Richmont Mines Inc

Published : July 12th, 2016

Richmont Reports Strong Second Quarter Results from Island Gold; Consolidated Results On-Track for the Upper End of Production Guidance and Lower End of Cash Cost Guidance

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Richmont Reports Strong Second Quarter Results from Island Gold; Consolidated Results On-Track for the Upper End of Production Guidance and Lower End of Cash Cost Guidance

July 12, 2016

TORONTO, July 12, 2016/CNW/ - Richmont Mines Inc. (TSX: RIC) (NYSE MKT: RIC)('Richmont' or the 'Corporation'), reports that the Island Gold Mine delivered another strong quarter of operational results that contributed to second quarter consolidated production of 23,320 gold ounces at cash costs of $903per ounce (US$701per ounce). (All amounts are in Canadian dollars unless otherwise indicated).

HIGHLIGHTS FOR THE SECOND QUARTER

  • The Island Gold Mine produced 18,617 ounces of gold, a 24% increase over the prior year period. Company-wide production was 23,320 ounces for the quarter, an 11% decrease over the prior year period, mainly as a result of the depletion of the Monique stockpile earlier this year.
  • The Island Gold Mine reported record underground and milling productivity of 911 and 878 tonnes per day, respectively.
  • Cash costs for the Island Gold Mine were $766per ounce (US$595per ounce), a significant 20% decrease over the prior year period and well below current guidance estimates. Company-wide cash costs for the quarter were $903per ounce (US$701per ounce), a decrease of 7% over the prior year period and below current guidance estimates.
  • Revenues for the quarter were $40.6 million(US$31.5 million), at an average realized gold price of $1,628per ounce (US$1,263per ounce).
  • Richmont ended the quarter with a cash balance of $96 million(US$74 million) that includes net proceeds of $29 million(US$23 million) related to a bought-deal prospectus financing that was completed on June 7, 2016.

'The Island Gold Mine has delivered another solid quarter with record productivity from both the underground mine and the mill facility and we remain well positioned to achieve the upper end of production guidance and the lower end of our cost guidance. It is noteworthy that while wider zones were mined during the quarter, which had a negative impact on maximizing overall grade, Island Gold continued to have a positive reconciliation on mined grade versus reserve grade, demonstrating the quality of the deposit. Going forward we will continue to optimize our mining practices, maximizing reserve recovery while operating within the optimal grade profile.' stated Renaud Adams, CEO. He continued, 'At the Beaufor Mine we expect that stope mining will begin in the higher-grade Q Zone in the third quarter and we remain confident that this asset will be net free cash flow positive for the full year. With our strong cash position and growing cash flow stream, we are well positioned to fully fund the accelerated development program and the Phase 2 exploration program at our cornerstone Island Gold Mine.'

SECOND QUARTER OPERATIONAL HIGHLIGHTS

Second quarter operational highlights for the Island Gold and Beaufor Mines are provided in the tables below:

Production Highlights

Q2 15

Q3 15

Q4 15

Q1 16

Q2 16

H1 2016

2016 Guidance

Gold Produced (oz)

Island Gold Mine

14,997

15,076

14,203

26,589

18,617

45,206

62,000-67,000

Beaufor Mine

7,082

5,714

5,652

4,615

4,703

9,318

25,000-30,000

Monique Mine

4,235

2,688

2,525

1,165

-

1,165

-

Total Produced (oz)

26,314

23,478

22,380

32,369

23,320

55,689

87,000-97,000

Q4 2015 production includes a 3 week underground mine shutdown.

Processing of the remaining stockpile pad at the depleted Monique Mine was completed at the end of January 2016.

Cash Cost Highlights

Q2 15

Q3 15

Q4 15

Q1 16

Q2 16

H1 2016

2016 Guidance

Cash Costs ($)

Island Gold Mine

$954

$890

$1,026

$674

$766

$714

$900-$960

Beaufor Mine

$1,062

$974

$1,084

$1,398

$1,486

$1,441

$1,000-$1,060

Monique Mine

$914

$1,005

$977

$1,185

-

$1,185

-

Total Cash Costs ($)

$974

$926

$1,034

$806

$903

$848

$930-$1,000

Cash Costs (US$)

Island Gold Mine

$776

$680

$768

$491

$595

$537

$660-$705

Beaufor Mine

$864

$744

$812

$1,018

$1,154

$1,083

$735-$780

Monique Mine

$743

$768

$731

$863

-

$891

-

Total Cash Costs (US$)

$792

$707

$774

$587

$701

$637

$680-$730

Refer to the Non-IFRS Performance Measures disclosure presented at the end of this press release.

2016 guidance assumes a foreign exchange rate of 1.364 Canadian dollar to the US dollar.

Operational Highlights

Q1 15

Q2 15

Q3 15

Q4 15

Q1 16

Q2 16

Island Gold Mine

Underground tpd

552

759

669

657

853

911

Mill tpd

487

787

722

656

834

878

Mill head grade (g/t)

7.87

6.73

7.27

7.62

11.31

7.51

Recoveries (%)

97.2

96.8

97.1

96.0

96.3

96.5

Beaufor Mine

Underground tpd

367

360

338

306

323

286

Mill head grade (g/t)

8.44

6.05

5.93

6.30

4.96

5.27

Recoveries (%)

98.6

98.6

98.6

98.4

98.7

98.1

Fourth quarter underground productivity includes a 3 week mine shutdown.
Fourth quarter mill productivity includes a 2 week mill shutdown.
Production includes 1,624 ounces from the milling of slag accumulated at the Camflo Mill.

Island Gold Second Quarter Highlights

  • The Island Gold Mine produced 18,617 ounces of gold (20,147 ounces sold), an increase of 24% over the same period in 2015. As previously disclosed, the mine plan for the quarter was focused in lower-grade areas of the mine where ore development activities primarily occurred in the lower grade extensions of the second mining horizon. Overall, the operation reported a higher than planned mined grade of 7.51 g/t. The forward looking 2016 mine plan continues to forecast development and stope mining at grades of between 7.0 and 7.5 g/t gold, using the December 2015resource model capped at 95 g/t gold.
  • Underground productivity averaged a record 911 tonnes per day and mill processing averaged record productivity of 878 tonnes per day. The higher underground productivity and grade realized in the quarter were primarily the result of a positive reconciliation (mined vs. reserves) of 19%, comprised of 8% on tonnes and 10% on grade. As compared to Q1 2016, there was a negative impact on mined grades as a result of mining wider zones as compared to reserves. It is expected that over the coming quarters drilling patterns will continue to be evaluated to best optimize grade and tonnage profiles.
  • The ratio of higher cost development ore versus stope ore was 48% for the quarter, as compared to a planned 40%.
  • The development of the main ramp continued and reached a vertical depth of 800 metres at the end of the quarter. It is expected that the ramp development will reach the bottom of the third mining horizon at the 860 metre level by the end of the year.
  • Cash costs for the quarter were $766per ounce (US$595per ounce), well below guidance estimates and a significant 20% decrease over the prior year period.
  • As previously disclosed, a 3-week mill electrical upgrade to support potential expansion opportunities is scheduled to begin in late July 2016.
  • A final update on the Phase 1 exploration drilling program was recently issued, which demonstrates the potential to grow production and increase mine life both laterally above the 860 metre level, as well as in the vertical extension below the 1,000 metre level. The success of the Phase 1 program supported the launch of an aggressive 18 to 24 month Phase 2 exploration program of up to 142,000 metres of drilling.

Beaufor Second Quarter Highlights

  • Production for the quarter was 4,703 ounces (4,741 ounces sold), a 34% decrease over the prior year period, primarily as a result of lower than expected grades mined in secondary Zones M-MF and 12.
  • Development of the higher-grade Q Zone advanced during the quarter with stope mining planned for the third quarter, which should contribute to increased grade and ounces produced in the second half of the year.
  • Cash costs for the quarter were $1,486per ounce (US$1,154per ounce), a 40% increase over the prior year period and 6% higher than the prior quarter. Cash costs are expected to decrease as stope mining in the higher grade Q Zone begins in the third quarter.
  • Underground productivity at the Beaufor Mine averaged 286 tonnes per day, modestly lower than planned levels.

Corporate Highlights

  • On June 7, 2016, Richmont announced the completion of a bought-deal prospectus offering (the 'Offering'). Pursuant to the Offering, the Corporation issued 2,990,000 common shares (the 'Common Shares') at a price of $10.40per Common Share for gross proceeds of approximately $31 millionthat included 390,000 common shares issued pursuant to the exercise in full of the underwriter's over-allotment option.
  • Effective Friday, June 17, 2016Richmont was added to the S&P/TSX Global Mining Index and the S&P/TSX Global Gold Index.

Upcoming News

  • Q2 2016 Financial Results and Conference Call (August 8, 2016)
  • Phase 2 exploration update (September 2016)
  • Updated Preliminary Economic Assessment and Technical Session (Q4 2016)

Non-International Financial Reporting Standards ('IFRS') Performance Measures

In this press release, the term 'cash costs per ounce' is used, which is a non-IFRS performance measure, and may not be comparable to similar measures presented by other companies. The Corporation believes that, in addition to conventional measures prepared in accordance with IFRS, the Corporation and certain investors use this information to evaluate the Corporation's performance. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. 'Cash costs per ounce' is a common performance measure in the gold mining industry, but does not have any standardized definition. The Corporation reports cash cost per ounce based on ounces sold. Cash costs include mine site operating costs, administration and royalties but are exclusive of depreciation, accretion expense, capital expenditures and exploration and project evaluation costs.

About Richmont Mines Inc.
Richmont Mines has produced over 1.6 million ounces of gold from its operations in Quebec, Ontarioand Newfoundlandsince beginning production. The Corporation currently produces gold from the Island Gold Mine in Ontario, and the Beaufor Mine in Quebec. The Corporation is also advancing development of the significant high-grade resource extension at depth of the Island Gold Mine in Ontario. With 35 years of experience in gold production, exploration and development, and prudent financial management, the Corporation is well-positioned to cost-effectively build its Canadian reserve base and to successfully enter its next phase of growth.

Forward-Looking Statements
This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words 'estimate', 'project', 'anticipate', 'expect', 'intend', 'believe', 'hope', 'may' and similar expressions, as well as 'will', 'shall' and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made. Except as may be required by law, the Corporation undertakes no obligation and disclaims any responsibility to publicly update or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise.

The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may be set out in Richmont Mines' Annual Information Form, Annual Reports and periodic reports. The forward-looking information contained herein is made as of the date of this news release.

Cautionary note to US investors concerning resource estimates
Information in this press release is intended to comply with the requirements of the Toronto Stock Exchange and applicable Canadian securities legislation, which differ in certain respects with the rules and regulations promulgated under the United States Securities Exchange Act of 1934, as amended ('Exchange Act'), as promulgated by the SEC. The Reserve and Resource estimates in this press release were prepared in accordance with Regulation 43-101 adopted by the Canadian Securities Administrators. The requirements of Regulation 43-101 differ significantly from the requirements of the United States Securities and Exchange Commission (the 'SEC').

U.S. Investors are urged to consider the disclosure in our annual report on Form 20-F, File No. 001-14598, as filed with the SEC under the Exchange Act, which may be obtained from us (without cost) or from the SEC's web site: http://sec.gov/edgar.shtml.

Regulation 43-101
The geological data in this news release has been reviewed by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc., and a qualified person as defined by Regulation 43-101.

___________________________
Refer to the Non-IFRS Performance Measures disclosure presented at the end of this press release.

SOURCE Richmont Mines

PDF available at: http://stream1.newswire.ca/media/2016/07/12/20160712_C7595_PDF_EN_732448.pdf

Read the rest of the article at www.publicnow.com

Richmont Mines Inc

PRODUCER
CODE : RIC.TO
ISIN : CA76547T1066
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Richmont Mines is a gold producing company based in Canada.

Richmont Mines holds various exploration projects in Canada.

Its main assets in production are BEAUFOR MINE, ISLAND GOLD and EAST AMPHI MINE in Canada, its main asset in development is FRANCOEUR MINE in Canada and its main exploration properties are WASAMAC, CAMFLO MILL, MONIQUE, RENDELL-JACKMAN (HAMMERDOWN) and CRIPPLE CREEK in Canada.

Richmont Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 741.2 millions as of today (US$ 584.1 millions, € 489.6 millions).

Its stock quote reached its lowest recent point on December 06, 2013 at CA$ 1.00, and its highest recent level on November 24, 2017 at CA$ 11.72.

Richmont Mines has 63 240 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Richmont Mines Inc
1/7/2010Updates its 2010 Investor Presentation
Annual reports of Richmont Mines Inc
2008 annual report
Financings of Richmont Mines Inc
2/11/2015Closes Previously Announced Bought Deal Financing of Common ...
2/1/2012. Completes CAN$ 10 M Private Placement with Mr. Bob Buchan
6/1/2006announces closing of a bought deal of common shares
Nominations of Richmont Mines Inc
5/15/2009Announces Appointments to Board of Directors
Financials of Richmont Mines Inc
8/8/2016Reports Strong Second Quarter Financial Results; On Track to...
5/9/2013Reports First Quarter 2013 Results
2/21/2013Reports Full Year 2012 and Fourth Quarter Results
11/8/2012Reports Results for the Third Quarter of 2012
2/23/2012Reports Record Full Year 2011 and Strong Fourth Quarter Resu...
2/22/2011Reports Strong Fourth Quarter and Full Year 2010 Results
7/30/2009TR: Richmont Mines- News Release - Second Quarter 2009
2/26/2009(Island Gold)Reports Record Sales for the Fourth Quarter and Full Year 20...
1/22/2009(Beaufor Mine)Reports Gold Sales More Than Double in 2008 Fourth Quarter
1/22/2009(Island Gold)Reports Gold Sales More Than Double in 2008 Fourth Quarter
8/19/2008Second Quarter 2008 Fact Sheet
7/31/2008Reports 27.4% Increase in Revenue in the Second Quarter of 2...
5/23/2006announces re-statement and re-filing of first quarter financ...
Project news of Richmont Mines Inc
7/27/2017(Island Gold)Intersects High-Grade, Wide Mineralization in the Down Plung...
1/9/2013(Monique). Receives Mining Permit for Monique Gold Project
7/3/2012(Francoeur Mine)Announces Francoeur Mine Update
5/8/2012(Wasamac)Intercepts 6.40 g/t Au Over 52.8 Metres in Wasamac Main Zone...
3/15/2012(Wasamac).: 2012 Drilling Program at Wasamac Yields Additional Signif...
12/15/2011(Wasamac)Announces Significant Gold Resource Increase at Wasamac
8/30/2011(Wasamac)Intercepts 7.28 g/t Au Over 31.40 Metres at Wasamac; New Dri...
2/17/2011(Wasamac)Announces Resources of Over 1 Million Ounces of Gold at Its ...
1/21/2011(Francoeur Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Beaufor Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Island Gold)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
4/8/2010(Wasamac)Announces a 10,000 Metre Surface Drilling Program on Its Was...
8/7/2009NI 43-101 report on the Francoeur Gold Project
10/1/2008(Beaufor Mine)EXPLORATION DRILLING CONFIRMS MINERALIZATION AT BEAUFOR MINE...
6/8/2006(Valentine Lake (leprechaun))proceeds with earn-in requirements at Valentine Lake
5/26/2006Island gold project update information concerning East amphi...
Corporate news of Richmont Mines Inc
7/13/2016Richmont Mines Announces Details for the Second Quarter Fina...
7/12/2016Richmont Reports Strong Second Quarter Results from Island G...
7/7/2016Strategic Phase 2 Exploration Program Launched at Island Gol...
6/13/2016Richmont Mines Added to the S&P/TSX Global Mining Index and ...
6/7/2016Richmont Mines Completes CAN$31 Million Bought Deal Financin...
5/16/2016Richmont Mines Announces CAN$27 Million Bought Deal Financin...
5/12/2016Richmont Mines Announces Election of Directors
5/12/2016Richmont Mines Reports Strong First Quarter Financial Result...
5/12/2016Richmont Mines posts 1Q profit
1/12/2016Richmont Annual Production Exceeds Guidance: Island Gold Del...
12/22/2015Richmont Mines Inc.: Chairman Position to Become a Non-Execu...
12/21/2015Richmont Mines Provides Exploration Update for Island Gold
12/18/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
12/18/2015Richmont Appoints Christian Bourcier as Vice President, Oper...
12/15/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
11/5/2015Richmont Mines Reports Solid Third Quarter Financial Results...
11/5/2015Richmont Mines posts 3Q profit
10/22/2015Richmont Mines Announces Details For Third Quarter Financial...
10/21/2015Richmont Mines to Release Milling and Mining Study for Islan...
10/8/2015Richmont Reports Strong Third Quarter Production Results; Re...
9/16/2015Richmont Mines Provides an Update on the Surface Step-Out Ex...
9/15/2015Richmont Mines Strengthens Executive Team by Appointing Anne...
9/14/2015Richmont Mines Announces Inclusion in the S&P/TSX SmallCap I...
9/10/2015Deep Drilling to Commence at Richmont's Island Gold Mine to ...
8/6/2015Richmont Mines posts 2Q profit
8/6/2015Richmont Mines Reports Record Revenues for the Second Quarte...
7/14/2015Richmont Mines to Extend Beaufor Mine Life With Development ...
7/13/2015Richmont Mines Reports Record Quarterly Gold Production at I...
4/22/2015Richmont Mines Q1 Gold Production Up 23% Over 2014; 2015 Pro...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/19/2015annonce les résultats du quatrième trimestre et de l'année 2...
2/11/2015annonce la clôture du financement par actions ordinaires ann...
1/21/2015Richmont Mines Announces CAN$30 Million Bought Deal Financin...
1/21/2015Canada Stocks to Watch: Husky, Eldorado, Celestica, Richmont...
1/21/2015Richmont Mines Announces Increase of Bought Deal Financing t...
1/21/2015IIROC Trade Resumption - RIC; AKG
1/20/2015IIROC Trading Halt - RIC
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
12/1/2014Ex Barrick Executives Flock to Inca One Gold
11/17/2014Mr. Renaud Adams Officially Commences as President and Chief...
10/16/2013Enters a Land and Mining Rights Agreement with Argonaut Gold
10/4/2013(Monique).: Monique Gold Project Attains Commercial Production; 43-10...
8/23/2013Closes Previously Announced Senior Credit Facility for Up to...
6/17/2013Obtains Letter of Offer for Senior Credit Facility for Up to...
4/12/2013(Island Gold).: Island Gold Deep 43-101 Report Filed on Sedar; New Drill ...
9/24/2012Announces the Immediate Retirement of CAN$10 Million Debentu...
9/10/2012(Island Gold).: New Deep Drill Results Reaffirm Promising Potential at De...
4/12/2012Gold Industry Veteran Ebe Scherkus to Join the Richmont Mine...
3/28/2012(Wasamac)Announces Results From a Preliminary Economic Assessment for...
2/10/2012(Island Gold)Promising Drill Results From Island Gold Mine Confirm Potent...
1/11/2012Gold Industry Veteran Bob Buchan Joins the Board of Director...
12/20/2011(Monique)Announces Open Pit Resources at its Monique Property
11/29/2011(Wasamac)Announces Completion of 2011 Drilling Program at Wasamac; Up...
8/24/2011(Monique)s Final Drilling Results From the Monique Project, Studies U...
8/9/2011Announces a Significant Increase in Earnings and Cash Flow f...
6/22/2011(Monique)More Positive Drill Results From Richmont's Monique Project
5/9/2011(Wasamac)Signs Option Agreement With Globex; Expands Wasamac Explorat...
4/11/2011(Monique).: Monique Work Commitment Completed; Initial Drill Results ...
3/29/2011. Confirms and Amends its Shareholder Rights Plan
4/12/2010hits 73.54 g/t Au over 7 metres on its Cripple Creek Propert...
2/25/2010Q4 and F2009 Results
2/4/2010Shareholders Elect Four New Board Members at Special Shareho...
12/16/2009 Four board nominations at Richmont Mines - Building the nex...
10/29/2009Q3 2009 Release
12/16/2008 Acquires Patricia Mining Corp.
12/3/2008 Announces Acceptance of Normal Course Issuer Bid
9/4/2008AND LKA AGREE TO EXTEND INITIAL COMMITMENT PERIOD TO COMPLET...
7/10/2008TO START DRILLING AT THE GOLDEN WONDER PROJECT
5/18/2006Focus on profitable growth
1/26/2006and Patricia Mining Corp. Announce the purchase of the remai...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (RIC.TO)AMEX (RIC)
11.72+4.27%18,900.00-0.53%
TORONTO
CA$ 11.72
11/24 16:00 0.480
4.27%
Prev close Open
11.24 12.09
Low High
11.66 12.35
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  11.72 -%
Volume 1 month var.
625,800 -%
24hGold TrendPower© : 13
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :