| | Published : November 16th, 2011 | s Progress at Contact Copper Project=2C NV |
|
Article
|
Comments
|
Comment this article
|
Rating
|
♥
Follow Company
|
|
You are receiving this email because you opted in at our website Email not displaying correctly? View it in your browser. | |
|
|
Dear Subscriber, |
November 16, 2011 |
International Enexco Updates Progress at Contact Copper Project, NV
Vancouver, Canada November 16, 2011 - International Enexco Ltd. (TSX-V: IEC; OTCQX: IEXCF; Frankfurt: IE6) (the �Company� or �Enexco�) is pleased to update its shareholders on the progress at its 100%-owned Contact Copper Project in Elko County, Nevada, where, as recently announced on September 26, 2011, the Company completed the acquisition of adjoining land from Allied Nevada Gold Corp. ("Allied Nevada") (TSX: ANV; NYSE, Amex: ANV). The acquisition more than doubles the Company�s holdings in the district to approximately 13,000 acres. With the acquisition, Enexco sees potential for additional resources and reserves, and has scheduled a $1 million expansion drilling program to begin this fall. The Company is reviewing work towards a feasibility study on the project. About the Contact Copper Project The Contact Copper Project is a copper oxide project located in northeastern Elko County, Nevada. Low cost SX-EW recovery will be used to produce cathode copper on site. An updated Pre-feasibility Study (PFS) was completed in 2010 by Gustavson Associates that showed positive economics at a base case copper price of $2.25/lb. The project as outlined is targeted to produce 25 million pounds per year of cathode copper over a mine life of 9.5 years. Overall copper recovery is projected at 76%. Capital cost from the PFS is $86 million, with production targeted for 2014 at an average operating cost of $0.93/lb of copper. After-tax cash flow analysis for the base case shows a 20.2% IRR and NPV of $44 million at a 10% discount rate. From the PFS, Proven and Probable Mineral Reserves for the oxide copper project total 54.1 million tons grading 0.29% Cu. The Reserves were determined from Measured and Indicated Mineral Resources of 135 million tons of 0.26% Cu. Excluded from the project base case economics is an Inferred Mineral Resource of 53.5 million tons of 0.27% Cu. The Resources and Reserves were calculated with NI 43-101 guidelines using a base case copper price of $2.25/lb and a cut-off grade of 0.10% Cu. All Resources and Reserves reported in the PFS were limited to Enexco� s pre-acquisition property holdings, and included limitations on reserves due to property constraints on the mine design.
Category |
Tons |
Cu (%) |
Pounds Cu |
Reserves |
|
|
|
Proven |
27,011,000 |
0.305% |
164,701,000 |
Probable |
27,138,000 |
0.280% |
152,199,000 |
Total P&P |
54,149,000 |
0.293% |
316,899,000 |
Resources |
|
|
|
Measured |
52,976,000 |
0.282% |
298,397,000 |
Indicated |
82,233,000 |
0.251% |
413,413,000 |
Total M&I |
135,209,000 |
0.263% |
711,810,000 |
Inferred |
53,490,000 |
0.272% |
291,368,000 | Resources from Oct. 2010 NI 43-101 PFS update Resources and Reserves reported at 0.10% Cu cut-off Additional information on the project, including geology, resources and reserves, can be found on the company�s website at http://www.enexco.ca/s/contact_copper.aspand in the NI 43-101Technical Report Pre-feasibility Study Update for the Contact Copper Project, Elko County, Nevada as posted on Sedar. Previous Drilling The Resources and Reserves in the PFS were derived from drilling done by Enexco between 2006 and 2010, along with previous drilling by companies Golden Phoenix Minerals, Inc., Phelps Dodge Corporation and Calta Resources, Ltd. Total drilling by all four companies in the district amounts to 237,700 feet (72,450 metres ) in 268 drill holes, of which 92% were core and 8% were reverse circulation. Enexco�s drilling represents 60% of the total footage, amounting to 142,000 feet (43,281 metres) in 156 core holes. These holes were drilled on Enexco�s property before the acquisition. Of the 96,000 feet (29,261 meters) in pre-Enexco drilling, only 14,000 feet (4267 metres) in 17 holes fall outside of the PFS resource model on land acquired from Allied Nevada. In addition, Allied Nevada in 2010 drilled 4 holes (CON10-001 to CON10-004) on its property at the eastern end of the PFS reserves. In 2010, Enexco drilled one hole, EN-149, just beyond the eastern limits of the PFS resource model. East Expansion The PFS reserves fall within a plan area elongated 4,000 feet (1220 metres) east-west by 1,500 feet (457 metres) north-south. As seen in the accompanying map, the eastern end of the area was restricted by land ownership. The mine design terminated eastward due to depth of mineralization and the presence of property boundaries to the north and south. The acquisition allows the mine design to expand to full economic depth eastward. Within the 1500 feet (457 metres) east from the end of the PFS reserves, Enexco drilled 8 holes, as listed in the table below. Additional drilling is needed to in-fill this area and potentially extend it eastward beyond the furthest east hole, EN-149, which carries an intercept of 185 feet (56.4 metres) of 0.25% Cu. To expand the resource and upgrade it to Measured and Indicated categories, the Company plans 20,000 feet (6,096 metres) of drilling at a total cost of $1 million. Drilling for the expansion program is scheduled this fall.
Contact East Extension Area - Intervals above 0.10% Cu |
|
|
|
|
|
|
ENEXCO 2007-2010 |
From (ft) |
To (ft) |
Length (Ft) |
Length (m) |
Copper % |
Drill Hole # |
EN-134 |
330 |
410 |
80 |
24.4 |
0.15 |
|
455 |
477 |
22 |
6.7 |
0.82 |
EN-135 |
25 |
60 |
35 |
10.7 |
0.13 |
|
125 |
210 |
85 |
25.9 |
0.15 |
|
275 |
360 |
85 |
25.9 |
0.19 |
EN-147 |
77 |
210 |
133 |
40.5 |
0.30 |
|
350 |
370 |
20 |
6.1 |
0.18 |
|
470 |
535 |
65 |
19.8 |
0.23 |
|
655 |
675 |
20 |
6.1 |
0.54 |
EN-149 |
0 |
185 |
185 |
56.4 |
0.25 |
|
215 |
270 |
55 |
16.8 |
0.16 |
|
300 |
320 |
20 |
6.1 |
0.13 |
|
390 |
415 |
25 |
7.6 |
0.11 |
|
540 |
560 |
20 |
6.1 |
0.13 |
EN-150 |
125 |
145 |
20 |
6.1 |
0.34 |
|
270 |
305 |
35 |
10.7 |
0.19 |
|
495 |
565 |
70 |
21.3 |
0.22 |
|
665 |
685 |
20 |
6.1 |
0.46 |
EN-151 |
360 |
385 |
25 |
7.6 |
1.40 |
EN-152 |
180 |
200 |
20 |
6.1 |
0.14 |
|
320 |
340 |
20 |
6.1 |
0.65 |
|
395 |
425 |
30 |
9.1 |
0.25 |
EN-153 |
100 |
145 |
45 |
13.7 |
0.16 |
|
160 |
200 |
40 |
12.2 |
0.20 |
|
265 |
300 |
35 |
10.7 |
0.17 |
|
440 |
545 |
105 |
32.0 |
0.19 |
|
565 |
585 |
20 |
6.1 |
0.23 |
|
|
|
|
|
|
ALLIED NEVADA 2010 |
From (ft) |
To (ft) |
Length (Ft) |
Length (m) |
Copper % |
Drill Hole # |
CON10-001 |
215 |
240 |
25 |
7.6 |
0.31 |
CON10-002 |
no reportable intercepts |
|
|
|
|
CON10-003 |
no reportable intercepts |
|
|
|
|
CON10-004 |
40 |
60 |
20 |
6.1 |
0.20 |
|
|
|
|
|
|
CALTA pre-1973 |
From (ft) |
To (ft) |
Length (Ft) |
Length (m) |
Copper % |
Drill Hole # |
N-02 |
130 |
150 |
20 |
6.1 |
0.17 |
|
320 |
340 |
20 |
6.1 |
0.11 |
|
400 |
420 |
20 |
6.1 |
0.72 |
|
665 |
685 |
20 |
6.1 |
0.75 |
N-03 |
40 |
55 |
15 |
4.6 |
0.350 |
|
508 |
518 |
10 |
3.1 |
0.245 |
|
605 |
631 |
26 |
7.9 |
0.516 |
N-06 |
331 |
361 |
30 |
9.1 |
0.49 |
|
392 |
415 |
23 |
7.0 |
0.20 |
|
435 |
455 |
20 |
6.1 |
0.13 |
|
603 |
627 |
24 |
7.3 |
0.20 |
N-11 |
222 |
228 |
6 |
1.8 |
0.64 |
|
474 |
500 |
26 |
7.9 |
0.16 |
* portions of Calta holes unassayed |
|
|
|
Other Targets With the acquisition, the Company is also assessing targets for future exploration. Among these are areas with surface exposures of copper oxide mineralization, west and south of the PFS reserves, as well as deeper targets for copper sulfides below the PFS reserves and elsewhere on the property. Information on these targets is available on the Company�s website. The Company�s immediate plans are to continue to focus on advancing the copper oxide project toward production while continuing to add information and prioritize targets for longer term exploration and future drilling. The Contact Copper Project is under the supervision of Dr. William Willoughby, PE, a Qualified Person as defined in Canadian National Instrument 43-101, who is responsible for the preparation of the technical information in this news release. Assay procedures for intervals reported are described in NI 43-101 Technical Report Pre-feasibility Study Update for the Contact Copper Project, Elko County, Nevada as posted on Sedar and on the Company�s website. Assay intervals listed under Allied Nevada are as provided in data from Allied Nevada and have not been verified. About International Enexco Ltd. International Enexco Ltd is a North American exploration and development company focused on the feasibility stage Contact Copper Project in northern Nevada. The Company also pursues gold and silver exploration in Idaho and Nevada, and is advancing the Mann Lake Uranium Project located in Saskatchewan�s prolific Athabasca basin. This project is a joint venture with Cameco as operator and Areva�two of the world�s largest uranium companies.
Further Information: Tel: +1 604 669 8368 Fax: +1 604 662 3231 Email: info@enexco.caor visit www.enexco.ca2060 � 777 Hornby Street, Vancouver, B.C., Canada, V6Z 1T7 | On behalf of the Board of Directors, I look forward to keeping you updated with our corporate developments. "G. Arnold Armstrong� President & CEO Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements. A feasibility study has not been completed and there is no certainty the disclosed targets will be reached nor that the proposed operations will be economically viable. The TSX Venture Exchange or its Regulation Services Provider have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management. We seek safe harbour. | |
International Enexco Updates Progress at Contact Copper Project, NV
Vancouver, Canada November 16, 2011 - International Enexco Ltd. (TSX-V: IEC; OTCQX: IEXCF; Frankfurt: IE6) (the �Company� or �Enexco�) is pleased to update its shareholders on the progress at its 100%-owned Contact Copper Project in Elko County, Nevada, where, as recently announced on September 26, 2011, the Company completed the acquisition of adjoining land from Allied Nevada Gold Corp. ("Allied Nevada") (TSX: ANV; NYSE, Amex: ANV). The acquisition more than doubles the Company�s holdings in the district to approximately 13,000 acres. With the acquisition, Enexco sees potential for additional resources and reserves, and has scheduled a $1 million expansion drilling program to begin this fall. The Company is reviewing work towards a feasibility study on the project. About the Contact Copper Project The Contact Copper Project is a copper oxide project located in northeastern Elko County, Nevada. Low cost SX-EW recovery will be used to produce cathode copper on site. An updated Pre-feasibility Study (PFS) was completed in 2010 by Gustavson Associates that showed positive economics at a base case copper price of $2.25/lb. The project as outlined is targeted to produce 25 million pounds per year of cathode copper over a mine life of 9.5 years. Overall copper recovery is projected at 76%. Capital cost from the PFS is $86 million, with production targeted for 2014 at an average operating cost of $0.93/lb of copper. After-tax cash flow analysis for the base case shows a 20.2% IRR and NPV of $44 million at a 10% discount rate. From the PFS, Proven and Probable Mineral Reserves for the oxide copper project total 54.1 million tons grading 0.29% Cu. The Reserves were determined from Measured and Indicated Mineral Resources of 135 million tons of 0.26% Cu. Excluded from the project base case economics is an Inferred Mineral Resource of 53.5 million tons of 0.27% Cu. The Resources and Reserves were calculated with NI 43-101 guidelines using a base case copper price of $2.25/lb and a cut-off grade of 0.10% Cu. All Resources and Reserves reported in the PFS were limited to Enexco� s pre-acquisition property holdings, and included limitations on reserves due to property constraints on the mine design.
Category |
Tons |
Cu (%) |
Pounds Cu |
Reserves |
|
|
|
Proven |
27,011,000 |
0.305% |
164,701,000 |
Probable |
27,138,000 |
0.280% |
152,199,000 |
Total P&P |
54,149,000 |
0.293% |
316,899,000 |
Resources |
|
|
|
Measured |
52,976,000 |
0.282% |
298,397,000 |
Indicated |
82,233,000 |
0.251% |
413,413,000 |
Total M&I |
135,209,000 |
0.263% |
711,810,000 |
Inferred |
53,490,000 |
0.272% |
291,368,000 | Resources from Oct. 2010 NI 43-101 PFS update Resources and Reserves reported at 0.10% Cu cut-off Additional information on the project, including geology, resources and reserves, can be found on the company�s website at http://www.enexco.ca/s/contact_copper.aspand in the NI 43-101Technical Report Pre-feasibility Study Update for the Contact Copper Project, Elko County, Nevada as posted on Sedar. Previous Drilling The Resources and Reserves in the PFS were derived from drilling done by Enexco between 2006 and 2010, along with previous drilling by companies Golden Phoenix Minerals, Inc., Phelps Dodge Corporation and Calta Resources, Ltd. Total drilling by all four companies in the district amounts to 237,700 feet (72,450 metres ) in 268 drill holes, of which 92% were core and 8% were reverse circulation. Enexco�s drilling represents 60% of the total footage, amounting to 142,000 feet (43,281 metres) in 156 core holes. These holes were drilled on Enexco�s property before the acquisition. Of the 96,000 feet (29,261 meters) in pre-Enexco drilling, only 14,000 feet (4267 metres) in 17 holes fall outside of the PFS resource model on land acquired from Allied Nevada. In addition, Allied Nevada in 2010 drilled 4 holes (CON10-001 to CON10-004) on its property at the eastern end of the PFS reserves. In 2010, Enexco drilled one hole, EN-149, just beyond the eastern limits of the PFS resource model. East Expansion The PFS reserves fall within a plan area elongated 4,000 feet (1220 metres) east-west by 1,500 feet (457 metres) north-south. As seen in the accompanying map, the eastern end of the area was restricted by land ownership. The mine design terminated eastward due to depth of mineralization and the presence of property boundaries to the north and south. The acquisition allows the mine design to expand to full economic depth eastward. Within the 1500 feet (457 metres) east from the end of the PFS reserves, Enexco drilled 8 holes, as listed in the table below. Additional drilling is needed to in-fill this area and potentially extend it eastward beyond the furthest east hole, EN-149, which carries an intercept of 185 feet (56.4 metres) of 0.25% Cu. To expand the resource and upgrade it to Measured and Indicated categories, the Company plans 20,000 feet (6,096 metres) of drilling at a total cost of $1 million. Drilling for the expansion program is scheduled this fall.
Contact East Extension Area - Intervals above 0.10% Cu |
|
|
|
|
|
|
ENEXCO 2007-2010 |
From (ft) |
To (ft) |
Length (Ft) |
Length (m) |
Copper % |
Drill Hole # |
EN-134 |
330 |
410 |
80 |
24.4 |
0.15 |
|
455 |
477 |
22 |
6.7 |
0.82 |
EN-135 |
25 |
60 |
35 |
10.7 |
0.13 |
|
125 |
210 |
85 |
25.9 |
0.15 |
|
275 |
360 |
85 |
25.9 |
0.19 |
EN-147 |
77 |
210 |
133 |
40.5 |
0.30 |
|
350 |
370 |
20 |
6.1 |
0.18 |
|
470 |
535 |
65 |
19.8 |
0.23 |
|
655 |
675 |
20 |
6.1 |
0.54 |
EN-149 |
0 |
185 |
185 |
56.4 |
0.25 |
|
215 |
270 |
55 |
16.8 |
0.16 |
|
300 |
320 |
20 |
6.1 |
0.13 |
|
390 |
415 |
25 |
7.6 |
0.11 |
|
540 |
560 |
20 |
6.1 |
0.13 |
EN-150 |
125 |
145 |
20 |
6.1 |
0.34 |
|
270 |
305 |
35 |
10.7 |
0.19 |
|
495 |
565 |
70 |
21.3 |
0.22 |
|
665 |
685 |
20 |
6.1 |
0.46 |
EN-151 |
360 |
385 |
25 |
7.6 |
1.40 |
EN-152 |
180 |
200 |
20 |
6.1 |
0.14 |
|
320 |
340 |
20 |
6.1 |
0.65 |
|
395 |
425 |
30 |
9.1 |
0.25 |
EN-153 |
100 |
145 |
45 |
13.7 |
0.16 |
|
160 |
200 |
40 |
12.2 |
0.20 |
|
265 |
300 |
35 |
10.7 |
0.17 |
|
440 |
545 |
105 |
32.0 |
0.19 |
|
565 |
585 |
20 |
6.1 |
0.23 |
|
|
|
|
|
|
ALLIED NEVADA 2010 |
From (ft) |
To (ft) |
Length (Ft) |
Length (m) |
Copper % |
Drill Hole # |
CON10-001 |
215 |
240 |
25 |
7.6 |
0.31 |
CON10-002 |
no reportable intercepts |
|
|
|
|
CON10-003 |
no reportable intercepts |
|
|
|
|
CON10-004 |
40 |
60 |
20 |
6.1 |
0.20 |
|
|
|
|
|
|
CALTA pre-1973 |
From (ft) |
To (ft) |
Length (Ft) |
Length (m) |
Copper % |
Drill Hole # |
N-02 |
130 |
150 |
20 |
6.1 |
0.17 |
|
320 |
340 |
20 |
6.1 |
0.11 |
|
400 |
420 |
20 |
6.1 |
0.72 |
|
665 |
685 |
20 |
6.1 |
0.75 |
N-03 |
40 |
55 |
15 |
4.6 |
0.350 |
|
508 |
518 |
10 |
3.1 |
0.245 |
|
605 |
631 |
26 |
7.9 |
0.516 |
N-06 |
331 |
361 |
30 |
9.1 |
0.49 |
|
392 |
415 |
23 |
7.0 |
0.20 |
|
435 |
455 |
20 |
6.1 |
0.13 |
|
603 |
627 |
24 |
7.3 |
0.20 |
N-11 |
222 |
228 |
6 |
1.8 |
0.64 |
|
474 |
500 |
26 |
7.9 |
0.16 |
* portions of Calta holes unassayed |
|
|
|
Other Targets With the acquisition, the Company is also assessing targets for future exploration. Among these are areas with surface exposures of copper oxide mineralization, west and south of the PFS reserves, as well as deeper targets for copper sulfides below the PFS reserves and elsewhere on the property. Information on these targets is available on the Company�s website. The Company�s immediate plans are to continue to focus on advancing the copper oxide project toward production while continuing to add information and prioritize targets for longer term exploration and future drilling. The Contact Copper Project is under the supervision of Dr. William Willoughby, PE, a Qualified Person as defined in Canadian National Instrument 43-101, who is responsible for the preparation of the technical information in this news release. Assay procedures for intervals reported are described in NI 43-101 Technical Report Pre-feasibility Study Update for the Contact Copper Project, Elko County, Nevada as posted on Sedar and on the Company�s website. Assay intervals listed under Allied Nevada are as provided in data from Allied Nevada and have not been verified. About International Enexco Ltd. International Enexco Ltd is a North American exploration and development company focused on the feasibility stage Contact Copper Project in northern Nevada. The Company also pursues gold and silver exploration in Idaho and Nevada, and is advancing the Mann Lake Uranium Project located in Saskatchewan�s prolific Athabasca basin. This project is a joint venture with Cameco as operator and Areva�two of the world�s largest uranium companies.
Further Information: Tel: +1 604 669 8368 Fax: +1 604 662 3231 Email: info@enexco.caor visit www.enexco.ca2060 � 777 Hornby Street, Vancouver, B.C., Canada, V6Z 1T7 | On behalf of the Board of Directors, I look forward to keeping you updated with our corporate developments. "G. Arnold Armstrong� President & CEO Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements. A feasibility study has not been completed and there is no certainty the disclosed targets will be reached nor that the proposed operations will be economically viable. The TSX Venture Exchange or its Regulation Services Provider have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management. We seek safe harbour. |
|
Data and Statistics for these countries : Canada | All Gold and Silver Prices for these countries : Canada | All
Financings of International Enexco Limited |
Nominations of International Enexco Limited |
Project news of International Enexco Limited |
1/27/2014 | Commences $2.9 Million Drill Program on the Man Lake Uranium... |
12/10/2013 | International Enexco Gives a Base Metal (and Uranium) Balanc... |
11/13/2013 | (Mann Lake)Announces $2.9 Million Drill Program, on the Mann Lake Urani... |
10/10/2013 | (Contact Copper)Files Pre-Feasibility Study for Contact Copper Project, Neva... |
10/1/2013 | (Contact Copper)Announces Positive Pre-Feasibility Study for Contact Copper ... |
6/25/2013 | Announces Joint Venture with Denison Mines on Bachman Lake U... |
3/27/2013 | (Mann Lake)Reports On the Mann Lake Uranium Project, Athabasca SK |
2/19/2013 | (Mann Lake)JV Partner Cameco Adds Third Drill Rig On the Mann Lake Uran... |
2/8/2013 | (Mann Lake)Minesite.com Article: International Enexco Sets The Drills T... |
1/24/2013 | INTERNATIONAL ENEXCO (TSX-V: IEC) COMMENCES $6 MILLION, THRE... |
1/21/2013 | International Enexco Commences $6 Million, Three Rig Drill P... |
1/21/2013 | (Mann Lake)Commences $6 Million, Three Rig Drill Program, On the Mann L... |
9/18/2012 | International Enexco Announces Positive Metallurgical Result... |
9/18/2012 | (Contact Copper)Announces Positive Metallurgical Results from Contact Copper... |
9/10/2012 | (Contact Copper)Completes Drill Program at Contact Copper Project and Report... |
3/19/2012 | International Enexco Announces Additional Drill Results from... |
2/24/2012 | International Enexco's Shares Power Ahead, As The Contact Co... |
2/23/2012 | (Contact Copper)MINESITE.COM: International Enexco's Shares Power Ahead, As ... |
1/16/2012 | (Contact Copper)Drill Program Update for Contact Copper Project, Nevada |
11/28/2011 | (Contact Copper)Commences Drilling Contact Copper Project, Nevada |
7/27/2011 | (Contact Copper)to Acquire Properties of Allied Nevada at Contact, Nevada |
2/9/2011 | (Contact Copper)Rising Copper Prices Favor International Enexco |
8/17/2009 | Positive Copper Pre-Feasibility Study Received |
2/9/2009 | (Mann Lake)Drilling at Mann Lake Underway with Cameco as Operator |
1/7/2009 | (Mann Lake)Cameco to Commence 3rd Enexco Drill Program at Mann Lake |
9/29/2008 | (Contact Copper)Prepares to Drill Newly Optioned Boston Claim Group |
8/21/2008 | (Contact Copper)Pre-Feas Study to Commence at Contact - New Resource Calcula... |
|
Corporate news of International Enexco Limited |
11/4/2013 | Announces Drill Results From the Bachman Lake Uranium Projec... |
10/10/2013 | Mid=2DDay Breaking News From Zenyatta and International Enex... |
9/9/2013 | Mid=2DDay Breaking News From International Enexco=2C Miracul... |
8/26/2013 | Mid=2DDay Breaking News From Rango Energy and International ... |
8/26/2013 | and Denison Mines Commence Drill Program on the Bachman Lake... |
10/10/2012 | Mid-Day Breaking News From International Enexco, Gold Reach,... |
10/10/2012 | (Contact Copper)Announces an Increase of 49% to 1.06 Billion Pounds of Coppe... |
10/10/2012 | Announces an Increase of 49% to 1.06 Billion Pounds of Coppe... |
8/27/2012 | Mid-Day Breaking News From Pelangio, International Enexco, S... |
8/27/2012 | (Contact Copper)Confirms New Copper Target at Contact Copper Project (Nevada... |
6/20/2012 | Todd Hilditch Joins International Enexco as Director |
6/8/2012 | RESOURCE WORLD: INTERNATIONAL ENEXCO EXPANDING PROPERTY AND ... |
5/23/2012 | Mid-Day Breaking News From International Enexco, CardioComm,... |
5/23/2012 | (Contact Copper)Additional Drill Results from Contact Copper Project, Nevada |
5/10/2012 | JOIN INTERNATIONAL ENEXCO LTD. AT THE 2012 NEW YORK HARD ASS... |
4/26/2012 | Mid-Day Breaking News From International Enexco and Canada R... |
3/19/2012 | (Contact Copper)Announces Additional Drill Results From Contact Copper Proje... |
3/1/2012 | Mid-Day Breaking News From Mirasol, Novadx, Zimtu, Internati... |
3/1/2012 | (Mann Lake)Announces Winter Geophysical Survey Planned at Mann Lake, Sa... |
1/16/2012 | Mid-Day Breaking News From El Ni=F1o Ventures and Internatio... |
11/28/2011 | Mid-Day Breaking News From El Nino, Millrock, Golden Touch, ... |
7/11/2011 | Former Nevada Governor Jim Gibbons Joins International Enex... |
12/1/2010 | President's Letter International Enexco |
6/2/2010 | REPORTS 161% INCREASE IN MINEABLE COPPER AND 20.2% IRR, IN U... |
8/11/2009 | S SHAREHOLDERS ON MULTIPLE DRILL PROGRAMS |
6/9/2009 | signs JV with Nevada Exploration Inc. |
6/2/2009 | has entered into an option agreement with Fronteer Developme... |
|
|