Silver Standard Resources Inc.

Published : July 13th, 2016

Silver Standard provides Q2 2016 production results

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Silver Standard provides Q2 2016 production results

VANCOUVER, July 13, 2016 /CNW/ - Silver Standard Resources Inc. (NASDAQ: SSRI) (TSX: SSO) ('Silver Standard') provides its second quarter 2016 operational results.

Operating Highlights:

  • Expanded gold production profile demonstrates scale: Produced 97,790 gold equivalent ounces during the second quarter . This includes gold production at the Seabee Gold Operation prior to our acquisition.
  • Gold production on track to meet guidance at Marigold: Produced 47,195 ounces of gold during the second quarter of 2016.
  • Increased ore tonnes to leach pads at Marigold: Stacked ore increased to 6.7 million tonnes containing approximately 67,000 recoverable ounces loaded to the leach pads as mining benefited from three additional haul trucks that commenced operating early in the second quarter.
  • Gold production on track at the Seabee Gold Operation: Produced 17,524 ounces of gold in the second quarter, with 6,721 ounces produced from date of acquisition on May 31 to June 30, 2016, well positioned to meet the upper end of previously reported production guidance.
  • Continued strong production at Pirquitas: Produced 2.5 million ounces of silver, well on track to meet production guidance
  • Enhanced mine fundamentals at Pirquitas: Achieved record quarterly milling rate of 4,668 tonnes per day in the second quarter as a result of our ongoing Operational Excellence program.

Paul Benson, President and CEO said, 'In the second quarter we completed the acquisition of Claude Resources, adding the Seabee Gold Operation to our portfolio in a robust precious metals environment and establishing Silver Standard as a high-quality intermediate precious metals producer. At Seabee, we are focused on successful integration and working with the team to identify operational excellence and growth opportunities at the mine.'

'During the quarter all three operations delivered consistent production results and remain well-positioned to achieve full year production guidance. With three cash-flowing mines, a strong balance sheet and an experienced operating team, we continue to pursue our goal of creating value for shareholders through operational excellence and disciplined growth.'

Marigold mine, U.S.

Q2 2016

Q1 2016

% Change

Total material mined

kt

18,685

17,291

8.1%

Waste removed

kt

12,005

11,611

3.4%

Ore to leach pad

kt

6,680

5,680

17.6%

Strip ratio

w/o

1.8

2.0

(10.0%)

Gold grade to leach pad

g/t

0.44

0.47

(6.4%)

Gold recovery

%

71%

70%

1.4%

Gold produced

oz

47,195

50,520

(6.6%)

Gold sold

oz

47,124

48,605

(3.0%)

1.

Percent changes are calculated using rounded numbers presented in the table.

The Marigold mine produced 47,195 ounces of gold in the second quarter of 2016, on target to meet previously increased guidance. Second quarter production was lower than in the first quarter due to planned ore stacking at higher elevations on the leach pads with irrigation of these areas starting later in the quarter. We expect third and fourth quarter production to increase, relative to the first half of 2016, as the new leach pad is commissioned and the full impact of the additional trucks is realized. We recognized sales of 47,124 ounces of gold in the second quarter of 2016.

Three additional 300-tonne class haul trucks commenced operating ahead of schedule early in the second quarter. A total of 18.7 million tonnes was mined during the quarter, higher than the first quarter of 2016 due to the additional hauling capacity and the start of stripping the next phase of the Mackay pit. Approximately 6.7 million tonnes of ore were delivered to the leach pads at a gold grade of 0.44 g/t, containing approximately 67,000 recoverable ounces of gold stacked during the quarter. The strip ratio declined to 1.8:1 in the second quarter, a 10% reduction compared to the previous quarter, and ore tonnes reconciliation continued to be positive. Gold recovery was 71% in the second quarter, slightly higher than the first quarter of 2016. In the second quarter a premature failure of the swing bearing on one of our two hydraulic shovels occurred, which impacted total material mined. By quarter-end this repair work was completed and the shovel was operating normally. Total material mined is expected to further increase in the third quarter as the additional haul trucks ramp up to full capacity.

The construction of the new leach pad, budgeted for 2016, is on schedule to be completed by the end of the third quarter and is anticipated to benefit production later in the year.

Seabee Gold Operation, Canada

Period from Acquisition
to June 30, 2016

Q2 2016

Q1 2016

% Change

Total ore milled

t

18,856

71,218

74,179

(4.0%)

Ore milled per day

t/day

629

783

815

(3.9%)

Gold mill feed grade

g/t

7.79

7.97

8.99

(11.3%)

Gold recovery

%

96.6%

96.8%

96.5%

0.3%

Gold produced

oz

6,721

17,524

20,264

(13.5%)

Gold sold

oz

11,306

16,305

21,030

(22.5%)

1.

The data presented in this column is for the period from and after May 31, 2016, the effective date of our acquisition of Claude Resources Inc. ('Claude Resources'), to and including June 30, 2016.

2.

The data presented in this column is for the period from April 1, 2016 to June 30, 2016 and includes operating results for the Seabee Gold Operation for the period from April 1 to May 30, 2016 prior to our acquisition.

3.

First quarter 2016 data is presented as reported by Claude Resources in its Q1 2016 Management's Discussion and Analysis for the three months ended March 31, 2016.

4.

Percent changes are calculated using rounded numbers presented for Q1 2016 and Q2 2016 in the table.

5.

Gold produced is defined as gold poured in each period. Gold produced in the first quarter of 2016 is gold ounces poured during this period, compared to gold ounces produced as reported by Claude Resources.

The Seabee Gold Operation consists of the Seabee and Santoy underground mines, both of which feed a single processing facility. The operation produced 6,721 ounces of gold from May 31, 2016, the date of our acquisition, to the end of the second quarter of 2016 (the 'Period'). We recognized sales of 11,306 ounces of gold for the Period.

A total of 18,856 tonnes of ore were milled at a gold grade of 7.79 g/t during the Period. Mill throughput per day for the Period was 629 tonnes per day, while mill throughput per operating day during the Period averaged 820 tonnes per day. The total tonnes milled for the Period were impacted by an unplanned power outage which lasted a total of ten days. Seven days impacted tonnes milled in the second quarter and three days impacted tonnage in the third quarter of 2016. Seabee is on track to meet the upper end of annual production guidance as disclosed by Claude Resources in its news release dated May 5, 2016. The ore tonnes reconciliation in the Period was positive and gold recovery was 96.6%.

Pirquitas mine, Argentina

Q2 2016

Q1 2016

% Change

Total material mined

kt

2,543

2,520

0.9%

Waste removed

kt

1,814

1,726

5.1%

Ore mined

kt

729

794

(8.2%)

Strip ratio

w/o

2.5

2.2

13.6%

Silver mined grade

g/t

189

181

4.4%

Zinc mined grade

%

0.19%

0.37%

(48.6%)

Ore milled

kt

425

418

1.7%

Silver mill feed grade

g/t

238

247

(3.6%)

Zinc mill feed grade

%

0.21%

0.44%

(52.3%)

Silver recovery

%

77.6%

79.7%

(2.6%)

Zinc recovery

%

-

24.1%

(100.0%)

Silver produced

'000 oz

2,526

2,639

(4.3%)

Zinc produced

'000 lb

-

381

(100.0%)

Silver sold

'000 oz

2,594

3,223

(19.5%)

Zinc sold

'000 lb

798

-

100%

1.

Percent changes are calculated using rounded numbers presented in the table.

2.

Data for zinc production and sales relate only to zinc in zinc concentrate as any zinc metal within our silver concentrate does not generate revenue.

The Pirquitas mine produced 2.5 million ounces of silver during the second quarter of 2016, lower than production in the first quarter of 2016, due to slightly lower silver mill feed grade and silver recovery. We recognized sales of 2.6 million ounces of silver, lower than the first quarter as concentrate shipments that were delayed in December 2015 were recognized in the first quarter of 2016. There was no zinc production in the second quarter of 2016, as planned, due to lower zinc grade mined. Starting in the third quarter of 2016 we will discontinue disclosing zinc data.

Ore was milled at an average rate of 4,668 tonnes per day in the second quarter of 2016, a quarterly record for the mine since it began operating due to our ongoing Operational Excellence program. Ore milled contained an average silver grade of 238 g/t, 4% lower than the 247 g/t reported in the first quarter. We continue to encounter additional tonnes of ore in the bottom benches of the San Miguel open pit. The lower and medium grade material was stockpiled and will be processed after mining ceases at the end of 2016.

Qualified Persons

The scientific and technical data contained in this news release relating to the Marigold mine has been reviewed and approved by Thomas Rice, SME Registered Member, a Qualified Person under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ('NI 43-101') and our Technical Services Manager at the Marigold mine. The scientific and technical data contained in this news release relating to the Seabee Gold Operation has been reviewed and approved by Gordon Reed, P.Eng., a Qualified Person under NI 43-101 and General Manager at the Seabee Gold Operation. The scientific and technical data contained in this news release relating to the Pirquitas mine has been reviewed and approved by Bruce Butcher, P.Eng., a Qualified Person under NI 43-101 and our Director, Mine Planning.

About Silver Standard

Silver Standard is a Canadian-based precious metals producer with three wholly-owned and operated mines, including the Marigold gold mine in Nevada, U.S., the Seabee Gold Operation in Saskatchewan, Canada and the Pirquitas silver mine in Jujuy Province, Argentina. We also have two feasibility stage projects and an extensive portfolio of exploration properties throughout North and South America. We are committed to delivering safe production through relentless emphasis on Operational Excellence. We are also focused on growing production and Mineral Reserves through the exploration and acquisition of assets for accretive growth, while maintaining financial strength.

For further information contact:
W. John DeCooman, Jr.
Vice President, Business Development and Strategy
Silver Standard Resources Inc.
Vancouver, BC
N.A. toll-free: +1 (888) 338-0046
All others: +1 (604) 689-3846
E-Mail: [email protected]

To receive Silver Standard's news releases by e-mail, please register using the Silver Standard website at www.silverstandard.com.

Footnotes:

Gold equivalent production for the second quarter of 2016 is calculated using weighted average realized gold price at the Marigold mine and the Seabee Gold Operation and realized silver price at the Pirquitas mine.

Cautionary Note Regarding Forward-Looking Statements:

This news release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 (collectively, 'forward-looking statements'). All statements, other than statements of historical fact, are forward-looking statements.

Generally, forward-looking statements can be identified by the use of words or phrases such as 'expects,' 'anticipates,' 'plans,' 'projects,' 'estimates,' 'assumes,' 'intends,' 'strategy,' 'goals,' 'objectives,' 'potential,' or variations thereof, or stating that certain actions, events or results 'may,' 'could,' 'would,' 'might' or 'will' be taken, occur or be achieved, or the negative of any of these terms or similar expressions. The forward-looking statements in this news release relate to, among other things: future production of gold, silver and other metals; future costs of inventory, and cash costs and total costs per payable ounce of gold, silver and other metals sold; the prices of gold, silver and other metals; the effects of laws, regulations and government policies affecting our operations or potential future operations; future successful development of our projects; the sufficiency of our current working capital, anticipated operating cash flow or our ability to raise necessary funds; estimated production rates for gold, silver and other metals produced by us; timing of production and the cash costs and total costs of production at the Marigold mine, the Seabee Gold Operation and the Pirquitas mine; the estimated cost of sustaining capital; ongoing or future development plans and capital replacement, improvement or remediation programs; the estimates of expected or anticipated economic returns from our mining projects, including future sales of metals, concentrate or other products produced by us; and our plans and expectations for our properties and operations.

These forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied, including, without limitation, the following: uncertainty of production, development plans and cost estimates for the Marigold mine, the Seabee Gold Operation, the Pirquitas mine and our projects; our ability to replace Mineral Reserves; our ability to complete and successfully integrate an announced acquisition, including the recently announced acquisition of Claude Resources Inc.; subject to exercising our election to proceed, our ability to complete and successfully integrate Golden Arrow Resources Corporation's Chinchillas project, on a joint venture basis, into our current operations; commodity price fluctuations; political or economic instability and unexpected regulatory changes; currency fluctuations; the possibility of future losses; general economic conditions; fully realizing the value of our shareholdings in Pretium Resources Inc. and our other marketable securities, due to changes in price, liquidity or disposal cost of such marketable securities; potential export duty and related interest on past production and sales of silver concentrate from the Pirquitas mine; counterparty and market risks related to the sale of our concentrate and metals; uncertainty in the accuracy of Mineral Reserves and Mineral Resources estimates and in our ability to extract mineralization profitably; differences in U.S. and Canadian practices for reporting Mineral Reserves and Mineral Resources; lack of suitable infrastructure or damage to existing infrastructure; future development risks, including start-up delays and cost overruns; our ability to obtain adequate financing for further exploration and development programs and opportunities; uncertainty in acquiring additional commercially mineable mineral rights; delays in obtaining or failure to obtain governmental permits, or non-compliance with our permits; our ability to attract and retain qualified personnel and management; potential labour unrest, including labour actions by our unionized employees at the Pirquitas mine; the impact of governmental regulations, including health, safety and environmental regulations, including increased costs and restrictions on operations due to compliance with such regulations; reclamation and closure requirements for our mineral properties; social and economic changes following closure of a mine, including the expected closure of the Pirquitas mine in late 2016, may lead to adverse impacts and unrest; unpredictable risks and hazards related to the development and operation of a mine or mineral property that are beyond our control; indigenous peoples' title claims and rights to consultation and accommodation may affect our existing operations as well as development projects and future acquisitions; assessments by taxation authorities in multiple jurisdictions, including the recent reassessment by the Canada Revenue Agency; recoverability of value added tax and changes to the collection process in Argentina; claims and legal proceedings, including adverse rulings in litigation against us and/or our directors or officers; compliance with anti-corruption laws and internal controls, and increased regulatory compliance costs; complying with emerging climate change regulations and the impact of climate change; uncertainties related to title to our mineral properties and the ability to obtain surface rights; the sufficiency of our insurance coverage; civil disobedience in the countries where our mineral properties are located; operational safety and security risks; actions required to be taken by us under human rights law; competition in the mining industry for mineral properties; shortage or poor quality of equipment or supplies; an event of default under our convertible notes may significantly reduce our liquidity and adversely affect our business; failure to meet covenants under our senior secured revolving credit facility; conflicts of interest that could arise from certain of our directors' involvement with other natural resource companies; information systems security threats; and those other various risks and uncertainties identified under the heading 'Risk Factors' in our most recent Annual Information Form filed with the Canadian securities regulatory authorities and included in our most recent Annual Report on Form 40-F filed with the U.S. Securities and Exchange Commission ('SEC').

This list is not exhaustive of the factors that may affect any of our forward-looking statements. Our forward-looking statements are based on what our management considers to be reasonable assumptions, beliefs, expectations and opinions based on the information currently available to it. Assumptions have been made regarding, among other things, our ability to carry on our exploration and development activities, our ability to meet our obligations under our property agreements, the timing and results of drilling programs, the discovery of Mineral Resources and Mineral Reserves on our mineral properties, the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction and operation of our projects, the price of the minerals we produce, the costs of operating and exploration expenditures, our ability to operate in a safe, efficient and effective manner, our ability to obtain financing as and when required and on reasonable terms and our ability to continue operating the Marigold mine, the Seabee Gold Operation and the Pirquitas mine. You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. We cannot assure you that actual events, performance or results will be consistent with these forward-looking statements, and management's assumptions may prove to be incorrect. Our forward-looking statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof and we do not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statements.

Cautionary Note to U.S. Investors

This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the requirements of the SEC set out in SEC Industry Guide 7. Consequently, Mineral Reserves and Mineral Resources information included in this news release is not comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC. Under SEC standards, mineralization may not be classified as a 'reserve' unless the determination has been made that the mineralization could be economically produced or extracted at the time the reserve determination is made. Moreover, the requirements of NI 43-101 for identification of 'reserves' are also not the same as those of the SEC, and reserves reported by us in compliance with NI 43-101 may not qualify as 'reserves' under SEC standards. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

Cautionary Note Regarding Non-GAAP Measures

This news release includes certain terms or performance measures commonly used in the mining industry that are not defined under International Financial Reporting Standards ('IFRS'), including realized metal prices. We believe that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate our performance. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These non-GAAP measures should be read in conjunction with our consolidated financial statements.

SOURCE Silver Standard Resources Inc.

News Provided by Acquire Media

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Argentina | Canada | All
Gold and Silver Prices for these countries : Argentina | Canada | All

Silver Standard Resources Inc.

PRODUCER
CODE : SSO.TO
ISIN : CA82823L1067
CUSIP : 82823L 106
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Silver Standard is a silver producing company based in Canada.

Silver Standard produces silver, tin and zinc in Argentina, develops gold and silver in Peru, and holds various exploration projects in Mexico.

Its main asset in production is PIRQUITAS in Argentina, its main asset in development is SAN LUIS PROJECT in Peru and its main exploration properties are CANDELARIA NEVADA and BERENGUELA in Peru, VETA COLORADA, PITARILLA, PENASCO QUEMADO and SAN AGUSTIN in Mexico, CHALLACOLLO in Chile, DIABLILLOS and MAVERICK SPRINGS in Argentina and SUNRISE LAKE in Canada.

Silver Standard is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.4 billions as of today (US$ 1.1 billions, € 961.5 millions).

Its stock quote reached its lowest recent point on September 04, 1998 at CA$ 1.01, and its highest recent level on August 02, 2017 at CA$ 12.01.

Silver Standard has 119 400 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Silver Standard Resources Inc.
11/25/2009Silver Standard, a different company
6/17/2008Follow up N° 10
Annual reports of Silver Standard Resources Inc.
2007 Annual Report
Financings of Silver Standard Resources Inc.
4/8/2011Announces Closing of Secondary Offering of Units of Pretivm ...
Option Grants of Silver Standard Resources Inc.
4/24/2014Announces Amendments to Stock Option Plan
4/29/2011Announces Amendments to Stock Option Plan
Nominations of Silver Standard Resources Inc.
5/10/2013Announces Election of Directors
1/9/2013announces the appointment of two new board members and manag...
1/5/2012Announces Appointment of Chief Financial Officer
8/15/2011Announces Senior Management Change
5/27/2010Announces the Appointment of John Smith as President and Chi...
5/15/2008Announces the Appointment of Peter Tomsett as Chairman of th...
7/18/2007Appoints New Vice President, Finance and CFO
6/5/2007Appoints Senior Vice President, Operations
Financials of Silver Standard Resources Inc.
7/7/2016to announce second quarter 2016 consolidated financial resul...
5/12/2016reports first quarter 2016 results
4/20/2016to announce first quarter 2016 consolidated financial result...
4/8/2016Mails and Files Meeting Materials for Upcoming Annual and Sp...
2/26/2016reports fourth quarter and year-end 2015 results
1/26/2016to announce fourth quarter and year-end 2015 consolidated fi...
11/6/2015reports third quarter 2015 results
10/6/2015to announce third quarter 2015 consolidated financial result...
8/6/2015Reports Second Quarter 2015 Results
7/7/2015to Announce Second Quarter 2015 Consolidated Financial Resul...
11/5/2014Reports Third Quarter 2014 Results
10/2/2014to Announce Third Quarter Consolidated Financial Results Nov...
8/6/2014Reports Second Quarter 2014 Results
2/21/2014Reports Fourth Quarter and Year-End 2013 Results
11/6/2013Reports Third Quarter 2013 Results
10/3/2013to announce third quarter 2013 consolidated financial result...
8/8/2013Reports Second Quarter 2013 Results
7/9/2013to announce second quarter 2013 consolidated financial resul...
5/9/2013Reports First Quarter 2013 Results
4/8/2013to announce first quarter 2013 consolidated financial result...
10/11/2012to Announce Third Quarter 2012 Consolidated Financial Result...
7/25/2012to Announce Second Quarter 2012 Consolidated Financial Resul...
5/9/2012Reports First Quarter 2012 Financial Results
4/19/2012to Announce First Quarter 2012 Consolidated Financial Result...
2/22/2012to Announce Fourth Quarter and Year-Ended 2011 Consolidated ...
8/11/2011Reports Second Quarter 2011 Results
5/11/2011Reports First Quarter 2011 Results
3/2/2011Reports Fourth Quarter and Year-End 2010 Results
5/11/2010Reports First Quarter 2010 Results
3/5/2010Reports Fourth Quarter and Year-End 2009 Results
3/2/20102009 Financial Results and Conference Call
11/6/2009Reports Third Quarter 2009 Results
8/6/2009Reports Second Quarter 2009 Results
3/11/2009Reports Fourth Quarter and Year-End 2008 Results
8/8/2008Reports Second Quarter 2008 Results
11/7/2007Reports Third Quarter 2007 Results
Project news of Silver Standard Resources Inc.
11/8/2016Corporate Exploration Update
10/6/2016signs option agreement to explore Fisher Gold Project contig...
9/19/2016(Diablillos)Announces Transaction on Diablillos and M-18 Projects
9/14/2016to Sell Parral Exploration Properties
7/14/2016provides Q2 2016 production results
9/25/2015Silver Standard completes the acquisition of the Valmy Prope...
2/7/2014(Challacollo)Completes Sale of Challacollo Project
2/4/2014to Purchase Marigold Mine
1/15/2014Provides 2013 Production Results and Issues 2014 Guidance
12/30/2013(San Agustin)completes sale of San Agustin project
12/20/2013(Challacollo)to sell Challacollo Project
11/6/2013(San Agustin)to sell San Agustin Project
1/8/2013provides 2012 production results and issues 2013 production ...
9/11/2012(Pirquitas)Reports Silver and Zinc Mineralized Intercepts From Three Ta...
7/25/2012(Pirquitas)Reports Significant Silver and Zinc Mineralization in the Co...
4/17/2012(Pirquitas)Provides Q1 2012 Pirquitas Operations and Corporate Update
3/1/2012(Pitarilla)Pitarrilla Project and Resource Update
2/27/2012Camino Minerals Corporation Signs Purchase Of Rights Agreeme...
1/12/2012(Pirquitas)Provides Update on 2011 Pirquitas Operations and Announces 2...
12/24/2011(Pirquitas)Files NI 43-101 Technical Report for Pirquitas Mineral Resou...
10/25/2011(Pirquitas)Pirquitas Ball Mill and Sales Contract Update
9/26/2011(Bowdens)Completes Sale of Bowdens Project
8/1/2011(Bowdens)Sells Bowdens Project
6/14/2011(Pirquitas)Pirquitas Operations Update
3/1/2011(San Luis Project)Consolidates the San Luis Project
7/29/2010Brucejack Drilling Intersects More Bonanza-Grade Gold Minera...
6/8/2010(Pirquitas)Pirquitas Mine and Exploration Project Update
6/2/2010(Snowfield (sulphurets))Snowfield Preliminary Assessment Results
5/11/2010Reports San Luis Feasibility Study
2/19/2010(Silvertip)to Sell Silvertip Project
12/10/2009(Pirquitas)Pirquitas Silver Mine Production Guidance for 2010
12/4/2009(Pirquitas)Pirquitas Silver Mine Achieves Commercial Production
10/26/2009(Snowfield (sulphurets))Final Snowfield Zone Drilling Update
10/13/2009(Snowfield (sulphurets))Brucejack Drilling Update
10/1/2009(Snowfield (sulphurets))Snowfield Infill Drilling Update
9/15/2009(Snowfield (sulphurets))Brucejack Drilling Cuts Bonanza Grades
9/14/2009(Snowfield (sulphurets))Drilling Expands Snowfield Zone
8/20/2009(Snowfield (sulphurets))Snowfield Drilling Reveals New Zone
8/5/2009(Snowfield (sulphurets))Snowfield and Brucejack Drilling Update
6/25/2009(Pitarilla)Breccia Ridge Underground Pre-Feasibility Study and Pitarril...
2/18/2009(Pirquitas)s Pirquitas Project
2/3/2009(Snowfield (sulphurets))Snowfield Gold Resources Now 4.4 Million Ounces M&I and 14.3...
12/11/2008(Maverick Springs)More High-Grade Silver Intersected at Maverick Springs
12/3/2008(Snowfield (sulphurets))Reports Final Drill Results From Snowfield
12/2/2008(San Luis Project)San Luis Gold Resources Increase by 31%
7/17/2008(Shafter)Sale of Shafter Silver Project to Aurcana Closes
7/16/2008(Pitarilla)Measured & Indicated Silver Resources Increase 143% at Pitar...
5/14/2008(Pirquitas)Increases Pirquitas Silver Reserves by 43%
5/9/2008(San Luis Project)San Luis Project Update and New Resource Estimate to be Prep...
3/11/2008(Snowfield (sulphurets))Snowfield Measured & Indicated Gold Resources Grow to 3.1 Mi...
1/10/2008(Snowfield (sulphurets))Drilling Identifies New Gold Zone at Snowfield
11/26/2007(Pirquitas)Increases Pirquitas Reserves by 27% and Updates Capex
11/16/2007(San Luis Project)San Luis' Initial Resource Estimate; Nearby Porphyry-Style B...
11/7/2007(Pitarilla)Infill Drilling Increases Pitarrilla's Indicated Silver Reso...
9/18/2007and Esperanza Announce Further High-Grade Results at San Lui...
8/28/2007(Pitarilla)Updates Pitarrilla Drilling in Mexico
8/15/2007(San Luis Project)and Esperanza Update San Luis Exploration
5/14/2007(San Luis Project)and Esperanza Extend San Luis' High-Grade to Depth
4/16/2007and Esperanza Report Further San Luis High-Grade Drill Resul...
2/28/2007Esperanza and Silver Standard Announce New San Luis High-Gra...
Corporate news of Silver Standard Resources Inc.
5/2/2017Provides First Quarter 2017 Corporate Exploration Update
3/31/2017Receives Extension on the Chinchillas Project Option Agreeme...
7/13/2016Silver Standard provides Q2 2016 production results
5/31/2016Silver Standard Completes Acquisition of Claude Resources
1/26/2016Silver Standard to announce fourth quarter and year-end 2015...
1/19/2016Silver Standard Posts Q4, FY15 Production; Guides FY16
1/15/2016Silver Standard Reports Fourth Quarter and 2015 Production R...
1/8/2016Shares Of Silver Standard Lower Despite Record Annual Gold A...
1/7/2016Silver Standard Reports Production Records at Marigold and P...
11/25/2015Hedge Funds Are Crazy About Silver Standard Resources Inc. (...
11/6/2015General
11/6/2015Silver Standard reports third quarter 2015 results
10/20/2015Marigold Produces its Three Millionth Gold Ounce
10/16/2015Why Silver Standard Resources (SSRI) Could Be Positioned for...
10/8/2015Silver Standard Provides Q3 2015 Production Results
10/1/2015Silver Standard Signs Agreement with Golden Arrow for Chinch...
9/29/2015Silver Standard Concludes Valmy Property Acquisition
9/21/2015Silver Standard Intersects High Grade Silver Mineralization ...
9/18/2015Silver Standard Discovers Higher Grade Mineralized Area at t...
8/14/2015Silver Standard Closes New $75M Revolving Credit Facility
8/12/2015Silver Standard (SSRI) to Buy Valmy Property at Marigold
8/11/2015Silver Standard Acquires Valmy Property at Marigold
8/10/2015Edited Transcript of SSO.TO earnings conference call or pres...
8/6/2015Silver Standard Reports Second Quarter 2015 Results
8/5/2015Silver Standard Announces Closing of New $75 Million Revolvi...
8/5/2015General
7/30/2015Why Silver Standard Resources (SSRI) Could Shock the Market ...
7/28/2015Why Fortuna Silver Mines (FSM) Could Be Positioned for a Slu...
7/20/2015Mid-Morning Market Update: Markets Mostly Flat; Morgan Stanl...
7/15/2015Why Silver Standard Resources (SSRI) Could Shock the Market ...
7/14/2015Silver Standard Appoints Paul Benson as President & CEO - An...
7/14/2015Silver Standard Announces the Retirement of John Smith and A...
7/10/2015Silver Standard Posts Q2 Production Data, Tweaks FY15 View -...
7/8/2015Silver Standard Provides Q2 2015 Production Results and Incr...
7/7/2015Silver Standard to Announce Second Quarter 2015 Consolidated...
7/6/2015Silver Standard Reports Expanded Marigold Exploration Progra...
4/27/2015Final Glance: Silver companies
4/27/2015Midday Glance: Silver companies
4/27/2015Early Glance: Silver companies
4/22/2015Midday Glance: Silver companies
4/22/2015Early Glance: Silver companies
4/21/2015Final Glance: Silver companies
4/14/2015Early Glance: Silver companies
4/13/2015Silver Standard Provides Q1 2015 Production Results
4/13/2015Silver Standard to Announce First Quarter 2015 Consolidated ...
4/10/2015Final Glance: Silver companies
4/10/2015Midday Glance: Silver companies
4/10/2015Early Glance: Silver companies
4/2/2015Early Glance: Silver companies
3/27/2015Final Glance: Silver companies
3/27/2015Midday Glance: Silver companies
3/26/2015Early Glance: Silver companies
3/16/2015General
3/16/2015Silver Standard reports fourth quarter and year-end 2014 res...
4/4/2014Completes Marigold Mine Acquisition
10/10/2013provides Q3 2013 operational results
7/11/2013provides Q2 2013 operational results
4/12/2013provides Q1 2013 operational results
2/13/2013Announces Closing of Over-Allotment of Convertible Senior No...
2/5/2013Provides Option Purchase Notice and Notice of Convertibility...
1/16/2013completes US$250,000,000 convertible senior notes offering
1/16/2013completes US$250,000,000 convertible senior notes offering
1/16/2013completes US$250,000,000 convertible senior notes offering
11/8/2012(Pirquitas)Reports Third Quarter 2012 Financial Results and Further Exp...
10/18/2012Provides Q3 2012 Operational Results
7/11/2012Announces Two Additional Long-Term Silver Concentrate Sales ...
3/26/2012Announces Two Long-Term Silver Concentrate Sales Contracts W...
2/14/2012(Pirquitas)Pirquitas Silver Concentrate Sales Update
8/8/2011Revised Time for the Second Quarter Conference Call and Webc...
3/31/2011Announces Pricing of Secondary Offering of Units of Pretivm ...
3/24/2011Announces Secondary Offering of Common Shares of Pretivm Res...
2/1/2011Announces Automatic Conversion of Convertible Promissory Not...
1/28/2011Announces Senior Management Changes
1/6/2011Announces Exercise of Over-Allotment Option in Connection Wi...
7/12/2010Brucejack Drilling Cuts Bonanza-Grade Gold Mineralization
4/27/2010Provides Update on Exploration Program
2/12/2010Announces Pricing of Public Offering of Common Shares
2/11/2010announces public offering of common shares
2/5/2010Files Amended Base Shelf Prospectus
12/1/2009Snowfield and Brucejack Gold Resources: M&I-23.80 Million Ou...
11/25/2009Sale of Canadian ABCP Notes
8/17/2009Closing of Public Offering of Common Shares
8/13/2009Exercise of Over-Allotment Option
8/12/2009pricing of public offering of common shares
8/11/2009public offering of common shares
2/24/2009Announces Pricing of Public Offering of Common Shares
2/23/2009announces public offering of common shares
2/11/2009San Agustin Option Expires
2/11/2009Files Preliminary Base Shelf Prospectus
8/25/2008All Resources Increase at Pitarrilla's Breccia Ridge Zone
8/8/2008Changes to Silver Standard's Board of Directors
2/27/2008 Closes Sale of US$138 Million of Convertible Notes
2/22/2008Prices US$120 Million Convertible Notes Offering
2/20/2008Offers US$120 Million of Convertible Notes
8/22/2007Provides Short-Term Investment Status
4/10/2007Total Pitarrilla Silver Resources Increase by 28%
12/19/2005Follow up N° 9
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (SSO.TO)NASDAQ (SSRI)
12.01-1.23%11.50+2.95%
TORONTO
CA$ 12.01
08/02 16:00 -0.150
-1.23%
Prev close Open
12.16 12.14
Low High
12.01 12.23
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  12.01 -%
Volume 1 month var.
122,908 -%
24hGold TrendPower© : 11
Produces Silver - Tin - Zinc
Develops Gold - Silver
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.68-0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.89-1.36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.36-3.28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.64+2.69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+6.25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.67-0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :