Talisman Mining Limited

Published : December 16th, 2015

SFR: Doolgunna Project - Monty Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

SFR: Doolgunna Project - Monty Update

Microsoft Word - 17 Dec 15 - Doolgunna Project Monty Update - FINAL - PH_17H10.docx


ASX Announcement

17 December 2015



DOOLGUNNA PROJECT - MONTY UPDATE


Highlights


  • Joint Venture (JV) commences with Talisman Mining Limited (ASX:TLM) following Sandfire reaching $15M far -in threshold to earn a 70% interest in the Springfield Project



m

a

M

First Cash Call for JV funding dispatched (70% Sandfire and 30% T lisman)


Drilling is continuing to define the extents of the mineralisation at

drilling of the known mineralisation envelope ongoing

onty with in-fill

d

Drilling of the Homer tren at Springfield has commenced


Sandfire Resources NL (ASX: SFR; "Sandfire") is pleased to provide an update on Monty copper- gold discovery located 10km east of the DeGrussa Copper-Gold Mine on the Springfield Project, part of its farm-in with Talisman Mining Limited (ASX: TLM; "Talisman") (see Figures 1 and 2).


Drilling update


Diamond drilling has continued at Monty with drilling increasing to four rigs on double shift. Since

the last Monty exploration update approximately 8,000m of drilling have

been completed. This

drilling has focused on resource definition within the lower zone. This has been aimed at defining the edge and continuity of the mineralisation via an infill program.


Drilling will continue over coming months on a targeted 40m x 40m pattern with the results to be used to calculate a maiden Mineral Resource estimate for Monty in the new year.


Recent drilling results are substantiating initial interpretations that were bas initial exploration holes. See Figure 2 for the updated Monty long section.

e

d on the wide-spaced


d

Exploration drilling at Springfiel

outside of Monty is also continuing, subject to the RC rig being

released from drilling pre-collars for the Mineral Resource definition program.


Drilling of the Homer trend at Springfield has commenced with an initial RC drill hole to test for the stratigraphic horizon along strike from previous drilling that intersected interpreted exhalite material

(TLDD0001 and TLDD0003).

interpretations.

Further drilling programs will be driven

by initial results and


Farm-In/Joint Venture Agreement


Sandfire advises that it has reached the $15 million expenditure threshold (project to date) which marks the end of its sole-funding stage at Springfield and commencement of the joint venture with Talisman. Sandfire now owns 70 per cent of the project (subject to independent audit). The first

$10 million of this expenditure has been confirmed by Talisman, and Talisman has transferred to Sandfire it's first 51 interest in the project corresponding to that $10 million.


w

With the earn-in conditions no

met, Sandfire will fund 70 per cent of all future expenditure at

Springfield, with Talisman funding the remaining 30 per cent under the terms of the JV.

The unincorporated Springfield Joint Venture has been formed with Sandfire being the initial Manager in accordance with the Farm-In and Joint Venture Agreement entered into on 20 December 2013. The Joint Venture has held its first meeting to determine the Springfield exploration program and budget for the next three months and has made its first cash call to the JV partners. An expenditure budget of $7.5 million has been set for the three month period commencing 1 December 2015.


Sandfire and Talisman are in negotiations to replace the existing Farm-In and Joint Venture Agreement with a more detailed agreement now that the $15 million has been spent and the joint venture formed. The existing agreement is legally binding and governs the relationship between the parties until a more detailed agreement is reached.


ENDS


For further information contact:


Sandfire Resources NL

Karl Simich - Managing Director/CEO

Office: +61 8 6430 3800

Read Corporate

Mobile: +61 419 929 046 (Nicholas Read)

Mobile: +61 421 619 084 (Paul Armstrong)


Figure 1: Monty Prospect showing drill-hole collar locations and interpreted schematic geology


Figure 2: Vertical Longitudinal Projection and initial interpretation of the Monty Prospect showing drill-hole piercepoints at the top of the primary intercept shown in bold. All intercepts are down-hole widths. A significant intersection is defined here as any intersection 3m estimated true width that has a grade of 2.0 % Cu, inclusive of non-mineralised material. To determine whether intersections that are 2.0% Cu, with the non-mineralised material included, then the intersection is considered significant. New intersections (not previously reported) are highlighted in yellow.



Figure 3: Interpretive cross-section of the Monty mineralisation (Lower Zone)



Competent Person's Statement - Exploration Results


The information in this report that relates to Exploration Results is based on information compiled by Mr. Shannan Bamforth who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Bamforth is a permanent employee of Sandfire Resources and has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bamforth consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Exploration and Resource Targets

Any discussion in relation to the potential quantity and grade of Exploration Targets is only conceptual in nature. While Sandfire is confident that it will report additional JORC compliant resources for the DeGrussa Project, there has been insufficient exploration to define mineral resources in addition to the current JORC compliant Mineral Resource inventory and it is uncertain if further exploration will result in the determination of additional JORC compliant Mineral Resources.

Forward-Looking Statements

Certain statements made during or in connection with this statement contain or comprise certain forward-looking statements regarding Sandfire's Mineral Resources and Reserves, exploration operations, project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Although Sandfire believes that the expectations reflected in such forward-looking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements and no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management. Except for statutory liability which cannot be excluded, each of Sandfire, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in this statement and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this statement or any error or omission. Sandfire undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly you should not place undue reliance on any forward looking statement.

Read the rest of the article at www.noodls.com

Talisman Mining Limited

CODE : TLM.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Talisman Mining Ltd is a and nickel exploration company based in Australia.

Talisman Mining Ltd holds various exploration projects in Australia.

Its main exploration properties are TRILLBAR, MOUNT JAMES and BUSTLER WELL in Australia.

Talisman Mining Ltd is listed in Australia. Its market capitalisation is AU$ 49.2 millions as of today (US$ 31.8 millions, € 29.8 millions).

Its stock quote reached its highest recent level on September 24, 2010 at AU$ 1.26, and its lowest recent point on March 27, 2020 at AU$ 0.06.

Talisman Mining Ltd has 185 700 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Nominations of Talisman Mining Limited
6/17/2009Key Board Appointments
2/19/2009 Strengthens Management Team with Key Appointments
12/23/2008 Appoints Gary Lethridge as Managing Director
Project news of Talisman Mining Limited
8/7/2016Sinclair Nickel Project Exploration Update
7/13/2015Further massive sulphide mineralisation at Monty Prospect
3/30/2011(Springfield Project)Recommencement of drilling at Springfield Project
2/18/2011Sale of non-core iron ore projects completed
2/14/2011Option to sell non-core iron ore projects exercised
8/23/2010(Springfield Project)Drilling recommences at Springfield project
6/3/2010(Springfield Project)Exploration Update: Springfield Copper-Gold Project
4/23/2010(Springfield Project)Drilling Update - Springfield Project
3/17/2010(Springfield Project)Drilling To Commence At Springfield Project
1/22/2010(Springfield Project)Exploration Update - Copper-Gold Projects
11/25/2009(Springfield Project)Springfield Copper Gold Project - Exploration Update
10/15/2009(Springfield Project)Springfield Copper-Gold Project - Exploration Update
10/8/2009(Springfield Project)Springfield Copper-Gold Project - Exploration Update
8/31/2009(Springfield Project)Copper-Gold Exploration Re-Commences at Springfield
6/26/2009(Wonmunna)Wonmunna Pilbara Iron Ore Project
1/21/2009(Wonmunna) Delivers 80 per cent Increase in Wonmunna Iron Ore Resource...
9/10/2008(Wonmunna)WONMUNNA IRON UPDATE
8/28/2008(Wonmunna)NMM Inferred Resource of 44Mt @ 55.9% Iron
4/2/2008(Wonmunna)Reconnaissance Drill Results
Corporate news of Talisman Mining Limited
7/25/2016Investor Presentation - July 2016
6/23/2016Notice of General Meeting/Proxy Form
5/4/2016Change of Company Secretary
3/31/2016Talisman Board and Management Changes
1/20/2016Monty Exploration Update
12/16/2015SFR: Doolgunna Project - Monty Update
11/29/2015Sinclair Project - Exploration Update
11/6/2015Results of Meeting
11/6/2015AGM Presentation
10/14/2015Monty - Exploration Update
10/5/2015Notice of Annual General Meeting/Proxy Form
9/30/2015Corporate Governance Statement and Appendix 4G
9/30/2015Annual Report to shareholders
9/24/2015Resource Rising Stars Investor Presentation
9/21/2015SFR: Doolgunna Project - Drilling Update
9/21/2015Monty Update
9/17/2015Sinclair Nickel Project - Maiden Drilling Program
9/16/2015SFR: Doolgunna Project - Drilling Update
9/13/2015SFR: Doolgunna Project - Drilling Update
9/7/2015SFR: Doolgunna Project - Assay Results
9/7/2015Monty - Assay Results
8/23/2015SFR: Doolgunna Project - Drilling Update
8/12/2015SFR: Doolgunna Project - Assay Results
8/2/2015August Investor Presentation
7/30/2015Quarterly Activities Report
7/26/2015SFR: Doolgunna Project - Drilling Update
7/20/2015SFR: Doolgunna Project - Assay Results
7/19/2015SFR: Doolgunna Project - Drilling Update
7/17/2015Change in substantial holding
7/10/2015Talisman raises $8 million through Share Placement
7/7/2015Trading Halt
6/16/2015SFR: Doolgunna Project - Exploration Update
6/16/2015Springfield Exploration Update
4/12/2015Sinclair Nickel Project -Tenements
3/3/2015Half Yearly Report and Accounts
1/16/2015Change of Director's Interest Notice
10/28/2014Quarterly Cashflow Report
10/28/2014Quarterly Activities Report
10/21/2014Investor Presentation -Sinclair Nickel Project-
10/19/2014Talisman to Acquire Sinclair Nickel Project
4/30/2010March 2010 Quarterly Report
4/6/2010Final Springfield Tenement to be Granted During April
2/19/2010Raises $9.5 Million Through Strongly Supported Share Placeme...
1/28/2010December 2009 Quarterly Report
10/30/2009Report Quarter Ended 30 September 2009
10/14/2009Farm-Out Agreement with Shaw River Resources on Pilbara Mang...
7/28/2009June 2009 Quarterly Report
5/28/2009Raises $5.2 Million Through Oversubscribed Share Placement
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (TLM.AX)
0.265+0.00%
AUSTRALIA
AU$ 0.265
05/01 12:26 -
0%
Prev close Open
0.265 0.260
Low High
0.260 0.265
Year l/h YTD var.
0.170 -  0.300 10.42%
52 week l/h 52 week var.
0.120 -  0.300 65.62%
Volume 1 month var.
207,439 -1.85%
24hGold TrendPower© : -15
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202489.29%
20231.45%0.220.13
2022-13.75%0.200.13
202164.95%0.260.09
20208.99%0.190.06
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.53-2.21%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.46-6.22%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54+2.68%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65+0.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.72-4.61%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+4.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.23+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.74-8.42%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.18-3.58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :