Atlas Iron Limited

Published : July 06th, 2015

Supplementary Prospectus

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Supplementary Prospectus

ASX Announcement 6 July 2015

Atlas Iron (ASX AGO) advises that a supplementary prospectus that supplements the prospectus dated 11 June

2015 is attached to this announcement. Under the prospectus (as supplemented by the supplementary prospectus), Shareholders have a priority right to subscribe for new shares (through the Shareholder Participation Offer, 'SPO') at 5 cents, with 1 free attached option at 7.5 cents.

www.atlasiron.com.au to download the prospectus, supplementary prospectus and the application form accompanying the supplementary prospectus.

Please note that the offers to most eligible shareholders and the general public close at 5pm Perth time on Monday the 13th July 2015.

If you have any questions about the capital raising, including how to participate, please contact the Atlas shareholder hotline on 1300 723 432 (from within Australia) or +61 3 9946 4434 (from outside Australia) at any time between 9:00am and 5:00pm (Sydney time) on Monday to Friday during the period in which any of the offers

under the prospectus remain open.

Investor Enquiries:

Atlas Iron +61 8 6228 8000

David Flanagan, Managing Director

Media Enquiries:

Read Corporate +61 8 9388 1474

Paul Armstrong +61 421 619 084

Atlas Iron Limited

ABN 63 110 396 168

Raine Square, Level 18

300 Murray Street Perth WA 6000

PO Box 7071

Cloisters Square Perth WA 6850

P: +61 8 6228 8000

F: +61 8 6228 8999

E: [email protected]
W: www.atlasiron.com.au

ATLAS IRON LIMITED ACN 110 396 168

SUPPLEMENTARY PROSPECTUS

1. IMPORTANT NOTICE
This document is a supplementary prospectus (Supplementary Prospectus) and supplements, and is intended to be read together with, the prospectus dated 11 June
2015 (Prospectus) that was issued by Atlas Iron Limited ACN 110 396 168 (Atlas or

Company).

This Supplementary Prospectus is dated 6 July 2015 and was lodged with ASIC on that date.
Neither ASIC nor ASX takes any responsibility for the contents of this Supplementary
Prospectus.
This Supplementary Prospectus will be issued with the Prospectus as an electronic prospectus and may be accessed on the Company's website at www.atlasiron.com.au. You may obtain a paper copy of this Supplementary Prospectus, and the Prospectus, free of charge by contacting the Company.
The changes in this Supplementary Prospectus are for clarification purposes only and, accordingly, are not (in the opinion of the Directors of Atlas) materially adverse from the point of view of an investor. Accordingly, there are no withdrawal rights attaching to valid applications received to date under the Prospectus.
No previous supplementary prospectus has been lodged with ASIC in relation to the Prospectus. If there is a conflict between the Prospectus and this Supplementary Prospectus, this Supplementary Prospectus prevails to the extent of that inconsistency.
This is an important document and should be read in its entirety. If after reading this Supplementary Prospectus (in conjunction with the Prospectus) you have any questions about the New Securities being offered or any other matter, you should consult your stockbroker, accountant or other professional adviser. The New Securities offered should be considered speculative. This Supplementary Prospectus may not be released or distributed in the United States. Please refer to Sections 1.2 and 1.3 of the Prospectus for full details about the restrictions on distribution of the Prospectus and the foreign jurisdictions; these Sections apply equally to this Supplementary Prospectus.
Terms and abbreviations defined in the Prospectus have the same meaning in this
Supplementary Prospectus unless otherwise indicated.
2. ATLAS' BREAK EVEN PRICE CURRENTLY AND THROUGH RAMP UP TO TARGETED CALENDAR YEAR END PRODUCTION RATE
As specified in the Prospectus, Atlas' Break Even Price is approximately US$50/dmt (IODEX 62% FE CFR China basis) based on Full Cash Costs of production corresponding to a nominal production run-rate of 15Mtpa, and Atlas' targeted year-end production rate is
14-15Mtpa. Atlas expects to be producing at a rate of 15Mtpa during the course of
December 2015.
To recap, in the Prospectus Break Even Price is defined to mean the price at which Atlas must sell iron ore (equivalent IODEX 62% FE CFR China basis) to cover the Full Cash Costs.
1

THIS IS A SUPPLEMENTARY PROSPECTUS DATED 6 JULY 2015 TO BE READ IN CONJUNCTION WITH THE PROSPECTUS DATED 11 JUNE 2015 IN RELATION TO NEW SECURITIES OF ATLAS IRON LIMITED ACN 110 396 168

To provide further clarification about the Company's current estimated Break Even Price based on Full Cash Costs, and the trend towards the estimated US$50/dmt Break Even Price as production grows over the coming months, further detail is provided in the graph below and in the discussion that follows.

In summary, the estimated Break Even Price is shown to generally reduce as the Company's production rate grows towards the targeted 15Mtpa by calendar year end. During the period from August to October 2015, production from the previously suspended Mt Webber mine is expected to ramp up, so as to ultimately achieve a targeted annualised rate of 6Mtpa from that mine in the December 2015 quarter. Lump production is expected to commence at the Mt Webber mine during November 2015.
The key assumptions underlying the estimated Prospectus Break Even Prices above are:

AUD/USD $0.785.

For the period July to December 2015 "Estimated Break Even Price Prospectus Assumptions" based on forecast production and Full Cash Costs for those months and the Prospectus revenue assumptions.

"Prospectus Breakeven Price Estimate" based on nominal production run- rate and Full Cash Costs at 15mtpa (i.e. 320kt/mth, 480kt/mth and

450kt/mth from Abydos, Wodgina and Mt Webber respectively) and the
Prospectus revenue assumptions.

Sea freight of US$6.25/wmt

No Contractor Collaboration Deed cost assumed for Mt Webber, however estimated 10-12% mining cost savings (via the BGC Agreement).

Private and State Royalties of 10.5% at Wodgina and 8.0% at Mt Webber and Abydos.

Interest of 8.75% p.a. applied to secured debt of US$269m (i.e. A$343m at AUD/USD $0.785).

Payment of Contractor Collaboration Margin included for Wodgina and

Abydos.

Moisture of 5.7%, 3.8% and 4.5% at Wodgina, Abydos and Mt Webber respectively (i.e. average expected moisture over next 24 months).

2

THIS IS A SUPPLEMENTARY PROSPECTUS DATED 6 JULY 2015 TO BE READ IN CONJUNCTION WITH THE PROSPECTUS DATED 11 JUNE 2015 IN RELATION TO NEW SECURITIES OF ATLAS IRON LIMITED ACN 110 396 168

Average assumed lump premium of A$10/dmt, with Lump contributing

66% and 50% of Abydos and Mt Webber product respectively. No Lump product assumed to be produced at Wodgina.

Initial Lump production at Mt Webber from November 2015, growing during December 2015 to stated 50% of product tonnes.

Average 'Other' contractual penalties of US$0.50/dmt assumed to provide

for impurities not specified in contracts.

Quality / Value in Use discount of 12.5%, relating to discounts for ore impurities.

Average assumed grade of Atlas ore of 57.0% Fe, compared with benchmark grade of 62.0% Fe.

WA State Government Royalty Relief not included in Break Even Price

analysis.
The current operating outcomes as at the date of this Supplementary Prospectus demonstrate a lower estimated Break Even Price than the equivalent estimate using the Prospectus Break Even Price assumptions (described in the paragraph immediately above). As at the date of this Supplementary Prospectus, the estimated Break Even Price at the current production run-rate and operating outcomes is between US$52.50 and US$53.50/dmt. This is primarily a result of the combined effects of a lower AUD:USD exchange rate, lower product discounts and higher lump product premiums being achieved in the current market; with these gains being partially offset by higher sea freight. While representative of current market conditions as at the date of this Supplementary Prospectus, there is no guarantee that these positive developments will be available to the Company beyond the month of July 2015. However, as the above graph indicates, the Company expects to achieve a Break Even Price of approximately US$50/dmt by year end as it works towards its targeted production run-rate of 15Mtpa.
Key assumptions underlying the estimated Break Even Price stated (in the paragraph immediately above) as applicable to current operating outcomes are:

AUD/USD $0.76.

July Full Cash Costs estimates based on 600kt and 320kt production from

Wodgina and Abydos respectively, and no production from Mt Webber.

Sea freight of US$7.00/wmt

Private and State Royalties of 10.5% at Wodgina and 8.0% at Abydos.

Interest of 8.75% p.a. applied to secured debt of US$269m.

Payment of Contractor Collaboration Margin included for Wodgina and

Abydos.

Moisture of 5.7%, 3.8% at Wodgina and Abydos respectively.

Average assumed lump premium of A$13/dmt, with Lump contributing

66% of Abydos product. No Lump product assumed to be produced at
Wodgina or Mt Webber.

Average 'Other' contractual penalties of US$0.50/dmt assumed to provide for impurities not specified in contracts.

Quality / Value in Use discount of 11.5%, relating to discounts for ore impurities.

Average assumed grade of Atlas ore of 57.0% Fe, compared with

benchmark grade of 62.0% Fe.

WA State Government Royalty Relief not included in Break Even Price analysis.

3

THIS IS A SUPPLEMENTARY PROSPECTUS DATED 6 JULY 2015 TO BE READ IN CONJUNCTION WITH THE PROSPECTUS DATED 11 JUNE 2015 IN RELATION TO NEW SECURITIES OF ATLAS IRON LIMITED ACN 110 396 168

3. INDEPENDENT ECONOMIC FORECASTERS
For completeness, the Company confirms that the independent economic forecasters from which Atlas sourced forecast iron ore price and forecast AUD:USD exchange rate information for the purposes of preparing the Prospectus are as follows:

CRU Group;

Metalytics; and

Wood Mackenzie.

Each of the parties referred to above:
(a) has not authorised or caused the issue of this Supplementary Prospectus or the
Prospectus;
(b) does not make, or purport to make, any statement in this Supplementary
Prospectus or in the Prospectus;
(c) has not made any statement on which a statement in this Supplementary
Prospectus or the Prospectus is based, other than as specified in this Section 3;
(d) to the maximum extent permitted by law, expressly disclaims all liability in respect of, makes no representation regarding, and takes no responsibility for, any part of, or any statements in, or any omissions from, this Supplementary Prospectus or the Prospectus, other than the reference to its name and the statements (if any) included in the Prospectus with the consent of that party as specified in this Section
3; and
(e) has given and, at the time of lodgement of this Supplementary Prospectus, has not withdrawn its written consent to:
(i) being named in this Supplementary Prospectus and in the Prospectus (in the case of the latter, as an "independent economic forecaster") in the form and context in which it is named; and
(ii) the inclusion in the Prospectus of reference to independent economic forecast information prepared by that party.
4. CORRECTION OF TYPOGRAPHICAL ERROR ON PAGE 15 OF THE PROSPECTUS
To avoid any potential for confusion, the Company clarifies that the denomination of the columns in the summary table provided in B. Key Financial Information "What are the key investment metrics and financial information" (see Section 5 of the Prospectus at page 15) should have been "$,000" not "$M".
This was a typographical error and the remainder of the Prospectus (in particular, Section
10 Financial Information) is accurate.
5. CONFIRMATION OF TIMETABLE AND IMPORTANT DATES
To avoid any doubt, the key dates set out in section 4 of the Prospectus are unchanged. Importantly, the Closing Date for the Shareholder Participation Offer, the Contractor Issue
and, in respect of the general public, the Placement and Shortfall Placement, is scheduled
to be 5.00pm (Perth time) on 13 July 2015.
4

THIS IS A SUPPLEMENTARY PROSPECTUS DATED 6 JULY 2015 TO BE READ IN CONJUNCTION WITH THE PROSPECTUS DATED 11 JUNE 2015 IN RELATION TO NEW SECURITIES OF ATLAS IRON LIMITED ACN 110 396 168

6. APPLICATIONS FOR NEW SECURITIES
All new applications for New Securities must be made on the Supplementary Personalised SPO Acceptance Form or Supplementary Placements Application Form (as applicable) attached to or accompanying this Supplementary Prospectus.
New applications must not be made on the Personalised SPO Acceptance Form or Placements Application Form attached to or accompanying the Prospectus, unless the Company is satisfied that applicants have received a copy of both the Prospectus and the Supplementary Prospectus.
The forms must be completed in accordance with the instructions contained in the forms and according to the instructions set out in the Prospectus, except as modified by this Supplementary Prospectus.
Applications must be received by the Closing Date.
To avoid any doubt, for Eligible Shareholders wishing to subscribe under the Shareholder Participation Offer and pay by BPAY, please follow the instructions on your Supplementary Personalised SPO Acceptance Form (which includes the Biller Code and your unique reference number). You can only make a payment via BPAY if you are the holder of an account with an Australian financial institution that supports BPAY transactions.
If you are paying by BPAY, please make sure to use the specific Biller Code and unique Reference Number on your Supplementary Personalised SPO Acceptance Form. If you have multiple holdings and receive more than one Supplementary Personalised SPO Acceptance Form, when applying for SPO Shares, please only use the Reference Number specific to the holding on each Application Form. If you do not use the correct Reference Number specific to each holding, or inadvertently use the same Reference Number for more than one of your holdings, your Application will not be recognised as valid.
Please note that should you choose to pay by BPAY:
(a) you do not need to submit the Supplementary Personalised SPO Acceptance Form but are taken to have made the statements contained in that Supplementary Personalised SPO Acceptance Form; and
(b) you are deemed to have taken up such whole number of New Securities, which is covered in full by your Application Monies.
It is your responsibility to ensure that your BPAY payment is received by the Share Registry by no later than the Closing Date (subject to variation). You should be aware that your financial institution may implement earlier cut-off times with regard to electronic payment and you should therefore take this into consideration when making payment.
5

THIS IS A SUPPLEMENTARY PROSPECTUS DATED 6 JULY 2015 TO BE READ IN CONJUNCTION WITH THE PROSPECTUS DATED 11 JUNE 2015 IN RELATION TO NEW SECURITIES OF ATLAS IRON LIMITED ACN 110 396 168

7. DIRECTORS' CONSENT
Each Director of Atlas has consented to the lodgement and issue of this Supplementary
Prospectus and has not withdrawn that consent. Signed for and on behalf of the Directors of Atlas:

Mr David Flanagan Managing Director Atlas Iron Limited

6

THIS IS A SUPPLEMENTARY PROSPECTUS DATED 6 JULY 2015 TO BE READ IN CONJUNCTION WITH THE PROSPECTUS DATED 11 JUNE 2015 IN RELATION TO NEW SECURITIES OF ATLAS IRON LIMITED ACN 110 396 168

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | China | All
Gold and Silver Prices for these countries : Australia | China | All

Atlas Iron Limited

PRODUCER
CODE : AGO.AX
ISIN : AU000000AGO1
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Atlas Iron is a iron exploration company based in .

Atlas Iron holds various exploration projects in Australia.

Its main asset in production is PARDOO in Australia, its main assets in development are WODGINA and RIDLEY MAGNETITE PROJECT in Australia and its main exploration properties are ABYDOS, MT WEBBER and MID WEST IRON in Australia.

Atlas Iron is listed in Australia and in Germany. Its market capitalisation is AU$ 416.8 millions as of today (US$ 302.7 millions, € 265.6 millions).

Its stock quote reached its highest recent level on July 29, 2011 at AU$ 3.96, and its lowest recent point on June 24, 2016 at AU$ 0.01.

Atlas Iron has 9 261 129 728 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Atlas Iron Limited
10/16/2018Australia's Atlas Iron names ex-Hancock executive CEO in boa...
6/8/2018Australia's Fortescue takes stake in Atlas Iron, may block b...
2/28/2018Atlas Iron reveals strategy to weather storm of discounts
12/24/2014Atlas Iron to take a $900 million write-down
Nominations of Atlas Iron Limited
5/25/2011Retirement of Chairman and Appointment of Interim Chairman
12/2/2008Appoints Geoff Clifford as Chairman
Financials of Atlas Iron Limited
10/19/2016September 2016 Quarterly Activities Report
Project news of Atlas Iron Limited
9/22/2016Mineral Resources and Ore Reserves at 30 June 2016
5/9/2011(Wodgina)Increases production capacity at Wodgina by 75% to 7Mtpa
6/21/2010(Wodgina)Mining Commences at Wodgina
6/16/2010(Wodgina)New DSO Discovery at Wodgina
4/7/2010(Wodgina)Key DSO Growth Projects on Track
10/13/2009(Pardoo)Progress Update - North Pilbara DSO Projects
8/4/2009(Mt Webber)Maiden Resource for Mt Webber DSO Project
7/31/2009(Wodgina)Wodgina DSO Project Feasibility Study Compete
6/19/2009(Mt Webber)Continued North Pilbara Exploration Success
5/26/2009(Wodgina)Wodgina DSO Project - Interim Feasibility Study Outcomes
5/21/2009(Mt Webber)New DSO Discovery at Mt Webber
5/19/2009(Wodgina)500% Increase in Wodgina DSO Resource
3/9/2009Drilling Results Add to Wodgina Infrastructure Potential
1/29/2009(Pardoo)Atlas Increases Pilbara DSO Resources By 45 per cent to 56.7...
1/7/2009(Pardoo)Intersects High Grade at Pardoo DSO Project
12/31/2008(Abydos)New Hematite Discoveries at the Abydos DSO Project
12/11/2008(Abydos)New DSO Discovery at Wodgina
12/8/2008(Abydos)Signs Native Title Mining Agreement for Abydos
11/26/2008(Pardoo)Ridley Magnetite Resource Upgrade to 2 Billion Tonnes
11/24/2008(Pardoo)Pilbara DSO Projects - Operations Update
11/10/2008(Pardoo)Delivers First Iron Ore to Port
10/2/2008(Pardoo)Ridley Magnetite Resource Upgrade
8/6/2008(Abydos)Abydos Magnetite Joint Venture with FMG
7/30/2008(Abydos)Abydos Direct Shipping Ore Project - Pre Feasibility Study U...
6/17/2008Ridley Magnetite Pre Feasibility Study Technical Update
4/7/2008(Abydos)Abydos Drilling Continues To Impress
Corporate news of Atlas Iron Limited
11/16/2016Change in substantial holding for Centaurus
11/16/2016Change in substantial holding (Marathon)
7/27/2016June 2016 Quarterly Report
6/28/2016Atlas welcomes WA Government announcement
6/28/2016David Flanagan resigns as Managing Director
6/23/2016Change in substantial holding for CTM
6/6/2016Appointment of Chairman
5/23/2016May 2016 Investor Presentation
5/10/2016Ceasing to be a substantial holder
5/6/2016Implementation of Creditors' Scheme
4/29/2016Creditors' Scheme
4/27/2016Chairman's Address to Shareholders at General Meeting
4/27/2016Presentation at General Meeting
4/21/2016Atlas March 2016 Quarterly Activities Report
4/18/2016Letter to Shareholders
4/4/2016Update on Debt Restructure
3/24/2016Notice of General Meeting/Proxy Form
12/23/2015Atlas signs debt restructure agreement
12/22/2015Trading Halt
12/15/2015Change in substantial holding for CTM
12/2/2015Change in substantial holding for CTM
10/28/2015Managing Director's AGM Presentation
10/28/2015Chairman's Address to Shareholders
10/22/2015Atlas Iron September 2015 Quarterly Report
10/22/2015Pre-feasibility Study Underway for Corunna Downs
10/6/2015Company Secretary Appointment/Resignation
9/29/2015Notice of Annual General Meeting/Proxy Form
9/29/2015Annual Report
9/24/2015New Iron Ore Sales Agreement and Marketing Update
9/9/2015Atlas Production Figures
9/1/2015Executive Changes as Part of Cost Reduction Programme
8/28/2015Production Update
8/17/201513 August 2015 Sale of Pilbara Iron Tenements
8/14/20152015 Annual Results
8/14/20152015 Annual Financial Report
8/14/2015Appendix 4E - 30 June 2015
8/13/2015Full Year Results Presentation FY2015
8/13/20152015 Annual Financial Report and Appendix 4E
8/13/2015SFX: Sale of Pilbara Iron Tenements
7/31/2015Quarterly Report
7/30/2015Ceasing to be a substantial holder
7/29/2015Becoming a substantial holder
7/29/2015MCS: Business Update and FY15 Result
7/27/2015Shares in Australia's Atlas Iron sink 70%
7/24/2015Reinstatement to Official Quotation
7/24/2015Request to Lift Suspension
7/22/2015Australia shares fall on profit taking, NZ stocks up
7/20/2015Atlas set for stronger future after raising $86m
7/15/2015Extension of the Closing Date - SPO and General Placement
7/8/2015Update on Forward Price Strategies
7/6/2015Supplementary Prospectus
7/2/2015Letter to Shareholders
6/17/2015Prospectus
6/11/2015Capital Raising to Strengthen Balance Sheet
6/11/2015Change of Date for General Meeting
6/11/2015David Flanagan Appointed as Managing Director
4/21/2015Voluntary Suspension Extension Request
4/14/2015Update Regarding Operational and Financial Review
4/13/2015Atlas Iron Suspends Production
4/12/2015Abydos Contract Update (1 pages)
4/10/2015Atlas Suspends Production in Response to Low Iron
4/6/2015Voluntary Suspension
3/9/2015Resignation of Director
3/6/2015S&P DJ Indices Announces March Quarterly Review
2/13/2015AGO: Investment Update - Mt Webber Project and Shaw River
2/13/2015Investment Update - Mt Webber Project and Shaw River
4/21/2011Quarterly Report for the Period Ending 31 March 2011
4/7/2011Media Alert - Atlas Iron MD to shed his locks this Friday......
4/4/2011Atlas posts shipping record in March
2/24/2011Reports $30M maiden half year profit
2/14/2011Declares Giralia takeover offer unconditional and accelerate...
7/6/2010More DSO Success at Hercules
5/28/2010Broker Report from Credit Suisse
5/5/2010to Ship Additional Tonnes Through Port Hedland Port Ahead of...
4/29/2010To Raise $63.5 Million To Capitalise On Strong Iron Ore Pric...
2/22/2010Atlas And Aurox Enter Into Utah Point Port Cooperation Agree...
11/6/2009Dr David Smith Joins The Atlas Board
10/20/2009Merger Moves Ahead
9/8/2009and Warwick Resources Agree to Merge
7/31/2009June 2009 Quarterly Report
6/15/2009to raise $116.7 Million to fund development of Pilbara Iron ...
2/17/2009and Talison Complete Infrastructure Sharing Agreement
1/19/2009 Ships Second Commercial Iron Ore to China
1/15/2009Maiden Inferred Resource At Wodgina
12/19/2008Completes Sale of Second Shipment of Connie Deposit Ore
12/15/2008Additional Excellent Results Enhance Wodgina DSO Project
12/5/2008Ships First Commercial Iron Ore to China
11/21/2008Managing Director's Address
9/25/2008Pardoo DSO Project - Mining Team Mobilised to Site
8/6/2008Signs Port Access Agreement with FMG
8/4/2008North West Iron Ore Alliance Maintains Pressure for Fair and...
8/1/2008June 2008 Quarterly Activities Report
7/28/20081.3 Billion Tonne Ridley Magnetite Resource
7/25/2008 DSO Resource and Reserve Update Summary
7/22/2008Pardoo Project Development Update
7/17/2008New Hematite Mineralisation Discovered at Pardoo
6/23/2008Welcomes NCC Recommendation to Declare Goldsworthy Railway
6/16/2008EPA Recommends Pardoo DSO Project for Ministerial Approval
5/19/2008Pardoo Mining Contract Awarded to CDE Capital
5/1/2008Supports Goldsworthy Railway Declaration
4/23/2008to Raise $100 Million to Accelerate Growth of Pilbara Iron O...
3/25/2008 Targets 120-180Mt of Pilbara Iron Ore
2/25/2008Open BriefingR. Production and Export of DSO
1/31/2008December 2007 Quarterly Activities Report
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (AGO.AX)Berlin (ATU.BE)
0.045+0.00%0.0000
AUSTRALIA
AU$ 0.045
11/21 10:00 -
0%
Prev close Open
0.045 0.045
Low High
0.045 0.045
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.045 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 19
Produces Iron
Develops Iron
Explores for Iron
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.68-0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.89-1.36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.36-3.28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.64+2.69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+6.25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.67-0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :