Salazar Resources Ltd

Published : September 09th, 2017

Salazar Intersects 22.42 Metres (True) Averaging 7.4 G/T Gold, 82.1 G/T Silver, 4.43% Copper and 4.41% Zinc in the El Domo Deposit and Succesfully Ends the Phase V Diamond Drilling Program at its Curi

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Salazar Intersects 22.42 Metres (True) Averaging 7.4 G/T Gold, 82.1 G/T Silver, 4.43% Copper and 4.41% Zinc in the El Domo Deposit and Succesfully Ends the Phase V Diamond Drilling Program at its Curipamba Project

VANCOUVER , Sept. 8, 2017 /CNW/ - Salazar Resources Limited (TSX.V: SRL; FRANKFURT: CCG.F) ("Salazar" or the "Company") is pleased to report results from the last eight holes (2,430.30 metres) of the phase V diamond drill program that was completed on the Company's 100-per-cent owned (21,500 ha) Curipamba volcanogenic massive sulphide ("VMS") project in Ecuador . Five holes represent new exploratory and development drilling around the El Domo resource and were not included in the latest El Domo resource estimate which was released on January 16, 2015 . Three holes were drilled in the Barranco Colorado area, which is within the Curipamba project, to test regional exploration targets.

HIGHLIGHTS:

  • Hole CURI-236
  • Hole CURI-237
  • Successful finalization of the phase V drilling program


PROGRAM RESULTS:

The latest eight holes (2,430.30 metres) (Table 1) were drilled as part of the planned 40-hole (10,000 metres) drill program that was completed with the purpose of expanding the El Domo VMS deposit and exploring its margins, as well as testing geophysical anomalies and surface showings around the Curipamba Project (Figure 1). The drilling activities of the program ended on August 7 th, 2017.

A total of 36 holes (10,472.62 metres) were drilled. Thirty-three (33) holes were drilled in and around the El Domo deposit and three (3) holes were drilled in the Barranco Colorado area. In addition to the significant intersections being reported here, five (5) other holes intersected significant mineralization: CURI-213, CURI-218, CURI-224, CURI-231and CURI-234 ( News Releases of March, May and August 2017 ).

Hole CURI-236 intersected 2.30 metres averaging 1.42 g/t gold, 51.73 g/t silver, 2.45% copper and 5.59% zinc in  massive and semi-massive of chalcopyrite and pyrite. This intersection is located in the northeastern sector of the  El Domo deposit, approximately 50 metres south from the CURI-231 which cut 3.09 metres (3.08 m true) averaging 0.60 g/t gold, 9.40 g/t silver, 6.43% copper & 0.18% zinc (news release of August 14, 2017 ). This new intersection extends the previously interpreted mineralization trend identified by CURI-224, CURI-198 and CURI-231 an additional 50 metres to the south, making this new trend a total length of approximately 200m. This trend will most likely be connected to the main resource body given that the CURI-236 intersection is only 60 metres northeast from the CURI-166, which previously marked the edge of the latest El Domo resource estimate. 

Hole CURI-237 was a deep exploratory hole that was collared approximately 30 meters north east from the CURI-106 which was drilled in April of 2010 and intersected 36.33 metres 3.74 g/t gold, 35.85 g/t silver, 4.39 % copper and 1.5% zinc in the west-central sector of the El Domo deposit. CURI-237 was drilled vertically down to 537.80 metres to test the potential for additional underlying VMS depositional lenses and the potential for strong feeder zones related to the existing El Domo VMS body.  CURI-237 intersected 36.79 metres averaging 5.0 g/t gold, 53.4 g/t silver, 2.93% copper and 2.9 % zinc; which includes two intervals:

  • 11.10 metres averaging 1.5 g/t gold, 10.77g/t silver, 0.73% copper and 0.70% zinc in grainstone with clasts of semi-massive sulphides. The Grainstone is a marker unit in the immediate hanging wall of the VMS mineralization.
  • 22.42 metres averaging 7.4 g/t gold, 82.1 g/t silver, 4.43% copper and 4.41% zinc in  massive and semi-massive sulphide of sphalerite, chalcopyrite and pyrite.


This intersection represents an in-fill addition to the known El Domo resource. Below the El Domo deposit  drilling intersected the usual altered and mineralized dacitic unit, followed by the rhyolitic flow which is the deepest formation reached in several previous  holes. Below the rhyolite  another large dacitic unit with sporadic sedimentary lenses was intersected with yet another  rhyolitic flow at the base. The hole intersected weak sporadic sulphide mineralization with sphalerite, chalcopyrite and pyrite all the way down to the end of the hole in the form of veinlets and fracture fillings. In addition, this hole showed that the basement marine volcanic rocks, Piñon Formation, which was believed to be at shallower depths was not encountered suggesting that the mineralization and alteration system extends as deep as  420 metres below the El Domo deposit.

Fredy Salazar , President and CEO, commented: "The culmination of our Phase V drilling program marks an important landmark in our company and the development of our Curipamba project. As a result, the El Domo resource has been better defined and important mineralization extensions have been intersected that will add significant value to the previously defined reserves. Also, the Barranco Colorado holes have shown us the additional exploration potential on the Curipamba project outside of El Domo. Salazar is very satisfied with the results and looks forward to the future possibilities that this drilling campaign has opened for us."

OTHER RESULTS:

CURI-235 collared on the same platform as CURI-234 (6.87 metres (6.45 m true) averaging 1.47 g/t gold, 10.9 g/t silver, 7.42% copper, 1.01% zinc (news release of August 14, 2017 ) was drilled southwesterly to test the possible extension of CURI-234 mineralization towards the east.  It intersected a massive gypsum interval and the underlying dacitic unit. Gypsum frequently occurs as part of the outer shell stockwork mineralization.

CURI-238 and CURI-239 were drilled to explore the eastern limits of the El Domo mineralization.  CURI-238 was drilled vertically approximately 150 metres from the El Domo resource.  CURI-239 was drilled westerly around 200 metres from the El Domo resource. Both holes intersected weak mineralization in the underlying dacitic unit.

Holes BC-1, BC-2 and BC-3 were drilled on the southeast corner of the Barranco Colorado area, Curipamba Project, located approximately 10 km west from El Domo deposit (Figure 2). Previous detailed surface geologic mapping identified large phyllic altered andesite and hydrothermal breccias boulders that averaged 0.5- 8.3 g/t Au, 0.05 – 0.75% Cu, 0.05 – 0.69 % Zn. Soil sampling identified anomalous values of gold, copper and zinc:  up to 0.3 ppm Au, 600 ppm Cu, and 1000 ppm Zn.  Also, geophysical anomalies were recognized in the induced polarization survey completed in  April 2017 , which defined the three initial targets. These holes encountered moderately phyllic alterated volcanic flows  with dioritic and microdioritic intrusions and an acid unit at the base. Holes  BC-1 and BC 2 intersected sporadic decimetric and metric channels of silicified crackle breccias with pyrite and traces of chalcopyrite and sphalerite.  BC-2 had the better accumulation of this mineralization with an interval of up to 25 metres in thickness which includes a few sporadic sphalerite and chalcopyrite filled veins of up to 2cm in thickness. In addition, the lower part of the BC-1 intersected about 30 meters of a Dacite/Rhyolite unit with a moderate anhydrite stockwork and up to 7%  disseminated pyrite which exhibits similarities  to the underlying dacitic unit of the El Domo deposit. In conclusion, the surface findings, the remaining geophysical anomalies and these recent drill holes results show the potential for massive sulphides in this area. More exploration is warranted  in Barranco Colorado.

TABLE 1

HOLE ID

EAST

NORTH

ELEV (M)

AZIMUTH

DIP

DEPTH (M)

ACCUMULATED

DEPTH

CURI-235

695351.79

9855236.17

1052.99

145

-66

338.60

338.60

CURI-236

695437.07

9855437.60

998.38

270

-90

215.65

554.25

CURI-237

695026.00

9855275.00

906.20

90

-90

537.80

1092.05

CURI-238

695600.00

9855400.00

1075.00

270

-85

330.60

1422.65

CURI-239

695762.00

9855310.00

1115.00

270

-80

300.00

1722.65

BC-01

684950.00

9851921.00

187.00

270

-75

417.10

2139.75

BC-02

684780.00

9851902.00

151.00

315

-75

167.75

2307.50

BC-03

684725.00

9852050.00

143.00

270

-75

122.80

2430.30

*PSAD_1956_UTM_Zone_17S


Figure 1El Domo Deposit – Pierce Point Map

View photos

View original content with multimedia: http://www.newswire.ca/en/releases/archive/September2017/08/c1363.html

Read the rest of the article at https:
Data and Statistics for these countries : Ecuador | Georgia | All
Gold and Silver Prices for these countries : Ecuador | Georgia | All

Salazar Resources Ltd

EXPLORATION STAGE
CODE : SRL.V
ISIN : CA7940071045
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Salazar is a copper and zinc exploration company based in Canada.

Salazar holds various exploration projects in Ecuador.

Its main exploration properties are RUMINAHUI, MENDEZ, CURIPAMBA and SANTIAGO ECUADOR in Ecuador.

Salazar is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 9.1 millions as of today (US$ 6.6 millions, € 6.2 millions).

Its stock quote reached its highest recent level on April 27, 2007 at CA$ 4.22, and its lowest recent point on November 13, 2015 at CA$ 0.03.

Salazar has 114 150 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Salazar Resources Ltd
3/31/2015Provides Update on Promissory Note Financing
9/17/2013Announces Final Closing of Private Placement
6/10/2013Announces Initial Closing of Private Placement
Nominations of Salazar Resources Ltd
4/12/2011.: QP Appointment and Addition of Second Rig at Curimpamba
Project news of Salazar Resources Ltd
6/1/2011(Curipamba)Continues to Cut High Grade in Curipamba With 7.95 Meters of...
5/24/2011(Curipamba)Hits New High Grade at Curipamba With 15.6 Meters of 1.59 g/...
4/28/2011(Curipamba)Cuts 21.43 Meters of 4.01 g/t Gold & 3.23% Copper in Curipam...
1/25/2011(Curipamba)Will Drill 20,000 Metres at Curipamba in 2011
Corporate news of Salazar Resources Ltd
8/2/2016SMr. Fredy Salazar, President and CEO, is pleased to announc...
8/2/2016Mr. Fredy Salazar is pleased to report that the Company has ...
6/14/2016Salazar Provides Update on its Recapitalization Plan More...
5/10/2016Salazar Announces The Resignation Of Graeme Robinson More...
4/27/2016Salazar Announces Delay Of Financing More...
4/27/2016Salazar Announces Closing Of Private Placement And Debt Sett...
4/12/2016Salazar Announces Terms For Financing And Royalty Sale With ...
12/23/2015Salazar Announces Results Of Annual General Meeting More...
3/31/2015Salazar Provides Update On Promissory Note Financing More...
3/31/2015Salazar Provides Update on Promissory Note Financing
3/31/2015Salazar sells up to us$600,000 of promissory notes More...
3/31/2015Sells Up to US$600,000 of Promissory Notes
3/31/2015Salazar Sells Up to US$600,000 of Promissory Notes
1/22/2015Salazar Files Amended Technical Report More...
1/22/2015Salazar Files Amended Technical Report
12/16/2014Salazar Provides Corporate Update More...
12/16/2014Salazar Provides Corporate Update
10/27/2014Salazar Provides Update on Curipamba Agreement
9/25/2014Salazar Announces Results of Annual General and Special Meet...
8/26/2014Salazar and Guangshou Group Announce Letter-Of-Intent to Adv...
8/22/2014Salazar Retains Questrade Inc.
5/6/2014Salazar Provides Update on $1.98 Million Private Placement
4/10/2014REPEAT: Salazar Provides Update on El Domo Development
4/9/2014Salazar Provides Update on El Domo Development
3/26/2014Salazar Announces $1.98 Million Private Placement Financing
5/13/2013Announces Further Funding
5/13/2013Announces Further Funding
4/23/2013Proceeds with PEA at El Domo
3/26/2013(Curipamba)Announces Funding Agreement to Advance Curipamba to Producti...
7/12/2011Updating El Domo Mineral Resource Estimate
6/22/2011James Hutton Appointed Director of Salazar Resources Ltd.
6/16/2011Extends High Grade With 12.8 Meters of 4.01 g/t Gold, 137.85...
5/10/2011(Curipamba)Extends High Grade Copper & Gold Mineralization in Curipamba...
3/28/2011Corporate Update and Plan for 2011 Mining Contracts in Ecuad...
3/3/2011Expands El Domo Resources With 16.08 m of 3.27 g/t Gold, 74....
2/23/2011Hutton to Join Salazar Resources as Manager of Investor Rela...
2/23/2011Discovers New Gold Zone 300m From El Domo VMS Deposit
4/20/2007Continuation of Channel Sampling at Curipamba Returns 10 m a...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SRL.V)FRANKFURT (SRLZF.F)
0.080+0.00%
TSX-V
CA$ 0.080
04/19 16:56 -
0%
Prev close Open
0.080 0.080
Low High
0.080 0.085
Year l/h YTD var.
0.050 -  0.090 33.33%
52 week l/h 52 week var.
0.050 -  0.090 -11.11%
Volume 1 month var.
93,604 14.29%
24hGold TrendPower© : -1
Produces
Develops
Explores for Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/2/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202433.33%
2023-52.00%0.180.05
2022-58.33%0.330.10
2021-20.00%0.420.21
2020120.59%0.390.13
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :