Western Lithium Significantly Upgrades Its Kings Valley Lithium Resource in Nevada, USA
Published : July 14, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Bolivia | Chile | Germany | Growth | Lead | Lithium | Market | Recovery | Water |

RENO, NEVADA--(Marketwire - July 14, 2011) - Western Lithium USA Corporation (News - Market indicators)(OTCQX:WLCDF) ("Western Lithium" or the "Company") is pleased to announce that the 2010 and 2011 drill program has resulted in a significant increase to the project's resource size. The resource for Stage I is now defined by approximately 200 drill holes that have all intersected lithium bearing clays. It is expected that the new resource will provide for increased feedstock grade to the proposed lithium carbonate process plant.

In addition, the Company is advancing permitting activities for the Kings Valley Project. Recently, the necessary permits were received to bulk sample 100 tonnes of clay which will be used to feed a demonstration plant planned for later this year. The technical team is continuing baseline environmental studies, including wildlife, vegetation, ground water and air quality. To lead these important environmental initiatives, the Company recently hired an Environmental Director, Catherine Clark. Ms. Clark has over twenty-four years of experience as an environmental professional, focusing on local, state, and federal permitting within the mining industry. Specifically, Ms. Clark has three years of experience in government, and over twenty-one years as an environmental consultant. She has an M.S. Degree in Environmental Resource Management and has been involved in all facets of mine development.

Jay Chmelauskas, President of Western Lithium stated, "The recent lithium carbonate price increases of up to 25% indicate strong growth in lithium demand that would support new supply requirements. Additionally, with the introduction of several new congressional bills, including the Critical Minerals Policy Act, United States politicians are turning their attention towards developing secure, competitive mineral supply sources."

Mr. Chmelauskas continued, "We welcome Catherine to our strong team of developers and operators in Nevada as we transition the Company towards becoming a major lithium producer in a strong and growing lithium market."

The drilling program completed earlier this year indicates sufficient lithium resources to potentially increase the mining grade used in the 2010 Preliminary Assessment and Economic Evaluation (PAEE), which demonstrated strong economics. At an expected average cut-off grade of 0.35% lithium, the upgraded measured and indicated resource for Stage I now totals 37.3 million tonnes with an average grade of 0.40% lithium. At this higher cut-off, total measured and indicated tonnes have the potential for a 25+ year mine life. The Company is now optimizing mine scheduling to determine higher grade feed for the start-up years of production.

Kings Valley Stage I measured and indicated resources(1), as of June 28, 2011, are tabulated below:

Kings Valley Stage I Resources
As at June 28, 2011
At 0.35% lithium cut-off
Category Tonnes (thousands) Lithium (%) Lithium Oxide (%) LCE
(tonnes)
Measured 13,100 0.420 0.90 293,000
Indicated 24,200 0.395 0.85 508,000
Total 37,300 0.404 0.87 801,000
 
Inferred 24,200 0.386 0.83 498,000
* Measured tonnes minimum 3 drill holes within 75 x 100m with at least 5 composites used in the estimation; Indicated tonnes minimum 2 drill holes within 150x200m with at least 4 composites used in the estimation, Inferred tonnes one drill hole within 225x300m with at least 3 composites used in the estimation. Contained metal does not allow for mine and metallurgical recovery. 1.8 tonnes/m3 tonnage factor used. Reasonable prospects of economic extraction by open pit mining established using: $3.00 lithium carbonate/lb, 92% metallurgical recovery, $69/tonne processing, $2.35 USD/tonne mining. To convert Lithium (Li) to Lithium Carbonate (Li2CO3) multiply Li by 5.323. Rounding errors may exist.

Pilot-scale lithium studies have now been completed at a specialized facility in Germany. The results will be incorporated in the Prefeasibility Study that has been underway since the beginning of the year and expected to be complete by the fall of 2011. The work to-date continues to support and optimize the 2010 PAEE Study to position the Company as a very competitive and scalable new lithium producer located in the USA. 

A demonstration plant is planned for the end of 2011. The Company will commence bulk sampling of approximately 100 tonnes of lithium ore starting in mid-July at the Kings Valley site. Alternatives are being considered for the size and location of the demonstration plant with a decision expected during the summer.

Qualified Person

The resource estimate was calculated by Timothy J. Carew, P. Geo., Principal, Reserva International LLC, an independent Qualified Person as defined by NI 43-101. Timothy Carew is the Qualified Person that has approved the scientific and technical data in this news release and has verified the data relevant to such disclosure in the course of preparation of the resource estimate.

Western Lithium is developing the Kings Valley, Nevada lithium deposit into potentially one of the world's largest(2) strategic, scalable and reliable sources of high quality lithium carbonate. The Company is positioning itself as a major U.S.-based supplier to support the rising global demand for lithium carbonate that is expected from the increased use of hybrid/electric vehicles.

(1) Mineral resources that are not mineral reserves do not have demonstrated economic viability.

(2) Western Lithium has completed National Instrument 43-101 resource estimates on two portions of the property, one of which is envisioned for the initial stage of mine development. These resources cover part of the mineralization from a historical estimate of 11 million tonnes of lithium carbonate equivalent (LCE) prepared by Chevron Resources Corp. in the 1980s that encompasses all of the King's Valley lithium lens deposits identified to date, and ranks in size behind deposits in Bolivia (47 million tonnes LCE), Chile (37 million tonnes LCE), North Carolina (14 million tonnes LCE) and the DRC (12 million tonnes LCE). Source: R. Keith Evans, 2010; Roskill Information Services Ltd., 2009; and company disclosures. A qualified person has not done sufficient work to classify the historical estimate as current mineral resources under National Instrument 43-101, the Company is not treating the historical estimate as current mineral resources and the historical estimate should not be relied upon.

Forward Looking Statements

Certain of the statements made and information contained herein, including the timing and results of a pre-feasibility study, the size and scope of any potential mine plan on Stage I of the King's Valley Property, the timing and results of pilot scale testing and a demonstration plant is "forward-looking information" within the meaning of the Ontario Securities Act,. Forward-looking information is subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, risks and uncertainties relating to commodity price fluctuations; uncertain political and economic environments; changes in laws or policies, delays or the inability to obtain necessary governmental permits, risks inherent in mine planning and development such as cost overruns, metallurgical and recovery factors and financing risks; risks associated with the estimation of mineral resources and reserves and the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; actual ore mined varying from estimates of grade, tonnage, dilution and metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses,; and other risks and uncertainties, including those described in each management discussion and analysis. Forward-looking information is in addition based on various assumptions including, without limitation, the expectations and beliefs of management, the assumed long term price of lithium; appropriate equipment and sufficient labour and that the political environment where the Company operates will continue to support the development and operation of mining projects. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the forward-looking information. Accordingly, readers are advised not to place undue reliance on forward-looking information.

The TSX has neither approved nor disapproved the contents of this press release. Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this press release.

Western Lithium USA Corporation
Brian Bergot
Investor Relations
604-331-9842
info@westernlithium.com
www.westernlithium.com
Data and Statistics for these countries : Bolivia | Chile | Germany | All
Gold and Silver Prices for these countries : Bolivia | Chile | Germany | All

DEVELOPMENT STAGE
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Lithium Americas. is a exploration company based in Canada.

Lithium Americas. develops lithium and uranium in USA.

Its main asset in development is KINGS VALLEY in USA.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of
2/6/2013Completes Royalty Financing
Option Grants of
1/29/2011Grants 1,000,000 Stock Options
7/15/2010Grants Stock Options
12/17/2009Grants Stock Options
Nominations of
9/30/2013Re-Appoints Edward Flood as Director
6/18/2012APPOINTS NEW CHAIRMAN
6/15/2012Appoints John Macken as New Chairman
4/1/2011Appoints two Vice Presidents and a Director and Reports on R...
4/1/2010Appoints Dr. Graham R. Thompson to Advisory Committee
2/8/2010Appoints Corporate Secretary
12/15/2009Appoints Sr. VP, Project Development To Advance Its Lithium ...
Project news of
9/3/2013Hires VP Marketing and Process Manager For its Drilling Addi...
4/2/2013Proceeds with Environmental Assessment and Detailed Engineer...
4/16/2012WLC Demonstrates High Performance Results from Rechargeable ...
12/2/2011Nevada's Top Ten Exploration Projects for 2012
7/14/2011(Kings Valley)Significantly Upgrades Its Kings Valley Lithium Resource in ...
1/29/2011(Kings Valley)Commences Pre-Feasibility Study
Corporate news of
12/29/2015Western Lithium Announces Release of Final Tranche by Bangch...
12/17/2015Western Lithium Announces Investor Conference Call; Provides...
12/16/2015WESTERN LITHIUM SECURES US$5,000,000 LINE OF CREDIT
10/23/2015Remembering Ed Flood, Founder of Western Lithium USA Corpora...
9/24/2015Western Lithium Progress and Timeline Update for Lithium Sup...
9/8/2015Western Lithium and Lithium Americas Announce Completion of ...
9/4/2015Western Lithium and Lithium Americas Announce Completion of ...
9/1/2015Western Lithium and Lithium Americas Announce Shareholder Ap...
8/27/2015Western Lithium and Lithium Americas Remind Their Shareholde...
8/18/2015Glass Lewis and ISS Recommend that Western Lithium and Lithi...
8/5/2015Western Lithium Provides Update on Proposed Merger With Lith...
7/27/2015Western Lithium Closes US$5 million Subscription Receipt Off...
4/10/2015Western Lithium Reports on Results of Annual General and Spe...
3/31/2015Western Lithium Reports on Results of Annual General and Spe...
3/6/2015Western Lithium Produces First High Purity Lithium
2/24/2015Western Lithium Produces First High Purity Lithium in German...
2/19/2015Western Lithium to Participate in the Prospectors & Develope...
1/6/2015Western Lithium’s Hectatone™ Business Starts 2015 with First...
1/6/2015Western Lithium's Hectatone(TM) Business Starts 2015 With Fi...
12/5/2014Western Lithium to Ramp Up Production For Initial Hectatone™...
12/3/2014Western Lithium to Ramp Up Production for Initial Hectatone(...
10/10/2014Western Lithium Hosts Ceremonial Opening of Its Hectatone Or...
9/30/2014Western Lithium Signs Distribution Agreement for Us Regional...
9/8/2014Western Lithium Advances Nevada Lithium Supply With Demonstr...
7/31/2014Organoclay Industry Veteran Frank B. Wright Jr. Joins Wester...
5/22/2014Western Lithium Receives Environmental Approvals to Commence...
5/20/2014Western Lithium to Participate in Upcoming Conferences in Va...
4/28/2014Western Lithium's Demonstration Plant to Operate in Fall of ...
4/17/2014IIROC Trade Resumption - WLC
4/16/2014IIROC Trading Halt - WLC
4/1/2014Western Lithium Appoints New Director
4/1/2014CANADA STOCKS-TSX set to open higher as Fed comments ease co...
2/13/2014Initiates Planned Lithium Demonstration Plant to Validate Lo...
9/23/2013Secures US$5.5 Million From Strategic Investor Orion Mine Fi...
9/14/2013Notice regarding recent trading activity
9/3/2013Hires VP Marketing and Process Manager for Its Drilling Addi...
8/28/2013Successfully Completes Bulk Sampling of 3,000 Tons of Hector...
7/18/2013(Kings Valley)Commences Bulk Sampling at its Kings Valley Hectorite Clay S...
7/10/2013Purchases Established Industrial Site in Fernley=2C Nevada=2...
7/10/2013Purchases Established Industrial Site in Fernley, Nevada, to...
6/13/2013Orders Lead Time Items to Start Construction of Hectatone(TM...
5/9/2013Receives USA Patent for Lithium Extraction Process
4/2/2013Proceeds with Environmental Assessment and Detailed Engineer...
3/22/2013Reports on Results of Annual and Special Meeting
2/5/2013Arranges US$20 Million Royalty Financing for Oilfield Drilli...
10/11/2012Initiates Permitting for Specialty Hectorite Commercial Clay...
9/14/2012Provides Update on Commercial Clay and Lithium Strategy
4/16/2012Demonstrates High Performance Results From Rechargeable Lith...
3/27/2012Reports on Results of Annual Meeting
1/27/2012Files Preliminary Feasibility Study Technical Report
1/4/2012(Kings Valley)completes prefeasibility on Kings Valley
12/14/2011(Kings Valley)Kings Valley Lithium Project Pre=2DFeasibility Study Indicat...
10/5/2011Argonne=2C Western Lithium to develop lithium carbonate for ...
5/19/2011Funded For Pre-Feasibility Study and Planned Demonstration P...
3/11/2011Completes Purchase of Royalties and Mineral Property Titles ...
2/5/2011Graduates to TSX
6/21/2010Reports on Results of Annual Meeting
5/28/2010Changes Name to Western Lithium USA Corporation
3/29/2010Announces Formation of Advisory Committee and Resignation of...
2/5/2010Named as Part of TSX Venture 50
10/23/2009to Acquire Rocky Mountain Resources
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (LAC.T)
Prev close Open
Low High
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  - -
Volume 1 month var.
-
Produces
Develops Lithium
Explores for
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.66-0.78%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.22-0.33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.52-0.76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.48+1.54%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+4.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.23+9.52%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 53.08+0.70%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :