Nevada Copper Submits Mine Development Permit Applications and Announces Drill Results
Published : July 10, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Copper | Gold | Market | Senator | Silver | Unemployment | Water |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 10, 2012) - Nevada Copper Corp. (News - Market indicators) ("Nevada Copper") is very pleased to announce that it has submitted mine development and operating permit applications to the State of Nevada for its 100% owned Pumpkin Hollow Property located near Yerington, Nevada. These documents take the form of applications to modify Nevada Copper's existing State permits as outlined below. Nevada regulations provide for six months to review and approve mine permit applications which will result in mine development and operating permits being issued in Q1-2013. Nevada Copper will work closely with State agencies to ensure that the applications are thoroughly reviewed and that permits are issued within the statutory review period.

Drill results are also reported, representing results from the current step-out and expansion drilling program that commenced in November 2010. To date, 94 holes totaling 47,000 meters have been drilled. These drill results will be incorporated into an updated resource estimate that will be released in early August, 2012. The updated resource estimate will be incorporated into feasibility study updates as described in press release dated June 20, 2012.

Permitting

Nevada Copper has submitted requests for modification of our existing Nevada Water Pollution Control Permit and Nevada Reclamation Permit. The modifications of the existing permits address the development of a Pumpkin Hollow mine under either one of two development scenarios:

  1. Private Land Underground Mine ("PLUM") with stand-alone 5,000 to 7,500 ton per day processing facility ("PLUM Processing Facility") as a Phase 1 operation. The PLUM operation would be located entirely on patented private claims and require no Federal permits; or
  1. Integrated open pit and underground mine with a single 67,500 ton per day processing facility ("Integrated Operation"). 

Should Nevada Copper elect to develop the Pumpkin Hollow initially with the PLUM operation, open pit mining and processing would be constructed later as a second phase ("Phase 2"). Nevada Copper's ability to develop the larger, Integrated Operation option under the State permits that were applied for is subject to successful passage of the Yerington Land Conveyance and Sustainable Development Act, discussed below. 

The permit applications are reviewed, and permits granted, by the Nevada Division of Environmental Protection ("NDEP") Bureau of Mining Regulation and Reclamation ("BMRR"). Nevada state regulations provide for a six month period to review and approve mine permit applications, which imply that these permits for both the PLUM and Integrated Operations would be issued in Q1-2013.

Now that these permit applications have been submitted, Nevada Copper will prepare and submit other permit applications and other regulatory documents in order to meet a Q1-2013 target date for receipt of all permits needed to commence construction of either the Integrated Operation or PLUM operation. It is important to note that the company will also prepare a Bureau of Land Management ("BLM") Plan of Operations and submit that to the BLM to initiate that process to ensure that if the Yerington Land Conveyance and Sustainable Development Act is delayed or does not pass, the schedule for receipt of federal approvals for a Phase 2 open pit mining and processing can be processed in the most expeditious manner possible. In this case, since Phase 1 PLUM alternative does not require federal approvals, it will be advanced in 2013 under the expected State permits.

Giulio T. Bonifacio, President & CEO, commented: "By permitting both the Integrated Operation and the PLUM case, we can significantly decrease the permitting and financial risks to the project by providing alternative development scenarios. We have evaluated both development options and believe either option economically robust however, the ultimate development scenario will be subject to several factors going forward including the pending conveyance of federal lands to the City of Yerington, completion of project financing arrangements and receipt of required permits."

Timothy M. Dyhr, Vice President Environment and External Relations, commented: "This represents a significant milestone for the project as these are the two key, critical path permits for the project. We have been working on the technical baseline studies to support these applications since 2007, including groundwater monitoring from 2007-2012; mine rock, ore, tailings and underground paste backfill characterization from 2008-2012; groundwater hydrology test pumping and modeling from 2009-12. Thousands of man-hours have been invested to develop a comprehensive environmental evaluation; mine permit applications and a comprehensive environmental management program."

Yerington Land Conveyance Bill Update

The permit applications are part of a strategic environmental and sustainable development plan being prepared for the project. A critical aspect of sustainable development is the transfer of BLM-administered federal lands to the City of Yerington, currently being advanced via federal legislation: the Yerington Land Conveyance and Sustainable Development Act. That act was introduced into the U.S. Congress as House bill H.R. 4039 on February 16, 2012, sponsored by Nevada Congressman Mark Amodei and co-sponsored by Congresswoman Shelley Berkley and Congressman Joe Heck. The bill was passed by the House of Representatives as part of a larger "omnibus" lands bill on June 19, 2012. An identical companion bill, sponsored by Nevada Senator Dean Heller, was introduced into the U.S. Senate (S. 2228) on March 13, 2012 and is awaiting the scheduling of a Senate Energy and Natural Resources Committee hearing as requested by Senator Heller on June 21, 2012. Now that the House has approved the bill, the City and Nevada Copper continue to consult with the entire Nevada Congressional delegation, including Senator Majority Leader Harry Reid, to support passage of this critical legislation through the Senate. 

Passage of the bill into law will help jumpstart the economy of Lyon County, the third most economically stressed county in the U.S. with over 16% unemployment for the last four years.

Drill Results

The drill results reported below include 17 holes drilled in the open-pittable Western deposits and one hole in the underground East deposit. Much of the drilling focused on expanding open mineralization in the North deposit and the area between the North and South open pits. The holes have intersected new mineralization within or just outside the outside the current National Instrument 43-101 Feasibility Study ultimate pit limits.

Five holes were drilled in the northeastern portion of the North deposit (NC11-53, NC12-05, NC12-09, NC12-13 and NC12-14). Results continue to expand mineralization to the east and at depth. In addition to successfully intersecting deeper mineralization, NC12-14 intersected higher grade mineralization in the main zone. NC12-14 intersected 204 feet (62.2 meters), 151.2 feet (46.2 meters) true thickness grading 1.01% copper, greater than adjacent hole L-175 which intersected 154 feet (46.9 meters), 108.9 feet (33.2 meters) true thickness grading 0.36% copper. Mineralization remains open at depth and to the East.

Five holes were drilled along the southern boundary of the North deposit (Drill holes NC12-08, NC12-12, NC12-15, NC12-16, NC12-17). Drilling continues to intersect mineralized zones that are just outside and also within the present ultimate pit limit. NC12-17 drilled on the southwest edge of the deposit intersected 330 feet (100.6 meters), 253 feet (77.1 meters) true thickness grading 0.35% copper. Future drill programs will follow up on the open mineralization.

Five holes were drilled between the North and South deposits (Drill holes NC11-52, NC12-04, NC12-06, NC12-07, NC12-10). Drilling continues to intersect and expand mineralization between the deposits. NC11-52 intersected a large zone of mineralization, 206.5 feet (62.9 meters), 162.7 feet (49.6 meters) true thickness grading 0.20% copper. The mineralization remains open between the deposits.

Drill hole NC11-48 targeted the open mineralization along the southwestern portion of the East deposit. The results continue to expand underground grades and confirm the continuity of the flat lying nature of the mineralization. NC11-48 intersected, 80 feet (24.4 meters), true thickness grading 1.42% copper. Mineralization remains open to the southwest.

Drill hole NC12-11 was drilled in the Southeast deposit and confirmed mineralization.

Gregory French, Vice President, Senior Project Manager, commented, "We are encouraged that the step out drill program continues to expand mineralization between the North and South open pits. The drill results are expected to have a very positive effect on the upcoming resource update. In addition to expanding the resource, we are encouraged that the expansion of mineralization between the deposits as well as the enlargement of mineralization outside the current Feasibility Study pits suggests the pits will eventually merge and improve mining efficiencies."

NORTH DEPOSIT - Assays greater than 0.15% Cu
 
Drill Hole # From To Length Length True Length Copper Gold Silver Mo
  (m) (m) (m) (ft) (m) % (g/t) (g/t) (g/t)
NC11-53 278.9 296.1 17.2 56.5 15.6 0.33 0.025 1.4 0.003
  335.3 346.3 11.0 36.0 10.0 0.23 0.011 1.5 0.001
  580.6 614.1 33.5 110.0 30.4 0.18 0.005 0.6 <0.001
NC12-05 269.8 278.9 9.1 30.0 7.5 0.19 0.020 0.9 0.002
  299.0 304.8 5.8 19.0 4.8 0.32 0.034 2.5 <0.001
  333.8 350.5 16.7 55.0 13.7 0.36 0.032 1.8 0.001
  378.0 393.2 15.2 50.0 12.5 0.18 0.013 1.1 <0.001
  430.1 437.1 7.0 23.0 5.7 0.40 0.027 1.4 <0.001
NC12-08 249.9 266.7 16.8 55.0 16.7 0.43 0.019 1.2 0.002
NC12-09 213.4 220.4 7.0 23.0 6.9 0.23 0.022 1.0 0.020
  247.8 263.6 15.8 52.0 15.5 0.37 0.029 1.6 <0.001
  318.5 326.1 7.6 25.0 7.5 0.41 0.036 0.7 <0.001
  345.6 368.8 23.2 76.0 22.8 0.21 0.020 0.9 <0.001
NC12-10      No Significant Intercepts
NC12-12 222.5 231.6 9.1 30.0 7.5 0.17 0.002 0.6 0.007
  263.7 272.2 8.5 28.0 7.0 0.23 0.005 0.5 0.008
  332.2 339.8 7.6 25.0 6.2 0.15 0.023 0.8 <0.001
  352.0 403.8 51.8 170.0 42.4 0.43 0.036 1.7 <0.001
NC12-13 258.6 275.8 17.2 56.5 14.0 0.45 0.055 1.4 0.007
  321.6 335.3 13.7 45.0 11.2 0.36 0.052 1.5 <0.001
  347.5 432.8 85.3 280.0 70.0 0.30 0.057 1.4 0.003
  461.8 477.0 15.2 50.0 12.4 0.22 0.014 0.5 0.001
  496.8 504.4 7.6 25.0 6.2 0.23 0.032 1.0 <0.001
NC12-14 278.9 341.1 62.2 204.0 46.2 1.01 0.116 3.8 0.004
  431.1 464.8 33.7 110.5 25.0 0.33 0.040 1.5 <0.001
  474.0 481.6 7.6 25.0 5.6 0.30 0.045 1.8 <0.001
NC12-15 198.1 206.0 7.9 26.0 7.4 0.75 0.009 1.1 <0.001
  293.7 335.1 61.4 201.5 57.5 0.34 0.058 1.4 0.004
  512.1 521.2 9.1 30.0 8.6 0.42 0.030 1.8 0.001
NC12-16 217.9 224.0 6.1 20.0 6.1 0.27 0.005 1.1 <0.001
NC12-17 344.4 445.0 100.6 330.0 77.1 0.35 0.037 1.3 0.006
  463.3 491.0 27.7 91.0 21.2 0.39 0.045 2.1 0.008
 
 
BETWEEN NORTH & SOUTH DEPOSITS - Assays greater than 0.15% Cu
 
Drill Hole # From To Length Length True Length Copper Gold Silver Fe
  (m) (m) (m) (ft) (m) % (g/t) (g/t) (%)
NC11-52 146.3 153.9 7.6 25.0 6.0 0.66 0.019 1.0 4.6
  193.5 224.0 30.5 100.0 24.0 0.19 0.020 0.9 35.1
  237.8 300.7 62.9 206.5 49.6 0.20 0.031 0.9 38.1
NC12-04      No Significant Intercepts
NC12-06 170.7 187.5 16.8 55.0 13.2 0.44 0.019 1.0 0.001
  207.3 227.1 19.8 65.0 15.6 0.26 0.025 0.8 0.001
  245.4 253.0 7.6 25.0 5.0 0.34 0.037 1.3 <0.001
NC12-07 234.7 262.1 27.4 90.0 21.6 0.60 0.048 1.6 0.002
NC12-10      No Significant Intercepts
 
 
EAST DEPOSIT - Assays greater than 0.75% Cu
 
Drill Hole # From To Length Length True Length Copper Gold Silver Fe
  (m) (m) (m) (ft) (m) % (g/t) (g/t) (%)
NC11-48 691.9 716.3 24.4 80.0 80.0 1.42 0.127 2.0 7.8
 
 
SOUTHEAST DEPOSIT - Assays greater than 0.15% Cu
 
Drill Hole # From To Length Length True Length Copper Gold Silver Fe
  (m) (m) (m) (ft) (m) % (g/t) (g/t) (%)
NC12-11 120.4 140.2 19.8 65.0 19.5 0.67 0.147 1.5 16.6
  227.1 248.4 21.3 70.0 21.3 0.43 0.089 0.7 17.9

Plan maps with the respective drill locations will be made available at http://www.nevadacopper.com/i/pdf/20120709_PHM.pdf

The Pumpkin Hollow drilling program is under the supervision of Gregory French, CPG #10708, a Qualified Person as defined in Canadian National Instrument 43-101, who is responsible for the preparation of the technical information in this news release. All assaying and whole rock geochemistry is processed at the American Assay Laboratories (AAL) in Reno, Nevada. Samples are delivered from the project core logging facility to AAL by Nevada Copper or AAL personnel. A Quality Assurance and Quality Control Assay Protocol have been implemented whereby blanks and standards are inserted into the assay stream and check samples are sent to Chemex-Reno and Inspectorate-Reno laboratories.

For additional information about Nevada Copper please visit our website at www.nevadacopper.com.

NEVADA COPPER CORP.

Giulio T. Bonifacio, President & CEO

We seek safe harbour.



Nevada Copper Corp.
Eugene Toffolo
Corporate Communications
604-683-8266 or Toll free: 1-877-648-8266
etoffolo@nevadacopper.com
or
Nevada Copper Corp.
Robert McKnight, P.Eng.
Executive Vice President
604-683-1309
bmcknight@nevadacopper.com
www.nevadacopper.com

Nevada Copper

DEVELOPMENT STAGE
CODE : NCU.TO
ISIN : CA64128F1099
CUSIP : 64128F
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Nevada Copper is a copper exploration company based in Canada.

Nevada Copper develops copper, gold, iron and silver in USA.

Its main asset in development is PUMPKIN HOLLOW in USA.

Nevada Copper is listed in Canada and in Germany. Its market capitalisation is CA$ 9.3 millions as of today (US$ 7.4 millions, € 6.5 millions).

Its stock quote reached its highest recent level on April 08, 2011 at CA$ 6.42, and its lowest recent point on November 06, 2020 at CA$ 0.06.

Nevada Copper has 88 170 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Nevada Copper
5/9/2019Nevada Copper inks $115m deal to construct Pumpkin Hollow
8/31/2018Nevada Copper shares jump on construction decision
5/16/2018Nevada copper provides positive update on drill program: int...
Financings of Nevada Copper
4/19/2016Amends Red Kite and Pala Loan Terms
4/27/2010Closes $23,7 Million Bough-Deal Private Placement Financing
4/9/2010$20.6 Million Bought-Deal Private Placement Financement
10/27/2009$11,250,000 Private Placement with Capstone Mining Corp.
Nominations of Nevada Copper
8/8/2013Appoints Director
2/28/2012Appoints New Director and Launches Project Website
Project news of Nevada Copper
9/9/2013Receives All Permits For Stage 1 Underground Mine
7/28/2011(Pumpkin Hollow)Obtains 100% of Water Needs for the Pumpkin Hollow Project
4/28/2011(Pumpkin Hollow)Provides Update on Feasibility Study & Engages Merit for Pre...
4/12/2011INTERSECTS 415 FEET OF 1.84% COPPER
3/31/2011(Pumpkin Hollow)s Mineral Resource Estimate and Clarifies Technical Disclosu...
2/8/2011S FEASIBILITY STUDY PROGRESS
8/4/2010(Pumpkin Hollow)Intersects 230 Feet of 1.46% Copper in The Open Pittable Nor...
7/8/2010(Pumpkin Hollow)E2 Deposit Drilling Intersects 145 Feet of 2.37% Copper and ...
6/16/2010(Pumpkin Hollow)Mineralization Remains Open at North Deposit: Intersecting 9...
5/27/2010(Pumpkin Hollow)Increases Drilling Program
5/18/2010(Pumpkin Hollow)Discovers Two New Zones Intersecting 275 Feet of 0.98% Coppe...
5/6/2010(Pumpkin Hollow)Step Out Drilling Expands the Open Pittable North Deposit: I...
4/23/2010(Pumpkin Hollow)Drills Over 650 Feet Of Greater Than 0.70% Copper In Three S...
2/16/2010(Pumpkin Hollow)Continues to Intersect High Grade Copper
1/21/2010(Pumpkin Hollow)Intersects 31.1 Meters of 2.45% Copper
1/14/2010Files NI 43-101 Preliminary Economic Assessment
12/8/2009(Pumpkin Hollow)Commences Pre-Feasibility & 25,000 Meter Drilling Program
8/25/2009(Pumpkin Hollow)Files resource update NI 43-101 on Sedar
7/15/2009(Pumpkin Hollow)Reports Significant Resource Increase to 9.3 Billion Pounds ...
Corporate news of Nevada Copper
6/9/2016Nevada Copper Closes Cdn$4.6 Million Equity Offering
6/3/2016Nevada Copper Closes Cdn$ 10.5 Million Financing With Red Ki...
6/1/2016Nevada Copper Solar Zoning Approved
5/27/2016Nevada Copper Annual Meeting Results
5/27/2016Nevada Copper Announces Red Kite Funding Commitment And Equi...
5/3/2016Nevada Copper and City of Yerington Advance Solar Zoning
4/22/2016Nevada Copper Announces Filing Of Amended Prospectus And Exe...
4/5/2016Nevada Copper Amends Red Kite and Pala Loan Terms
1/28/2016Nevada Copper Appoints Directors
11/3/2015Nevada Copper Intersects 105 Feet of 2.55% Copper in the Eas...
10/13/2015Nevada Copper Acquires Private Land & Completes Federal Land...
9/30/2015Nevada Copper Provides Corporate and Project Update
9/10/2015Nevada Copper Intersects 462 Feet of 0.64% Copper
8/21/2015IIROC Trade Resumption - NCU
8/21/2015Federal Land Conveyance Complete at Nevada Copper's Pumpkin ...
8/20/2015IIROC Trading Halt - NCU
8/17/2015Nevada Copper Fully Permitted
7/31/2015Nevada Copper Extends and Increases Bridge Loan Facility
7/31/2015Nevada Copper Receives Air Pollution Control Permit
7/17/2015Nevada Copper Receives Decision Record on Yerington Land Con...
7/15/2015Nevada Copper Intersects 448 Feet Grading 1.0% Copper
7/9/2015Nevada Copper Files Integrated Feasability Study on SEDAR
6/29/2015Nevada Copper Election of New Director and Annual Meeting Re...
6/24/2015Nevada Copper Continues to Expand Open Pit Mineralization In...
4/23/2015Nevada Copper Pumpkin Hollow Project Update
2/10/2015Nevada Copper Pumpkin Hollow Project Update
12/30/2014Nevada Copper Closes US$200 Million Loan Facility
12/22/2014President Signs National Defense Authorization Act That Incl...
12/3/2014Nevada Copper Project Update
11/4/2014Nevada Copper Project Update
7/30/2014Nevada Copper Advances Lyon County Bill
7/16/2014Nevada Copper Provides 2014 Update
7/2/2014Nevada Copper Provides Update & AGM Results
5/12/2014Nevada Copper Update on Lyon County Land Bill
1/23/2014NCU - Nevada Copper featured on KTVN - Channel 2 News
10/28/2013Announces Management Additions
10/9/2013Receives Additional US$15 Million Under Its US$200 Million S...
10/1/2013Announces $24 Million Equipment Financing
8/26/2013Receives Water Pollution Control Permit
7/16/2013Remaining Stage One Permits Issued for Public Comment
6/25/2013Receives Special Use Permit and Provides Update on Land Bill
6/17/2013North Deposit Drilling Intersects Multiple Zones of Minerali...
6/10/2013Receives Reclamation Permit
5/28/2013Provides Update on State Permits
5/7/2013s Lyon County Bill Status
4/23/2013(Pumpkin Hollow)to Proceed With Two-Stage Approach to Building Pumpkin Hollo...
4/17/2013s Permitting and Yerington Land Bill Status
4/17/2013s Permitting and Yerington Land Bill Status
3/28/2013Closes US$200 Million Loan Facility and Concentrate Off-Take...
3/11/2013North Deposit Mineralization Continues to Expand Intersectin...
2/15/2013-Permitting and Feasibility Study Update
1/3/2013Status of Congressional Action-Lyon County Land Bill
10/30/2012North Deposit Mineralization Remains Open Intersecting 119 F...
10/19/2012Files Resource Update NI 43-101 Technical Report on SEDAR
10/5/2012to Purchase 17.8% of Mercator Minerals
9/5/2012Governor Sandoval's Trade Mission to China and South Korea
8/9/2012Drilling Continues to Expand Shallow Mineralization in the S...
7/10/2012Submits Mine Development Permit Applications and Announces D...
6/20/2012-Project Update/Land Bill Passed by the House
6/5/2012s Permitting and Yerington Land Conveyance
5/29/2012Intersects 470 Feet at 0.73% Copper in the North Deposit
4/19/2012Provides an Update on House Subcommitee Hearing on Yerington...
4/10/2012Mineralization Continues to Expand in the North Deposit; Lan...
3/26/2012Announces Introduction of Land Conveyance Bill in the United...
3/13/2012Intersects 9.08% Copper in Open Pittable North Deposit
2/27/2012Appoints New Director & Launches Project Website
2/22/2012Breaks Ground on Underground Shaft
2/16/2012Announces Introduction Of Yerington Land Conveyance Bill
2/7/2012Files Feasibility Study on SEDAR
1/23/2012Announces Positive Feasibility Study Results
1/17/2012(Pumpkin Hollow)Hosts Conference Call to Discuss Pumpkin Hollow Definitive F...
1/9/2012North Deposit Continues to Expand-NC1127 Intersects Minerali...
12/16/2011Announces Selection of Underground Contractor
11/29/2011Coppper-Update on Underground Contractor Selection & Feasibi...
9/29/2011Annnounces Management Addition and Shaft Contract Update
9/19/2011-Feasibility Study Update and Land Transfer
9/7/2011Mineralization Continues to Expand, Intersecting Over 600 Fe...
8/16/2011North Deposit Continues to Expand, Drilling Multiple Interva...
6/14/2011Expands North Deposit Intersecting 785 Feet of 0.73% Copper ...
5/25/2011Steps Out and Drills 126 Feet of 1.26% Copper/Definitive Fea...
5/3/2011(Pumpkin Hollow)Intersects 1,164 Feet of 0.49% Copper in the Pumpkin Hollow ...
12/1/2009Robust Economic Results
12/1/2009Reports robust economic results
11/3/2009Capstone Mining Makes Strategic Investment in Nevada Copper
6/29/2009US$2,000,000 Convertible Debenture
5/2/2007Press Release: Augusta Files Q1 Financials - Negotiates Sale...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (NCU.TO)FRANKFURT (ZYT.F)
0.105-4.55%0.045-4.26%
TORONTO
CA$ 0.105
04/16 16:44 -0.010
-4.55%
Prev close Open
0.110 0.105
Low High
0.100 0.110
Year l/h YTD var.
0.060 -  0.140 -25.00%
52 week l/h 52 week var.
0.060 -  0.380 -71.62%
Volume 1 month var.
207,501 50.00%
24hGold TrendPower© : 20
Produces
Develops Copper - Gold - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-30.00%
2023-48.28%0.420.14
2022-53.23%0.790.20
2021327.59%1.220.07
2020-60.27%0.380.06
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.76-1.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04-1.95%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56-3.12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.44-2.01%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.23-1.17%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.23-4.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-7.14%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.76+2.03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.18-0.95%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :