Riverstone Starts Major Drill Program at Yaramoko and Reports Additional Gold Assays From Bissa West
Published : May 25, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Burkina Faso | Diamond | Gold | Gold Mine | Market |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - May 25, 2011) - Riverstone Resources Inc. (News - Market indicators)(OTCQX:RVREF)(FRANKFURT:3RV) is pleased to announce that it has contracted Boart Longyear to perform 5,000 metres of core drilling on the Yaramoko and Bissa West Concessions, on behalf of its partner, Roxgold Resources. The initial target area will be the Bagassi Central area where previously reported reverse circulation (RC) drilling returned gold intercepts of 28.6 g/t gold over 20 metres and 24.6 g/t gold over 6 metres (see News Releases Feb 28, 2011 and Apr 8, 2011) and the Bagassi South area, which returned gold intercepts of 11.9 g/t gold over 6 metres and 14.8 g/t gold over 2 metres (See News Release Jan 16, 2008).

The Company has also received assays from the final 10 reverse circulation drill holes from its Bissa West Gold Concession in Western Burkina Faso, West Africa. Assay results remain pending for 15 holes drilled during Phase 1 on the Solna Concessions. Both properties, as well as Yaramoko, have been optioned to Roxgold, which has the right to earn a 60% interest, with Riverstone retaining 40%. Highlights of the Bissa West Drilling are:

  • 10 metres grading 2.84 g/t gold at Koala Area, Bissa West
  • 6 metres grading 1.95 g/t gold at Pelgtanga Area, Bissa West

"We are pleased with these additional assay results from Bissa West," commented M.D. McInnis, CEO of Riverstone Resources Inc. "For a first pass program to identify four separate zones worthy of follow up drilling speaks to the great potential of this well located property."

BISSA WEST RESULTS

At Bissa West, significant results (including holes from previous releases) from the 25 RC holes (2,488 metres) drilled in February and March 2011 are presented in the Table below:

      TD Intercept Width Au Grade  
Hole # Az Dip (m) (m) (m) (g/t) Area
BBL-11-RC-003*
including
320 55 103 24-34
30-32
10
2
1.10
3.66
Pelgtanga
BBL-11-RC-023 140 55 130 54-64 10 0.46 Pelgtanga
BBL-11-RC-024 320 55 193 38-44 6 1.95 Pelgtanga
BBL-11-RC-005* 120 55 103 60-64 4 1.87 Bouboulou 2
BBL-11-RC-006*** 120 67 115 70-90 20 2.26 Bouboulou 2
and       100-110 10 1.42  
BBL-11-RC-012* 120 50 120 100-108 8 1.21 Rawema 1
BBL-11-RC-013** 109 50 109 74-86 12 5.46 Rawema 1
and       86-109 23 0.52  
BBL-11-RC-019 240 55 109 68-78 10 0.50 Koala
and       96-100 4 0.53  
BBL-11-RC-020 270 55 103 40-50 10 2.84 Koala
Including       42-44 2 12.45  
BBL-11-RC-021 240 55 130 6-8 2 3.94 Koala
BBL-11-RC-022 140 55 133 44-48 4 1.63 Koala
and       80-82 2 0.77  
               
*Previously reported
 
**Previously reported. Hole bottomed in mineralization. All other holes returned either geochemically anomalous or no significant results. Hole BBL-11-RC-15 was lost at 30 metres before reaching the target due to drilling difficulties.
 
***Note minor correction from previous report.

Bissa West comprises the Bouboulou permit which is located approximately 75 km northwest of the capital city of Ouagadougou and some 200 km northeast of the Yaramoko Concession. The permit covers an area of about 40 km². The Phase 1 RC drill program tested five widely spaced anomalous zones within the concession, four of which returned results worthy of follow up core drilling which will occur after the Yaramoko zones have been tested.

YARAMOKO PROGRAM

The Rotary Air Blast (RAB) percussion drill program (324 holes) has been completed on the Yaramoko permit further defining the soil and rock anomalies for core drilling. The initial assays from this program are being received. RAB drilling tests the soil and saprolite above the bedrock and a short distance into the bedrock. The Yaramoko permit is almost entirely covered by a thick (3-50 metres) mantle of this weathered material with exposures of outcrop and veins relatively rare. RAB drilling helps determine the extent of lateral movement of gold within this medium relative to its bedrock source and assists in the positioning of follow up RC and core drill holes.

The Phase 2 program, consisting of a planned 5,000 metres of core drilling will provide important structural and lithological information. This Diamond drill program will commence at gold zones previously discovered by the RAB and RC drill programs. The Yaramoko permit lies directly south of, and is contiguous to, the Semafo's Mana Gold Mine.

SOLNA (SOLNA, YANTARA, and TEYANGO)

15 holes of reverse circulation drilling were completed on the Solna permits in Eastern Burkina Faso during April. This program targeted anomalous trench, rock and soil values from previous exploration programs. Assays are pending. The RAB drill will now be sent from Yaramoko to the Teyango and Yantera properties to conduct a 14,000 metre program. The Samira Hills Gold Mine operated by Semafo Inc. is located about 50 km from the eastern boundary of the Teyango Concession.

All holes referenced in this press release were drilled at an angle of 50-67 degrees and mineralized structures appeared to be sub-vertical suggesting that true widths of mineralized zones approximate 75% of reported widths.

QUALITY ASSURANCE/QUALITY CONTROL

Riverstone Resources Inc. is the operator of the current program and maintains a quality control program involving the use of repeat assays, inserted blanks and the use of certified standards from an accredited Canadian laboratory. All Yaramoko and Bissa West RC samples were assayed using standard fire assay with atomic absorption techniques, with samples grading over one gram gold per tonne re-assayed with a gravimetric finish, at the independent Abilab Burkina SARL laboratories in Ouagadougou, Burkina Faso, which is part of the ALS Chemex group. A high level of exploration and development activity in the gold sector in Burkina Faso has resulted in an increase in the turnaround time for receiving all gold assays.

Riverstone Resources Inc. is active in gold exploration in Burkina Faso, West Africa, where the company holds an extensive portfolio of six high quality exploration projects covering 2,300 square kilometres. For further information about the company and its activities, please refer to the company's website at www.riverstoneresources.com and under the Company's profile at www.sedar.com.

ON BEHALF OF THE BOARD

Michael D. McInnis, P. Eng., President & CEO

Paul Anderson, P.Geo.is a Qualified Person for RVS and has reviewed and approved the contents of this release.

Certain statements made and information contained in this news release and elsewhere constitutes "forward-looking information" within the meaning of the Ontario Securities Act. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation, risks and uncertainties relating to the interpretation of drill results and the estimation of mineral resources, the geology, grade and continuity of mineral deposits, the possibility that future exploration, development results will not be consistent with the Company's expectations, accidents, equipment breakdowns, title matters and surface access, labour disputes, the potential for delays in exploration activities, the potential for unexpected costs and expenses, commodity price fluctuations, currency fluctuations, failure to obtain adequate financing on a timely basis and other risks and uncertainties, including those described under Risk Factors in each management discussion and analysis. In addition, forward-looking information is based on various assumptions including, without limitation, the expectations and beliefs of management, the assumed long term price of gold, that the Company will receive required permits and access to surface rights, that the Company can access financing, appropriate equipment and sufficient labour and that the political environment within Burkina Faso will continue to support the development of environmentally safe mining projects. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Accordingly, readers are advised not to place undue reliance on forward-looking statements.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Riverstone Resources Inc. - Vancouver Office
Michael D. McInnis
President
604-801-5020
info@riverstoneresources.com
or
Riverstone Resources Inc.
Raju Wani
Investor Relations
403-240-0555
or
Riverstone Resources Inc.
Ron Cooper
Investor Relations
604-986-0112
or
Riverstone Resources Inc.
Don Mosher
Corporate Development
604-685-6465
www.riverstoneresources.com
Data and Statistics for these countries : Burkina Faso | All
Gold and Silver Prices for these countries : Burkina Faso | All

True Gold Mining

DEVELOPMENT STAGE
CODE : TGM.V
ISIN : CA89783T1021
CUSIP : 768906
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

True Gold. is a gold development stage company based in Canada.

True Gold. holds various exploration projects in Burkina Faso.

Its main asset in development is KARMA in Burkina Faso and its main exploration properties are LIGIDI, BISSA, SOLNA, YARAMOKO and GOULAGOU / RAMBO / KAO in Burkina Faso.

True Gold. is listed in Canada and in United States of America. Its market capitalisation is CA$ 267.2 millions as of today (US$ 212.1 millions, € 187.6 millions).

Its stock quote reached its lowest recent point on January 09, 2009 at CA$ 0.09, and its highest recent level on April 15, 2011 at CA$ 1.09.

True Gold. has 398 840 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of True Gold Mining
5/17/2011Withdraws Public Offering of Common Shares
5/9/2011. Announces Equity Financing
6/2/2009Announces Non-Brokered Private Placement
10/1/2008Announces Proposed C$1.98 million Private Placement with IFC
6/23/2008Closes 1.75 Million Unit Private Placement at $0.60
6/13/2008Announces Closing of Private Placement
5/26/2008reases Private Placement to Raise C$1.9 Million
Option Grants of True Gold Mining
2/11/2011Grant of 300,000 options to PR Firm
4/23/2010GRANT OF 300.000 STOCK OPTIONS TO B&D CAPITAL PARTNERS
9/9/2009Grant of 2.460.000 stock options
1/28/2009GRANT OF 730.000 STOCK OPTIONS TO directors, officers, emplo...
2/6/2008GRANT OF 1.010.000 STOCK OPTIONS TO directors, officers, emp...
12/3/2007GRANT OF 180.000 STOCK OPTIONS TO PR FIRM
10/22/2007GRANT OF 150.000 STOCK OPTIONS TO PR FIRM ASCENTA CAPITAL
7/9/2007GRANT OF 1.255.000 STOCK OPTIONS TO directors, officers, emp...
6/27/2007GRANT OF 150.000 STOCK OPTIONS TO PR FIRM MAU CAPITAL (MR....
2/27/2006GRANT OF 250.000 STOCK OPTIONS TO Mr. Ron Cooper for PR Ser...
1/26/2006GRANT OF 500.000 STOCK OPTIONS TO directors
5/5/2004GRANT OF 805.000 STOCK OPTIONS TO directors, officers, emplo...
1/12/2004GRANT OF 440.000 STOCK OPTIONS TO directors, officers, emplo...
8/19/2003GRANT OF 610.000 STOCK OPTIONS TO directors, officers, emplo...
Nominations of True Gold Mining
3/26/2015Appoints Christian Milau as Chief Executive Officer
2/11/2011Announces Investor Relations Advisor, Stock Options
6/9/2006announces hiring of exploration manager
Project news of True Gold Mining
4/26/2016Endeavour completes acquisition of True Gold
7/18/2011(Karma)Intersects 58 Metres Grading 1.13 g/t Gold at Karma
6/9/2011(Karma)Intersects New Gold Zone at Karma
6/1/2011(Karma)Reports 38 Metres Grading 5.6 g/t Gold From Karma
5/26/2011(Bissa)Starts Major Drill Program at Yaramoko and Reports Additiona...
4/26/2011(Karma)Reports More Positive Gold Results from Karma
4/8/2011(Yaramoko)Reports 28.61 g/t Au Over 20 Metres on Yaramoko Gold Project...
3/24/2011(Karma)Intersects High Grade Gold at Karma
2/28/2011(Karma)Increases Gold Resources at Karma by 70 Percent
7/13/2010(Bissa)Grants Options on Three Gold Properties
1/18/2010(Karma)Defines High Grade Gold Mineralized Trend
1/6/2010(Karma)Drilling Defines Gold Mineralized Trend
11/4/2009(Karma)New Gold Zone
9/24/2009(Karma)Commences Drilling on Karma Gold Project
8/26/2009(Karma)Drilling Plans on Karma Gold Project
7/6/2009(Karma)Independent Technical Report on the Karma Gold Project
9/18/2008(Karma)Extends Gold Mineralization at Karma
8/12/2008(Karma)Continues to Expand Gold Mineralization at Karma
7/10/2008(Karma)Initiates Resource Estimate for Karma Project
5/7/2008(Goulagou / Rambo / Kao)Extends Goulagou Mineralization to Depth at Karma
3/10/2008Intersects 16.7 g/t Gold (0.49 oz/ton) over 12 Metres at Kar...
2/28/2008 Intersects 5.47 g/t Gold over 10 Metres at Karma
1/29/2008(Goulagou / Rambo / Kao)Resumes Drilling at Kao Main Gold Zone
4/16/2007Intersects 10 metres of 3.55g/t Gold on Kao
4/5/2007(Rambo - Kao)Confirms And Extends Multiple Gold Zones On Kao
6/6/2006(Ligidi)plans 15,000m of RAB drilling on Burkina properties
Corporate news of True Gold Mining
4/21/2016Endeavour and True Gold Shareholders Approve Acquisition Tra...
4/21/2016True Gold Announces Securityholder Approval of Plan of Arran...
4/11/2016True Gold Announces First Gold Production
4/11/2016LEADING INDEPENDENT ADVISORY FIRMS ISS AND GLASS LEWIS SUPPO...
4/11/2016Independent Advisory Firms ISS and Glass Lewis Support Plant...
3/24/2016True Gold Mails and Files Meeting Materials for Upcoming Spe...
1/13/2016True Gold announces appointment of new Director
1/12/2016True Gold signs $10 million equipment finance facility
12/31/2015True Gold grants incentive stock options
10/26/2015True Gold appoints Peter Hardie as Chief Financial Officer
10/24/2015Sandstorm Gold Provides Asset Updates
10/23/2015Sandstorm Gold Provides Asset Updates
10/20/2015True Gold begins mining at Karma
9/25/2015Karma Mine Update
9/17/2015Karme Mine Update
9/17/2015True Gold: Karma Mine Update
8/24/2015True Gold Mining reports Q2 2015 financial & operating resul...
6/22/2015True Gold introduces David Laing as Chief Operating Officer
6/19/2015True Gold grants incentive stock options
3/26/2015True Gold appoints Christian Milau as Chief Executive Office...
3/2/2015Ture Gold provides update on Karma Project
3/2/2015True Gold Provides Update on Karma Project
1/29/2015True Gold Provides Progress Update on Karma
1/20/2015True Gold Provides Corporate and Operational Update
1/14/2015IIROC Trading Resumption - TGM
1/14/2015(Karma)Temporarily Suspends Operations at Karma
1/14/2015True Gold Temporarily Suspends Operations at Karma
1/14/2015IIROC Trading Halt - TGM
12/24/2014True Gold draws down additional US$20.7M of project financin...
12/9/2014True Gold reports temporary work slowdown
12/6/2014True Gold Files PEA for North Kao and Updated Feasibility St...
11/24/2014True Gold Mining reports Q3 2014 financial results
11/17/2014Karma Gold Mine construction on time, on budget
10/31/2014True Gold Mining provides update on events in Burkina Faso
10/30/2014True Gold Mining Provides Update on Events in Burkina Faso
10/21/2014True Gold's North Kao Deposit to generate over US$118 millio...
9/25/2014Sandstorm Gold Remits First Upfront Payment to True Gold
9/25/2014True Gold Commences Draw Down of Project Financing
9/18/2014True Gold Receives All Permits for the Karma Gold Project
9/8/2014True Gold Secures Long-Term Cement Contract at a Price Signi...
2/22/2013.: Directors Approve Name Change
2/13/2013.: Widely Spaced RC Drilling at Liguidi Hits Near-Surface Go...
1/29/2013(Karma).: RAB Program Reveals Widespread Near-Surface Gold Minerali...
12/12/2012Announces Change in Financial Year-End
11/7/2012(Karma)Files NI 43-101 Updated Resource Estimate Technical Report o...
10/15/2012.: Corporate Update
10/10/2012(Bissa)Intersects 6.95 g/t Gold Over 6 m at Bissa East Property
9/17/2012Intersects 9.50 g/t Gold Over 12 Metres at Kao Deposit
9/10/2012Intersects 2.39 g/t Gold Over 24 Metres at Kao
7/11/2011Reports Thick Gold Intercepts at Goulagou I
6/20/2011Reports Multiple Mineralized Intervals From Nami
3/23/2010Commences Drilling at Nami Site
12/8/2009HRA Advisories Coverage of Riverstone Resources (RVS: TSX-V)
2/9/2010Sampling Program Underway at Nami Gold Discovery Zone
2/8/2010Raises $1.8 Million
1/28/2010Commences Follow-up Program at Nami Gold Discovery Zone
6/19/2009Raises $2.1 Million
6/16/2008Resumes Drilling at Karma
4/29/2008Grants Financing and Option Rights to Teck Cominco
4/7/2008Expands Kao Main Zone at Karma
3/21/2006(Ligidi)new exploration permits signed in the Bissa area of Burkina ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (TGM.V)
0.670+0.00%
Last quotes and information before delisting
Prev close Open
0.670 0.670
Low High
0.670 0.680
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.670 -%
Volume 1 month var.
601,334 -%
Produces
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :