Metanor Resources Inc.

Published : February 27th, 2018

Step Out Drilling Extends Main Zone at Depth and Intercepts 21.2 g/t Au over 1.7 metres at Barry Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Campaign | Diamond | Exploration | Future | Georgia | Gold | Mine | Mining | Plan | Press | Target |

Step Out Drilling Extends Main Zone at Depth and Intercepts 21.2 g/t Au over 1.7 metres at Barry Project

VAL-D'OR, QUEBEC--(Marketwired - Feb 27, 2018) - Metanor Resources Inc. ("Metanor") (TSX VENTURE:MTO) is pleased to announce new high-grade results of 21.2 g/t Au over 1.7 metres, 31.5 g/t Au over 1.1 meters and 24.7 g/t Au over 1.5 metres at the Barry project. Metanor has also extended the main shear zone at depth with grades of 6.4 g/t Au over 5.1 metres and 3.9 g/t Au over 12.0 metres.

Metanor continues to advance the exploration of the Barry project by expanding known shear zones at depth and along strike through its surface drilling campaign. The program has a total of 3 diamond drill rigs, 2 drilling on the Barry project and 1 drill rig exploring other targets in the camp.

The gold mineralization at the Barry project is structurally controlled and is hosted in a sheared basalt containing quartz-carbonate-albite veins with pyrite. Metanor has identified three main sub-vertical shear zones and approximately ten secondary lower dipping shear zones. These structures are open in all directions.

Highlights of drill intercepts in high-grade shear zones include:

• MB-17-142 from 184.9 m. to 186.6 m. 21.2 g/t Au over 1.7 m.
Strong shear zone in altered basalt along felsic intrusive contact. Numerous quartz veinlets with ~10% pyrite.
• MB-17-143 from 180.1 m. to 181.6 m. 24.7 g/t Au over 1.5 m.
Sheared and altered basalt with ~15% pyrite, pyrrhotite and folded quartz veining with VG.
• MB-17-52 ext from 163.0 m. to 164.1 m. 31.5 g/t Au over 1.1 m.
Altered and sheared basalt containing numerous quartz veinlets and ~5% fine pyrite.
• MB-18-152 from 257.0 m. to 262.1 m. 6.4 g/t Au over 5.1 m.
Silicified sheared basalt with VG and ~6% fine pyrite - pyrrhotite.

Highlights of the last 12 drill holes intercepting multiple shears are as follows.

# Hole From (m) To (m) Length (m) Grade Au(g/t)
MB-17-141 198.0 199.0 1.0 16.9
209.0 212.0 3.0 4.5
478.0 479.4 1.4 5.0
MB-17-142 142.0 143.0 1.0 8.0
184.9 186.6 1.7 21.2
MB-17-143 180.1 181.6 1.5 24.7
226.5 227.5 1.0 4.4
MB-17-144 148.0 149.0 1.0 7.2
MB-17-145 146.0 147.0 1.0 12.7
MB-17-146 56.0 57.0 1.0 6.5
63.5 64.5 1.0 5.4
387.0 389.3 2.3 3.1
MB-18-148 459.0 471.0 12.0 3.9
MB-18-149 337.2 338.9 1.7 6.3
MB-18-150 650.4 650.9 0.5 17.8
MB-18-151 137.7 138.2 0.5 8.8
MB-18-152 257.0 262.1 5.1 6.4
MB-17-52 ext 142.0 142.5 0.5 16.9
163.0 164.1 1.1 31.5

Hole location:

Hole Number Azimuth Dip Length (m) UTM East UTM North Elevation
MB-17-141 335 -66 486 443956 5426321 400
MB-17-142 330 -49 453 443775 5426201 400
MB-17-143 330 -43 429 443810 5426195 395
MB-17-144 330 -46 324 444044 5426450 395
MB-17-145 330 -65 423 443995 5426306 400
MB-17-146 330 -52 462 443809 5426295 400
MB-18-148 330 -55 1002 444363 5426065 400
MB-18-149 330 -55 477 444550 5426172 400
MB-18-150 330 -55 1100 444550 5426172 400
MB-18-151 330 -56.5 510 444140 5426419 395
MB-18-152 330 -57 475 444188 5426336 395
MB-17-52 ext 330 -45 400 443981 5426403 394

Plan view of the Barry project is available at http://media3.marketwire.com/docs/BarryGold.jpg

Quality Control and Reporting Protocols

Metanor estimates that the actual thicknesses of the mineralized intersections are between 70% and 95% of the core lengths. No capping grade is used at this stage. The Company uses a rigorous QA-QC analytical program according to industry standards. The analytical results were done by pyroanalysis (A.A.) at the mine laboratory. Blanks, duplicates and certified reference standards are inserted into the sample stream to monitor laboratory performance. The company QA-QC analytical verification program requires that a minimum of 5% of the samples be audited at an independent laboratory. Theses audit assays were sent to ALS laboratory located in Val-d'Or, Quebec. The results of the audits are consistent with those obtained.

The Barry Project

The Barry project is located in the Urban-Barry mining camp, 110 km east from the city of Lebel-sur-Quévillon, and 110 km south of the Bachelor mill. 624,414 tonnes of ore grading 2.2 g/t for 43,970 ounces were extracted from three small pits between 2008 and 2010. A drilling campaign is underway at the Barry property to increase mineral resources below the pits in multiple high-grade shear zones and proceeding with an underground bulk sample program.

Lastly, the Corporation wishes to add to the press release issued December 28, 2017 regarding the completed private placement. In addition to the insider participation described, three insiders of Metanor participated in the non-brokered private placement for aggregate proceeds of $40,800.

Qualified Persons

Pascal Hamelin, P. Eng., President and COO, is the Qualified Person under NI 43-101, responsible for reviewing and approving the technical information contained in this news release.

Cautionary and Forward-Looking Statements

This press release includes certain statements that may be deemed "forward-looking statements".

The potential quantity and grade is conceptual in nature as there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. All statements in this discussion, other than those of historical fact, that address future exploration drilling, exploration activities and projected exploration, including costs and other estimates upon which such projections are based, and events or developments that the company expects, are considered forward-looking statements. Although the Company believes the expectations expressed in these forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those forward-looking statements.

Neither the TSX Venture Exchange, nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

Read the rest of the article at https:
Data and Statistics for these countries : Georgia | All
Gold and Silver Prices for these countries : Georgia | All

Metanor Resources Inc.

EXPLORATION STAGE
CODE : MTO.V
ISIN : CA59138Q1037
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Metanor is a gold and palladium exploration company based in Canada.

Metanor holds various exploration projects in Canada.

Its main exploration properties are NELLIGAN, OPINACA, VASSAN, WAHNAPITEI, BARRY, BACHELOR LAKE / HEWFRAN and DUBUISSON in Canada.

Metanor is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 36.4 millions as of today (US$ 28.1 millions, € 23.9 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 1.37, and its lowest recent point on January 29, 2016 at CA$ 0.03.

Metanor has 62 820 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Metanor Resources Inc.
9/17/2007Mill to Turn
1/26/2007Still Mad About Metanor
7/12/2006Mad about Metanor
Financings of Metanor Resources Inc.
2/23/2015Announces Amendment to Outstanding Convertible Debentures a...
6/14/2013Closes Second Tranche of Increased Private Placement
2/21/2011CLOSING OF A PRIVATE PLACEMENT OF $7,095,850
Nominations of Metanor Resources Inc.
5/31/2007 Hires Mr. C. Imbeault As General Manager And Updates Booste...
Financials of Metanor Resources Inc.
4/4/2011METANOR RECEIVES US$9M FROM SANDSTORM
Project news of Metanor Resources Inc.
10/6/2016(Bachelor Lake / Hewfran)MeTANOR RECOUPE 12,0 g/t Au SUR 3,9 M?TRES DANS UN NOUVEAU S...
7/13/2016(Barry)Etude technico economique pour le projet Barry
6/30/2016RECOUPE 10,4 g/t Au SUR 8,8 MeTRES a LA MINE BACHELOR
4/12/2016Publish on 04-12-2016 Metanor begins drilling campaign to up...
1/29/2014Radio Show on Metanor Resources
1/27/2014s on Metanor Resources Inc
8/20/2013MarketWatch on Metanor Resources
6/1/2011(Barry)METANOR DRILLED A NEW GOLD HORIZON AT BARRY
4/26/2011(Bachelor Lake / Hewfran)BACHELOR LAKE PROJECT UPDATE
4/6/2011(Bachelor Lake / Hewfran)ENCOURAGING RESULTS ON THE NEW GOLD ZONE AT BACHELOR/HEWFRAN
6/20/2008(Barry)BARRY PIT IS GROWING: Encouraging Positive Preliminary Resul...
6/14/2007(Bachelor Lake)Surface Stripping Begins - Bachelor Lake Property
Corporate news of Metanor Resources Inc.
6/30/2016Publish on 06-30-2016 METANOR INTERSECTS 10.4 g/t Au OVER 8....
6/23/2016Publish on 06-23-2016 METANOR INCREASES TOTAL OUNCES IN NEW ...
6/14/2016Publish on 06-13-2016 METANOR DISCOVERS NEW GOLD ZONES ON TH...
5/19/2016Publish on 05-19-2016 METANOR INTERSECTS 2.3 g/t Au OVER 60M...
5/12/2016Publish on 05-11-2016 METANOR INTERSECTS 2.1 g/t Au OVER 40M...
4/27/2016Publish on 04-27-2016 METANOR CONFIRMS HIGH GRADE EXTENSION ...
4/27/2016Publish on 04-20-2016 Metanor confirms the extension of the ...
1/21/2016Publish on 01-21-2016 METANOR INTERSECTS 7.5 g/t Au OVER 7.2...
1/21/2016Metanor Intersects 7.5 g/t Au Over 7.2 m at Bachelor Mine
1/21/2016Publish on 01-20-2016 METANOR PUBLISHES THE RESULTS FROM THE...
1/20/2016Metanor Publishes the Results From the Geophysic Survey on t...
12/17/2015Publish on 12-17-2015 METANOR INTERSECTS 5.4 g/t Au OVER 10....
12/17/2015Metanor Intersects 5.4 g/t Au Over 10.0 Meters on the Moroy ...
10/29/2015Metanor Intersects 6.7 g/t Au Over 38.4 Meters Near Surface
10/28/2015Metanor Reports its Financial Results for the Quarter and Ye...
10/27/2015Publish on 10-27-2015 METANOR CONFIRMS THE DISCOVERY OF A NE...
9/22/2015Publish on 09-22-2015 METANOR INTERSECTS 10.1 g/t Au OVER 26...
9/22/2015IIROC Trading Resumption - MTO
9/22/2015Metanor Intersects 10.1 g/t Au Over 26.2 Meters Near Surface
9/21/2015IIROC Trading Halt - MTO
9/16/2015Publish on 09-16-2015 METANOR INTERSECTS 7.2 g/t OVER 8.1 ME...
9/15/2015Metanor Intersects 7.2 g/t Over 8.1 Meters at Bachelor Mine
8/10/2015Publish on 07-17-2015 METANOR PRODUCED 10,277 OUNCES DURING ...
8/10/2015Publish on 08-06-2015 METANOR INTERSECTS 10.2 g/t OVER 13.1 ...
8/10/2015Publish on 07-30-2015 METANOR INTERSECTS 12 g/t OVER 3.25 ME...
8/10/2015Publish on 08-10-2015 METANOR REPORTS A FATAL ACCIDENT AT IT...
7/30/2015Metanor Intersects 12 g/t Over 3.25 Meters at Bachelor Mine
7/29/2015Metanor Intersects 11.9 g/t Au Over 11.85 Meters at Bachelor...
7/17/2015Metanor Produced 10,277 Ounces During Quarter Ended June 30t...
6/25/2015IIROC Trading Resumption - MTO
6/22/2015Publish on 06-02-2015 METANOR PROVIDES UPDATE
6/22/2015Metanor Intersects 22.85 g/T Over 4.04 Meters at Bachelor Mi...
4/9/2015Metanor Reports Larger Intersection With 6.14 g/t Over 15 Me...
3/30/2015Intersects 8.64 g/T Over 5.8 Meters at Bachelor Mine
3/27/2015Metanor Resources Inc.: Maturity Date of Debentures Extended...
3/20/2015Metanor: Update on Private Placement
3/17/2015Publish on 03-12-2015 NEW GOLD CORRIDOR AT BACHELOR MINE
3/17/2015Publish on 03-17-2015 METANOR INTERSECTS 6.1 g/T OVER 6.8 ME...
3/17/2015Metanor Intersects 6.1 g/T Over 6.8 Meters at Bachelor Mine
3/17/2015Intersects 6.1 g/T Over 6.8 Meters at Bachelor Mine
3/12/2015Metanor Resources Inc.: New Gold Corridor at Bachelor Mine
3/9/2015Publish on 02-27-2015 METANOR REPORTS ITS FINANCIAL RESULTS ...
3/9/2015Publish on 02-24-2015 METANOR ANNOUNCES AMENDMENT TO CONVERT...
3/7/2015METANOR ANNOUNCES AMENDMENT TO CONVERTIBLE DEBENTURES AND PR...
2/27/2015Metanor Reports its Financial Results for the Quarter Ended ...
2/23/2015Metanor Announces Amendment to Outstanding Convertible Deben...
2/13/2015Metanor Produces 3,425 Ounces During the Month of January
1/19/2015METANOR PRODUCED 8,332 OUNCES DURING THE QUARTER ENDING DECE...
1/19/2015Metanor Produced 8,332 Ounces During the Quarter Ending Dece...
11/28/2014Metanor Reports its Financial Results for the Quarter Ended ...
10/28/2014METANOR REPORTS ITS FINANCIAL RESULTS FOR THE QUARTER AND YE...
10/27/2014Metanor Reports its Financial Results for the Quarter and Ye...
10/10/2014Metanor Produces 11,598 Ounces During the Quarter Ended Sept...
10/8/2014METANOR intersected 25.80 g/t Au over 5.6 m at Barry
9/18/2014Metanor Resources Inc.: Grant of Incentive Options
9/15/2014Metanor Resources Inc.: Corporate Update
8/15/2014Metanor Expands its "B" Vein Above Level 10 by Intersecting ...
8/15/2014Metanor Resources Inc.: Corporate Update
7/10/2014Metanor Produces 13,083 Ounces of Gold During the Quarter En...
6/5/2014Record Production at Bachelor Mine; Metanor Produces 5,202 O...
2/20/2014Communiqu=C3=A9 de presse - 20 f=C3=A9vrier 2
2/6/2014Communiqu=C3=A9 de presse - 6 f=C3=A9vrier 20
1/23/2014Communiqu=C3=A9 de presse - 23 janvier 2014
1/13/2014Article on Metanor - Sector Newswire
1/9/2014Communiqu=C3=A9 de presse - 9 janvier 2014
12/16/2013Article on Metanor - Sector Newswire
12/11/2013Communiqu=C3=A9 de presse -11 d=C3=A9cembre 2013
11/18/2013Article on Metanor - Sector Newswire
11/14/2013BNN Commodities Show
11/8/2013Communiqu=C3=A9 de presse - 7 novembre 201
10/21/2013MarketWatch - The Wall Street Journal
10/17/2013Produces 3,231 Ounces in September at Bachelor
10/7/2013Sector Newswire
10/7/2013Communiqu=C3=A9 de presse - 7 octobre 2013
10/7/2013(Barry)Initiates a 15,000 Meter Drill Program at Barry
9/23/2013Communiqu=C3=A9 de presse - 23 septembre 2013
9/23/2013(Barry)Commencement of 30,000 Meter Drill Program at BACHELOR and B...
9/4/2013Intersects 17.66 g/t Over 12.55 m at Bachelor
8/23/2013Communiqu=C3=A9 de presse - 20 ao=C3=BBt 2013
8/13/2013Sector Newswire - August 9, 2013
8/13/2013Precious Metals Review, August 9, 2013
7/30/2013Communiqu=C3=A9 de presse - 30 Juillet 2013
7/11/2013Communiqu=C3=A9 de presse - 14 Juillet 2013
7/11/2013Produces a Monthly Record of 3,215 Ounces in June
6/17/2013Communiqu=C3=A9 de presse - 14 Juin 2013
5/29/2013Communiqu=C3=A9 de presse - Mai 2013
5/29/2013May 2013
5/29/2013Intersects 8.49 g/T Over 15.24 m, and 14.17 g/T Over 5.64 m ...
5/22/2013Provides Bachelor Project Update
5/8/2013s Bylaws With Advance Notice Requirement for Director Nomina...
4/29/2013Provides Bachelor Project Update and Intersects 7.57 g/T Ove...
4/2/2013News Release
3/28/2013Video - Ron Perry - Metanor
2/19/2013Pours Record Gold Bar of 868 Oz
2/7/2013Produces 2,236 oz of Gold in January at its Bachelor Project
1/28/2013TR: Latest Article regarding Metanor on WSJ Marketwatch.com
1/21/2013Intersects 29.63 g/t Over 4.42m, 14.79 g/t Over 14.02m and 1...
1/14/2013TR: Metanor article in Northern Miner
12/11/2012Produces 1,715 Oz in November vs 1,250 Oz in October at the ...
11/13/2012Continues the Development of the Bachelor Project Toward Com...
10/17/2012Continues to Pour Gold at Bachelor-97.4% Recovery at the Mil...
9/26/2012Announces the Signing of a Socio-Economic Participation Agre...
9/21/2012Grants Stock Options
9/14/2011Latest Article on Metanor
9/6/2011TR: latest article on the web
9/6/2011TR: Latest Industrial Alliance CoreTalk on MTO
8/26/2011TR: Latest NEWS Release on Metanor send to our mailing list ...
6/16/2011Communiqu=E9 de presse - METANOR
6/14/2011LATEST METANOR VIDEO
6/9/2011Latest featured note on Metanor
2/4/2010Analyst Coverage
2/20/2009Interview with Ronald Perry, VP & Treasurer of Metanor Resou...
11/28/2007Update of the Bulk Sampling at the Barry Deposit
10/30/2007 Receives Positive Preliminary Economic Assessment on Barry ...
10/23/2007Higher grades at the Barry Deposit
10/11/2007 Bulk Sampling has begun at the Barry Open Pit
9/28/2007Adoption of a Shareholder Rights Plan, modification of the S...
9/6/2007acquires more properties and Renegotiates NSR royalties
9/4/2007now holds 100% of Bachelor Property / Update on Bachelor and...
5/8/2007Re-Evaluates The Barry Gold Deposit
3/14/2007Update: Refurbishing of the Bachelor Lake Gold Mill
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MTO.V)FRANKFURT (M3R.F)
0.580+0.00%0.070+20.69%
TSX-V
CA$ 0.580
09/25 16:54 -
0%
Prev close Open
0.580 0.580
Low High
0.580 0.610
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.580 -%
Volume 1 month var.
232,400 -%
24hGold TrendPower© : -11
Produces
Develops
Explores for Cobalt - Gold - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/3/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.68-0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.89-1.36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-1.26%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.36-3.28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.64+2.69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+6.25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.67-0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :