Monument Mining Limited

Published : April 30th, 2013

s Selinsing and Buffalo Reef Resources

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
You are receiving this email because you opted in at our website
Email not displaying correctly? View it in your browser.
Dear 24H,

April 30, 2013

Monument Updates Selinsing and Buffalo Reef Resources and Reserves and Finalizes a Landmark Land Acquisition Agreement


Release #18 - 2013

Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (�Monument� or the �Company�) is pleased to announce that proven and probable reserves at its 100% owned Selinsing operating gold mine, including the adjacent Buffalo Reef property, in Pahang State, Malaysia, estimated at August 31, 2012, are 222.9 koz of gold from 4,890 kilotonnes (kt) of material at a grade of 1.4 grams of gold per tonne (g/t).  These reserves are within a newly estimated measured and indicated resource of 289.4 koz of gold from 6,307 kt of material at a grade of 1.4 g/t.  The inferred resource at Selinsing and Buffalo Reef is an additional 48.0 koz of gold from 1,070 kt of material at a grade of 1.4 g/t.  The tables below summarize the newly calculated reserves and resources by area and ore type.  A map showing the area locations can be seen on the Company�s web site here: http://www.monumentmining.com.  
 
Table 1.  Selinsing and Buffalo Reef Mineral Reserves:  August 31, 2012
  Cut off Grade Proven Probable Proven + Probable
Area g/t Kt g/t koz kt g/t koz kt g/t koz
Oxide Reserves                    
Selinsing 0.30 - - - 6 0.6 0.1 6 0.6 0.1
Buffalo Reef South and Central 0.30 14 1.6 0.7 336 1.9 20.8 350 1.9 21.5
Buffalo Reef North 0.31 12 0.9 0.3 155 1.2 5.7 166 1.1 6.1
Stockpile 0.30 2,335 0.7 53.6 - - - 2,335 0.7 53.6
Oxide Total   2,360 0.7 54.6 496 1.7 26.7 2,857 0.9 81.3
                     
Sulfide Reserves                    
Selinsing 0.62 183 2.7 16.1 630 2.2 44.6 812 2.3 60.7
Buffalo Reef South and Central 0.65 59 2.3 4.3 1,008 2.1 69.5 1,068 2.2 73.8
Buffalo Reef North 0.66 4 1.5 0.2 130 1.5 6.1 133 1.5 6.3
Stockpile 0.62 20 1.3 0.8 - - - 20 1.3 0.8
Sulfide Total   266 2.5 21.4 1,768 2.1 120.2 2,034 2.2 141.7
                     
Total All Sources   2,626 0.9 76.0 2,264 2.0 146.9 4,890 1.4 222.9
Notes:
(1)    the following parameters were used to determine the gold cutoff grade for each reserve area:  a US$1,550 per oz gold price; metallurgical gold recoveries ranging from 85% to 87% for sulfide materials and 92% for oxide material; processing costs of $10.84/tonne for oxide and $22.99/tonne for sulfide material; and mining costs ranging from $2.08 to $2.25 per tonne;
(2)    reserves are contained within fully engineered pits based on Lerch Grossman optimized pits and include 5% mining losses and 5% mining dilution;
(3)    mineral reserves were determined by Mark Odell, P.E., Practical Mining LLC.
 
Monument�s Vice President of Exploration, Todd W. Johnson, commented, �The new NI 43-101 reserve allows the operations to continue until the end of 2017 at the current mining rate and 1,000,000 tonne per annum processing rate.  Monument has been conducting aggressive drilling campaigns in the district since late 2011 using two to three drills.  All of the Monument mine staff have been working hard to help achieve gold production targets and to help define additional resources for possible future development and are responsible for the successful mine performance�.
 
The new reserve estimate was calculated using an average gold price of US$1,550 per ounce whereas the resources were calculated using a US$1,700 per ounce gold price.  Mining and stockpiling of Buffalo Reef oxide materials started in November 2012 and processing of them at the Selinsing processing plant commenced in early March 2013.  Practical Mining LLC has verified the drill hole data used to support the technical and scientific information in this news release, including the sampling, sample security, analytical techniques, original assay certificates, and Quality Assurance/Quality Control procedures and has determined that CIM and NI 43-101 Industry Standards have been sufficiently followed.  Practical Mining LLC has also verified published Selinsing drill hole information included in previous Company press releases.  Practical Mining LLC constructed a 3D model of the mineralized bodies using modeling software and calculated the August 31, 2012 Selinsing and Buffalo Reef resources and reserves.  In addition, Practical Mining LLC reviewed the recent 2011 and 2012 sulfide metallurgy work and confirms that final engineering should commence on the Phase IV flotation and bio-oxidation plant expansion.
 
Table 2.  Selinsing and Buffalo Reef Measured and Indicated Mineral Resources, Including Reserves:  August 31, 2012
  Cutoff Grade Measured Indicated Measured + Indicated
Area g/t kt g/t koz kt g/t koz kt g/t koz
Oxide Resources                    
Selinsing 0.27 - - - 9 0.7 0.2 9 0.7 0.2
Buffalo Reef South and Central 0.28 14 1.6 0.7 373 1.8 21.9 386 1.8 22.6
Buffalo Reef North 0.28 12 0.8 0.3 207 1.1 7.4 219 1.1 7.7
Stockpile 0.27 2,335 0.7 53.6 - - - 2,335 0.7 53.6
Oxide Total   2,361 0.7 54.6 588 1.6 29.5 2,949 0.9 84.1
                     
Sulfide Resources                    
Selinsing 0.56 229 2.2 16.0 1,436 1.9 88.4 1,664 2.0 104.5
Buffalo Reef South and Central 0.59 60 2.3 4.3 1,283 2.0 81.6 1,343 2.0 86.0
Buffalo Reef North 0.60 13 1.3 0.6 317 1.3 13.5 331 1.3 14.0
Stockpile 0.56 20 1.3 0.8 - - - 20 1.3 0.8
Sulfide Total   322 2.1 21.7 3,036 1.9 183.6 3,358 1.9 205.3
                     
Total All Sources   2,682 0.9 76.3 3,624 1.8 213.0 6,307 1.4 289.4
Notes:
(1)    the resource cutoff grades were calculated based on a US$1,700 per oz gold price and metallurgical gold recoveries of 92% for oxide and 85% to 87% for sulfide materials, respectively;
(2)    the open pit resources are constrained by a Lerch Grossman pit shell;
(3)    mineral resources that are not mineral reserves do not have demonstrated economic viability; and
(4)    mineral resources determined by Mark Odell, P.E., Practical Mining LLC.
 
 
 
Table 3.  Selinsing and Buffalo Reef Inferred Mineral Resources:  August 31, 2012
  Cutoff Grade Inferred
Area g/t Kt g/t koz
Oxide Resources        
Selinsing 0.27 3 0.6 0.1
Buffalo Reef South and Central 0.28 216 1.2 8.5
Buffalo Reef North 0.28 49 0.9 1.4
Stockpile 0.27 - - -
Oxide Total   268 1.2 10.0
         
Sulfide Resources        
Selinsing 0.56 121 1.1 4.5
Buffalo Reef South and Central 0.59 632 1.6 31.9
Buffalo Reef North 0.60 48 1.1 1.7
Stockpile 0.56 - - -
Sulfide Total   801 1.5 38.0
         
Total Inferred Resources   1,070 1.4 48.0
Notes:
(1)     similar resource tabulation methodologies described for Table 2 above apply to the resources in Table 3;
(2)     mineral resources that are not mineral reserves do not have demonstrated economic viability; and
(3)     mineral resources determined by Mark Odell, P.E., Practical Mining LLC.
 
The updated mineral resource estimate incorporates a new property-wide geological model which includes a total of 28 new surface Diamond drilling results completed by Monument since the last resource estimate was completed in 2007.  Drill hole assays received as of June 8, 2012 were used in this resource and reserve update along with the August 31, 2012 mine face positions as surveyed by Monument staff.
 
Monument is also pleased to announce that on April 2, 2013 it finalized an agreement to explore and develop 14 blocks totaling 3,920 hectares owned by the Federal Land Development Authority (FELDA) of Malaysia.  These FELDA lands are generally located east and south of the existing resources and Monument tenements and will allow additional exploration, infill drilling and development of the Buffalo Reef Central, Buffalo Reef South, and Selinsing resources.  Robert Baldock, President and CEO of Monument, states �This is considered to be a landmark agreement.  We are extremely happy to continue our good relationship with our adjacent land neighbors and continue to provide the local community with employment opportunities.  This agreement allows Monument a chance to grow the resources at the site utilizing the existing facilities to sustain the mining and processing operations well into the future.�
 
The 2012 Selinsing and Buffalo Reef mineral resources were estimated by Mark Odell, P.E. and owner of Practical Mining LLC, who is the independent Qualified Person for the August 31, 2012 Mineral Resources and Reserves as defined by NI 43-101.  Practical Mining LLC is preparing an updated NI 43-101 Technical Report entitled �Selinsing Gold Mine and Buffalo Reef Project Expansion, Pahang State, Malaysia� which will include these new resource and reserve results. This NI 43-101 Technical Report will be filed within 45 days. 
 
The Phase IV plant expansion will be needed to process refractory sulfide materials and will include adding a flotation circuit and a regrind mill circuit, bio-oxidation tanks, and converting some existing CIL leach tanks to neutralization tanks within the existing plant.  The Phase IV plant and mining expansion, as estimated in the NI 43-101 report, has a capital cost of US$45.8 million dollars, provides a US $10.7M NPV, and 21% rate of return.  Monument is currently examining different and less expensive ways to implement the Phase IV plant expansion that could significantly improve the economics of the project, which include implementing a bio-oxidation demonstration plant as soon as possible.
 
Exploration is continuing at Selinsing and Buffalo Reef with three drill rigs currently operating 24 hours per day.  Drilling has been focused on defining mineralization at depth below the existing pits, within gap zones inbetween the known resources that contain little drill hole information, and to convert inferred materials to indicated and/or measured materials. 
 
The mineral resources identified above have been estimated in accordance with the standards adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (�CIM�) Council in November 2010, as amended, and prescribed by the Canadian Securities Administrators� National Instrument 43-101 Standards of Disclosure for Mineral Projects.
 
Mark Odell, of Practical Mining LLC, has reviewed and approved the contents of this news release, and is the independent Qualified Person for this news release.
 
About Monument
Monument Mining Limited (TSX-V:MMY, FSE:D7Q1) is an established Canadian gold producer that owns and operates the Selinsing Gold Mine in Malaysia.  Its experienced management team is committed to growth and is advancing several exploration and development projects in Malaysia, including the 100% owned, development stage, Mengapur Polymetallic Project. The Company employs 330 people in Malaysia and is committed to the highest standards of environmental management, social responsibility, and health and safety for its employees and neighboring communities.
 
Robert F. Baldock, President and CEO
Monument Mining Limited
Suite 910- 688 West Hastings Street
Vancouver B.C. Canada V6B 1P1

FOR FURTHER INFORMATION visit the company web site at www.monumentmining.com or contact:

Nick Kohlmann, MMY Toronto               T: +1-647-478-3594                   nkohlmann@monumentmining.com

Richard Cushing, MMY Vancouver          T: +1-604-638-1661 x102        rcushing@monumentmining.com

Wolfgang Seybold, Axino AG-Europe     T: +49 711-2535-92 40             wolfgang.seybold@axino.de


"Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release."
 
Forward-Looking Statements
This news release contains forward-looking information and forward-looking statements about Monument (together referred to herein as �forward-looking statements�). Forward-looking statements are statements that are not historical facts and include statements regarding: expected operations, mining and processing rates at the Company�s Selinsing gold mine; exploration and development plans for the Selinsing and Buffalo Reef projects; costs, timing, value and rate of return for the Phase IV plant expansion; and other plans and expectations of the Company described herein.  Forward-looking statements are based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made, and are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These risks and certain other factors include: the Company�s expectations in connection with its exploration, development and expansion projects; the impact of general business and economic conditions; changes in project parameters as plans continue to be refined; costs of future activities; capital and operating expenditures; success of exploration activities; the estimated cash cost per ounce of gold production and the estimated cash flows which may be generated from the operations; mining or processing issues; currency exchange rates; government regulation of mining operations; environmental risks; general economic factors and other factors that may be beyond the control of Monument.  Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements, including the risks factors listed above, other risks inherent in the mining industry and other risks described in the management discussion and analysis of the Company, which is available under the profile of the Company on SEDAR at www.sedar.com.  Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward- looking statements. The Company does not undertake to update any forward-looking statements, except as required by applicable securities laws.

| Send to a Friend | Update Profile
Data and Statistics for these countries : Canada | Malaysia | All
Gold and Silver Prices for these countries : Canada | Malaysia | All

Monument Mining Limited

PRODUCER
CODE : MMY.V
ISIN : CA61531Y1051
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Monument Mining is a gold producing company based in Canada.

Its main asset in production is SELINSING in Malaysia and its main exploration properties are MENGAPUR and BUFFALO REEF in Malaysia.

Monument Mining is listed in Canada and in Germany. Its market capitalisation is CA$ 51.6 millions as of today (US$ 37.5 millions, € 35.2 millions).

Its stock quote reached its highest recent level on January 21, 2011 at CA$ 0.74, and its lowest recent point on April 09, 2020 at CA$ 0.04.

Monument Mining has 322 720 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Monument Mining Limited
2/13/2013Announces Closing of First Tranche of Brokered Private Place...
10/17/2012Announces Private Placement
10/12/2011Announces Private Placement of up to $70=2C000=2C000
8/12/2010Closes $13.0 Million Financing
7/22/2008Closes $38.1 M Private Placement and Convertible Note Financ...
Nominations of Monument Mining Limited
1/8/2014Receives Notice of Nominations for Election of Directors
1/8/2014Receives Notice of Nominations for Election of Directors
10/28/2013Appoints Executive General Manager, Monument Malaysia Group
9/20/2012Appoints Chief Operating Officer
6/29/2012Appoints Gerald Ruth to Board
1/25/2012Grants Share Purchase Options to its Directors
12/21/2011Appoints Graham Dickson as Chairman of the Board
6/9/2010Grants 1,600,000 options to CHF investor relation firm
6/9/2010Engages CHF in Investor Relations and Updates $12 Million Fi...
6/30/2009Appoints New Director
12/17/2008Appoints New Directors and Names George Brazier Chairman of ...
8/25/2008Appoints General Manager and Mine Manager
6/20/2008Appoints AXINO AG to provide Investor Relation Services (Rev...
Financials of Monument Mining Limited
11/29/2013Reports First Quarter Fiscal 2014 Results
5/30/2013Reports Third Quarter Fiscal 2013 Results
6/1/2012=E2??s 2012 Third Quarter Results
3/1/20122012 Second Quarter Results
1/5/2012=E2??s 2012 First Quarter Results
5/30/2011 2011 Third Quarter Results
5/9/2011 Third Quarter Production and Sales Results
3/1/2011 2011 Second Quarter Results
Project news of Monument Mining Limited
5/15/2013Central Australian Phosphate and Monument Mining to Establi...
5/1/2013s Its Interest In Central Australian Phosphate Limited
4/30/2013(Selinsing)s Selinsing and Buffalo Reef Resources
3/19/2013Abandons Earn=2DIn on Mersing Project
10/26/2012Attending Singapore and German Resource Conferences
10/25/2012(Selinsing)to Vigorously Defend Opportunistic Claim Filed Against Seli...
10/9/2012(Mengapur)Signs Harmonization Agreement on Mengapur Project
3/26/2012(Selinsing)Exposes Gold Thieves at Selinsing Gold Mine
2/21/2012(Mengapur)Closes Acquisition of 70% of the Mengapur Polymetalic Projec...
2/2/2012(Mengapur)Receives Final Acceptance from the TSX=2DV to Close the Meng...
12/3/2011(Mengapur)Enters into Definitive Agreement for Acquisition of 70% of ...
9/15/2011Grows Gold Project Pipeline
7/26/2011(Selinsing)Releases Positive Drill Results from Selinsing Property in M...
7/22/2011(Selinsing)to Expand Tailings Storage Facility at Selinsing Gold Mine i...
6/1/2011(Mengapur)Agrees to Acquire a 70% interest in the Mengapur Polymetalic...
5/29/2011(Buffalo Reef)REPORTS NI43-101 RESOURCES AT BUFFALLO REEF PROPERTY
3/3/2011(Selinsing)to Increase Gold Production
2/21/2010(Selinsing)Starts Commissioning CIL Circuit While Gravity Circuit is in...
11/4/2009(Selinsing)Pours First Gold From Gravity Circuit
9/1/2009(Selinsing)Obtains Power Connection at the Selinsing Gold Project and
7/20/2009(Selinsing)Commences Open-Pit Mining at the Selinsing Gold Project
2/11/2009(Buffalo Reef)Confirms Amended Plan for Gold Production from Phase I Gravi...
2/2/2009(Buffalo Reef)Releases Drill Results, Selinsing Developments and Director’...
3/7/2008(Buffalo Reef)Releases Positive Drill Results?Phase II Program at Buffalo ...
3/4/2008(Buffalo Reef)Positive Drill Results?Phase II Program at Buffalo Reef
2/7/2008(Buffalo Reef)'s Phase I Drill Program Confirms Previous Drill Results on ...
Corporate news of Monument Mining Limited
7/11/2016Monument Announces Significant Intercepts Assay Results at N...
6/13/2016Monument Collects Judgment and Adds Peter Kestel Personally ...
5/31/2016Monument Reports Third Quarter Fiscal 2016 Results
5/9/2016Monument Announces Not to Proceed with Matala
5/2/2016Monument Withdraws Technical Disclosure regarding Matala Pro...
4/11/2016Monument Announces Significant Intercepts Assay Results at B...
3/24/2016Monument Comments on Unusual Trading Activity
3/23/2016Monument files NI43-101Technical Report for Resource Estimat...
11/30/2015Monument Reports First Quarter Fiscal 2016 Results
11/21/2015Monument Mining Announces Results of Annual General Meeting ...
9/30/2015Monument Commissions Intec Pilot Plant at Selinsing
9/30/2015Monument's Fiscal 2015 Results
9/28/2015Monument Progresses Mine Development at Burnakura Site
8/17/2015Monument Murchison Gold Project Update
8/12/2015Monument Files Amended Technical Report for Murchison Gold P...
7/31/2015Monument Litigation Update
4/2/2015Monument files NI43-101Technical Report for Resource Estimat...
4/2/2015Monument files NI43-101 Technical Report for Resource Estima...
3/23/2015Monument Mining Announces Results of Annual General Meeting ...
3/8/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Delays Start-up of Iron and Copper Project at Menga...
2/18/2015Monument Announces Mineral Resource on Alliance/New Alliance...
2/16/2015Monument Files Claim Against Summer Empire Sdn. Bhd. and Kes...
2/13/2015Monument Announces Adjournment of Shah Alam High Court Trial...
2/7/2015Monument Issues Shares for Intec Transaction
2/6/2015Monument Issues Shares for Intec Transaction
2/2/2015Monument Secures Intec License to Exploit Sulphide Gold and ...
1/21/2015Monument Update Selinsing Litigation
1/20/2015Monument Update Selinsing Litigation
1/19/2015Monument Announce RC Assay Results from Federal City Drillin...
12/23/2014Monument Announces Termination of Proposed Transaction with ...
12/1/2014Monument Reports First Quarter Fiscal 2015 Results - Gold Pr...
11/30/2014Monument Reports First Quarter Fiscal 2015 Results
11/18/2014Monument Receives Order to Extend Time for Holding Annual Ge...
11/18/2014Monument Announces Second Round of RC Assay Results at Murch...
11/18/2014Extension of Closing Date for Proposed Transaction, 189 KB
11/17/2014Monument Extends Closing Date of Proposed Transaction with G...
11/12/2014Monument Completes Tuckanarra Gold Project Acquisition in We...
11/8/2014Monument to Extend Time for Holding Annual General Meeting
10/27/2014Monument Extends Close Date of Tuckanurra Acquisition
10/20/2014Monument Updates Selinsing Litigation
10/6/2014Monument Updates Selinsing Litigation
9/30/2014Monument's Fiscal 2014 Results
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/20/2014Warns Shareholders to Be Wary of the Dissident Group Attempt...
5/23/2013(Selinsing)Files Technical Report for Selinsing and Buffalo Reef
5/1/2013Reports Third Quarter Gold Production of 13=2C255 Ounces
4/24/2013Confirms Indicative Non=2DBinding Conditional Proposal to ac...
4/15/2013(Buffalo Reef)Starts Mining and Processing Oxide Materials at Buffalo Reef
4/2/2013Announces Results of Annual General Meeting of Shareholders
3/13/2013President and CEO to Speak at Hong Kong Conference
2/22/2013Settles Legal Disagreement
2/21/2013Welcomes Support from Major Shareholder
2/8/2013Further Comments on GoldMet Disclosure
2/8/2013Comments on GoldMet Disclosure=3A No Agreement Reached
1/17/2013Provides Update to Shareholders
1/11/2013Reports Record Second Quarter Gold Production of 15=2C902 Ou...
11/14/2012Has Engaged Mackie Research Capital Corporation as Financial...
11/10/2012to Extend Time for Holding Annual General Meeting
10/2/2012=E2??s 2012 Annual Results=3A Gross Revenue of $61.7 M with ...
8/24/2012(Mengapur)Confirms Historic Drilling Results at Mengapur Polymetalic P...
8/16/2012(Selinsing)Completed Selinsing Gold Plant Expansion
8/7/2012(Mengapur)Provides Updates on Mengapur Project and Private Placement
7/30/2012=E2??s 2012 Fourth Quarter Production Result
7/24/2012Received $12 Million through Exercise of Stock Purchase Warr...
6/19/2012and PLSB Working Together Harmonizing Oxide Magnetite Iron O...
5/14/2012=E2??s 2012 Third Quarter Production
5/9/2012Announces Senior Management Appointments
4/25/2012to Attend The INVEST 2012 Conference in Stuttgart
1/25/2012=E2??s 2012 Second Quarter Production
1/4/2012Announces Results of Annual and Special General Meeting of S...
12/20/2011Reminds Shareholders to Vote
12/16/2011(Mengapur)Discusses Mengapur Property Iron Ore Production Information
12/15/2011Provides Details of Annual General and Special Meeting
12/13/2011Annual General and Special Meeting Important Reminder
10/26/2011=E2??s 2012 First Quarter Production
9/29/2011=E2??s 2011 Annual Results
8/8/2011=E2??s 2011 Fourth Quarter Production and Sales Results
1/15/2010Fundamental Research Report Update #2
12/21/2009to Raise $12.0 M in Convertible Debenture and Forward Gold S...
9/18/2009to Issue Shares for Debt to Avocet Mining PLC
7/8/2009Moves to New Office
5/13/2009Releases Selinsing Gold Project Update
2/13/2009 Grants Stock Purchase Options to its Key Staff and Consulta...
12/24/2008Amends Selinsing Gold Project Construction Plan
9/24/2008Fundametal Initial Research Report
8/20/2008Announces TSXV’s Acceptance of its Ball Mill Acquisition fro...
8/15/2008Grants Stock Purchase Options to its Directors Officers unde...
8/8/2008Commences Action for Injunction and Damages
7/28/2008Closes Avocet Mill Transaction For Future Plant Upgrade
7/8/2008Acquires Package of Additional Adjacent Land - Update
6/20/2008Notice of Change of Business Address
5/26/2008Acquires Second Mill for Future Production Plant Upgrade
5/13/2008Monument Announces $38.0 M Capital Raising to Commence Plant...
1/21/2008Acquires Package of Additional Adjacent Land
10/25/2007 Q1 Project Development Update
9/13/2007Commences Exploration Program
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MMY.V)FRANKFURT (D7Q1.F)
0.160+6.67%0.100-6.54%
TSX-V
CA$ 0.160
04/18 16:59 0.010
6.67%
Prev close Open
0.150 0.150
Low High
0.150 0.160
Year l/h YTD var.
0.130 -  0.195 -5.88%
52 week l/h 52 week var.
0.080 -  0.195 52.38%
Volume 1 month var.
166,704 14.29%
24hGold TrendPower© : -40
Produces Gold
Develops
Explores for Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/19/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202418.52%
202392.86%0.150.07
2022-41.67%0.130.06
202133.33%0.210.09
2020125.00%0.120.04
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.87+2.34%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :