Minera Andes Inc

Published : October 12th, 2007

SAN JOSE PROJECT DRILLING HITS 3.22 OUNCES PER TON GOLD AND 40 OUNCES PER TON SILVER AT

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
 


MINERA ANDES SAN JOSE PROJECT DRILLING
HITS 3.22 OUNCES PER TON GOLD AND 40 OUNCES PER TON SILVER AT THE FREA VEIN

  
TSX: MAI   
NASD-OTCBB: MNEAF    
   

SPOKANE, WA––October 11, 2007–– Minera Andes Inc. (TSX: MAI and US OTC: MNEAF) is pleased to announce the drilling results from the ongoing 2007 exploration program at its San José operation in Southern Argentina .   Recent exploration highlights include a newly discovered mineralized area about 500 meters long at the Frea vein.  The highest grade intercept from this drilling campaign is in hole SJD-357 that encountered 100.09 g/t (3.22 ounces per tonne - opt) gold and 1,234 g/t (40 opt) silver over 0.50 meters (see table below).

Phase one of the planned 38,000 meter exploration drilling program announced earlier in 2007 at San José was completed in July.  A total of 8,310 meters was drilled with the first fourteen drill holes reported in our news release dated September 6th, 2007.  Assays for the remaining 14 drill holes from the phase one program are reported in the table below.  These holes were drilled northwest along strike of the known reserves at the Frea vein and encountered a hanging wall vein related to the Frea vein (see attached map).  The next phase of drilling is underway with over 2,000 meters completed and is focused on the Frea vein and the open ended targets to the west in the Odin and Ayelen areas. Assays are pending for the new drilling.

The Frea vein is located 2 kilometers northwest of the Huevos Verdes vein, and both veins are currently being mined on several levels. Proven reserves of 534,000 tonnes and probable reserves 75,000 tonnes ( totaling 609,000 tonnes grading 9.34 g/t gold and 375 g/t silver) at the Frea vein are currently delineated over a strike length of about 575 meters and to a depth of approximately 350 meters below the surface. The drilling completed this year extends the known mineralization along the Frea vein trend another 500 meters along strike- over an 87% increase in strike length.

The recent exploration drilling concentrated on the northwest extension of the Frea vein.  Significant drilling results include SJD-350 that encountered 49.34 g/t gold and 2,721 g/t silver over 1.04 meters of high grade mineralization some 450 meters northwest of the defined reserves at the Frea vein.  Drill hole SJD-357 encountered 1.50 meters grading 30.49 g/t gold and 423 g/t silver about 300 meters northwest of the Frea reserves.  Hole SJD-359 encountered 2.60 meters containing 13.12 g/t gold and 661 g/t silver approximately 180 meters northwest of the current reserves.  In summary, drilling at the Frea vein to date indicates that it is an open-ended mineralized silver/gold vein that averages about 2.7 meters in width.

Allen Ambrose, president of Minera Andes, said:  "The exploration drilling at the San José project continues to expand the project. The Frea vein area is revealing significant potential to expand the reserves and mine life of the project."

Minera Santa Cruz S. A. (“MSC”), the joint venture corporation co-owned by Minera Andes (49%) and Hochschild Mining plc. (51%) owns the producing San José property. The discovery of new high-grade silver/gold extensions to veins such as Frea represents additional mineralization that may add to the current reserves/resources under production at the project. These discoveries also indicate the large mineral potential of the San José property where more than 40 kilometers of vein trend target is currently known to exist, of which less than 15 percent has been explored in detail.

Table 1 - 2007 Drill Intercepts Frea Vein, San José Project

 

Location

Drill Hole*

From
(meters)

To
(meters)

Intercept
(meters)

Au
(g/t)

Ag
(g/t)

Frea NW

SJD-348

268.30

269.80

1.50

5.42

509

 

 

297.10

297.45

0.35

6.22

115

Frea NW

SJD-349

166.50

168.00

1.5

1.42

127

 

 

271.15

273.15

2.0

6.65

65

Frea NW

SJD-350

122.14

122.54

0.4

3.56

250

 

 

326.66

327.90

1.04

49.34

2,721

Frea NW

SJD-351

118.40

118.70

0.30

8.69

671

 

 

298.97

299.56

0.59

1.96

27

Frea NW

SJD 352

183.45

184.34

0.89

4.84

128

 

 

335.81

336.59

0.78

0.04

8

Frea NW

SJD 353

222.20

223.05

0.90

0.02

5

Frea NW

SJD 354

0

311.20

Vein

not

intercepted

Frea NW

SJD 355

191.77

192.06

0.30

1.28

204

Frea NW

SJD 356

0

269.00

Vein

not

intercepted

Frea NW

SJD 357

248.10

249.60

1.50

30.49

423

 

includes

249.10

249.60

0.50

100.09

1,234

Frea NW

SJD 358

161.93

162.43

0.50

0.01

3

Frea NW

SJD 359

216.30

218.90

2.60

13.12

661

 

includes

217.25

218.01

0.76

25.96

1,373

 

 

392.72

393.08

0.36

1.15

21

Frea NW

SJD 360

0

298.10

Vein

not

intercepted

Frea NW

SJD 361

351.23

352.10

 

0.40

21

*All of the drill holes are drilled at minus 50 degrees. True thickness of the vein is undetermined.

Assay results for the drilling were reviewed by Brian Gavin, Minera Andes’ vice president of exploration, who is an appropriately qualified person as defined by National Instrument 43-101. All samples were collected in accordance with industry standards. Splits from the drill core samples were submitted to Alex Stewart Assayers, Argentina, S.A., in Mendoza, Argentina, for fire assay and ICP analysis. Accuracy of results is tested through the systematic inclusion of standards, blanks and check assays.

In addition, the San José operation was commissioned during the third quarter of 2007. Currently, the mining operation is expected to reach full production and the process plant is expected to complete its initial start-up phase of production by yearend, with full production forecasted in first half of 2008.  As disclosed in August 2007, we have a cash call to the San José partners that is due on October 29, 2007.  We anticipate securing our portion of the cash call through a debt facility.

Minera Andes is a gold, silver and copper exploration company working in Argentina. The Corporation holds about 410,000 acres of mineral exploration land in Argentina including the co-owned San José silver/gold mine that has started initial production.  Minera Andes is also exploring the Los Azules copper project in San Juan province, where an exploration program is underway to define a resource. Other exploration properties, primarily silver and gold, are being evaluated in southern Argentina. The Corporation presently has 166,717,517 shares issued and outstanding.

This news is submitted by Allen V. Ambrose, president and director of Minera Andes Inc.



For further information, please contact: Art Johnson at the Spokane office, or Krister A. Kottmeier, investor relations – Canada, at the Vancouver office. Visit our Web site: www.minandes.com.

Spokane Office
111 East Magnesium Rd.,
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com

Vancouver Office
Suite 911 - 470 Granville St,
Vancouver, BC. V6C 1V5
Phone: (604) 689-7017 / 877-689-7018
E-mail: ircanada@minandes.com

Caution Concerning Forward-Looking Statements:
This press release contains certain "forward-looking statements", including, but not limited to, the statements regarding the Company's strategic plans, evolution of mineral resources and reserves, work programs, development plans and exploration budgets at the Company's San José Project. Investors should be aware that the introduction of new technology such as ILR can create added risk in achieving metallurgical performance. The forward-looking statements express, as at the date of this press release, the Company's plans, estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements involve a number of risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. In particular, there can be no assurance that commercial production at the San José mine will be achieved on a timely basis, or at all, that production capacity at the San José mine will be successfully increased, that resources and reserves at the San José mine will be increased or that Minera Andes will successfully raise the funds necessary to maintain its interest in the San José mine. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, risks associated with foreign operations, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral reserves, dilution risks to it 49% ownership by not being able to contribute pro-rata to Minera Santa Cruz S.A. cash calls, and other risks. Reference is made to the risk factors and uncertainties described in the Company’s continuous disclosure record, a copy of which is available under the Company's profile at www.sedar.com. In addition, Minera Andes’ joint venture partner, a subsidiary of Hochschild Mining plc, and its affiliates do not accept responsibility for the use of project data or the adequacy or accuracy of this release.

Cautionary Note to U.S. Investors:
The United States Securities and Exchange Commission (the "SEC") permits mining companies, in their filings with the SEC, to disclose only those mineral deposits with "mineral reserves" that a company can economically and legally extract or produce. We use certain terms in this press release, such as "mineral resources", that the SEC guidelines strictly prohibit us from including in our filings with the SEC.

THE TSX HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

 

Forward email

This email was sent to .com, by ircanada@minandes.com
Update Profile/Email Address | Instant removal with ™ | Privacy Policy.

Minera Andes Inc. | 911 - 470 Granville St. | Vancouver | British Columbia | V6C 1V5 | Canada

Data and Statistics for these countries : Argentina | Canada | All
Gold and Silver Prices for these countries : Argentina | Canada | All

Minera Andes Inc

CODE : MAI.TO
ISIN : CA6029101012
CUSIP : 602910101
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Minera Andes is a silver producing company based in Canada.

Minera Andes is listed in Canada and in United States of America. Its market capitalisation is CA$ 730.0 millions as of today (US$ 728.7 millions, € 555.9 millions).

Its stock quote reached its lowest recent point on February 06, 2009 at CA$ 0.32, and its highest recent level on April 15, 2011 at CA$ 3.39.

Minera Andes has 282 959 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Minera Andes Inc
3/23/2006New Analysis
10/16/2006Learning from the Iconoclast
Annual reports of Minera Andes Inc
2008 Annual report
2006 Annual Report
Financings of Minera Andes Inc
2/26/2009COMPLETES SECOND TRANCHE OF PRIVATE PLACEMENT WITH ROB McEWE...
2/17/2009revised C$40.0 million private placement with Robert R. McEw...
Financials of Minera Andes Inc
8/11/2011Announces Second Quarter 2011 Financial Results
6/6/2011Announces First Quarter 2011 Financial Results and Restated ...
3/30/2011Announces 2010 Full Year Financial Results and Record Earnin...
7/17/2009(San Jose Argentina)second quarter 2009 San José Production
5/16/2009REPORTS FIRST QUARTER 2009 FINANCIAL RESULTS
1/23/2009(San Jose Argentina)ANNOUNCES FOURTH QUARTER GOLD/SILVER PRODUCTION INCREASES AT...
11/14/2008REPORTS THIRD QUARTER 2008 RESULTS
11/11/2008(San Jose Argentina)ANNOUNCES THIRD QUARTER GOLD/SILVER SALES AT THE SAN JOSE MI...
8/15/2008REPORTS NET INCOME FOR SECOND QUARTER OF $0.05 PER SHARE
7/30/2008ANNOUNCES SECOND QUARTER GOLD/SILVER SALES AT THE SAN JOSE M...
5/9/2008(San Jose Argentina)ANNOUNCES FIRST QUARTER 2008 PRODUCTION FOR SAN JOSE MINE TO...
Project news of Minera Andes Inc
12/7/2011(San Jose Argentina)Provides Update On Exploration Drilling at the San Jose Mine
8/30/2011(San Jose Argentina)Provides Update on Exploration Drilling at the San Jose Mine
6/27/2011(Los Azules Argentina)Reports Drill Results and Development Update for the Los Azu...
5/17/2011(Los Azules Argentina)on Litigation With TNR Gold Corp.
5/4/2011(San Jose Argentina)Announces Work Resumption at San Jose Mine
3/13/2011(San Jose Argentina)Announces Outstanding 2010 Exploration Drill Results at the ...
10/5/2009(San Jose Argentina) Production Has Resumed At TheSan Jos=E9 Mine
10/2/2009(Los Azules Argentina)Provides Confirmation of its 100% Earn-In on the Los Azules ...
6/6/2009(San Jose Argentina) Announces completion of NI 43-101 Technical report on the J...
6/6/2009(Los Azules Argentina) Announces delivery of Earn-in notice under option agreement...
1/16/2009(San Jose Argentina)ANNOUNCES INCREASE IN FORECAST PRODUCTION AT THE SAN JOSE GO...
1/10/2009(San Jose Argentina)Announces Remaining Results From 2008 San Jose Drilling
9/25/2008(Los Azules Argentina)ANNOUNCES EXCELLENT METALLURGICAL TESTING RESULTS FOR LOS AZ...
9/8/2008(Los Azules Argentina)announces a mineral resource estimate of 922 million tonnes ...
8/13/2008(San Jose Argentina)REPORTS SAN JOSE PRODUCTION CASH COSTS AT $322/oz GOLD AND $...
6/27/2008(Los Azules Argentina)Exploration Program Increases The Size Of The Los Azules Por...
4/16/2008(Los Azules Argentina)DRILLING CUTS 132 METERS (433FT) OF 1.11 PERCENT COPPER AT L...
3/28/2008(San Jose Argentina) PROVIDES SAN JOSE MINE UPDATE
3/12/2008(Los Azules Argentina)ANNOUNCES 113 METERS OF +1 PERCENT COPPER IN DRILLING AT LOS...
3/7/2008(San Jose Argentina)ANNOUNCES 1.69 OZ/TON GOLD AND 37 OZ/TON SILVER FROM SAN JOS...
12/11/2007(Los Azules Argentina) ANNOUNCES DRILLING COMMENCES AT LOS AZULES COPPER PROJECT
10/26/2007(San Jose Argentina) ENGAGES MACQUARIE BANK LIMITED FOR DEBT FINANCING FOR SAN J...
8/15/2007(San Jose Argentina)ANNOUNCES PROGRESS AND PLANS AT SAN JOSE MINE
5/31/2007(Los Azules Argentina)drills significant copper at Los Azules Project, Argentina
Corporate news of Minera Andes Inc
3/22/2012Files Annual 2011 Financial Statements and MD&A and Project ...
1/18/2012Announces Fourth Quarter and Full Year 2011 San Jose Mine Pr...
1/13/2012(Los Azules Argentina).: Response to TNR Gold Corp. News Release Regarding Los Azu...
12/21/2011Rob McEwen Letter to Shareholders of US Gold and Minera Ande...
10/3/2011(San Jose Argentina)Announces Full Repayment of Loans From San Jose Mine
9/22/2011US Gold and Minera Andes Enter Into Arrangement Agreement to...
7/20/2011Announces Second Quarter 2011 San Jose Mine Production
4/20/2011Announces First Quarter 2011 San Jose Mine Production
2/7/2011' Treasury Increases by $19 Million
1/24/2011Reminds Warrant Holders of Accelerated Expiry on January 31,...
7/3/2009'AGM Presentation On Video
2/23/2009Rob McEwen becomes Executive Chairman of Minera Andes - Two ...
2/6/2009Announces Results Of Preliminary Assessment At Los Azules Co...
10/1/2008Recent Media Coverage on Minera Andes Inc.
9/2/2008ANNOUNCES 2.05 OZ/TON GOLD AND 37 OZ/TON SILVER FROM ONGOING...
8/6/2008ADDS ROB MCEWEN AND OTHER MINING INDUSTRY EXECUTIVES TO ITS ...
7/30/2008Welcomes Lundin Mining Executive To Board
12/22/2007ANNOUNCES 1st CLOSING ON FINANCING
12/19/2007 ANNOUNCES PROPOSED FINANCING
11/27/2007 ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD MINE...
11/15/2007SIGNS DEFINITIVE AGREEMENT AT LOS AZULES COPPER PROJECT WITH...
11/9/2007 ANNOUNCES SAN JOSE UPDATE
10/12/2007SAN JOSE PROJECT DRILLING HITS 3.22 OUNCES PER TON GOLD AND ...
9/18/2007ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD RESOUR...
9/6/2007SAN JOSE PROJECT DRILLING HITS 1.86 OUNCES PER TON GOLD AND ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (MAI.TO)OTC BB (MNEAF.OB)
2.58-2.64%2.54-3.05%
Last quotes and information before delisting
Prev close Open
2.65 2.71
Low High
2.48 2.73
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.58 -%
Volume 1 month var.
2,733,962 -%
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 9/7/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56+1.27%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.39-3.24%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.31+0.39%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.76-1.68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.04-1.00%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :