Anglo Asian Mining plc

Published : July 14th, 2016

Substantial increase in gold production at Gedabek mine, Azerbaijan highlighted in Q2 & H1 2016 prod

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

 

14 July 2016

 

Anglo Asian Mining plc

Q2 and H1 2016, Production Update and Operations Review

  Gedabek gold, copper and silver mine, Azerbaijan

 

Anglo Asian Mining plc ("Anglo Asian" or "the Company"), the AIM listed gold, copper and silver producer focused in Azerbaijan, is pleased to provide an operations and production update for its Gedabek gold, copper and silver mine ("Gedabek") in western Azerbaijan for the three months to 30 June 2016 ("Q2 2016") and the six months to 30 June 2016 ("HY1 2016").  Note that all references to "$" are to United States dollars.

 

Production overview

                Q2 2016

?         Gold production for Q2 2016 increased to 19,665 ounces with 17,926 ounces contained within gold dor?, 4 ounces from SART processing and 1,735 ounces from flotation (Q1 2016: total 14,172 ounces)

?         Copper production for Q2 2016 totalled 537 tonnes, 195 tonnes from SART processing and 342 tonnes from flotation (Q1 2016: total 432 tonnes)

?         Silver production for Q2 2016 totalled 56,440 ounces with 2,983 ounces contained within gold dor?, 8,979 ounces from SART processing and 44,478 ounces from flotation (Q1 2016: total 34,342 ounces)

H1 2016

?         Gold production for HY1 2016 totalled 33,837 ounces (HY1 2015: total 35,938 ounces)

?         Copper production for HY1 2016 totalled 969 tonnes (HY1 2015: 418 tonnes)

?         Silver production for HY1 2016 totalled 90,782 ounces (HY1 2015: total 6,477 ounces)

FY 2016 target production

?         Target production for the year to 31 December 2016 ("FY 2016") remains at between 73,000 ounces and 77,000 ounces of gold and 1,700 to 2,100 tonnes of copper

Sales

?         Q2 2016 gold dor? sales of 15,661 ounces of gold at an average of $1,265 per ounce (Q1 2016: 12,058 ounces at an average of $1,184 per ounce)

?         Q2 2016 copper concentrate shipments to the customer totalled 1,582 dry metric tonnes ("dmt") with a sales value of $3 million (excluding Government of Azerbaijan profit share) (Q1 2016: 1,330 dmt with a sales value of $2.1 million)

?         18,000 ounces of gold sales in HY2 2016 now hedged at no cost with a minimum and maximum sales price per ounce of $1,200 and $1,426 respectively

 

Operational update

?         Second SAG mill expected to be operational by early August

?         Contracts for water treatment plant and evaporation equipment now executed

?         Contract to build electrical sub-station and associated overhead power lines executed with completion expected by end of 2016 - anticipated annual savings of $1.8 to $2.0 million from 2017 onwards

?         New underground equipment now fully deployed

 

Company financials

?         Net debt, being interest-bearing loans and borrowings less cash and cash equivalents, totaled $40.8 million at 30 June 2016 ($47.5 million at 31 March 2016)

 

Anglo Asian CEO Reza Vaziri said, "We are delighted to report these highly encouraging second quarter production numbers which show a substantial increase over the first quarter. The second half of the year has historically been our best performing half due to the seasonally better weather and our production will also benefit from the second SAG mill which is due to start operating next month. We are therefore confident of meeting our production target for 2016 of between 73,000 and 77,000 ounces of gold and 1,700 to 2,100 tonnes of copper.

 

"The Company continues to invest at Gedabek both to improve the sustainability of the operation and to lower costs to further enhance our operational and financial performance. In addition to the second SAG mill, two other major initiatives were undertaken in the first half. The first initiative is to purify water from the tailings dam so it can be released into the environment and the second is to use cleaner and cheaper electric power from the grid. These will both be highly beneficial for your company and also lower costs. The new underground equipment which is now in full time use at Gadir is also improving our productivity. That these investments have been undertaken whilst we have also significantly reduced the Company's net debt shows that the Company's financial position is improving as we work towards our goal of returning the Company towards profitability.

 

"The Company also took the opportunity to hedge some future gold sales due to the recent strength in the gold price resulting from the uncertainty of the UK's EU referendum decision. This protects the Company against any significant downside in the price of gold whilst still giving us considerable exposure to any further increases in this volatile gold market. This is the first time Anglo Asian has hedged gold sales and this transaction therefore marks another stage in the development of your Company.

 

"I look forward to providing further updates in due course as we continue to improve our production performance and lower costs in order to deliver the utmost value for shareholders."

 

Production and sales details

 

During Q2 2016, the Company mined 491,210 tonnes of ore from its Gedabek open pit (Q1 2016: 344,171 tonnes). In Q2 2016, 37,732 tonnes of ore with an average grade of 9.29 grammes per tonne was mined from its Gadir underground mine (Q1 2016: 17,756 tonnes with an average grade of 7.91 grammes per tonne).

 

As previously reported, low grade ore (less than 1.5 grammes per tonne of gold) is being treated by heap leaching, whilst higher grade ore (more than 1.5 grammes per tonne of gold) is being processed through the agitation leaching plant.

 

During Q2 2016, Anglo Asian stacked 110,202 tonnes of dry crushed ore on to heap leach pads with an average gold content of 1.36 grammes per tonne (Q1 2016: 91,450 tonnes with an average gold grade of 1.46 grammes per tonne). The Company also heap leached uncrushed (Run of Mine - "ROM") ore. During Q2 2016, Anglo Asian stacked 263,432 tonnes of ROM ore on to heap leach pads with an average gold content of 0.76 grammes per tonne (Q1 2016: 114,508 tonnes with an average gold grade of 0.88 grammes per tonne).

 

During the quarter, the Company processed 151,649 tonnes of ore with an average gold content of 3.59 grammes per tonne through the agitation leaching plant (Q1 2016: 131,930 tonnes with an average gold grade of 2.93 grammes per tonne).

 

There was a 74 per cent. gold recovery in agitation leaching for Q2 2016, an increase from 70 per cent. seen in the previous quarter. The increased gold recovery was as a result of the higher grade of ore processed. Gold dor? is produced from both heap and agitated leach intermediate solutions, which are combined for final processing and also recirculated around the plant, heap leach pads and tailings dam. Heap leaching is a long term process and recoveries are therefore only estimates calculated from available metallurgical statistics.

 

During Q2 2016, the Company produced gold dor? containing 17,926 ounces of gold and 2,983 ounces of silver at Gedabek (Q1 2016: 13,383 ounces of gold and 1,958 ounces of silver). The agitation leach plant produced 12,928 and 2,122 ounces of gold and silver, respectively, and the heap leach operations produced 4,998 and 869 ounces of gold and silver, respectively. The increased gold dor? production from agitation leaching was due to the higher amount of crushed ore feedstock processed by the plant, the higher grade of ore and the increased recoveries.

 

During Q2 2016, 140,570 dmt of agitation leach plant tailings were processed by the flotation plant. The gross metal contained within this feed-stock was 5,724 ounce of gold, 99,416 ounces of silver and 606 tonnes of copper. Copper concentrate totaling 1,988 dmt was produced containing 342 tonnes of copper and 1,735 ounces of gold.

 

The following table summarises gold dor? production and sales at Gedabek for FY 2015 and Q1 and Q2 2016:

 

 

Gold produced*

(ounces)            

Silver

Produced*

(ounces)

Gold sales**

(ounces)

Gold Sales price

($/ounce)

Quarter ended

 

 

 

 

31 March 2015

17,185

597

17,206        

  1,214

30 June 2015

18,739

900

16,088

  1,193

30 Sept 2015

18,158

907

14,871

1,123

31 Dec 2015

17,588

1,858

15,759

1,108

 

 

 

 

 

FY 2015 - total

71,670

4,262

63,924

1,161

 

 

 

 

 

31 March 2016

13,383

1,958

12,058

1,184

30 June 2016

17,926

2,983

15,661

1,265

 

 

 

 

 

* including Government of Azerbaijan's share

** excludes Government of Azerbaijan's share

 

The following table summarises copper concentrate production from both its SART and flotation plants for Q1 and Q2 2016:

 

Concentrate

Copper 

Gold

Silver

production*

content*

content*

content*

 

(dmt)

(tonnes)

(ounces)

(ounces)

 

 

 

 

 

Quarter ending 31 March 2016

 

 

 

 

SART processing

363

181

12

7,789

Flotation

1,458

251

777

24,595

    Sub - total

1,821

432

789

32,384

Quarter ending 30 June 2016

 

 

 

 

SART processing

373

195

4

8,979

Flotation

1,988

342

1,735

44,478

    Sub - total

2,361

537

1,739

53,457

6 months ending 30 June 2016

 

 

 

 

SART processing

736

376

16

16,768

Flotation

3,446

593

2,512

69,073

    Total

4,182

969

2,528

85,841

 

* including Government of Azerbaijan's share

 

The following table summarises total copper concentrate production and sales at Gedabek for FY 2015 and H1 2016. Note that sales of concentrate are initially recorded at provisional amounts until agreement of final assay:

 

Concentrate

Copper 

Gold

Silver

 Concentrate

 

Concentrate

production*

content*

content*

content*

sales**

sales**

 

(dmt)

(tonnes)

(ounces)

(ounces)

(dmt)

($000)

Quarter ended

 

31 March 2015

298

182

8

1,354

234

660

30 June 2015

391

236

6

3,627

372

1,076

30 Sept 2015

406

216

7

3,532

279

661

31 Dec 2015

955

335

341

15,851

817

1,285

 

 

 

 

 

 

 

FY 2015 - total

2,050

969

362

24,364

1,702

3,682

 

 

 

 

 

 

 

31 March 2016

1,821

432

789

32,384

1,330

2,137

30 June 2016

2,361

537

1,739

53,457

1,582

3,019

 

* including Government of Azerbaijan's share

** excludes Government of Azerbaijan's share

 

 

 

Operational update

 

The agitation leaching plant's second semi-autogenous grinding ("SAG") mill is now in place at Gedabek and is being commissioned. It is expected that commissioning will be completed by early August. Once in operation, it will ensure sustainable production and assist in achieving our 2016 annual production target.

 

The Company has started on several initiatives to improve the sustainability and lower costs at Gedabek. Contracts totalling $1.7 million have been signed to purify, and dispose of, waste water. A membrane filtration plant will produce water of sufficient purity from water in the tailings dam that it can be discharged into the environment. Further water can also be disposed of by the ancillary evaporation equipment which is also being installed. A by-product concentrate will also be produced from which metal and cyanide can be recovered. This will improve the water balance of the site and save costs as it will reduce the tailings dam capacity required. It will also enable the recovery of metal currently in the tailings dam. The system is estimated to be installed and in operation by Q4 2016.

 

The Company has also contracted for $2 million to construct and install a 35/6 kV 2x16 MVA electrical sub-station and associated overhead power lines to connect the site to the electricity grid. This will result in cleaner and cheaper electrical power at Gedabek. It is expected that the work will be completed and power will be available from the electricity grid by the end of 2016. Once in operation, purchasing electricity from the grid compared to generating electricity using diesel generators will result in cost savings of approximately $1.8 to $2.0 million per annum.

 

The new underground equipment which was purchased from Atlas Copco comprising an underground drill machine, loader and truck is now fully deployed in the Gadir underground mine.

 

Company financial details

 

On 27 June 2016, the Company entered into a series of net zero cost options with a lower (PUT option) sales price of US$1,200 per ounce and an upper (CALL option) sales price of US$1,426 per ounce. The options mature in lots of 1,500 ounces of gold with the first lot maturing on 12 July 2016. The remainder of the lots mature every two weeks from this date with the final lot maturing on 13 December 2016. The PUT options give the right to the Company (but not the obligation) to sell gold at the option price. The CALL options give the right to the holder (but not the obligation) to buy gold at the option price. The 18,000 ounces will therefore have a minimum and maximum sales price per ounce of $1,200 and $1,426 respectively. Where the spot price on date of sale is between $1,200 and $1,426, sales will take place at spot price and the options will expire without exercise.

 

The Company had net debt at 30 June 2016 of $40.8 million, a reduction of $8.2 million since 31 December 2015. The net debt at 30 June 2016 was as follows:                              

 

$m

Amsterdam Trade Bank -  Agitation plant loan

22.2

International Bank of Azerbaijan -  loan

International Bank of Azerbaijan - credit line

8.7

2.8

Atlas Copco equipment finance loan

YapiKredit

Pasha Bank

Director

1.5

1.4

3.3

3.9

 

Total Loans    

43.8

Cash on hand and at bank

(3.0)

Net debt

40.8

 

 

**ENDS**

 

For further information please visit www.angloasianmining.com or contact:

 

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Bill Morgan

Anglo Asian Mining plc

Tel: +994 502 910 400

Ewan Leggat

SP Angel Corporate Finance LLP

Nominated Adviser and Broker

Tel: +44 (0) 20 3470 0470

Laura Harrison

SP Angel Corporate Finance LLP

Tel + 44 (0) 20 3470 0470

Lottie Brocklehurst

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

Susie Geliher

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

 

 

 

 

 

 

 

 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan.  The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

 

The Company developed Azerbaijan's first operating gold/copper/silver mine, Gedabek, which commenced gold production in May 2009.  Gedabek is an open cast mine with a series of interconnected pits. The Company is also mines high grade ore from the Gadir underground mine which is co-located at the Gedabek site. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

 

Gold production for the year ended 31 December 2015 from Gedabek totaled 72,032 ounces with 969 tonnes of copper also produced.  Gedabek is a polymetallic deposit and its ore has a high copper content, and as a result the Company produces copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant. Anglo Asian also produces a copper and precious metal concentrate from its flotation plant, which commenced production in the last quarter of 2015. This is initially processing tailings from the agitation leach plant.

 

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company.

 

 

 

 

cid:image001.jpg@01D02E70.74B813E0

 

Grace-Anne Marius

St Brides Partners Ltd

3 St Michael's Alley, London, EC3V 9DS

www.stbridespartners.co.uk 

Tel: +44 (0) 207 236 1177  | Mob: +44 (0) 753 564 2059 |   Twitter: @StBridesP

 

 

Disclaimer

 

The information contained in this communication from the sender is confidential.  This email is intended solely for the named recipient. It may contain privileged and/or confidential information. If you are not one of the intended recipients, please notify the sender immediately, and destroy this email: any disclosure, copying, distribution or any action taken or omitted in relation to the contents of this information is prohibited and may be unlawful. Any views expressed in this message are solely those of the author and do not necessarily represent those of St Brides Partners Limited, its subsidiaries or associates, except where expressly stated to be.

 

Although St Brides Partners Limited believes this email and any attachments to be free of viruses it cannot guarantee that attachments are virus-free or compatible with your systems and does not accept any liability in respect of viruses which may be transmitted in or with this message, or for any computer problems experienced.

 

St Brides Partners Limited is registered in England with company number 09359105 at 3 St Michael's Alley, London, EC3V 9DS.

 

Data and Statistics for these countries : Azerbaijan | All
Gold and Silver Prices for these countries : Azerbaijan | All

Anglo Asian Mining plc

PRODUCER
CODE : AAZ.L
ISIN : GB00B0C18177
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Anglo Asian Mining is a gold and copper development stage company based in United kingdom.

Anglo Asian Mining produces gold, copper, silver in Azerbaijan.

Its main asset in production is GEDABEK in Azerbaijan and its main exploration properties are GOSHA and ORDUBAD in Azerbaijan.

Anglo Asian Mining is listed in United Kingdom. Its market capitalisation is GBX 7.8 billions as of today (US$ 9.2 billions, € 8.6 billions).

Its stock quote reached its lowest recent point on July 10, 2009 at GBX 10.00, and its highest recent level on April 03, 2020 at GBX 99.80.

Anglo Asian Mining has 113 761 024 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Project news of Anglo Asian Mining plc
7/14/2016(Gedabek)Substantial increase in gold production at Gedabek mine, Aze...
5/25/2016FY2015 Results - Record gold production of 72Koz; 28.6Koz si...
5/28/2013Live alert - Market Movers: Leyshon Resources, Northcote Ene...
6/2/2006(Gedabek)encouraging results at Gedabek
Corporate news of Anglo Asian Mining plc
7/14/2016Q2 & H1 2016, Production Update, Operations Review
6/29/2016Hedging of gold sales for remainder of 2016
6/28/2016Result of AGM
6/27/2016AGM Statement
5/25/2016Final Results
4/13/2016Q1 2016 operations and production update, Gedabek
12/21/2015Floating exchange rate regime
11/24/2015Copper Concentrate Shipment from Floatation Plant
10/14/2015Q3 2015 Production Update
7/31/2015Total Voting Rights
7/22/2015Issue of Shares / Directors Dealing
4/14/2015Q1 2015 Gedabek Update
3/19/2015Director Dealing
3/16/2015Flotation Plant Update - Gedabek Mine Azerbaijan
3/16/2015Director Dealing
11/5/2014Q3 2014 Production and Operational Update
4/12/2006(Gosha)Preliminary results for the 11 month period ended 31 Dec 200...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
LSE (AAZ.L)
68.89+0.57%
LSE
GBX 68.89
04/19 15:15 0.390
0.57%
Prev close Open
68.50 67.90
Low High
67.00 71.00
Year l/h YTD var.
51.50 -  68.89 14.82%
52 week l/h 52 week var.
42.00 -  114.50 -35.31%
Volume 1 month var.
193,638 25.25%
24hGold TrendPower© : -31
Produces Copper - Gold - Silver
Develops
Explores for Copper - Gold - Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/26/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-0.16%
2023-29.23%99.00100.00
2022-13.33%99.75100.00
2021-14.45%165.00104.60
2020-14.05%99.80102.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56+4.63%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :