Silver Bear Resources Inc.

Published : September 28th, 2015

Silver Bear Orders Additional Long Lead Time Equipment and Awards Procurement Contract

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Silver Bear Orders Additional Long Lead Time Equipment and Awards Procurement Contract

TORONTO, ONTARIO--(Marketwired - Sept. 28, 2015) - Silver Bear Resources Inc. ('Silver Bear' or the 'Company') (TSX:SBR) is pleased to announce that orders have been placed for vital long lead process equipment items, and in addition the Company has awarded a procurement services contract for the ongoing works at the Company's wholly-owned Mangazeisky Silver Project in Yakutia, Russia.

Highlights:

  • Placed order for three vital long-lead items namely; electrowinning cell processing equipment; high performance filters with built in cake-washing capability, and; mill used for regrinding the concentrate before intensive leaching, all items are expected to help increase silver recovery and minimise operating costs; and
  • Awarded procurement services contract to PT Mining, Russia ensuring the Company meets its deadlines during the tight and intensive 2015-2016 procurement window.

Long Lead Processing Equipment

Further to the order that was placed with CITIC Heavy Industries Co. Ltd. for a 500 kW (ø3.0 x 3.7 m EGL) ball mill announced in July (refer to July 16, 2015 press release for full details) the Company has entered into an agreement to purchase the emew® electrowinning cell processing equipment from Electrometals Group. This electrowinning processing equipment enables the Company to produce high grade (three 9's) solid silver powder directly from the leach solution without an intermediate carbon stage. The anticipated delivery is in time for 2016 winter road resupply. The emew® system has been available for nearly 20 years successfully installed in over 50 industrial plants worldwide. The technology offers increased production capacity, on a reduced footprint and excellent recoveries from lower concentrations.

The Company has also placed an order with Bilfinger of Italy for two high performance filters with built in cake-washing capability. These machines constitute the essential final stage in the separation of silver bearing solution from the barren solids; supplying clear solution to the electrowinning system. In addition, the Company has placed an order with Metso for a mill used for regrinding the gravity concentrate before the intensive leaching. It is anticipated that this gravity concentration and intensive leaching will minimise cyanide consumption and improve silver recovery.

Procurement Services Contract

Due to a tight and intensive procurement window the Company has awarded PT Mining of Russia a contract for procurement services for the Mangazeisky silver mine development. PT Mining demonstrated the necessary experience and skills to perform the procurement service, with the added ability to maximise the use of Russian based suppliers. It will be PT Mining's responsibility to compile packages of equipment and materials to supply complete process plant sections and take responsibility for delivery and potentially erection on site. PT Mining will work in collaboration with the Company's own procurement specialists and Tetra Tech.

Silver Bear's CEO, Graham Hill commented: 'Over the 2015 field season the Company has embarked on an aggressive project implementation program and the ordering of key long-lead items such as the ball mill and the electrowinning equipment, and the award of the procurement services contract are all significant milestones in the project's development. At this time the accelerated construction and mine plan for the Vertikalny deposit is progressing well and we are confident that the Company is in the position to meet its target of commissioning silver production by the second half of 2016.'

Mr. Jacques du Toit, Pr.Eng., MSc.Eng., PMP of Tetra Tech is a Qualified Persons under National Instrument 43-101 and has reviewed the scientific and technical information in this release.

About Silver Bear

Silver Bear (TSX:SBR) is focused on the development of its wholly-owned Mangazeisky Silver Project, covering a licence area of ~570 sq. km that includes the high grade Vertikalny deposit (amongst the highest grade silver deposits in the world) located 400 km north of Yakutsk in the Republic of Sakha (Yakutia) within the Russian Federation. The Company was granted a 20-year mining licence for the Vertikalny deposit in September 2013 and completed a Preliminary Economic Assessment in February 2014. The Feasibility Study, scheduled for completion in 2H 2015, is contracted to Tetra Tech in the UK with SRK and ERM as subcontractors for the mining and environmental studies respectively. Other information relating to Silver Bear is available on SEDAR at www.sedar.com as well as on the Company's website at www.silverbearresources.com.

Cautionary Notes

This release and subsequent oral statements made by and on behalf of the Company may contain forward-looking statements, which reflect management's expectations. Wherever possible, words such as 'intends,' 'expects,' 'scheduled,' 'estimates,' 'anticipates,' 'believes' and similar expressions or statements that certain actions, events or results 'may,' 'could,' 'would,' 'might' or 'will' be taken, occur or be achieved, have been used to identify these forward-looking statements. Although the forward-looking statements contained in this release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, Silver Bear cannot be certain that actual results will be consistent with these forward-looking statements. A number of factors could cause events and achievements to differ materially from the results expressed or implied in the forward-looking statements. Such risk factors include but are not limited to risk factors identified by Silver Bear in its continuous disclosure filings filed from time to time on SEDAR. These factors should be considered carefully and prospective investors should not place undue reliance on the forward-looking statements. Forward-looking statements necessarily involve significant known and unknown risks, assumptions and uncertainties that may cause Silver Bear's actual results, events, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Although Silver Bear has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, prospective investors should not place undue reliance on forward-looking statements. These forward-looking statements are made as of the date of this release, and Silver Bear assumes no obligation to update or revise them to reflect new events or circumstances, unless otherwise required by law.

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Italy | Russia | All
Gold and Silver Prices for these countries : Italy | Russia | All

Silver Bear Resources Inc.

EXPLORATION STAGE
CODE : SBR.TO
ISIN : CA82735N1096
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Silver Bear Res. is a silver development stage company based in Canada.

Its main exploration property is MANGAZEISKY in Russia.

Silver Bear Res. is listed in Canada. Its market capitalisation is CA$ 8.1 millions as of today (US$ 6.5 millions, € 5.9 millions).

Its stock quote reached its highest recent level on December 28, 2007 at CA$ 3.50, and its lowest recent point on January 15, 2016 at CA$ 0.02.

Silver Bear Res. has 162 930 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Silver Bear Resources Inc.
2007 Annual Report
Financings of Silver Bear Resources Inc.
10/17/2013Announces Close of First Tranche of Private Placement Financ...
7/17/2012Announces Close of Final Tranche of Private Placement Financ...
6/8/2012Announces Close of First Tranche of Private Placement Financ...
3/19/2012Announces Closing of the Private Placement With Tabac Ventur...
3/14/2012Announces Private Placement Financing With a Strategic Inves...
Nominations of Silver Bear Resources Inc.
6/17/2013Announces Election of Directors
3/11/2013Welcomes Robin Birchall as Executive Chair and Member of Boa...
Financials of Silver Bear Resources Inc.
3/31/2015Announces the Filing of its Financial Results for the Year E...
5/16/2012Provides Operational Update and Announces First Quarter 2012...
3/29/2011Announces 2010 Year End Results and Updates Mineral Resource...
Project news of Silver Bear Resources Inc.
12/21/2011(Mangazeisky)Achieves Significant Milestone With Exploration License Exte...
Corporate news of Silver Bear Resources Inc.
7/5/2016Silver Bear Files Technical Report On The Mangazeisky Silver...
6/9/2016Silver Bear Announces Completion Of Positive Feasibility Stu...
4/28/2016Silver Bear Announces Entering Into Non-Binding Term Sheet f...
4/13/2016Silver Bear Announces Mineral Resource Update for Mangazeisk...
3/30/2016Silver Bear Completes a Private Placement Financing of US$20...
12/18/2015TSX Delisting Review - Silver Bear Resources Inc. (Symbol: S...
10/8/2015Silver Bear Agrees to a Private Placement Financing of C$11....
10/8/2015IIROC Trade Resumption - SBR
10/8/2015IIROC Trading Halt - SBR
9/28/2015Silver Bear Orders Additional Long Lead Time Equipment and A...
7/20/2015Silver Bear Announces AGM Results and Forthcoming Chairman C...
7/16/2015Silver Bear Places Purchase Order for Ball Mill
6/29/2015Silver Bear Announces Extension to Promissory Note Loans
4/14/2015Silver Bear Files Technical Report on the Mangazeisky Silver...
4/13/2015(Mangazeisky)Files Technical Report on the Mangazeisky Silver Project Upd...
4/13/2015Silver Bear Files Technical Report on the Mangazeisky Silver...
3/31/2015Silver Bear Announces the Filing of its Financial Results fo...
3/2/2015Silver Bear Enters into US$7,000,000 Promissory Notes
2/26/2015Silver Bear Resources Announces Updated Mineral Resource Est...
2/5/2015Silver Bear Provides Corporate Update
11/18/2014Silver Bear Appoints Graham Hill as CEO
7/30/2014Silver Bear Announces AGM Results
6/16/2014Silver Bear Resources Inc.: Silver Metallurgical Recoveries ...
5/21/2014Silver Bear Closes First Tranche of Private Placement Financ...
10/7/2013Announces Private Placement Financing of Up to CAD $4.25 Mil...
9/18/2013Enters Into CAD $1 Million Promissory Notes
9/3/2013Mining License Issued to Silver Bear
5/13/2013Announces Private Placement Financing of up to CAD $3 Millio...
1/15/2013Airborne Geophysics Supports Origins of Surface Gold Veins N...
1/9/2013Four Year Licence Extension Issued to Silver Bear
9/20/2012(Mangazeisky)Expands Inferred Silver Resource by 13.5 Million Ounces of S...
9/6/2012Metallurgical Test Hole Delivers 29 Meters of 1,960 g/t Silv...
8/14/2012Receives Certificate of First Discovery From Russian Authori...
8/8/2012Intersects 114 Meters of 97 g/t of Silver Near Surface, Incl...
3/28/2012Announces 2011 Annual Results
12/5/2011Intersects 354 g/t Ag Over 3.4 Meters and 1090 g/t Ag Over 1...
8/15/2011Mineralization Intersection on First Drill Hole Supports Con...
8/2/2011Announces Appointment of Vice President of Exploration and P...
6/9/2011Announces 2011 First Quarter Results and Announces Expanded ...
3/7/2011(Mangazeisky)Corrects Comments Made in The Northern Miner
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (SBR.TO)
0.050+0.00%
TORONTO
CA$ 0.050
08/01 10:30 -
0%
Prev close Open
0.050 0.050
Low High
0.050 0.050
Year l/h YTD var.
0.050 -  0.050 -%
52 week l/h 52 week var.
0.050 -  0.050 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -2
Produces
Develops
Explores for Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20240.00%
20230.00%0.050.05
2022-44.44%0.120.04
2021-40.00%0.200.08
20207.14%0.240.05
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :