Richmont Mines Inc

Published : July 07th, 2016

Strategic Phase 2 Exploration Program Launched at Island Gold - High-Grade Resource Potential Identified Laterally and at Depth

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Strategic Phase 2 Exploration Program Launched at Island Gold - High-Grade Resource Potential Identified Laterally and at Depth

July 7, 2016

Deep Drilling Intersects 18.63 g/t over 6.60 metres and 9.11 g/t over 4.12 metres;
Lateral Drilling Intersects 17.41 g/t gold over 2.27 metres and 21.0 g/t over 2.78 metres

TORONTO, July 7, 2016/CNW Telbec/ - Richmont Mines Inc. (TSX: RIC) (NYSE MKT: RIC) ('Richmont' or the 'Corporation'), is pleased to announce that based on the positive results reported from the Phase 1 exploration drilling program, a strategic Phase 2 exploration drilling program has been launched at the Island Gold Mine. The Corporation is also providing a final update on the Phase 1 drilling program (Figure 1), which continues to demonstrate the potential of the cornerstone Island Gold Mine. (All amounts are in Canadian dollars unless otherwise indicated).

The Phase 1 exploration drilling program commenced in September 2015and focused on three key priorities: 1) testing the lateral continuity of the known deposit to potentially extend mine life above the 1,000 metre level; 2) following up on gold intersections that support the potential for a down plunge extension of the deposit between the 1,000 and 1,500 metre levels; and 3) testing high-priority regional gold targets elsewhere across the prospective Island Gold property.

The results from the Phase 1 drilling program have met our objectives, which has supported the launch of an aggressive Phase 2 exploration program of up to 142,000 metres that will be completed over the next 18 to 24 months. The primary objective of the Phase 2 program is to expand the existing resource inventory laterally along strike, mainly to the east of the main deposit, with a goal of extending mine life above the 1,000 metre level that could support the potential expansion scenarios currently under review, as well as to identify the next million-plus ounces of high-grade inferred resource at depth, between the 1,000 and 1,500 metre levels.

'Drilling to date has identified the potential for high-grade resource blocks in the eastern lateral extension that could add incremental ounces to the near-term production plan, support potential expansion opportunities and increase mine life. The success of the deep directional drilling program increases our confidence in the potential to add another million or more, high-grade ounces at depth, which could support medium-to-longer term production growth opportunities.' stated Renaud Adams, CEO. He continued, 'The Phase 2 program will continue to focus on expanding our global resource inventory with a target of adding inferred ounces both laterally and at depth by the end of the year, with an ultimate goal of unlocking the multi-million ounce potential of the Island Gold Mine.'

PHASE 1 EXPLORATION DRILLING PROGRAM UPDATE

Recent highlights from the Phase 1 exploration drilling program include:

Lateral Exploration (Figure 2)

Approximately 50,100 metres of the Phase 1 lateral exploration program (east and west) have been completed, including 16,440 metres from surface, 23,850 metres from the 450 and 620 metre levels, 2,612 metres from the 190 metre level and 7,170 metres from the 340 metre level.

Recent highlights include (all results are reported with estimated true width and high grade capped at 95 g/t gold):

  • Hole 620-543-34: 17.41 g/t gold over 2.27 metres
  • Hole 620-556-04: 21.00 g/t over 2.78 metres
  • Hole GD-590-05: 10.55 g/t gold over 2.46 metres

The Phase 1 lateral exploration program has successfully identified a potential resource block located approximately 300 metres east of the main deposit as well as a second contiguous mineralized sector identified 800 metres east of the main deposit, which demonstrates the potential to increase the resource inventory to the east of the main deposit.

Phase 1 Deep Directional Drilling (Figure 3)

The Phase 1 deep directional drilling program was designed to test the down plunge extension of the deposit between the 860 and 1,500 metre levels and to follow-up on a single deep hole from surface that intersected 19.87 g/t over 3.93 metres at a depth of 1,200 metres. High grade gold values over wide zones continue to be intersected, confirming the interpreted high grade zone at depth. Approximately 21,700 metres of the Phase 1 directional drilling program have been completed, including five pilot holes and 15 wedged holes. All of the holes drilled to date have intersected the main mineralized structure.

Recent highlights include (all results are reported with estimated true width and high grade capped at 95 g/t gold):

  • Hole MH1-6: 18.63 g/t gold over 6.60 metres
  • Hole MH1-7: 9.11 g/t gold over 4.12 metres
  • Hole MH3-6: 12.49 g/t gold over 2.19 metres
  • Hole MH4-1: 6.36 g/t gold over 5.84 metres (parallel zone to the main C Zone)

Phase 1 drilling has also identified a potential new high-grade resource block located in the eastern down plunge extension between the 900 and 1,250 metre levels, which shows similar geological characteristics as the main C Zone structure. The weighted average grade of the 20 holes located within the potential inferred resource area (16 from deep directional drilling and 4 from previous drilling programs) is 10.85 g/t gold (capped at 95 g/t gold) over an average true thickness of 4.35 metres. This compares to the main million ounce discovery that has an average resource grade of 10.73 g/t gold (capped at 95 g/t gold) over a 4.5 metre true width.

Regional Surface Exploration (Figure 4)

A 7,500 metre regional exploration program was initiated in 2015 to test the east and west regional extensions of the Island Gold deposit along strike as well as for new deposits within the Goudreau shear zone. The Phase 1 program included drilling in the former Kremzar Mine area, which tested the extension of the previously mined mineralized zone at depth, with 3 holes completed to date. Results to date confirm the extension of the mineralized quartz veins at depth in 2 of the holes (main zone and subsidiary zones). To date, a total of approximately 4,000 metres of drilling have been completed with the remaining 3,500 metres to be incorporated into the Phase 2 drilling program. Ongoing drilling will also focus on the previously identified high-priority gold targets located elsewhere on the highly prospective 77 km Island Gold property.

PHASE 2 EXPLORATION PROGRAM (Figure 5)

The Phase 2 exploration program will build on the success of the Phase 1 program and will focus on three key priorities over the next 18 to 24 months: 1) continuing to test the lateral continuity of the known deposit to the east of the main deposit to potentially add new resource blocks with the overall objective of extending mine life above the 1,000 metre level; 2) to identify the next million-plus ounce, high grade inferred resource in the vertical extension of the deposit between the 1,000 and 1,500 metre levels; and 3) continuing to test high priority regional gold targets across the prospective Island Gold property.

Approximately 39,000 metres ($7 million) of the approximately 142,000 metre Phase 2 drilling program is expected to be completed over the balance of the year. (Refer to Table 2 for additional details of the Phase 2 drilling program).

Eastern Lateral Drilling Program (Figure 5)

The Phase 2 eastern lateral drilling program will follow up on the potential addition of new resource blocks located east of the main deposit that were identified as part of the Phase 1 program, as well as continue to test the main mineralized structure laterally along strike above the 1,000 metre level.

Approximately 9,000 metres of an overall 42,000 metres of drilling is expected to be completed over the balance of the year, including approximately 3,000 metres of infill drilling (50 metre drill spacing), to potentially define an inferred resource block between the 500 and 750 metre levels located approximately 300 metres east of the main deposit.

One conventional surface drill and one underground drill from the 340 metre level are currently drilling in the target area. Should infill drilling confirm the potential for a new inferred resource, the 620 metre exploration drift will be extended and infill drilling would then be transitioned to underground drilling from the 620 metre exploration drift.

Due to the favourable results from the Phase 1 drilling to the east, including better access for drilling and proximity to the existing mining infrastructure, drilling to test the potential extension to the west of the known deposit will be deferred until further analysis is complete.

Deep Drilling Program (Figure 5)

The objective of the Phase 2 deep directional program is to continue to test the significant potential of the vertical extension of the main deposit between the 1,000 and 1,500 metre levels with the overall objective of adding the next million-plus ounces of high-grade inferred resources.

Approximately 27,000 metres of an overall 80,000 metres of drilling, including 5,000 metres of infill drilling (50 metre drill spacing), is estimated to be completed over the balance of the year. Four surface directional drills and two surface conventional drills (infill drilling) are currently drilling in the target area. The objective of the deep infill program is to define a potential inferred resource block that was identified through the Phase 1 program, which is located in the eastern down plunge extension of the C Zone between the 1,000 and 1,500 metre levels. The infill drilling will transition to underground drilling once access to the 860 metre drift has been established.

The complete 18 to 24 month deep drilling program will consist of exploring the western and eastern down plunge corridors between the 1,000 and 1,500 metre programs, as well as infill drilling for the potential conversion to inferred high-grade resources at depth that could potentially support additional expansion opportunities and extend mine life.

Regional Program

Approximately 3,000 metres of an overall 20,000 metre drilling program are expected to be completed in 2016. The Phase 2 regional drilling program will continue to evaluate the potential extension of the mineralization below the Kremzar mine as well as the previously identified high-priority gold targets located elsewhere on the highly prospective 77 km Island Gold property.

About Richmont Mines Inc.
Richmont Mines has produced over 1.6 million ounces of gold from its operations in Quebec, Ontarioand Newfoundlandsince beginning production. The Corporation currently produces gold from the Island Gold Mine in Ontario, and the Beaufor Mine in Quebec. The Corporation is also advancing development of the significant high-grade resource extension at depth of the Island Gold Mine in Ontario. With 25 years of experience in gold production, exploration and development, and prudent financial management, the Corporation is well-positioned to cost-effectively build its Canadian reserve base and to successfully enter its next phase of growth.

Forward-Looking Statements
This news release contains forward-looking statements that include risks and uncertainties. When used in this news release, the words 'estimate', 'project', 'anticipate', 'expect', 'intend', 'believe', 'hope', 'may' and similar expressions, as well as 'will', 'shall' and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made. Except as may be required by law, the Corporation undertakes no obligation and disclaims any responsibility to publicly update or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise.

The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include changes in the prevailing price of gold, the Canadian-United States exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may be set out in Richmont Mines' Annual Information Form, Annual Reports and periodic reports. The forward-looking information contained herein is made as of the date of this news release.

Cautionary note to US investors concerning resource estimates
Information in this press release is intended to comply with the requirements of the Toronto Stock Exchange and applicable Canadian securities legislation, which differ in certain respects with the rules and regulations promulgated under the United States Securities Exchange Act of 1934, as amended ('Exchange Act'), as promulgated by the SEC. The Reserve and Resource estimates in this press release were prepared in accordance with Regulation 43‑101 adopted by the Canadian Securities Administrators. The requirements of Regulation 43-101 differ significantly from the requirements of the United States Securities and Exchange Commission (the 'SEC').

U.S. Investors are urged to consider the disclosure in our annual report on Form 20-F, File No. 001-14598, as filed with the SEC under the Exchange Act, which may be obtained from us (without cost) or from the SEC's web site: http://sec.gov/edgar.shtml.

Regulation 43-101
The geological data in this news release has been reviewed by Mr. Daniel Adam, Geo., Ph.D., Vice-President, Exploration, an employee of Richmont Mines Inc., and a qualified person as defined by Regulation 43-101.

Table 1: Drill Results

LATERAL EXPLORATION

(East of Main Zone)

Hole Number

Length (metres)

From (metres)

To (metres)

True Width (metres)

Uncut Grade

(g/t Au)

Cut Grade

(g/t Au)

Zone

Vertical depth of Intersection (metres)

620-543-32

141

123.27

126.00

2.66

0.86

0.86

E1E

575

620-543-34

231

201.79

204.56

2.27

17.41

17.41

E1E

715

620-543-35

285

236.39

239.83

2.44

2.51

2.51

E1E

767

620-543-36

250

221.58

228.00

4.86

4.01

4.01

E1E

731

620-543-39

180

156.36

158.86

2.32

3.04

3.04

E1E

622

620-556-02

234

214.34

219.88

4.68

0.48

0.48

E1E

697

620-556-03

180

141.53

151.66

9.78

0.32

0.32

E1E

607

620-556-04

285

267.97

271.82

2.78

21.00

21.00

E1E

753

GD-580-02

1,161

986.51

990.64

2.07

2.35

2.35

E1E

950

GD-590-04

1,050

829.38

835.21

3.34

0.12

0.12

E1E

781

GD-590-05

1,050

747.73

751.74

2.46

19.20

10.55

E1E

660

including

748.65

748.95

0.18

210.72

95.00

DEEP DRILLING PROGRAM

Hole Number

Length

(metres)

From

(metres)

To

(metres)

True Width (metres)

Uncut Grade

(g/t Au)

Cut Grade (g/t Au)

Zone

Vertical depth of Intersection (metres)

MH1-4

1,540

1,252.50

1,256.00

3.16

0.45

0.45

E1E

1,045

MH1-6

1,490

1,299.95

1,308.37

6.60

20.31

18.63

E1E

1,130

including

1,300.75

1,301.30

0.43

120.82

95.00

MH1-7

1,500

1,391.07

1,398.00

4.12

11.87

9.11

E1E

1,280

including

1,393.43

1,394.00

0.34

45.77

45.77

including

1,395.76

1,396.06

0.18

158.68

95.00

MH2A

1,422

1,262.85

1,265.60

2.06

3.35

3.35

X

1,091

MH2A-3

1,442

1,199.50

1,202.60

2.27

2.42

2.42

X

1,031

MH2A-3

1,442

1,276.00

1,278.74

2.01

4.31

4.31

E1E

1,091

MH3-6

1,505

1,362.84

1,367.66

2.19

12.49

12.49

E1E

1,257

MH4

1,400

1,276.00

1,282.60

4.91

1.17

1.17

X

1,061

MH4

1,400

1,289.40

1,293.40

2.75

4.29

4.29

C

1,070

MH4-1

1,400

1,106.61

1,114.65

5.84

6.36

6.36

X

932

including

1,108.84

1,109.33

0.36

68.47

68.47

MH4-1

1,400

1,292.10

1,295.21

2.27

1.53

1.53

C

1,068

Table 2: Phase 2 Exploration Drilling

Phase 2 Exploration Program

Amount (C$)

Lateral Drilling Program

Surface Drilling (15,000m)

$1,650,000

Underground Drilling (27,000m)

$2,200,000

620m and 740m exploration drifts extension

$3,750,000

Total Lateral Drilling

$7,600,000

Deep Drilling Program

Surface directional drilling (40,000m)

$8,400,000

860m exploration drift (500m)

$3,200,000

Infill underground drilling (40,000m)

$3,200,000

Total Deep Drilling

$14,800,000

Regional Drilling Program

Surface drilling (20,000m)

$2,200,000

Total Phase 2 Exploration

$24,600,000

SOURCE Richmont Mines

PDF available at: http://stream1.newswire.ca/media/2016/07/07/20160707_C3068_PDF_EN_728925.pdf

Read the rest of the article at www.publicnow.com

Richmont Mines Inc

PRODUCER
CODE : RIC.TO
ISIN : CA76547T1066
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Richmont Mines is a gold producing company based in Canada.

Richmont Mines holds various exploration projects in Canada.

Its main assets in production are BEAUFOR MINE, ISLAND GOLD and EAST AMPHI MINE in Canada, its main asset in development is FRANCOEUR MINE in Canada and its main exploration properties are WASAMAC, CAMFLO MILL, MONIQUE, RENDELL-JACKMAN (HAMMERDOWN) and CRIPPLE CREEK in Canada.

Richmont Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 741.2 millions as of today (US$ 584.1 millions, € 489.6 millions).

Its stock quote reached its lowest recent point on December 06, 2013 at CA$ 1.00, and its highest recent level on November 24, 2017 at CA$ 11.72.

Richmont Mines has 63 240 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Richmont Mines Inc
1/7/2010Updates its 2010 Investor Presentation
Annual reports of Richmont Mines Inc
2008 annual report
Financings of Richmont Mines Inc
2/11/2015Closes Previously Announced Bought Deal Financing of Common ...
2/1/2012. Completes CAN$ 10 M Private Placement with Mr. Bob Buchan
6/1/2006announces closing of a bought deal of common shares
Nominations of Richmont Mines Inc
5/15/2009Announces Appointments to Board of Directors
Financials of Richmont Mines Inc
8/8/2016Reports Strong Second Quarter Financial Results; On Track to...
5/9/2013Reports First Quarter 2013 Results
2/21/2013Reports Full Year 2012 and Fourth Quarter Results
11/8/2012Reports Results for the Third Quarter of 2012
2/23/2012Reports Record Full Year 2011 and Strong Fourth Quarter Resu...
2/22/2011Reports Strong Fourth Quarter and Full Year 2010 Results
7/30/2009TR: Richmont Mines- News Release - Second Quarter 2009
2/26/2009(Island Gold)Reports Record Sales for the Fourth Quarter and Full Year 20...
1/22/2009(Beaufor Mine)Reports Gold Sales More Than Double in 2008 Fourth Quarter
1/22/2009(Island Gold)Reports Gold Sales More Than Double in 2008 Fourth Quarter
8/19/2008Second Quarter 2008 Fact Sheet
7/31/2008Reports 27.4% Increase in Revenue in the Second Quarter of 2...
5/23/2006announces re-statement and re-filing of first quarter financ...
Project news of Richmont Mines Inc
7/27/2017(Island Gold)Intersects High-Grade, Wide Mineralization in the Down Plung...
1/9/2013(Monique). Receives Mining Permit for Monique Gold Project
7/3/2012(Francoeur Mine)Announces Francoeur Mine Update
5/8/2012(Wasamac)Intercepts 6.40 g/t Au Over 52.8 Metres in Wasamac Main Zone...
3/15/2012(Wasamac).: 2012 Drilling Program at Wasamac Yields Additional Signif...
12/15/2011(Wasamac)Announces Significant Gold Resource Increase at Wasamac
8/30/2011(Wasamac)Intercepts 7.28 g/t Au Over 31.40 Metres at Wasamac; New Dri...
2/17/2011(Wasamac)Announces Resources of Over 1 Million Ounces of Gold at Its ...
1/21/2011(Francoeur Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Beaufor Mine)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
1/21/2011(Island Gold)2010 Gold Sales Increase 14%; Company Provides 2011 Producti...
4/8/2010(Wasamac)Announces a 10,000 Metre Surface Drilling Program on Its Was...
8/7/2009NI 43-101 report on the Francoeur Gold Project
10/1/2008(Beaufor Mine)EXPLORATION DRILLING CONFIRMS MINERALIZATION AT BEAUFOR MINE...
6/8/2006(Valentine Lake (leprechaun))proceeds with earn-in requirements at Valentine Lake
5/26/2006Island gold project update information concerning East amphi...
Corporate news of Richmont Mines Inc
7/13/2016Richmont Mines Announces Details for the Second Quarter Fina...
7/12/2016Richmont Reports Strong Second Quarter Results from Island G...
7/7/2016Strategic Phase 2 Exploration Program Launched at Island Gol...
6/13/2016Richmont Mines Added to the S&P/TSX Global Mining Index and ...
6/7/2016Richmont Mines Completes CAN$31 Million Bought Deal Financin...
5/16/2016Richmont Mines Announces CAN$27 Million Bought Deal Financin...
5/12/2016Richmont Mines Announces Election of Directors
5/12/2016Richmont Mines Reports Strong First Quarter Financial Result...
5/12/2016Richmont Mines posts 1Q profit
1/12/2016Richmont Annual Production Exceeds Guidance: Island Gold Del...
12/22/2015Richmont Mines Inc.: Chairman Position to Become a Non-Execu...
12/21/2015Richmont Mines Provides Exploration Update for Island Gold
12/18/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
12/18/2015Richmont Appoints Christian Bourcier as Vice President, Oper...
12/15/2015Richmont Mines Announces Filing of NI 43-101 Technical Repor...
11/5/2015Richmont Mines Reports Solid Third Quarter Financial Results...
11/5/2015Richmont Mines posts 3Q profit
10/22/2015Richmont Mines Announces Details For Third Quarter Financial...
10/21/2015Richmont Mines to Release Milling and Mining Study for Islan...
10/8/2015Richmont Reports Strong Third Quarter Production Results; Re...
9/16/2015Richmont Mines Provides an Update on the Surface Step-Out Ex...
9/15/2015Richmont Mines Strengthens Executive Team by Appointing Anne...
9/14/2015Richmont Mines Announces Inclusion in the S&P/TSX SmallCap I...
9/10/2015Deep Drilling to Commence at Richmont's Island Gold Mine to ...
8/6/2015Richmont Mines posts 2Q profit
8/6/2015Richmont Mines Reports Record Revenues for the Second Quarte...
7/14/2015Richmont Mines to Extend Beaufor Mine Life With Development ...
7/13/2015Richmont Mines Reports Record Quarterly Gold Production at I...
4/22/2015Richmont Mines Q1 Gold Production Up 23% Over 2014; 2015 Pro...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/27/2015Richmont Mines President and CEO Mr. Renaud Adams to Oversee...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/23/2015Richmont Mines Announces the Appointment of Mr. Steve Burlet...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/19/2015Richmont Mines 2014 Revenues Up 47% and Operating Cash Flow ...
2/19/2015annonce les résultats du quatrième trimestre et de l'année 2...
2/11/2015annonce la clôture du financement par actions ordinaires ann...
1/21/2015Richmont Mines Announces CAN$30 Million Bought Deal Financin...
1/21/2015Canada Stocks to Watch: Husky, Eldorado, Celestica, Richmont...
1/21/2015Richmont Mines Announces Increase of Bought Deal Financing t...
1/21/2015IIROC Trade Resumption - RIC; AKG
1/20/2015IIROC Trading Halt - RIC
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/15/2015Richmont Mines Provides Guidance for 2015 and Transformation...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
1/8/2015Deep Exploration Drilling Extends Mineralisation to a Depth ...
12/1/2014Ex Barrick Executives Flock to Inca One Gold
11/17/2014Mr. Renaud Adams Officially Commences as President and Chief...
10/16/2013Enters a Land and Mining Rights Agreement with Argonaut Gold
10/4/2013(Monique).: Monique Gold Project Attains Commercial Production; 43-10...
8/23/2013Closes Previously Announced Senior Credit Facility for Up to...
6/17/2013Obtains Letter of Offer for Senior Credit Facility for Up to...
4/12/2013(Island Gold).: Island Gold Deep 43-101 Report Filed on Sedar; New Drill ...
9/24/2012Announces the Immediate Retirement of CAN$10 Million Debentu...
9/10/2012(Island Gold).: New Deep Drill Results Reaffirm Promising Potential at De...
4/12/2012Gold Industry Veteran Ebe Scherkus to Join the Richmont Mine...
3/28/2012(Wasamac)Announces Results From a Preliminary Economic Assessment for...
2/10/2012(Island Gold)Promising Drill Results From Island Gold Mine Confirm Potent...
1/11/2012Gold Industry Veteran Bob Buchan Joins the Board of Director...
12/20/2011(Monique)Announces Open Pit Resources at its Monique Property
11/29/2011(Wasamac)Announces Completion of 2011 Drilling Program at Wasamac; Up...
8/24/2011(Monique)s Final Drilling Results From the Monique Project, Studies U...
8/9/2011Announces a Significant Increase in Earnings and Cash Flow f...
6/22/2011(Monique)More Positive Drill Results From Richmont's Monique Project
5/9/2011(Wasamac)Signs Option Agreement With Globex; Expands Wasamac Explorat...
4/11/2011(Monique).: Monique Work Commitment Completed; Initial Drill Results ...
3/29/2011. Confirms and Amends its Shareholder Rights Plan
4/12/2010hits 73.54 g/t Au over 7 metres on its Cripple Creek Propert...
2/25/2010Q4 and F2009 Results
2/4/2010Shareholders Elect Four New Board Members at Special Shareho...
12/16/2009 Four board nominations at Richmont Mines - Building the nex...
10/29/2009Q3 2009 Release
12/16/2008 Acquires Patricia Mining Corp.
12/3/2008 Announces Acceptance of Normal Course Issuer Bid
9/4/2008AND LKA AGREE TO EXTEND INITIAL COMMITMENT PERIOD TO COMPLET...
7/10/2008TO START DRILLING AT THE GOLDEN WONDER PROJECT
5/18/2006Focus on profitable growth
1/26/2006and Patricia Mining Corp. Announce the purchase of the remai...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (RIC.TO)AMEX (RIC)
11.72+4.27%18,900.00-0.53%
TORONTO
CA$ 11.72
11/24 16:00 0.480
4.27%
Prev close Open
11.24 12.09
Low High
11.66 12.35
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  11.72 -%
Volume 1 month var.
625,800 -%
24hGold TrendPower© : 13
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :