Great Basin Gold s hollister and burnstone mineral reserves and life of mine estimates and announces new term loan

 

 

 

 

 

  • Hollister updated Mineral Reserve and 2011E production guidance of approximately 110,000 recovered gold equivalent ounces (Au(eqv) oz)
  • Hollister forecast Life of Mine ("LOM") average production of 110,000 Au(eqv) oz over 8 years at steady state with a cash cost, inclusive of royalties of approximately US$527 per Au(eqv) oz recovered over the LOM.
  • Burnstone updated Mineral Reserve increased by 55% and 2011E production guidance of 110,000 to 140,000 recovered gold oz (Au oz)
  • Burnstone forecast LOM average production of 254,000 Au oz over 25 years at steady state with a cash cost, inclusive of royalties, of US$450 per Au oz recovered over the LOM
  • Final credit approval for Term Loan financing of US$60 million of which US$52 million will be used to retire senior secured notes

VANCOUVER, Feb. 2 /CNW/ - Great Basin Gold Ltd. ("Great Basin Gold" or the "Company"), (TSX: GBG; NYSE Amex: GBG; JSE: GBG) announces increases for both its Hollister Project and Burnstone Mine Mineral Reserve and life-of mine ("LOM") estimates. The Company has also received credit committee approval for a US$60 million Term Loan financing from Credit Suisse AG, the proceeds of which will be used to repay the high cost Senior Secured Notes issued during the 2008 credit crisis.

Hollister Project, Carlin Trend, Nevada

Ongoing technical work at Hollister has resulted in a 13% increase, on a directly comparable basis, in the Mineral Reserves from those published in January 2009. (Capitalized terms not otherwise defined herein have the meanings set out in Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects) The Hollister project is still in the trial mining stage, however, based on production techniques tested to date, the Company has estimated applicable call factors for mining of approximately 85% and metallurgical recoveries of approximately 92% for Au and 85% for Ag. Since the 2009 Mineral Reserve estimate, a total of 165,772 tons have been extracted at an average grade of 1.06 Au(eqv) oz/ton (36.4 g/t), delivering 176,387 Au(eqv) contained ounces. At a cut-off grade of 0.25 oz/ton (8.57 g/t) Au, the combined Proven and Probable Mineral Reserves contain an estimated net 907,000 Au(eqv) ounces, grading 0.79 oz/ton (27.02 g/t) Au and 4.75 oz/ton (163 g/t) silver (Ag) after application of the noted call factors for mining and metallurgical recoveries.

Results of Hollister's January 2011 Mineral Reserve Estimate are shown below:

Reserve category

Cut-off
oz/ton

Tons

Au
oz/ton

oz Au

Ag
oz/ton

oz Ag

Au
equivalent
oz

Proven

0.25

347,100

1.33

460,300

7.75

2,689,400

500,700

Probable

0.25

701,800

0.53

371,800

3.27

2,296,600

406,300

Total Proven & Probable

0.25

1,048,900

0.79

832,100

4.75

4,986,000

907,000

Note: *The equivalent gold ounces reported herein were calculated using a gold price of US$1,000/oz, a silver price of US$15/oz. A call factor of 85% and metallurgical recovery factors of 92% for Au and 85% for Ag were applied.

The table below shows the reconciliation between the depleted January 2009 and January 2011 Mineral Reserve estimates, using a cut-off of 0.25 oz/t Au and applying similar call factors and metallurgical recoveries:

Description

Cut-off 
oz/ton

Tons
('000)

Au
equivalent
oz/ton

Au
equivalent
oz
('000)

January 2009 Reserve estimate*

0.25

1,398

0.90

1,257

Apply 85% call factor

N/A

-

-

(188)

Trial mined 2009 -2011

N/A

(166)

1.06

(176)

Apply metallurgical recoveries

N/A

-

-

(90)

Restated January 2009 Reserve estimate

N/A

1,232

0.65

803

January 2011 Reserve estimate

0.25

1,048

0.87

907

Mineral Reserves added

 

 

 

104

 

Note: 

*No mining and plant recovery factors applied

A minimum stoping width of 0.91 meters (36 inches) was assumed for purposes of Mineral Reserve estimation, along with dilution defined as waste tonnes (or tons) carrying zero grade and 100 percent in-stope extraction. An analysis by the Company's technical staff confirms that no systematic, in-stope pillars will be required because of the cut-and-fill trial mining method now being utilized.  Based on the results of trial stoping and grade reconciliation studies, where vein widths of 0.76 meters (30 inches) or greater were considered, a total of 0.15 meters (six inches) of hanging wall dilution and 0.15 meters (six inches) of footwall dilution was applied.  Where appropriate, other average dilution rates were applied. The in-situ wireframe model generated with the Mineral Resource update announced September 9, 2010, were used as basis for this mineral reserve update.

Using the updated Mineral Reserve estimate, an average production profile of 110,000 Au(eqv) oz over 8 years was projected with the estimated cash cost, inclusive of royalties, amounting to US$527 per Au(eqv) oz recovered over the LOM. Cash costs for 2011 are forecast to be in the range of US$550 - US$600 per Au eqv oz. The estimated Net Present Value ("NPV") of the Hollister Project (using metal prices of US$1,000/oz for Au and US$15/oz for Ag) at a 5% discount rate is calculated at US$236 million.

Burnstone Mine, Witwatersrand Basin, South Africa

At Burnstone, Mineral reserves increased by 55% with the majority of the increase attributable to the improved geological information obtained from underground development and drilling conducted since the January 2009 reserve update as well as additional reserves included from Area 2. Detailed planning has shown that production at Area 2 of the Burnstone property can be increased and be extracted through separate infrastructure. Since the January 2009 reserve update, Great Basin Gold has completed over 6,000 meters (19,685 feet) of on-reef development and over 3,851 meters2 (41,452 feet2) of long hole stoping ("LHS"). The January 2011 Mineral reserve update and LOM planning is based on LHS as the preferred mining method, and the decrease in dilution from this mining method also positively impacted on the updated reserve estimate.

At a cut-off gold content of 350 centimeter-grams per tonne (cmg/t) the combined Proven and Probable Mineral reserves contain  6.4 million Au oz grading 4.47 g/t (0.13 oz/ton) Au after application of a 95% call factor for mining and a 95% metallurgical recovery. Currently, 53% of the Measured and indicated Mineral resources have been converted into Proven and Probable Reserves.

Results of Burnstone's January 2011 Mineral Reserve Estimate are tabulated below:

Reserve category

Cut-off
cmg/t

Tonnes

Au g/t

oz Au

Proven

350

29,784,000

4.11

3,933,000

Probable

350

14,436,000

5.23

2,427,000

Total Proven & Probable

350

44,220,000

4.47

6,360,000

Using the updated Mineral Reserve estimate, an average annual production profile of 254,000 Au oz over 25 years was scheduled with the cash cost, inclusive of royalties, amounting to US$450/oz of Au recovered over the LOM. The estimated NPV for Burnstone (using a metal price of US$1,000/oz for Au and an exchange rate of USD1: ZAR9) at a 5% discount rate is US$1,530 million.

The potential for an increase in the production build-up in the medium term using LHS as the preferred mining method is demonstrated by the updated LOM plan. On-reef development remains the key to delivering the planned production build-up and will therefore be the priority focus for 2011. The production range of 110,000 to 140,000 Au oz is therefore the result of the increased focus on on-reef development. Cash costs for 2011 are forecast in the range of US$520 - US$620/oz and are impacted by the diluted grade from the additional on-reef development. 

The metallurgical plant has achieved its targeted rate for January 2011 of 90,000 tonnes milled. The current focus is to ramp up production and achieve a milling rate of 125,000 tons per month. 

The Burnstone Mineral Resources have been revised in-line with the Mineral reserve update. The Mineral Resources announced August 23, 2010 were based on a "4 2 1 model", which uses a minimum of 4 informing samples for a Measured Resource classification, 2 for an Indicated classification and 1 for an Inferred classification. The current model uses the same estimation parameters but more stringent classification criteria, which is a minimum of 6 informing samples for Measured, 3 for Indicated and 2 for Inferred.

A comparison of the Mineral Resources estimated under the two models at a range of gold content cut-off values is tabulated below:

Comparison of Burnstone 6 3 2 vs 4 2 1 Mineral Resource Estimates

 

6 3 2¹ model

4 2 1² model

Resource
Classification

Cut off
Cmg/t

Mass
M tons

Au grade
g/t

Au Content
Oz

Mass
M tons

Au grade
g/t

Au Content
oz

Measured

300

41.2

5.67

7,496,000

40.0

5.78

7,435,000

Measured

350

37.2

5.78

6,900,000

36.5

5.90

6,927,180

Measured

400

33.1

5.94

6,326,000

33.7

6.01

6,514,390

 

 

 

 

 

 

 

 

Indicated

300

23.5

7.31

5,516,000

31.2

6.44

6,472,770

Indicated

350

21.3

7.60

5,199,000

27.2

6.84

5,978,830

Indicated

400

19.8

7.77

4,956,000

24.1

7.20

5,567,960

 

 

 

 

 

 

 

 

M + I

300

64.6

6.26

13,012,000

71.2

6.07

13,907,770

M + I

350

58.4

6.44

12,099,000

63.7

6.30

12,906,010

M + I

400

53.0

6.63

11,283,000

57.8

6.50

12,082,350

 

 

 

 

 

 

 

 

Inferred

300

66.8

4.33

9,306,000

67.5

4.33

9,392,970

Inferred

350

54.9

4.75

8,374,000

61.0

4.49

8,799,830

Inferred

400

49.1

4.86

7,679,000

52.2

4.75

7,977,520

 

Note: 

Mineral Resources are undiluted and assume 100% metallurgical recoveries.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
The Mineral Resources under the 6 3 2 model above include the Mineral Reserves reported in the previous table.

 

16 3 2 indicates minimum number of informing points for Measured (6), Indicated (3) and Inferred (2)

 

24 2 1 indicates minimum number of informing points for Measured (4), Indicated (2) and Inferred (1)

At a 350 cmg/t cut-off, the tighter classification parameters have resulted in an 8% decrease in total Measured and Indicated Resources tonnage, a 2% increase in grade from 6.30 to 6.44 g/t Au, and a combined 6% adjustment downwards of contained gold in the Measured and Indicated Resources categories to 12.1 million ounces. The 350 cmg/t cut-off is lower than the 400 cmg/t used for previous estimates and conversions to Mineral Reserves, reflecting increased confidence in these estimates.

Term Loan Financing Finalized

Great Basin Gold has also obtained final credit approval from Credit Suisse AG to enter into a Term Loan Financing for US$60 million which is now primarily subject only to negotiation of customary definitive loan documents. Key terms include:

  • Maximum term of 4 years from date of drawdown, with interest and capital repayment commencing 3 months after draw down.
  • Interest at a margin of 3.75% over the USD LIBOR rate (currently 0.3%).
  • Great Basin Gold will have the option to retire the loan 12 months after draw down at no additional cost.
  • Secured by the Hollister Project and Esmeralda property.
  • Hedging program typical for these facilities will be finalized and implemented in the following weeks. It is anticipated that a zero-cost-collar structure for a total of up to 105,000 Au oz over the next 4 years of gold production will form the basis for the program.

It is anticipated that this transaction will be closed before the end of February 2011. The net proceeds from this financing will be used to settle the 2008 Senior Secured Notes which currently bear interest at 14% per annum.

Ferdi Dippenaar, Great Basin Gold CEO, commented:

"Our ongoing evaluations of the two ore bodies, which encompass delineation drilling and results from trial mining, continue to confirm the value of the Hollister and Burnstone properties, as evidenced in both increased reserves and increased confidence in our measurements. The tighter geological controls used in determining these estimates are also improving trial stope tonnage and grade estimates and, as a consequence, our mine planning is benefiting from more accurate information. 

"At Hollister, exploration drilling from underground is successfully tracking the lateral extensions of the Hollister veins northwestward to the Gloria vein system and the Butte bounding fault structure, and southeastward from the Gwenivere vein system to the Hatter Graben. As the underground development continues, there will be further opportunities to drill test the extensions of a number of high grade zones that are emerging from this evaluation work. 

"Production from trial mining at Hollister is expected to remain at the level of 110,000 recovered-Au(eqv) oz/annum for the near future. We have conservatively estimated production at the Burnstone mine, which will experience its first full year of mining in 2011, and have focused the management team on prioritizing on-reef development to ensure that this plus 25-year life, world class project has a solid foundation to deliver successful production in the future.

"With the commitment of the Credit Suisse facility, Great Basin Gold now has the necessary funds to retire the US$52 million Senior Secured Notes, a debt facility put in place in November 2008.  This both reduces our cost of capital and provides us better financial coordination with a single corporate lender."

The Mineral Reserve estimates and other technical information herein were completed under the supervision of Johan Oelofse, Pr.Eng., FSAIMM, Great Basin Gold's Chief Operating Officer. Mr Oelofse is a Qualified Person as defined by Canadian Securities Regulations in National Instrument 43-101, who has also reviewed and approved the information in this news release. 

The Mineral Resource estimate for Burnstone was completed by Freddie de Bruin, Pr.Sci.Nat., of Deswik Mining and Resource Consultants, under the supervision of Phil Bentley, Pr.Sci.Nat., Great Basin Gold's Vice President: Geology & Exploration. Mr Bentley is a Qualified Person as defined by Canadian Securities Regulations in National Instrument 43-101, who has also reviewed and approved the information in this news release.   

Details of these estimates will be included in NI 43-101 compliant technical reports filed on www.sedar.com

Ferdi Dippenaar
President and CEO

Samples collected from the Hollister Development Block Project are delivered to Inspectorate America Corporation (Inspectorate) in Sparks, Nevada. The primary analytical facility for the Burnstone Project from 2003-2005 has been SGS Lakefield Research Africa (Pty) Limited and subsequently (2006-2010), ALS Chemex has been the primary laboratory. Both facilities are located in Johannesburg, South Africa.

This document contains "forward-looking statements" that were based on Great Basin Gold's expectations, estimates and projections as of the dates as of which those statements were made. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "outlook", "anticipate", "project", "target", "believe", "estimate", "expect", "intend", "should" and similar expressions. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the Company's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. These include but are not limited to:

  • uncertainties and costs related to the Company's exploration and development activities, such as those associated with determining the extent of mineral resources or reserves which  exist on a property;
  • uncertainties related to feasibility studies that provide estimates of expected or anticipated costs, expenditures and economic returns from a mining project; uncertainties related to expected production rates, timing of production and the cash and total costs of production and milling;
  • uncertainties related to the ability to obtain necessary licenses, permits, electricity, surface rights and title for development projects;
  • operating and technical difficulties in connection with mining development activities;
  • uncertainties related to the accuracy of our mineral reserve and mineral resource estimates and our estimates of future production and future cash and total costs of production, and the geotechnical or hydrogeological nature of ore deposits, and diminishing quantities or grades of mineral reserves;
  • uncertainties related to unexpected political,  judicial or regulatory proceedings;
  • changes in, and the effects of, the laws, regulations and government policies affecting our mining operations, particularly laws, regulations and policies relating to
    • mine expansions, environmental protection and associated compliance costs arising from exploration, mine development, mine operations and mine closures;
    • expected effective future tax rates in jurisdictions in which our operations are located;
    • the protection of the health and safety of mine workers; and
    • mineral rights ownership in countries where our mineral deposits are located, including the effect of the Mineral and Petroleum Resources Development Act (South Africa);
  • changes in general economic conditions, the financial markets and in the demand and market price for gold, silver and other minerals and commodities, such as diesel fuel, coal, petroleum coke, steel, concrete, electricity and other forms of energy, mining equipment, and fluctuations in exchange rates, particularly with respect to the value of the U.S. dollar, Canadian dollar and South African rand;
  • unusual or unexpected formation, cave-ins, flooding, pressures, and precious metals losses (and the risk of inadequate insurance or inability to obtain insurance to cover these risks);
  • changes in accounting policies and methods we use to report our financial condition, including uncertainties associated with critical accounting assumptions and estimates;
  • environmental issues and liabilities associated with mining including processing and stock piling ore;
  • geopolitical uncertainty and political and economic instability in countries which we operate;  and
  • labour strikes, work stoppages, or other interruptions to, or difficulties in, the employment of labour in markets in which we operate mines, or environmental hazards, industrial accidents or other events or occurrences, including third party interference that interrupt the production of minerals in our mines.

Cash costs per ounce are numbers commonly used in the mining industry to assess performance.  They are not terms recognized under generally accepted accounting principles. Investors will wish to review the NI 43-101 technical reports which support these estimates in order to understand the cost elements which make up the cash cost estimate.

Information Concerning Estimates of Measured, Indicated and Inferred Resources

This news release also uses the terms "measured resources", "indicated resources" and "inferred resources". The Company advises investors that although these terms are recognized and required by Canadian regulations (under National Instrument 43-101 Standards of Disclosure for Mineral Projects), the U.S. Securities and Exchange Commission does not recognize them. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into SEC-recognized reserves. In addition, 'inferred resources' have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre-feasibility studies, or economic studies except for Preliminary Assessment as defined under 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.

The mineralized material at the Hollister Project is currently classified as a measured and indicated resource, and a portion of it qualifies under Canadian mining disclosure standards as a proven and probable reserve, but readers are cautioned that no part of the Hollister Project's mineralization is considered to be a reserve under US mining standards as all necessary mining permits and project financing would be required in order to classify the project's mineralized material as an economically exploitable reserve.  Although work has been done to confirm the mine design, mining methods and processing methods assumed in the 2011 Update, construction and operation of the mine and processing facilities depend on securing environmental and other permits on a timely basis.  Additional permits, when required, have yet to be applied for and there can be no assurance that required permits can be secured or secured on a timely basis.

For further information on Great Basin Gold, investors should review the Company's annual Form 40-F filing with the United States Securities and Exchange Commission www.sec.com and home jurisdiction filings that are available at www.sedar.com

 

 

Data and Statistics for these countries : South Africa | All
Gold and Silver Prices for these countries : South Africa | All

Great Basin Gold Ltd

PRODUCER
CODE : GBG.TO
ISIN : CA3901241057
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Great Basin Gold is a gold development stage company based in Canada.

Great Basin Gold produces gold, silver in South Africa and in USA, develops gold in South Africa, and holds various exploration projects in Tanzania.

Its main assets in production are HOLLISTER in USA and BURNSTONE in South Africa, its main asset in development is ESMERALDA in South Africa and its main exploration properties are TSETSERA in Mozambique and LUPA/LAKE VICTORIA in Tanzania.

Great Basin Gold is listed in Canada, in Germany, in South Africa and in United States of America. Its market capitalisation is CA$ 44.2 millions as of today (US$ 45.6 millions, € 34.7 millions).

Its stock quote reached its highest recent level on December 31, 2004 at CA$ 3.85, and its lowest recent point on September 14, 2012 at CA$ 0.08.

Great Basin Gold has 552 436 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Great Basin Gold Ltd
2008 Annual Report
2007 Annual Report
Financings of Great Basin Gold Ltd
2/23/2011Announces Closing of C$86.26 Million Bought Deal Public Offe...
Nominations of Great Basin Gold Ltd
10/3/2011announces the appointment of Chief Operating Officer
5/16/2011ANNOUNCES THE APPOINTMENT OF NEW DIRECTORS
11/3/2008APPOINTS CHRIS KNOETZE AS GENERAL MANAGER OF THE BURNSTONE M...
Financials of Great Basin Gold Ltd
2/24/2011Financing Activities and Unaudited Results for Q4 2010 and t...
Hedging of Great Basin Gold Ltd
3/17/2011REPAYS SENIOR SECURED NOTES
Project news of Great Basin Gold Ltd
9/11/2012(Burnstone)Suspends Operations at its Burnstone Mine
4/11/2011(Hollister)S EXPLORATION AND DRILLING RESULTS FOR HOLLISTER PROJECT...
3/24/2011(Hollister)HOLLISTER OPERATION REMOVED FROM SAFETY WATCH LIST
1/19/2011(Hollister)PROVIDES Q4 2010 PRODUCTION UPDATE
8/11/2009(Hollister)successfully completes refurbishment of Esmeralda Mill
5/19/2009(Hollister)RESOURCE WATCH WITHDRAWS APPEAL AGAINST THE RENEWAL OF THE H...
11/12/2008(Burnstone)REPORTS PROGRESS IN QUARTER ENDING SEPTEMBER 30 2008
11/10/2008(Hollister)HOLLISTER PROJECT COMPLETES THIRD TEST BATCH AT NEWMONT'S MI...
9/3/2008(Hollister)ANNOUNCES ADDITIONAL HIGH GRADE INTERCEPTS IN THE NEWLY DISC...
8/13/2008(Hollister)COMMENCES TRIAL MINING ON GWENIVERE AND CLEMENTINE HIGH GRAD...
2/13/2008(Hollister)'S HOLLISTER DEVELOPMENT PROJECT ENCOUNTERS EXCEPTIONA
11/13/2007(Hollister)EXPLORATION CONFIRMS EXTENSIONS TO MINERALIZATION AT GREAT B...
Corporate news of Great Basin Gold Ltd
10/4/2012s Insolvency Proceedings and DIP Loan Status
9/18/2012subsidiary seeks creditor protection pending loan negoti...
3/20/2012To Our Valued Shareholders
3/14/2012Provides Tranter Update
2/2/2011S HOLLISTER AND BURNSTONE MINERAL RESERVES AND LIFE OF MINE ...
2/2/2011S HOLLISTER AND BURNSTONE MINERAL RESERVES AND LIFE OF MINE ...
8/25/20092009 Mpumalanga govan Mbeki housing awards
7/22/2009ANNOUNCES CHANGES TO THE BOARD
5/14/2009REPORTS PROGRESS IN QUARTER ENDING MARCH 31, 2009
6/26/2008enhances its communication strategy with an added value comm...
6/18/2008HOLLISTER PROJECT INCREASES MEASURED AND INDICATED RESOURCES...
4/1/2008REPORTS INCREASE IN LOSSES AS CAPITAL EXPENDITURE ON GROWTH ...
3/26/2008 PRESENT AT AMEX PRECIOUS AND BASE METALS INVESTORS CONFEREN...
2/18/2008GREAT BASIN CLARIFIES RUSAF GOLD ACQUISITION
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (GBG.TO)FRANKFURT (GBS.F)
0.080-11.11%0.067+1.52%
TORONTO
CA$ 0.080
09/14 12:09 -0.010
-11.11%
Prev close Open
0.090 0.080
Low High
0.080 0.090
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.080 -%
Volume 1 month var.
1,328,110 -%
24hGold TrendPower© : -27
Produces Gold - Silver
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/27/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.49%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :