Miranda Gold Corp

Published : June 20th, 2018

Signs Option Agreement On Advanced Gold-Copper Project In Colombia

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

OTCBB: MRDDF    TSX-V: MAD    FSE: MRG


15381 - 36th Avenue, South Surrey, B.C. V3Z 0J5
Tel: (604) 417-4653    Fax: (604) 648-8706
www.mirandagold.com

Monday, June 18, 2018 NEWS RELEASE

Miranda Gold Signs Option Agreement On Advanced Gold-Copper Project In Colombia

Vancouver, BC, Canada -- June 18, 2018 -- Miranda Gold Corp. ("Miranda") (TSX-V: MAD) is very pleased to announce it has signed an option agreement on the Cauca project - an advanced gold-copper project in the Miocene-age mineral belt of southern Colombia. The Cauca project is in the Cauca department, 47km south of the department capital Popayan - in the Almaguer Mining District - and consists of one title and one application, for a total land area of 1,808 hectares. The Miocene Mineral Belt containing Cauca extends from Colombia into Ecuador, and is characterized by numerous well-known districts and discoveries including Solgold's Cascabel Project less than 40km from the Colombia border. Cauca is within one of the least explored terrains in Colombia. Cauca will join Miranda's Mallama Project for our second project in this important region.

The agreement is between Miranda and Carboandes, a private Colombian coal producer active in the central Andes. Carboandes drilled a significant gold-copper-silver deposit called "La Custodia" on the Cauca project in 2010.

Drilling in La Custodia and other targets (62 core holes for 22,047m total) on the project shows gold-copper porphyry mineralization with a persistent overprint of epithermal gold and carbonate-gold-base metal veins. Carboandes produced an internal resource estimate from the La Custodia deposit of 700,000 ounces at 0.66 g Au/t; but Miranda believes vertical epithermal veins are significantly under-sampled by wide-spaced drilling, and a more accurate representation of higher-grade veins in the deposit may provide a higher estimated resource grade.

Of particular interest to Miranda in the La Custodia deposit, are local intercepts containing epithermal mineralization that range from 2m at 28.4 g Au/t (2 g Ag/t) up to 2m at 1,095 g Au/t (257g Ag/t) superposed on lower-grade porphyry-style veinlets. Miranda has determined that core intercepts over 1 g Au/t consistently show high-angle epithermal veins sub-parallel to core, cross-cutting porphyry-style veins. It is likely that numerous untested veins or vein extensions occur between the current drill-holes that are spaced at an average of 100m to 200m.

Important "takeaways" for the Cauca acquisition are:
  • The Cauca project exposes Miranda shareholders to a potential quality deposit with excellent upside potential.
  • Of particular interest is that the orientation and distribution of epithermal related mineralization has not been defined and modeled. Thus, it is likely that significant higher-grade epithermal mineralization is under-represented in previous drilling and the historical resource estimate. Miranda believes most existing drill holes, on 100m to 200m centers whether vertical or angled are sub-parallel to the trend of high-angle veins. Miranda recognizes that higher values in drilling consistently correlate with epithermal veins subparallel to core. To estimate grades in the deposit, and for property-wide exploration, it is critical to determine vein trends and density and then drill angle holes perpendicular to veins on a tighter spacing.
  • Miranda has a path to a 100% interest in the property in the option agreement and can advance the project on our own or with a joint venture funding partner at the appropriate stage of advancement.
  • Carboandes has done extensive baseline corporate social license work with local stakeholders, and that advance work will aid the project's advancement for Miranda. The project has received permits in the past for large-scale drill programs, and construction of support facilities, and it is likely these permits can be re-opened in a timely fashion.
  • Grid sampling shows extensive untested soil anomalies within the project, similar to those occurring over the La Custodia drill-indicated mineralization. Rock samples indicate undrilled epithermal veins in several areas. It is expected that expanded exploration will show significant mineralization away from La Custodia
  • The first-year Miranda expenditure obligation is modest and will be designed to provide "Proof of Concept" that higher grade epithermal associated gold is significantly under-sampled by the current drill-hole orientation and spacing. Early Miranda exploration programs will prioritize close-spaced trenching to resolve epithermal vein distribution and geometry, followed up by close-spaced angle-drilling to create a three dimensional geology and grade model.
  • Miranda believes that our early drilling results, combined with Carboandes' existing drilling in the La Custodia target zone will allow Miranda to produce a "Maiden" NI 43-101 Resource Report as early as 2019.
Project details:

Structural controls and porphyry-emplacement are related to fault and fracture systems of the Cauca-Romeral Mega-structure or Suture zone. The predominant lithologies are continental sediments intruded by hypabyssal diorite and quartz-diorite porphyry. Alteration is external propylitic to phyllic to internal potassic in the core of the intrusives. Epithermal veins trend predominantly northwest and secondarily northeast and have phyllic and potassic selvages. The La Custodia is a gold-copper porphyry deposit with a persistent low-sulfidation epithermal overprint, including gold-silver quartz veins, veinlets and stockwork, and quartz-carbonate veins with base metals and gold.

The epithermal mineralization shows classic dark ginguro texture and abundant fine-to-coarse free gold. Fluid inclusion studies show temperatures of vein formation at 400 to 500�C for Type A and Type B porphyry-style veins, and 150�C for epithermal veins, indicating specific stages for vein formation. Porphyry mineralization was probably followed by carbonate-gold-base metal veins, and then low-temperature gold - silver veins.

The project has several exploration targets. Exploration targets similar to La Custodia include La Esperanza and El Lim�n - both with porphyry-gold-copper combined with epithermal-type mineralization. The Hueco Hondo prospect is 3.8km from La Custodia - midway between La Custodia and La Esperanza -- and is characterized by parallel northwest-trending epithermal veins that show reconnaissance channel sample values up to 127 g Au/t. The Hueco Hondo target is important in that it may illustrate the prevalent orientation of veins on the project, including the orientation of potentially under-sampled veins in La Custodia. Hueco Hondo consists of multiple parallel high-grade veins without a porphyry component, further supporting a persistent epithermal overprint.

Several gold-arsenic soil anomalies occur across a significant part of the 1,808 hectare property - but only two anomalies have been drilled to date. Drilling in one of these soil anomalies resulted in the identification of the La Custodia deposit. Open soil anomalies occur between La Custodia and Hueco Hondo, east of La Custodia, and north, south and east of La Esperanza, which is seven kilometers north of La Custodia. Several high level stream sediment anomalies have not been followed up with prospecting or soil grids.

Historic Internal Valuation Studies:

Carboandes discovered the La Custodia in 2010, and produced a project technical report. They have conducted internal studies in support of resource estimations, preliminary economic evaluations, metallurgy, and mining studies. The internal resource estimate of the La Custodia - completed and internally reported in 2015 -- provided a resource of 700,000 ounces gold at 0.66 g Au/t. Within this resource, using a plus-0.3 g Au/t cut-off, a three-dimensional "grade-shell" was modeled and used for a trial pit optimization. Internal to the pit, the gold-grade shell contains estimates of 307,450 ounces of gold, 1,323,000 ounces of silver, and 80,897,000 pounds of copper from a volume of 34 million tons of mineralized material - at prices significantly below current prevailing prices. Additional plus-0.3 g Au/t grade shells occur both below and adjacent to the pit shell. The vendor's internal metallurgical work shows a 95% gravimetric recovery of gold in the oxide zone and an 85% recovery of gold; 80% recovery of copper; and 60% recovery of silver combining gravity with flotation, in the sulfide zone.

The optimization utilized very preliminary assumptions for mining costs for an open-pit blast, shovel, and truck operation with a production rate of 5,000 tons per day. A simple inverse distance-squared isometric projection appropriate to generally uniformly distributed mineralization, with cumulative frequency grade capping was used to model grades. The optimization used metal prices of $1,254 per ounce gold, $15.80 ounce silver, and $2.05 per pound copper and recovery by gravimetric and conventional flotation milling. Recoveries were estimated from multiple bench-scale and larger tests performed by independent labs. The Carboandes internal report refers to all of its estimated resource as "inferred" but this should be considered a general term and not completed in accordance with CIM definitions of mineral resource categories.

No other resource estimates pre-date or post-date the 2015 estimate, and a qualified person has not done enough work to verify or classify this historical resource estimate as current mineral resources or reserves. Therefore, Miranda is not treating the information as a current mineral resource or reserve. The internal work was conducted using professional internal company standards and is considered reliable for its level of detail, but Miranda has not independently reviewed and substantiated the work - Miranda is using the internal Carbonandes work only to provide an estimate of exploration potential and as rationale to continue exploration. An independent qualified person will need to perform their own grade and resource modeling after additional drilling - and will do its own cost estimations and studies before preparing and filing an independent NI 43-101 technical report to support the mineral resource. Most important will be an accurate measurement and projection of higher grade epithermal-associated gold.

Importantly, Carboandes' internal pit design is contained within a small area of only 14 hectares of the total 1,808 hectare project area. The project is near the Pan-American Highway and secondary paved roads, the national power grid, and an airport. Topographic, elevation, social, and environmental aspects of the Project are favorable for exploration and development.

The Agreement provides Miranda a 60-day due diligence period before it becomes fully effective. The due diligence will start immediately.

Work completed on the Cauca project is summarized in the following table:
  La Custodia La Esperanza El Limon Total
Stream sediments 9 16 2 27
Soil samples 800 1,051 166 2,017
Rock chip samples 110 58 85 253
Channel samples 763 251 57 1,071
Thin-section samples 91 70 19 180
Pima samples 952 513 - 1,465
Core drilling samples 9,555 3,896 - 13,451
Screened Au samples 205 18 - 223
Cyanide leach samples 53 18 - 71


Significant drill intercepts are provided in the following table from the La Custodia deposit. Only intercepts greater than 0.5 g Au/t are shown. Values over 1 g Au/t consistently show some amount of epithermal quartz or quartz-carbonate veins, generally sub-parallel to core and thus the veins are probably near vertical.

Miranda believes that closer-spaced, and properly angled holes with respect to the vein trend, will better delineate the continuity and thickness of sub-vertical, higher gold grade epithermal veins that we believe are presently under-sampled on a volume weighted basis in the current La Custodia drill pattern and the La Custodia internal resource estimate.

HOLE From
(m)
To
(m)
Interval
(m)**
Average
(Au g/t)
DHHU007 216 254 38 0.68
DHHU004 230 288 58 0.60
DHHU008 3.3 32 28.7 1.38
69.6 92 22.4 0.71
DHHU008A 161 181.35 20.35 0.54
DHLC002 20 80.86 60.86 0.52
123.5 144 20.5 0.52
152.45 161.6 9.15 0.61
272 291 19 1.47
347 357 10 0.72
399 408 9 2.61
414.2 447.61 33.41 2.18
DHLC003 154.9 177.8 22.9 0.63
193 199 6 0.82
335.4 343.5 8.1 0.75
418.65 428.2 9.55 0.74
DHLC004 8 24 16 0.61
88.8 96.1 7.3 0.96
116.4 121.7 5.3 0.68
344 353.8 9.8 0.94
369 381.3 12.3 0.68
408.8 416.5 7.7 0.84
DHLC006 29.8 75 45.2 0.97
104 125.9 21.9 0.81
461.4 479.8 18.4 0.73
484.5 491.37 6.87 1.44
513 530.25 17.25 0.86
DHLC007 47.9 51.8 3.9 0.85
DHLC008 105 139.46 34.46 1.3
143.5 165.6 22.1 1.02
375 388.65 13.65 1.09
DHLC009A 144 153.5 9.5 0.71
292 297.45 5.45 0.74

** True thicknesses cannot be accurately estimated at this time, but generally, due to the nature of the deposit, drill thicknesses are thought to be close to true thicknesses.

Agreement details:

Miranda has signed a definitive option agreement to earn up to 100% of the Cauca Project, in three phases, as follow:
  1. To acquire the first 51% undivided interest in the Cauca project:
    Performance Date Annual Amount Cumulative Amount
    First anniversary of Effective Date US$250,000 (1) US$250,000
    Second anniversary of Effective Date US$750,000 US$1,000,000
    Third anniversary of the Effective Date US$2,000,000 US$3,000,000
    Fourth (2) anniversary of Effective Date US$2,000,000 US$5,000,000
    (1) obligation
    (2) may be extended up to 12-months with payment of US$500,000

    Also included in the earn-in, is a commitment to core drill up to 12,000 meters, to be completed during the first earn-in period.

    Subsequent to Miranda's exercise of the first option, the vendor shall be entitled to a 1.5% NSR royalty (the "Base Royalty") on any gold or gold equivalent ounces in excess of 1.0 million ounces produced from the property.
  2. To acquire the second 19% undivided interest in the Cauca project:
    Performance Date Annual Amount Cumulative Amount
    First anniversary of the exercise of first option $2,000,000 $7,000,000
    Second anniversary of the exercise of first option $4,500,000 $11,500,000
    Also included is a commitment to core drill up to 15,000 meters, to be completed during the second earn-in period, for a total commitment of 27,000 meters.
  3. To acquire the final 30% undivided interest in the Cauca project:
    Performance Date Performance Criteria
    First anniversary of the exercise of second option Delivery of a NI 43-101 Preliminary Economic Assessment ("PEA"), with the cost borne entirely by Miranda.
    Maximum of 120 days following the delivery of the PEA Delivery of a notice of intent to purchase the remaining 30%.
    Maximum of 90 (or 180) days following the delivery of the intent to purchase Agreement as to the fair market value ("FMV") of the Cauca project, within 90 days, to be mutually determined; or failing mutual agreement, by the use of an independent professional valuation expert. The valuation expert, if needed, may be given an additional 90 days to produce the final FMV report.
    Maximum of 60 days following the FMV agreement or delivery of the final FMV report on the Cauca project Payment of the pro-rata portion of the FMV, in cash. Payment of a 1.5% NSR royalty on all gold and gold equivalent ounces of production from the property (replacing the Base Royalty), beginning from the FMV agreement closing date and continuing for the life-of-mine.
In addition, there will be a payment due to the vendor based upon either Miranda's Maiden NI 43-101 Technical Report, or Miranda's Maiden internal resource estimate -- either of which must contain an estimate of measured, indicated and/or inferred gold resources on the property (the "Resource Bonus"). The payment of the Resource Bonus shall be calculated as USD$5.00 per ounce of gold or gold equivalent of such resources to a maximum of USD $4,500,000. The Resource Bonus shall be payable in two tranches: the first 50% shall be due on the date of the exercise of the first option, and the second 50% shall be due 12-months later.

Qualified Person

Data disclosed in this press release have been reviewed and verified by Miranda's Chief Executive Officer, Mr. Joseph Hebert, C.P.G., B.Sc. Geology, and Qualified Person as defined by National Instrument 43-101.

Corporate Profile

Miranda is a gold exploration company active in Colombia. Miranda employs a prospect generator and joint venture business model. Miranda focuses on generating projects with world-class discovery potential, and then joint ventures multiple projects to maximize the chance of discovery, while reducing economic risk and shareholder dilution. Miranda has an ongoing relationship with IAMGold Corporation.

For more information related to Miranda contact Joseph Hebert, Chief Executive Officer at 1-775-340-0450 or joseph.hebert@mirandagold.com - www.mirandagold.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans to continue to be refined; possible variations in ore grade or recovery rates; accidents, labor disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

Notice to US investors:

U.S. investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on our properties. We advise U.S. investors that the SEC's mining guidelines strictly prohibit information of this type in documents filed with the SEC.

This press release uses the terms "measured resources", "indicated resources" and "inferred resources", which are estimated in accordance with the Canadian National Instrument 43-101 and the Canadian Institute of Mining and Metallurgy Classification system. We advise investors that while those terms are recognized and required by Canadian regulations, the U.S. Securities and Exchange Commission does not recognize them. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. In addition, "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre-feasibility studies, except in certain exceptional cases. U.S. investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally minable.


Associated File: http://www.mirandagold.com/i/pdf/MAD-NR2018-06-Cauca-Option-Agree_FINAL.pdf
484 KB in size, approx. 1 minute, 31 seconds to download at 56.6Kbps

You can also view this News Release on our website at:
http://www.mirandagold.com/s/NewsReleases.asp?ReportID=828808


Home | Corporate | News | Investors | Projects | Investors | Contact

 
This message is personalized to you at .com.
Please do not forward this email.

Sent by
Miranda Gold Corp.
15381 - 36th Avenue, South Surrey, BC V3Z 0J5

Sent using QwikBroadcast� system from
Adnet Communications
#401 - 510 West Hastings St
Vancouver BC V6B 1L8, Canada
Report abuse: abuse@adnetinc.com

CLICK HERE TO UNSUBSCRIBE
Data and Statistics for these countries : Canada | Colombia | Ecuador | Georgia | All
Gold and Silver Prices for these countries : Canada | Colombia | Ecuador | Georgia | All

Miranda Gold Corp

DEVELOPMENT STAGE
CODE : MAD.V
ISIN : CA6046731031
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Miranda Gold is a gold exploration company based in Canada.

Miranda Gold holds various exploration projects in Colombia.

Its main asset in development is LOOKOUT MOUNTAIN in USA and its main exploration properties are RED CANYON, COAL CANYON, HORSE MOUNTAIN - MIRANDA, IRON POINT, BPV AND CONO, REDLICH, FUSE WEST, ANGEL WING, PPM, FUSE EAST and TAZ in USA and ROOK, EASTER DOME, RED HILL, CAJAMARCA, IBAGUE and FRESNO in Colombia.

Miranda Gold is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 3.6 millions as of today (US$ 2.7 millions, € 2.4 millions).

Its stock quote reached its highest recent level on February 14, 1997 at CA$ 7.00, and its lowest recent point on November 30, 2018 at CA$ 0.01.

Miranda Gold has 103 380 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Miranda Gold Corp
2008 Annual report
Financings of Miranda Gold Corp
5/20/2014Antioquia Gold Inc: Financing & Concordia Betulia Deal with ...
Option Grants of Miranda Gold Corp
2/26/2009Grants Stock Options
2/1/2008 Stock Options
Nominations of Miranda Gold Corp
12/11/2007 Appoints New Board Member from the Lundin Group of Companie...
Project news of Miranda Gold Corp
8/8/2013(Angel Wing)2013 Drilling Starts at Miranda Gold's Angel Wing Project
2/19/2013Finalizes Exploration Alliance in Colombia
1/28/2013(Red Hill)NuLegacy Gold Returns Miranda Gold's Red Hill and Coal Canyo...
10/31/2012(Angel Wing)2012 Drilling Concludes With 0.309 Oz Au/ton (10.6 G Au/t) I...
9/28/2012Terminates Ester Dome, Alaska Project
7/25/2012and Agnico-Eagle Enter Into Exploration Alliance in Colombia
6/21/2012(Big Blue)in Lower Plate Limestone at Miranda Gold's Big Blue Project
4/23/2012Invitation To A Luncheon In Toronto Hosted By Miranda Gold
4/19/2012(Big Blue)Drilling Begins At Miranda Gold'S Big Blue Project
3/28/2012(Red Hill)Drilling Starts at Miranda Gold's Red Hill and Coal Canyon P...
12/21/2011(Big Blue)Phase Two Drilling Completed at Miranda Gold's Big Blue Proj...
3/29/2011(Easter Dome)and Agnico-Eagle USA Sign Exploration Agreement for Ester Do...
3/20/2011(Big Blue)Drilling Begins on Miranda Gold's Big Blue Project
3/3/2011(Rook)Stakes Claims in East Roberts Mountains
2/20/2011(Taz)And Navaho Gold Sign Definitive Exploration Funding Agreemen...
2/14/2011(Pavo Real)Announces Exploration Results from Pavo Real
1/20/2011(Cajamarca)Options Five Properties in Colombia
1/20/2011(Ibague)Options Five Properties in Colombia
1/20/2011(Fresno)Options Five Properties in Colombia
1/20/2011(Santander Colombia)Options Five Properties in Colombia
9/22/2009(Red Hill)and NuLegacy Gold Corporation Sign Agreement to Explore Red ...
9/11/2009(Red Canyon)First Phase of Drilling Completed at Miranda Gold's Red Cany...
9/29/2008(Redlich)Advancing New Copper-Molybdenum Target at Redlich
9/22/2008(Coal Canyon)Reports Carlin-Style Gold Mineralization at Coal Canyon
9/4/2008(Red Hill)Drilling Begins on Miranda's Red Hill Project
8/28/2008(Red Canyon)Finalize Red Canyon Agreement
8/18/2008(Horse Mountain - Miranda)Drilling Begins on Miranda Gold's Horse Mountain Project
8/6/2008(Coal Canyon)Drilling Begins at Miranda Gold Corp.'s Coal Canyon Project
6/26/2008(Red Hill)Reports Red Hill 2007 Drill Results And 2008 Drill Program
6/19/2008(Red Canyon)Signs Letter of Intent with CMQ Resources on Red Canyon Proj...
4/23/2008(Iron Point)Drilling Begins at Miranda Gold Corp.'s Iron Point Project
3/20/2008(Redlich)Mine Development Associates Data Review Supports Upside Pote...
2/20/2008(Redlich)Announces Termination of Redlich Exploration Agreement
1/15/2008(Red Canyon) Intersects 85 Feet Of 0.046 oz Au/t at Red Canyon Project
10/23/2007(Red Hill)Drilling Commences on Miranda Gold's Redhill Project
10/16/2007(Redlich)Core Drilling Results From Miranda Gold's Redlich Property
8/20/2007(Angel Wing)Project Updates: Angel Wing and Horse Mountain
Corporate news of Miranda Gold Corp
6/23/2016Miranda Gold Closes $2.6m Non-Brokered Private Placement
6/15/2016Miranda Increases Private Placement To $2.6 Million
6/4/2016Miranda to Carry out $1.5 Million Private Placement
4/27/2016Miranda And Prism Announce Drill Program Testing Epithermal ...
4/14/2016Miranda Gold Files Updated Technical Report For The Willow C...
1/28/2016Miranda Gold Announces Promotion of Joseph Hebert to CEO and...
10/22/2015Miranda Acquires Rights to Purchase 3.3% Royalty at Willow C...
10/15/2015Miranda Signs Lease to Consolidate Antares Project in Colomb...
9/8/2015Miranda Retains Royalty and Transfers Ownership of Mustang P...
9/1/2015Miranda Gold Finalizes Red Canyon, Nevada Joint Venture
8/12/2015Miranda Reports Surface Ownership at Willow Creek Reunited w...
3/4/2015Miranda Gold Provides Corporate Update
3/3/2015Miranda Gold Provides Corporate Update
3/2/2015Miranda Gold Sells Four Nevada Properties
3/2/2015Miranda Gold Sells Four Nevada Properties
2/17/2015Miranda Gold Director Change and Option Grant
2/17/2015Miranda Gold Director Change and Option Grant
12/17/2014Miranda Gold Modifies Terms of Share Purchase Warrants
11/12/2014Miranda Gold Signs Joint Venture Agreement to Advance High-G...
10/23/2014Miranda Gold Files Technical Report for the Willow Creek Pro...
10/15/2014Miranda Gold Identifies New High-Grade Vein at Willow Creek,...
9/12/2014Miranda Gold Director Resigns
9/11/2014Miranda Gold Completes 43-101 Resource Estimate for Upper Co...
9/4/2014Miranda Gold Director Retires and Options Granted
8/6/2014Miranda Agrees to Joint Venture Terms to Develop Its Willow ...
6/24/2014Miranda and Prism Agreement Effective for Cerro Oro Project,...
5/13/2014Miranda Acquires a Large Epithermal Project in Colombia
4/2/2014Miranda and Prism Receive Exploration Contract at Cerro Oro,...
12/16/2013Adopts Advance Notice Policy
11/21/2013Acquires High-Grade Willow Creek Project in Alaska
9/30/2013(Angel Wing)2013 Drilling Completed at Miranda Gold's Angel Wing Project...
7/2/2013Colombia's Golden Potential, In conversation with Miranda Go...
10/12/2012Cortez Gold Trend Video
9/26/2012(Angel Wing)Follow-Up Drilling On 0.413 Oz Au/Ton Drill Intercept Starts...
8/30/2012(Angel Wing)Drilling Intersects 0.413 oz Au/ton (14.15 G Au/t) At Mirand...
8/7/2012(Angel Wing)2012 Phase I Drilling Intersects 0.131 Oz au/ton (4.49 g au/...
6/12/2012(Angel Wing)2012 Drilling Resumes At Miranda Gold'S Angel Wing Project
6/4/2012Video
1/17/2012Reports 2011 Drill Results From Ester Dome Project
7/28/2011letter - July 2011
7/20/2011Comments on Miranda Gold Corp. in a recent Gold Report
4/21/2011Revised Miranda Gold Newsletter - April 2011
4/20/2011letter - April 2011
11/21/2008MAD Newsletter - November 2008
11/20/2008Brent Cook Comments on Miranda Gold
11/10/2008President Interviewed on American Scene Radio
11/7/2008on 321gold.com
9/19/2008Shareholder Reception with Guest Speaker Paul van Eeden
9/16/2008letter September 2008
9/3/2008Adrian Day Comments on Miranda Gold Corp.
7/14/2008Exploration and Company Update
6/13/2008in the News
6/3/2008Hans Peter Schmidlin of Precious Capital Comments on Miranda...
5/29/2008Newcrest Signs Letter of Intent on Miranda's Horse Mountain ...
5/10/2008Recent interview with Streetwise Reports.
4/18/2008Acquires and Stakes Claims in Pequop Mountains
4/8/2008 Signs Agreement to Explore in Mexico
3/25/2008 2008 Drilling Forecast
3/11/2008New Exploration Funding Agreement Signed on Miranda's Coal C...
3/5/2008 Announces Termination of Romarco Agreement
11/7/2007Second Project Being Drilled as Drilling Commences on Mirand...
7/24/2007and Romarco Minerals Inc. Amend Terms on Red Canyon Joint Ve...
7/16/2007Announces Drill Program for Red Hill Project
5/17/2007and White Bear Resources Sign Second Joint Venture Agreement
4/4/2007Joint Venture Updates: Redlich, Iron Point and Coal Canyon
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MAD.V)FRANKFURT (MRG.F)
0.035+40.00%0.148+10.45%
TSX-V
CA$ 0.035
02/08 15:31 0.010
40%
Prev close Open
0.025 0.025
Low High
0.025 0.035
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.035 -%
Volume 1 month var.
1,560,800 -%
24hGold TrendPower© : 7
Produces
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/15/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :