down plunge projection of the Island Gold deposit on the eastern side between depths of 800 and 1,000 metres. This step out exploration drilling will encompass 4,800 metres (4 holes), at an estimated total cost of $0.5 million. This is in addition to the remaining budgeted 2014 exploration and definition drill programs of 3,000 metres and 9,800 metres, respectively, currently underway from underground.

At the end of September, Richmont announced that a contract had been signed with Manroc to accelerate and expand development of the deep extension of the Island Gold Mine. Manroc teams subsequently arrived on-site, and began development work in the last week of October. The 12 month contract encompasses 800 linear metres of ramp development that is expected to extend it to a depth of 735 metres by the end of 2015, as well as the development of a 500 metre exploration/definition drilling drift to the east on the 620 metre level, of which 200 metres are expected to be completed in 2014. This exploration drift will facilitate definition drilling in 2015 and 2016 to upgrade existing resources into reserves, in the eastern portion of the deposit, between depths of 500 to 800 metres, and will also allow for more cost-effective underground drill testing of a number of unexplored and untested areas of the property, including down plunge to the east, which is open. In preparation for mining of the first stopes in the lower resource, which is expected at the end of 2014 and in early 2015, a ventilation raise and an escape way system, from the 585 metre level to the 390 metre level will also be completed in Q4 2014. The work will enable Richmont to prepare a second mining horizon by the end of 2015, on the 735 metre level. Development of the first mining horizon on the 635 metre level will be completed in early 2015, in accordance with previously established plans. The 12-month contract plus the escape way extension have an estimated cost of $10 million, $4 million of which is expected to be spent in 2014. This increases 2014 capital expenditures at Island Gold from $16.4 million to $20.4 million.

Management Changes Announced

On September 25, 2014, the Corporation announced that Ms. Nicole Veilleux had been promoted to Vice-President, Finance, a role which she previously held for the Corporation, and that Mr. Pierre Rougeau, Executive Vice-President and Chief Financial Officer, had resigned to pursue other opportunities. A Chartered Professional Accountant with over 25 years of experience in finance, Ms. Veilleux has been with Richmont for over 16 years in positions of increasing responsibility. As previously announced in a July 2, 2014 press release as well as in the Corporation's Q2 2014 earnings releases, the Corporation announced that its previous President and CEO, Mr. Paul Carmel, had been relieved of his duties.

Cash Position and Capital Structure

Cash and cash equivalents of $37.9 million, plus $0.5 million of short-term guaranteed deposit totaled $38.4 million at September 30, 2014, up from the June 30, 2014 level of $35.7 million and the March 31, 2014 level of $13.5 million. As of September 30, 2014, Richmont Mines had 385 employees, compared to 414 as of June 30, 2014 and 455 as of September 30, 2013. The Corporation had working capital of $37.6 million, 47.9 million shares outstanding, and no gold or currency hedging contracts as of September 30, 2014. As of this date, the Corporation's long term debt totaled $5.8 million, of which $1.0 million is an advance royalty payment associated with the recently acquired 31% minority ownership of four claims within the Island Gold Mine deep resource, that is payable on January 1, 2016.

Island Gold Mine

Three months ended Nine months ended
September 30, September 30, September 30, September 30,
2014 2013 2014 2013
Ounces Poured
Tonnes 58,522 55,877 184,447 167,412
Head grade (g/t) 5.96 4.07 5.76 4.48
Gold recovery (%) 97.23 96.57 96.52 95.91
Recovered grade (g/t) 5.80 3.93 5.56 4.29
Ounces poured 10,907 7,058 32,990 23,104
Ounces Sold
Tonnes 60,258 62,080 184,827 169,494
Head grade (g/t) 5.96 4.16 5.76 4.51
Gold recovery (%) 97.23 96.57 96.52 95.91
Recovered grade (g/t) 5.80 4.02 5.56 4.32
Ounces sold 11,231 8,014 33,027 23,548
Cash cost per ounce (US$) 829 1,191 816 1,184

The Island Gold Mine generated solid results in the third quarter of 2014 driven primarily by improved grades that reflects the scheduled mining from higher-grade areas of the mine, including Extension #2, and development ore from the higher-grade resource extension at depth and the Goudreau area to the east. Based on ounces sold, a total of 60,258 tonnes of Island Gold Mine ore were processed at an average head grade of 5.96 g/t Au in the current quarter, compared to 62,080 tonnes at an average head grade of 4.16 g/t Au in the third quarter of 2013. Gold sales in the current quarter totaled 11,231 ounces at an average price of $1,388 (US$1,275) per ounce, versus gold sales of 8,014 ounces at an average price of $1,376 (US$1,325) per ounce in the comparable period of 2013. The average cash cost of $902 (US$829) per ounce of gold sold in the current quarter represented a notable improvement from the average cash cost of $1,237 (US$1,191) per ounce of gold sold in the prior year period. This 27% year-over-year decrease in average cash cost was driven by mine sequencing, and also higher costs in the prior year period as a result of mechanical problems with haulage equipment and mechanical issues at the mill that necessitated the short-term rental of equipment from an outside supplier.

During the first nine months of 2014 a total of 184,827 tonnes of ore were processed at a head grade of 5.76 g/t, and 33,027 ounces of gold were sold at an average price of $1,410 (US$1,289) per ounce. This compared to processed tonnage based on gold ounces sold of 169,494 tonnes at a head grade of 4.51 g/t, and gold sales of 23,548 ounces at an average price of $1,485 (US$1,451) per ounce in the comparable nine month period of 2013. The 9% increase in tonnage was attributable to improved ore transport capacity as a result of the addition of 4 new 30 tonne trucks at the end of 2013, as well as improved mine scheduling and mined grade in the first nine months of the year as ore originated from higher grade areas of the mine. These operational improvements translated into a 40% increase in the number of gold ounces sold and a 26% decrease in the average cash cost per ounce sold to $893 (US$816) in the first nine months of 2014, from $1,212 (US$1,184) in the comparable period of 2013.

As previously announced, Island Gold production levels in the last three months of 2014 will not be as robust as recent levels due to a greater amount of planned ore development work that is expected to result in lower production grades. In early October, a temporary primary jaw crusher and conveyor was successfully installed at the Island Gold mill to carry out crushing while required repairs are being completed on the permanent jaw crusher. However, following a recurrent problem with the old crusher, the decision was made to replace the primary crusher with a new one which is expected to be delivered and installed within the next month at a capital cost of approximately $0.45 million. As a result of the additional work and extra cost associated with the temporary equipment, cash operating cost per ounce is expected to be higher during the fourth quarter.

Beaufor Mine

Three months ended Nine months ended
September 30, September 30, September 30, September 30,
2014 2013 2014 2013
Ounces Poured
Tonnes 30,859 35,375 85,326 101,485
Head grade (g/t) 5.92 6.81 6.83 6.09
Gold recovery (%) 98.04 97.99 97.86 97.87
Recovered grade (g/t) 5.80 6.68 6.68 5.96
Ounces poured 5,757 7,594 18,326 19,445
Ounces Sold
Tonnes 31,793 34,135 84,409 99,350
Head grade (g/t) 6.31 6.90 6.84 6.07
Gold recovery (%) 98.04 97.99 97.86 97.87
Recovered grade (g/t) 6.19 6.76 6.69 5.94
Ounces sold 6,323 7,424 18,166 18,977
Cash cost per ounce (US$) 895 760 868 972

Based on ounces sold, 31,793 tonnes were processed from the Beaufor Mine in the third quarter of 2014, 7% below the 34,135 tonnes processed in the comparable period of 2013. The average head grade decreased to 6.31 g/t in the current quarter from 6.90 g/t in the year-ago period. The lower year-over-year tonnage and grade in the current quarter reflect less higher grade room-and-pillar mining. A total of 6,323 ounces of gold were sold in the third quarter of 2014 at an average price of $1,384 (US$1,271), compared to 7,424 ounces of gold sold at an average price of $1,358 (US$1,308) in the comparable period of 2013. The cash cost per ounce of gold sold of $974 (US$895) in the current quarter was higher than $790 (US$760) in the prior year, reflecting the lower grade and lower tonnage. The Corporation has continued both development and mining in the M Zone in the lower portion of the mine, where recent definition drilling and completed development have reaffirmed more potential than previously expected for the zone. Production from this zone is expected to continue through mid-2015. Development of the nearer-to-surface 350 Zone is beginning in the fourth quarter of 2014 in preparation for production in 2015.

Based on ounces sold, a total of 84,409 tonnes of Beaufor Mine ore were processed at a grade of 6.84 g/t Au during the first nine months of 2014, versus the 99,350 tonnes of ore processed at a grade of 6.07 g/t Au in the comparable nine months of 2013. The decreased tonnage during the nine month period is primarily attributable to lower year-over-year processed tonnage in the first quarter of 2014 following the Corporation's implementation of a more selective mining approach in mid-2013, which translated into improved grades and a correspondingly lower cash cost per ounce of gold sold in the first nine months of 2014 of $949 (US$868) per ounce, versus $994 (US$972) per ounce in the comparable period of 2013. A total of 18,166 ounces of gold were sold from the Beaufor Mine at an average price of $1,409 (US$1,288) in the first nine months of 2014, compared to gold sales of 18,977 ounces at an average price of $1,438 (US$1,405) in the prior year period.

Monique Mine

Three months ended Nine months ended
September 30, September 30, September 30, September 30,
2014 2013 2014 2013
Gold Poured
Tonnes 78,312 - 184,652 -
Head grade (g/t) 2.68 - 2.65 -
Gold recovery (%) 96.50 - 96.28 -
Recovered grade (g/t) 2.59 - 2.55 -
Ounces poured 6,523 - 15,138 -
Gold Sold
Tonnes 82,512 - 202,010 -
Head grade (g/t) 2.67 - 2.67 -
Gold recovery (%) 96.50 - 96.28 -
Recovered grade (g/t) 2.58 - 2.57 -
Ounces sold 6,843 - 16,716 -
Cash cost per ounce (US$) 692 - 953 -

Based on ounces sold, a total of 82,512 tonnes of ore at an average grade of 2.67 g/t Au were processed from the Monique open-pit mine during the third quarter of 2014. The improved milled tonnage in the third quarter was due to the W Zone closure giving more capacity in the Camflo Mill for the Monique ore. The improved tonnage mined in the pit over both the first and second quarter levels reflect improved mining efficiency and the decreasing strip ratio associated with the lower benches of the pit as well as the fact that Q1 mined tonnage was lower due to water treatment issues in the period. Third quarter results were also enhanced by the continued separation of higher grade material for immediate processing, from lower grade ore that is being stockpiled for milling in 2015. When combined with the 119,498 tonnes processed in the first six months of the year at an average grade of 2.67 g/t Au, the Monique Mine processed 202,010 tonnes at an average grade of 2.67 g/t Au in the first three quarters of 2014. The contract mining of the Monique open-pit is expected to be completed by the end of 2014 or early 2015, as per previous schedules. Ore will continue to be stockpiled on the Monique mine site, then will be transported to the Corporation's Camflo Mill and batch processed, beginning with the higher grade ore, through 2015. At September 30, the Monique ore stockpile was over 102,000 tonnes at 1.41 g/t Au.

A total of 6,843 ounces of gold were sold from the Monique Mine at an average price of $1,383 (US$1,270) per ounce in the third quarter of 2014, increasing year-to-date gold sales to 16,716 ounces at an average price of $1,396 (US$1,276) per ounce. The average cash cost per ounce of gold sold totaled $753 (US$692) in the third quarter of 2014, down 39% from cash costs of $1,242 (US$1,133) per ounce of gold sold in the first six months of the year, reflecting the decreasing in-pit strip ratio associated with the lower benches of the pit. For the first nine months 2014, total cash cost per ounce of gold sold was $1,042 (US$953).

W Zone

Three months ended Nine months ended
September 30, September 30, September 30, September 30,
2014 2013 2014 2013
Gold Poured
Tonnes - - 36,789 -
Head grade (g/t) - - 4.25 -
Gold recovery (%) - - 97.45 -
Recovered grade (g/t) - - 4.14 -
Ounces poured - - 4,900 -
Gold Sold
Tonnes 1,532 - 37,055 -
Head grade (g/t) 4.92 - 4.25 -
Gold recovery (%) 98.03 - 97.45 -
Recovered grade (g/t) 4.83 - 4.14 -
Ounces sold 238 - 4,929 -
Cash cost per ounce (US$) 546 - 907 -

Following the completion of operations at the W Zone as of June 30, 2014, a total of 238 ounces of gold were sold in the third quarter of 2014 at an average price of $1,394 (US$1,280) per ounce. The cash operating cost of these gold ounces was $594 (US$546), a reflection of the fact that operations were concluded at the end of the second quarter and therefore no drift excavation costs were incurred during the current period. A total of 4,929 ounces of gold were sold in the first nine months of 2014 at an average price of $1,405 (US$1,284) per ounce. For the nine month period, the cast cost per ounce of gold sold was $992 (US$907).

Camflo Mill

The Camflo Mill processed 113,634 tonnes in the third quarter of 2014, and 319,677 tonnes in the first nine months of the year, largely unchanged from the prior year's levels, reflecting the addition of W Zone and Monique Mine ore at the beginning of the third quarter of 2013. The Camflo Mill is expected to continue to run at capacity (1,200 tons per day) through the end of 2014 as available capacity following the completion of W Zone operations will be filled with additional ore, and stockpiled ore, from the Monique Mine. The Corporation continues to evaluate custom milling opportunities to utilize the excess capacity at Camflo once the milling of stockpiled ore from the Monique Mine is completed in second half of 2015.

Nine-Month Review

Revenues totaled $102.6 million for the nine-month period ended September 30, 2014, a 65% increase over the revenues of $62.4 million generated in the comparable period in 2013. Year-to-date results reflect the 71% increase in the number of ounces of gold sold, attributable to higher gold sales at the Island Gold Mine and the addition of 21,645 ounces of gold production from the Monique and W Zone operations. This was only partially offset by a 4% decrease in the average selling price per ounce of gold in Canadian dollars in the nine month period.

Cost of sales, which includes operating costs, royalties and amortization expenses were $86.8 million for the first three quarter of 2014, a 58% increase over operating costs of $54.8 million during the same period last year. This increase was driven by an 89% increase in processed tonnage in the period, attributable to a 9% increase in tonnage from the Island Gold Mine, the addition of 239,065 tonnes of combined tonnage from the W Zone and Monique Mine operations, partially offset by a 15% decrease in tonnage from the Beaufor Mine. The Corporation's cash cost per ounce of gold sold decreased by 15% to $948 (US$866) from $1,115 (US$1,089) in the first nine months of 2013, reflecting decreased cash costs at both the Island Gold and Beaufor mines that were primarily attributable to improved grades, and lower cost per tonne at Island Gold, and the addition of lower cost per tonne ore from the Monique and W Zone operations.

Exploration and project evaluation costs before depreciation and exploration tax credits were $1.9 million in the first three quarters of 2014, compared with $7.6 million in the year-ago period. The year-over-year decrease reflects lower exploration related costs at the Island Gold Mine as focus was shifted toward the development of the 1.1 million ounce inferred resource below Island Gold, as well as lower year-over-year exploration costs at the Beaufor Mine and the Wasamac Gold Property. On a segmented basis, exploration expenses, excluding depreciation and exploration tax credits, were approximately $0.3 million at the Island Gold Mine and $1.1 million at the Beaufor Mine. Exploration and project evaluation costs at other properties amounted to $0.5 million during the first nine months of 2014.

Excluding one-time severance costs associated with the departures of the President and CEO, and the Executive Vice-President and CFO, the Corporation's adjusted net earnings were $8.3 million, or $0.19 per share, in the first nine months of 2014, a significant improvement over the adjusted net loss of ($4.5) million, or ($0.11) per share, in the comparable period of 2013. Net earnings in the first nine months of 2014 were $7.1 million, or $0.16 per share, compared to a net loss of ($5.2) million, or ($0.13) per share in the year-ago period.

The Corporation generated nine month 2014 operating cash flows of $24.2 million, or $0.55 per share, compared to operating cash flows of ($4.7) million, or ($0.12) per share in the comparable period of 2013. Net free cash flow (operating cash flows less capital expenditures) was $5.6 million, or $0.13 per share, in the first nine months of 2014, a notable $1.01 per share improvement over net free cash flow of ($34.8) million, or ($0.88) per share, in the year-ago period.

Conference call

The Corporation will hold a conference call at 11:00 a.m. (EST) on November 6, 2014 to discuss third quarter 2014 results. To participate in the conference call, please dial 1 888 241-0394 (North America toll free) or 647 427-3413 (local and International).

A replay of this conference will be available for 30 days, and can be accessed by dialing 1 855 859-2056 (North America toll free) or 404 537-3406 (local and International), and entering passcode # 24240671.

Elaine Ellingham

Interim President and Chief Executive Officer

About Richmont Mines Inc.

Richmont Mines has produced over 1.4 million ounces of gold from its operations in Quebec, Ontario and Newfoundland since beginning production in 1991. The Corporation currently produces gold from the Island Gold Mine in Ontario and the Beaufor Mine and Monique Mine in Quebec. The Corporation is also advancing development of the extension at depth of the Island Gold Mine in Ontario. With over 20 years of experience in gold production, exploration and development, and prudent financial management, the Corporation is well-positioned to cost-effectively build its Canadian reserve base and to successfully enter its next phase of growth. Richmont routinely posts news and other important information on its website (www.richmont-mines.com).

Forward-Looking Statements

This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words "estimate", "project", "anticipate", "expect", "intend", "believe", "hope", "may" and similar expressions, as well as "will", "shall" and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made. Except as may be required by law, the Corporation undertakes no obligation and disclaims any responsibility to publicly update or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise.

The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may be set out in Richmont Mines' Annual Information Form, Annual Reports and periodic reports.

Cautionary note to US investors concerning resource estimates

Information in this press release is intended to comply with the requirements of the Toronto Stock Exchange and applicable Canadian securities legislation, which differ in certain respects with the rules and regulations promulgated under the United States Securities Exchange Act of 1934, as amended ("Exchange Act"), as promulgated by the SEC. The reserve and resource estimates in this press release were prepared in accordance with National Instrument 43-101 adopted by the Canadian Securities Administrators. The requirements of National Instrument 43-101 differ significantly from the requirements of the United States Securities and Exchange Commission (the "SEC").

U.S. Investors are urged to consider the disclosure in our annual report on Form 20-F, File No. 001-14598, as filed with the SEC under the Exchange Act, which may be obtained from us (without cost) or from the SEC's web site: http://sec.gov/edgar.shtml.

National Instrument 43-101 ("NI 43-101")

The geological data in this news release has been reviewed by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc., and a qualified person as defined by NI 43-101.

Visit our Facebook page

FINANCIAL STATEMENTS FOLLOW.

EXPLORATION AND PROJECT EVALUATION
(Unaudited) (in thousands of Canadian dollars)
Three months ended Nine months ended
September 30, September 30, September 30, September 30,
2014 2013 2014 2013
$ $ $ $
Exploration costs - Mines
Island Gold 39 1,400 328 4,020
Beaufor 558 385 1,126 1,621
Monique - 17 2 219
597 1,802 1,456 5,860
Exploration costs - Other properties
Wasamac 74 129 149 1,010
Other 17 78 39 305
Project evaluation 84 141 263 428
175 348 451 1,743
Exploration and project evaluation before depreciation and exploration tax credits 772 2,150 1,907 7,603
Depreciation 14 56 58 206
Exploration tax credits, including adjustments (273 ) (225 ) (727 ) (863 )
513 1,981 1,238 6,946
FINANCIAL DATA
Three months ended Nine months ended
September 30, September 30, September 30, September 30,
CAN$ 2014 2013 2014 2013
(Unaudited) (Unaudited) (Unaudited) (Unaudited)
Results (in thousands of $)
Revenues 34,215 21,152 102,634 62,385
Net earnings (loss) 4,369 (1,854 ) 7,147 (5,184 )
Cash flows from (used in) operating activities 8,471 5,038 24,224 (4,703 )
Results per share ($)
Basic and Diluted net earnings (loss) 0.09 (0.05 ) 0.16 (0.13 )
Cash flows from (used in) operating activities 0.18 0.13 0.55 (0.12 )
Basic weighted average number of common shares outstanding (thousands) 47,723 39,596 44,340 39,593
Diluted weighted average number of common shares outstanding (thousands) 48,058 39,596 44,501 39,603
Average selling price of gold per ounce 1,386 1,367 1,406 1,464
Average selling price of gold per ounce (US$) 1,273 1,321 1,285 1,430
September 30,
2014
December 31,
2013
(Unaudited) (Audited)
Financial position (in thousands of $)
Total assets 145,121 123,328
Working capital 37,561 13,952
Long-term debt 5,793 5,196
SALES AND PRODUCTION DATA
Three-month period ended September 30
Ounces of gold Cash cost
(per ounce sold)
Year Sales Production
US$ CAN$
Island Gold Mine 2014 11,231 10,907 829 902
2013 8,014 7,058 1,191 1,237
Beaufor Mine 2014 6,323 5,757 895 974
2013 7,424 7,594 760 790
W Zone Mine 2014 238 - 546 594
2013 - - - -
Monique Mine 2014 6,843 6,523 692 753
2013 - - - -
Total 2014 24,635 23,187 804 876
2013 15,438 14,652 984 1,022
Nine-month period ended September 30
Ounces of gold Cash cost
(per ounce sold)
Year Sales Production
US$ CAN$
Island Gold Mine 2014 33,027 32,990 816 893
2013 23,548 23,104 1,184 1,212
Beaufor Mine 2014 18,166 18,326 868 949
2013 18,977 19,445 972 994
W Zone Mine 2014 4,929 4,900 907 992
2013 - - - -
Monique Mine 2014 16,716 15,138 953 1,042
2013 - - - -
Total 2014 72,837 71,354 866 948
2013 42,525 42,549 1,089 1,115
Note: Average exchange rates used: Q3 2014: US$1 = CAN$1.0890, Year to date 2014: US$1 = CAN$1.0942
Average exchange rates used: Q3 2013: US$1 = CAN$1.0386, Year to date 2013: US$1 = CAN$1.0235
CONSOLIDATED INCOME STATEMENT
(Unaudited) (in thousands of Canadian dollars)
Three months ended Nine months ended
September 30, September 30, September 30, September 30,
2014 2013 2014 2013
$ $ $ $
CONTINUING OPERATIONS
Revenues 34,215 21,152 102,634 62,385
Cost of sales 27,900 18,655 86,794 54,825
GROSS PROFIT 6,315 2,497 15,840 7,560
OTHER EXPENSES (REVENUES)
Exploration and project evaluation 513 1,981 1,238 6,946
Administration 1,578 1,805 5,682 5,498
Loss on disposal of long-term assets 250 82 252 117
Other revenues (9 ) (23 ) (36 ) (53 )
2,332 3,845 7,136 12,508
OPERATING EARNINGS (LOSS) 3,983 (1,348 ) 8,704 (4,948 )
Financial expenses 28 23 83 73
Financial revenues (164 ) (52 ) (307 ) (443 )
EARNINGS (LOSS) BEFORE MINING AND INCOME TAXES 4,119 (1,319 ) 8,928 (4,578 )
MINING AND INCOME TAXES (RECOVERY) (250 ) (173 ) 1,781 (102 )
NET EARNINGS (LOSS) FROM CONTINUING OPERATIONS 4,369 (1,146 ) 7,147 (4,476 )
NET LOSS FROM DISCONTINUED OPERATION - (708 ) - (708 )
NET EARNINGS (LOSS) FOR THE PERIOD 4,369 (1,854 ) 7,147 (5,184 )
NET EARNINGS (LOSS) PER SHARE
Basic and diluted earnings (loss) per share
Earnings (loss) from continuing operations 0.09 (0.03 ) 0.16 (0.11 )
Loss from discontinued operation - (0.02 ) - (0.02 )
Basic and diluted net earnings (loss) 0.09 (0.05 ) 0.16 (0.13 )
BASIC WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING (in thousands) 47,723 39,596 44,340 39,593
DILUTED WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING (in thousands) 48,058 39,596 44,501 39,603
See accompanying notes to interim consolidated financial statements available on SEDAR (http://www.sedar.com/).
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
(in thousands of Canadian dollars)
September 30, December 31,
2014 2013
$ $
(Unaudited) (Audited)
ASSETS
CURRENT ASSETS
Cash and cash equivalents 37,897 17,551
Guaranteed investment certificate 474 -
Receivables 2,798 3,008
Income and mining tax assets 916 925
Exploration tax credits receivable 6,542 5,670
Inventories 12,271 9,075
60,898 36,229
RESTRICTED DEPOSITS 1,009 3,421
PROPERTY, PLANT AND EQUIPMENT 83,214 83,678
TOTAL ASSETS 145,121 123,328
LIABILITIES
CURRENT LIABILITIES
Payables, accruals and provisions 17,664 19,897
Income and mining taxes payable 3,611 1,225
Current portion of long-term debt 1,790 825
Current portion of asset retirement obligations 272 330
23,337 22,277
LONG-TERM DEBT 5,793 5,196
ASSET RETIREMENT OBLIGATIONS 7,689 7,603
DEFERRED INCOME AND MINING TAX LIABILITIES 2,585 1,899
TOTAL LIABILITIES 39,404 36,975
EQUITY
Share capital 143,469 132,202
Contributed surplus 12,203 11,253
Deficit (49,955 ) (57,102 )
TOTAL EQUITY 105,717 86,353
TOTAL LIABILITIES AND EQUITY 145,121 123,328
See accompanying notes to interim consolidated financial statements available on SEDAR (http://www.sedar.com/).
CONSOLIDATED STATEMENT OF CASH FLOWS
(in thousands of Canadian dollars)
(Unaudited) Three months ended Nine months ended
September 30, September 30, September 30, September 30,
2014 2013 2014 2013
$ $ $ $
OPERATING ACTIVITIES
Net earnings (loss) for the period 4,369 (1,854 ) 7,147 (5,184 )
Adjustments for:
Depreciation and depletion 6,368 2,984 17,909 7,785
Adjustment to estimated recoverable value of remaining Francoeur Mine's assets - 867 - 867
Taxes received (paid) 192 (5 ) 1,299 (1,505 )
Interest revenues (152 ) (76 ) (291 ) (347 )
Interest on long-term debt 39 10 124 22
Share-based compensation 342 684 1,407 1,804
Accretion expense - asset retirement obligations 28 19 83 57
Loss on disposal of long-term assets 250 81 252 100
Gain on disposal of shares of publicly-traded companies - - - (12 )
Mining and income taxes (250 ) (173 ) 1,781 (102 )
11,186 2,537 29,711 3,485
Net change in non-cash working capital items (2,715 ) 2,501 (5,487 ) (8,188 )
Cash flows from (used in) operating activities 8,471 5,038 24,224 (4,703 )
INVESTING ACTIVITIES
Guaranteed investment certificate 2,650 - 2,650 -
Restricted deposits (238 ) (2,650 ) (712 ) (2,737 )
Interest received 155 74 280 365
Property, plant and equipment - Island Gold Mine (7,647 ) (7,005 ) (16,028 ) (19,485 )
Property, plant and equipment - Beaufor Mine (129 ) (155 ) (1,574 ) (393 )
Property, plant and equipment - W Zone Mine - (117 ) (234 ) (3,019 )
Property, plant and equipment - Monique Mine - 875 (21 ) (6,582 )
Property, plant and equipment - Other (53 ) (85 ) (745 ) (570 )
Disposition of property, plant and equipment 50 9 350 154
Disposition of shares of publicly-traded companies - - - 12
Cash flows used in investing activities (5,212 ) (9,054 ) (16,034 ) (32,255 )
FINANCING ACTIVITIES
Long-term debt 1,940 - 1,859 -
Issue of common shares 368 - 12,041 62
Common shares issue costs - - (934 ) -
Interest paid (39 ) (10 ) (124 ) (22 )
Payment of asset retirement obligations (29 ) - (55 ) -
Financing costs - (654 ) - (654 )
Payment of finance lease obligations (192 ) (599 ) (631 ) (1,058 )
Cash flows from (used in) financing activities 2,048 (1,263 ) 12,156 (1,672 )
Net change in cash and cash equivalents 5,307 (5,279 ) 20,346 (38,630 )
Cash and cash equivalents, beginning of period 32,590 26,459 17,551 59,810
Cash and cash equivalents, end of period 37,897 21,180 37,897 21,180
See accompanying notes to interim consolidated financial statements available on SEDAR (http://www.sedar.com/).
Read the rest of the article at finance.yahoo.com

Richmont Mines Inc

PRODUCER
CODE : RIC.TO
ISIN : CA76547T1066
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Richmont Mines is a gold producing company based in Canada.

Richmont Mines holds various exploration projects in Canada.

Its main assets in production are BEAUFOR MINE, ISLAND GOLD and EAST AMPHI MINE in Canada, its main asset in development is FRANCOEUR MINE in Canada and its main exploration properties are WASAMAC, CAMFLO MILL, MONIQUE, RENDELL-JACKMAN (HAMMERDOWN) and CRIPPLE CREEK in Canada.

Richmont Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 741.2 millions as of today (US$ 584.1 millions, € 489.6 millions).

Its stock quote reached its lowest recent point on December 06, 2013 at CA$ 1.00, and its highest recent level on November 24, 2017 at CA$ 11.72.

Richmont Mines has 63 240 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Richmont Mines Inc
1/7/2010Updates its 2010 Investor Presentation
Annual reports of Richmont Mines Inc
2008 annual report
Financings of Richmont Mines Inc
2/11/2015Closes Previously Announced Bought Deal Financing of Common ...
2/1/2012. Completes CAN$ 10 M Private Placement with Mr. Bob Buchan
6/1/2006announces closing of a bought deal of common shares
Nominations of Richmont Mines Inc
5/15/2009Announces Appointments to Board of Directors
Financials of Richmont Mines Inc
8/8/2016Reports Strong Second Quarter Financial Results; On Track to...
5/9/2013Reports First Quarter 2013 Results
2/21/2013Reports Full Year 2012 and Fourth Quarter Results
11/8/2012Reports Results for the Third Quarter of 2012
2/23/2012Reports Record Full Year 2011 and Strong Fourth Quarter Resu...
2/22/2011Reports Strong Fourth Quarter and Full Year 2010 Results
7/30/2009TR: Richmont Mines- News Release - Second Quarter 2009
2/26/2009(Island Gold)Reports Record Sales for the Fourth Quarter and Full Year 20...
1/22/2009(Beaufor Mine)Reports Gold Sales More Than Double in 2008 Fourth Quarter
1/22/2009(Island Gold)Reports Gold Sales More Than Double in 2008 Fourth Quarter
8/19/2008Second Quarter 2008 Fact Sheet
7/31/2008Reports 27.4% Increase in Revenue in the Second Quarter of 2...
5/23/2006announces re-statement and re-filing of first quarter financ...
Project news of Richmont Mines Inc
7/27/2017(Island Gold)Intersects High-Grade, Wide Mineralization in the Down Plung...
1/9/2013(Monique). Receives Mining Permit for Monique Gold Project
7/3/2012(Francoeur Mine)Announces Francoeur Mine Update
5/8/2012(Wasamac)Intercepts 6.40 g/t Au Over 52.8 Metres in Wasamac Main Zone...
3/15/2012(Wasamac).: 2012 Drilling Program at Wasamac Yields Additional Signif...
12/15/2011(Wasamac)Announces Significant Gold Resource Increase at Wasamac
8/30/2011(Wasamac)Intercepts 7.28 g/t Au Over 31.40 Metres at Wasamac; New Dri...
2/17/2011(Wasamac)Announces Resources of Over 1 Million Ounces of Gold at Its ...
1/21/2011(Francoeur Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Beaufor Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Island Gold)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
4/8/2010(Wasamac)Announces a 10,000 Metre Surface Drilling Program on Its Was...
8/7/2009NI 43-101 report on the Francoeur Gold Project
10/1/2008(Beaufor Mine)EXPLORATION DRILLING CONFIRMS MINERALIZATION AT BEAUFOR MINE...
6/8/2006(Valentine Lake (leprechaun))proceeds with earn-in requirements at Valentine Lake
5/26/2006Island gold project update information concerning East amphi...
Corporate news of Richmont Mines Inc
7/13/2016Richmont Mines Announces Details for the Second Quarter Fina...
7/12/2016Richmont Reports Strong Second Quarter Results from Island G...
7/7/2016Strategic Phase 2 Exploration Program Launched at Island Gol...
6/13/2016Richmont Mines Added to the S&P/TSX Global Mining Index and ...
6/7/2016Richmont Mines Completes CAN$31 Million Bought Deal Financin...
5/16/2016Richmont Mines Announces CAN$27 Million Bought Deal Financin...
5/12/2016Richmont Mines Announces Election of Directors
5/12/2016Richmont Mines Reports Strong First Quarter Financial Result...
5/12/2016Richmont Mines posts 1Q profit
1/12/2016Richmont Annual Production Exceeds Guidance: Island Gold Del...
12/22/2015Richmont Mines Inc.: Chairman Position to Become a Non-Execu...
12/21/2015Richmont Mines Provides Exploration Update for Island Gold
12/18/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
12/18/2015Richmont Appoints Christian Bourcier as Vice President, Oper...
12/15/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
11/5/2015Richmont Mines Reports Solid Third Quarter Financial Results...
11/5/2015Richmont Mines posts 3Q profit
10/22/2015Richmont Mines Announces Details For Third Quarter Financial...
10/21/2015Richmont Mines to Release Milling and Mining Study for Islan...
10/8/2015Richmont Reports Strong Third Quarter Production Results; Re...
9/16/2015Richmont Mines Provides an Update on the Surface Step-Out Ex...
9/15/2015Richmont Mines Strengthens Executive Team by Appointing Anne...
9/14/2015Richmont Mines Announces Inclusion in the S&P/TSX SmallCap I...
9/10/2015Deep Drilling to Commence at Richmont's Island Gold Mine to ...
8/6/2015Richmont Mines posts 2Q profit
8/6/2015Richmont Mines Reports Record Revenues for the Second Quarte...
7/14/2015Richmont Mines to Extend Beaufor Mine Life With Development ...
7/13/2015Richmont Mines Reports Record Quarterly Gold Production at I...
4/22/2015Richmont Mines Q1 Gold Production Up 23% Over 2014; 2015 Pro...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/19/2015annonce les résultats du quatrième trimestre et de l'année 2...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/11/2015annonce la clôture du financement par actions ordinaires ann...
1/21/2015Richmont Mines Announces CAN$30 Million Bought Deal Financin...
1/21/2015Canada Stocks to Watch: Husky, Eldorado, Celestica, Richmont...
1/21/2015Richmont Mines Announces Increase of Bought Deal Financing t...
1/21/2015IIROC Trade Resumption - RIC; AKG
1/20/2015IIROC Trading Halt - RIC
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
12/1/2014Ex Barrick Executives Flock to Inca One Gold
11/17/2014Mr. Renaud Adams Officially Commences as President and Chief...
10/16/2013Enters a Land and Mining Rights Agreement with Argonaut Gold
10/4/2013(Monique).: Monique Gold Project Attains Commercial Production; 43-10...
8/23/2013Closes Previously Announced Senior Credit Facility for Up to...
6/17/2013Obtains Letter of Offer for Senior Credit Facility for Up to...
4/12/2013(Island Gold).: Island Gold Deep 43-101 Report Filed on Sedar; New Drill ...
9/24/2012Announces the Immediate Retirement of CAN$10 Million Debentu...
9/10/2012(Island Gold).: New Deep Drill Results Reaffirm Promising Potential at De...
4/12/2012Gold Industry Veteran Ebe Scherkus to Join the Richmont Mine...
3/28/2012(Wasamac)Announces Results From a Preliminary Economic Assessment for...
2/10/2012(Island Gold)Promising Drill Results From Island Gold Mine Confirm Potent...
1/11/2012Gold Industry Veteran Bob Buchan Joins the Board of Director...
12/20/2011(Monique)Announces Open Pit Resources at its Monique Property
11/29/2011(Wasamac)Announces Completion of 2011 Drilling Program at Wasamac; Up...
8/24/2011(Monique)s Final Drilling Results From the Monique Project, Studies U...
8/9/2011Announces a Significant Increase in Earnings and Cash Flow f...
6/22/2011(Monique)More Positive Drill Results From Richmont's Monique Project
5/9/2011(Wasamac)Signs Option Agreement With Globex; Expands Wasamac Explorat...
4/11/2011(Monique).: Monique Work Commitment Completed; Initial Drill Results ...
3/29/2011. Confirms and Amends its Shareholder Rights Plan
4/12/2010hits 73.54 g/t Au over 7 metres on its Cripple Creek Propert...
2/25/2010Q4 and F2009 Results
2/4/2010Shareholders Elect Four New Board Members at Special Shareho...
12/16/2009 Four board nominations at Richmont Mines - Building the nex...
10/29/2009Q3 2009 Release
12/16/2008 Acquires Patricia Mining Corp.
12/3/2008 Announces Acceptance of Normal Course Issuer Bid
9/4/2008AND LKA AGREE TO EXTEND INITIAL COMMITMENT PERIOD TO COMPLET...
7/10/2008TO START DRILLING AT THE GOLDEN WONDER PROJECT
5/18/2006Focus on profitable growth
1/26/2006and Patricia Mining Corp. Announce the purchase of the remai...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (RIC.TO)AMEX (RIC)
11.72+4.27%18,900.00-0.53%
TORONTO
CA$ 11.72
11/24 16:00 0.480
4.27%
Prev close Open
11.24 12.09
Low High
11.66 12.35
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  11.72 -%
Volume 1 month var.
625,800 -%
24hGold TrendPower© : 13
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.14+0.71%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 9.16+2.81%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.60+1.18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+10.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.10+1.94%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 13.38+5.60%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
 0.34+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.18-2.70%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 1.85+4.52%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.97+1.49%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.