Taseko Reports First Quarter 2015 Results

What's happening - and what's to come.

May 13, 2015

This release should be read with the Company's Financial Statements and Management Discussion & Analysis ("MD&A"), available at www.tasekomines.com and filed on www.sedar.com. Except where otherwise noted, all currency amounts are stated in Canadian dollars. Taseko's 75% owned Gibraltar Mine is located north of the City of Williams Lake in south-central British Columbia. Production volumes stated in this release are on a 100% basis unless otherwise indicated.

May 13, 2015, Vancouver, BC - Taseko Mines Limited (TSX: TKO; NYSE MKT: TGB) ("Taseko" or the "Company") reports the results for the three months ended March 31, 2015.

First Quarter Highlights

  • First quarter 2015 earnings from mining operations (before depletion and amortization)* were $2.3 million and adjusted EBITDA* was $11.2 million compared to a loss of ($0.9) million and ($8.4) million, respectively, in the fourth quarter 2014,
  • Gibraltar throughput averaged 86,100 tons per day in the first quarter, above design capacity and the best performing quarter since the concentrator was upgraded.
  • Total production in the first quarter was 28.4 million pounds of copper and 404 thousand pounds of molybdenum, relatively flat compared to production of 28.1 million pounds and 445 thousand pounds in the fourth quarter 2014.
  • Total sales for the quarter were 25.4 million pounds of contained copper in concentrate. Inventory increased by 3.0 million pounds due to shipment timing.
  • In January 2015, the Company took advantage of the weak copper price and settled all outstanding copper put options for cash proceeds of $17.4 million, resulting in a gain on derivatives of $11.8 million.
  • In April 2015, the Company acquired copper put options for 30 million pounds over the second and third quarters of 2015 at a strike price of US$2.50 per pound. Total cost of these put options was US$1.1 million.
  • In May 2015, an updated mine plan and reserve for Gibraltar was announced. The new plan reduces the overall strip ratio and increases profitability of the mine.
Russell Hallbauer, President and CEO of Taseko, commented, "Copper grade in the first quarter was similar to the fourth quarter, as expected, but trended higher in March to 0.240% and then to 0.260% in April. During the quarter we successfully operated our concentrators above design capacity in order to maximize production, given the lower copper grade. Mining operations have now worked through the lower grade material in the upper benches and are now progressing into higher grade ore, with the grade expected to fluctuate between 0.25%-0.28% for the balance of 2015. Copper recoveries during the first quarter were better than expected considering the lower copper grade. The increasing copper grade combined with work that has been completed on the grinding and flotation circuits in recent months is expected to result in improved recoveries going forward.

The table below details monthly production statistics for the first quarter, as well as a second quarter forecast:

Jan-15 Feb-15 Mar-15 Q1 Total Q2 Forecast
Tons Milled (000s tons) 2,480 2,600 2,680 7,760 7,700
Tons Per Day 79,800 92,700 86,500 86,100 84,600
Strip Ratio 2.4 2.1 2.5 2.4 2.2
Grade 0.23% 0.21% 0.24% 0.23% 0.27%
Recovery 81.1% 80.2% 83.0% 81.4% 84.0%
Cu Production (000s lbs) 9,100 8,600 10,700 28,400 35,500
Cost Per Tonne Milled (C$) $10.09 $8.96 $10.00 $9.66 $10.80
Site Operating Costs Net of
By-Product Credits (US$/lb)
$2.06 $2.13 $1.77 $2.00 $1.75
Note: Numbers may not add up exactly due to rounding.

"Last week we announced an updated mine plan and long-term reserves for Gibraltar. The six-month engineering study optimized cut-off grade, strip ratio and pit development sequencing. The new mine plan significantly reduces the strip ratio and in combination with the new pit development sequence, will result in lower costs and more profitable copper production," continued Mr. Hallbauer. "This is only achievable because of the investments we have made at Gibraltar. In recent months, we have been mining to a short-term plan which is similar to the updated long-term plan. In the space of just a few months, we have made significant reductions in cost per ton milled, and as the grade has been improving, costs per pound are also falling. Costs will continue to decline as grade stabilizes at higher levels, recoveries improve and as we advance other cost saving initiatives."

Mr. Hallbauer added, "Our Florence and Aley projects continue to progress through the permitting and environmental assessment phases. We are managing spending on these projects to correspond with our cash flow and liquidity. Until copper market conditions improve, we will maintain a very conservative spending policy."

Mr. Hallbauer concluded, "I would also like to congratulate three members of my management team who have recently received important industry awards. In January, Rob Rotzinger, Vice President, Capital Projects, was awarded the Mineral Processor of the Year by the Canadian Mineral Processors (CMP) Group. This award was presented to Rob in recognition of the outstanding work he performed on the GDP3 project, for his dedication to the successful advancement of the Gibraltar Mine, and for his commitment to advancing mineral processing solutions at Gibraltar and Taseko as a whole. In May, John McManus, Chief Operating Officer, was named Mining Person of the Year by the Mining Association of BC. This award publicly recognizes an outstanding individual who has shown leadership in advancing and promoting the mining industry in British Columbia. John was recognized for his work on leading the Mining Association of British Columbia both as Chairman and as a Director during a period when significant changes were occurring with respect to how our industry is perceived by the public, government, media, and First Nations."

"Also in May, Tom Broddy, Manager, Engineering Projects received two awards from the Canadian Institute of Mining, Metallurgy and Petroleum (CIM). He was presented the District Distinguished Service Award for exemplary effort in introducing students to the mining industry and to the CIM, as well as the Distinguished Service Medal for his commendable mentoring, his commitment to the Surface Mining Society and his dedication to the CIM Vancouver Branch."

HIGHLIGHTS

Financial Data Three months ended March 31,
(Cdn$ in thousands, except for per share amounts) 2015 2014 Change
Revenues 61,835 104,996 (43,161)
Earnings (loss) from mining operations before depletion and amortization* 2,329 19,439 (17,110)
Earnings (loss) from mining operations (7,979) 8,787 (16,766)
Net earnings (loss) (25,206) (9,148) (16,058)
Per share - basic ("EPS") (0.11) (0.05) (0.06)
Adjusted net earnings (loss)* (2,434) (2,710) 275
Per share - basic ("adjusted EPS") * (0.01) (0.01) -
EBITDA * (11,996) 8,858 (20,854)
Adjusted EBITDA * 11,224 14,594 (3,370)
Cash flows provided by (used for) operations (3,328) 23,301 (26,629)
Operating Data (Gibraltar - 100% basis) Three months ended March 31,
2015 2014 Change
Tons mined (millions) 21.0 25.9 (4.9)
Tons milled (millions) 7.8 7.0 0.8
Production (million pounds Cu) 28.4 34.5 (6.1)
Sales (million pounds Cu) 25.4 40.0 (14.6)
*Non-GAAP performance measure. See page 19 of this MD&A.

  • Earnings from mining operations before depletion and amortization were $2.3 million;
  • Copper production at Gibraltar was 28.4 million pounds (100% basis), and was impacted by lower head grades. Grade is steadily increasing and is expected to fluctuate between 0.25% and 0.28% for the remainder of 2015;
  • Site operating cost per ton milled* decreased to $9.66 in the first quarter of 2015, approximately 19% lower than the first quarter of 2014 due to an overall reduction in spending;
  • Total operating costs* were US$2.39 per pound produced, lower than the previous two quarters as a result of lower site operating costs and weakening Canadian dollar exchange rate;
  • At March 31, 2015 the Company had a cash balance of $58 million;
  • In May 2015, an updated mine plan and reserve for Gibraltar was announced. The new plan reduces the overall strip ratio and increases profitability of the mine;
  • In January 2015, when the copper price dropped to a recent low of US$2.45 per pound, the Company sold all outstanding copper put options for cash proceeds of $17.4 million. The Company's hedging strategy is designed to mitigate a short term decline in copper price; and
  • In April 2015, the Company acquired copper put options for 30 million pounds over the second and third quarters of 2015 at a strike price of US$2.50 per pound.
*Non-GAAP performance measure. See the end of the news release.

REVIEW OF OPERATIONS

Gibraltar mine (75% Owned)

Operating results in the following table are presented on a 100% basis.

Operating Data (100% basis) Q1 2015 Q4 2014 Q3 2014 Q2 2014 Q1 2014
Tons mined (millions) 21.0 25.1 32.5 30.2 25.9
Tons milled (millions) 7.8 7.6 7.8 7.7 7.0
Strip ratio 2.4 3.1 3.0 3.1 2.8
Site operating cost per ton milled (CAD) * $9.66 $10.13 $12.10 $11.42 $11.91
Copper concentrate
Grade (%) 0.225 0.222 0.267 0.285 0.290
Recovery (%) 81.4 81.3 83.3 85.3 84.6
Production (million pounds Cu) 28.4 27.7 34.5 37.6 34.5
Sales (million pounds Cu) 25.4 26.0 37.1 38.1 40.0
Inventory (million pounds Cu) 6.2 3.2 1.4 3.9 4.4
Copper cathode
Production (million pounds) - 0.4 0.9 0.9 -
Sales (million pounds) - 0.5 1.0 0.6 -
Molybdenum concentrate
Grade (%) 0.006 0.008 0.011 0.011 0.009
Recovery (%) 40.0 38.8 38.0 41.4 42.5
Production (thousand pounds Mo) 404 445 654 667 566
Sales (thousand pounds Mo) 379 481 708 731 589
Per unit data (US$ per pound) *
Site operating costs* $2.12 $2.43 $2.60 $2.11 $2.19
By-product credits * (0.12) (0.11) (0.25) (0.35) (0.21)
Site operating costs, net of by-product credits * $2.00 $2.32 $2.35 $1.76 $1.98
Off-property costs 0.39 0.45 0.40 0.36 0.50
Total operating costs (C1) * $2.39 $2.77 $2.75 $2.12 $2.48
*Non-GAAP performance measure. See the end of the news release.

OPERATIONS ANALYSIS

During the first quarter of 2015, Gibraltar milled 7.8 million tons of ore, slightly over the design capacity of 85,000 tons per day. Gibraltar mined 21.0 million tons of material which was lower than recent quarters due to the idling of mine equipment to reduce expenditures in the face of temporary lower grade to the mill.

Average head grade for the first quarter of 2015 was 0.225% compared to 0.29% in the first quarter of 2014. Head grades are expected to fluctuate between 0.25% and 0.28% for the remainder of 2015. Lower head grades also negatively impacted copper recoveries in the first quarter of 2015. As grade improves recoveries are expected to improve as well.

Copper in concentrate production in the first quarter of 2015 was 28.4 million pounds, a decrease of 18% from copper production in the first quarter of 2014 of 34.5 million pounds. Molybdenum production during the first quarter of 2015 was 0.4 million pounds, a decrease of 29% over the first quarter of 2014. The decrease in molybdenum production is due to lower molybdenum grade.

Gibraltar's SX/EW plant was seasonally idle in in the first quarter but was restarted in April 2015.

In the first quarter of 2015, site operating costs, net of by-product credits per pound of copper produced was US$2.00, compared to US$1.98 during the first quarter of 2014. Site operating cost per ton milled decreased by approximately 19% to $9.66 in the first quarter of 2015 as a result of a reduction in waste mining, declining diesel prices and lower maintenance costs. The weakening Canadian dollar is also having a positive impact on our reported US dollar unit cost. The increase in per pound unit costs is being driven by the lower copper production as a result of lower head grades, which has offset the impact of operating cost reductions.

Off-property costs, including transportation, treatment and refining charges, for the first quarter of 2015 were US$0.39 per pound produced, compared to US$0.50 per pound produced in the first quarter of 2014. Off-property costs are driven by sales volumes, and therefore off-property cost per pound produced fluctuates based on differences between production and sales volumes.

The total operating costs, including off-property costs, for the first quarter of 2015 were US$2.39 per pound produced, compared to US$2.48 per pound in the first quarter of 2014.

GIBRALTAR OUTLOOK

For the balance of 2015, copper grades are forecasted to fluctuate between 0.25% and 0.28%. Based on forecasted grades and subsequent improved recoveries, the Gibraltar Mine is expected to produce 130-140 million pounds of copper in 2015 (100% basis). Increases in copper grades and production are expected to reduce total operating costs per pound over the remainder of this year. There are a number of cost control initiatives underway including mine plan modifications to reduce waste stripping requirements, a workforce reduction effective in January 2015, and initiatives with vendors to reduce costs of supplies and consumables. The mine is also benefiting from continued declines in the price of diesel, which is a significant input cost. Diesel prices have fallen by approximately 23% since the beginning of this year. The Canadian dollar has fallen approximately 15% since the beginning of 2014 and with approximately 80% of Gibraltar's operating costs denominated in Canadian dollars, the weakening dollar has a significant impact on total operating costs per pound reported in US dollars.

The cumulative effects of these factors are expected to result in reduced operating costs at the Gibraltar Mine going forward.

REVIEW OF PROJECTS

Florence Copper Project

The Florence Copper Project is currently in the final stages of permitting for the Phase 1 Production Test Facility ("PTF").

The Temporary Aquifer Protection Permit ("APP") for the PTF issued in July 2013 by the Arizona Department of Environmental Quality ("ADEQ") was subject to an appeal. As a result of the appeal an amendment was submitted in March 2015 and issuance of the amended APP is now anticipated during the third quarter of 2015. In December, 2014, the Company announced the receipt of a draft Underground Injection Control (UIC) permit from the U.S. Environmental Protection Agency (EPA). The UIC permit regulates the construction and operation of Florence Copper's injection wells at the site and is the final regulatory milestone required by the Company to construct and operate the PTF. The public hearing for the draft permit was held on January 22, 2015 and the public comment period expired in April, 2015. The Company expects the UIC permit to be issued by mid-2015.

Aley Project

On September 19, 2014 the BC Environmental Assessment Office (EAO) issued a Section 10 Order under the BC Environmental Assessment Act, initiating the BC environmental assessment process for the Aley Niobium Project.

New Prosperity Project

On February 26, 2014 the Government of Canada announced its decision to not issue the authorizations necessary for the New Prosperity project to proceed. In the wake of this decision, Taseko initiated legal proceedings in the form of two separate judicial reviews which challenge the decision and the process by which the decision was reached. In August 2014, the Company applied to the Federal Court to convert both judicial reviews into a civil action. The motion was dismissed as the court felt that the judicial review process is the correct vehicle to pursue the remedies that the Company seeks.

On January 14, 2015 the British Columbia Minister of Environment granted the Company a five-year extension to the Environmental Assessment Certificate.

Taseko will host a conference call on Thursday, May 14, 2015 at 11:00 a.m. Eastern Time (8:00 a.m. Pacific) to discuss these results. The conference call may be accessed by dialing (877) 303-9079 in Canada and the United States, or (970) 315-0461 internationally. Alternatively, a live and archived webcast will also be available at tasekomines.com. The conference call will be archived for later playback until May 21, 2015 and can be accessed by dialing (855) 859-2056 in Canada and the United States, or (404) 537-3406 internationally and using the passcode 33407188.

For further information on Taseko, please see the Company's website at www.tasekomines.com or contact:

Brian Bergot, Vice President, Investor Relations - 778-373-4554, toll free 1-800-667-2114

Russell Hallbauer
President and CEO

No regulatory authority has approved or disapproved of the information in this news release.
NON-GAAP PERFORMANCE MEASURES

This document includes certain non-GAAP performance measures that do not have a standardized meaning prescribed by IFRS. These measures may differ from those used by, and may not be comparable to such measures as reported by, other issuers. The Company believes that these measures are commonly used by certain investors, in conjunction with conventional IFRS measures, to enhance their understanding of the Company's performance. These measures have been derived from the Company's financial statements and applied on a consistent basis. The following tables below provide a reconciliation of these non-GAAP measures to the most directly comparable IFRS measure.

Total operating costs & Site operating costs, net of by-product credits

Total costs of sales include all costs absorbed into inventory, as well as treatment and refining costs and transportation costs. Site operating costs is calculated by removing net changes in inventory, depletion and amortization and off-property costs from cost of sales. Site operating costs, net of by-product credits is calculated by removing by-product credits from the site operating costs. Site operating costs, net of by-product credits per pound are calculated by dividing the aggregate of the applicable costs by copper pounds produced. Total operating costs per pound is the sum of site operating costs, net of by-product credits and off-property costs divided by the copper pounds produced. By-product credits are calculated based on actual sales of molybdenum and silver during the period divided by the total pounds of copper produced during the period. These measures are calculated on a consistent basis for the periods presented.

Three months ended
March 31,
(Cdn$ in thousands, unless otherwise indicated) - 75% basis 2015 2014
Cost of sales 69,814 96,209
Less Depletion and amortization (10,308) (10,652)
Net change in inventory 7,061 (8,622)
Less off-property costs:
Treatment and refining costs (6,770) (7,702)
Transportation costs (3,617) (6,513)
Site operating costs 56,180 62,720
Less by-product credits:
Molybdenum (2,598) (5,090)
Silver (704) (1,012)
Site operating costs, net of by-product credits 52,878 56,618
Total copper produced (thousand pounds) 21,273 25,906
Total costs per pound produced 2.49 2.19
Average exchange rate for the period (CAD/USD) 1.24 1.10
Site operating costs, net of by-product credits (US$ per pound) 2.00 1.98
Site operating costs, net of by-product credits 52,878 56,618
Add off-property costs:
Treatment and refining costs 6,770 7,702
Transportation costs 3,617 6,513
Total operating costs 63,265 70,833
Total operating costs (C1) (US$ per pound) 2.39 2.48

Adjusted net earnings

Adjusted net earnings remove the effect of the following transactions from net earnings as reported under IFRS:

  • Unrealized gains/losses on derivative instruments;
  • Write down of marketable securities;
  • Unrealized foreign currency gains/losses; and
  • Non-recurring transactions, including non-recurring tax adjustments.
Management believes these transactions do not reflect the underlying operating performance of our core mining business and are not necessarily indicative of future operating results. Furthermore, unrealized gains/losses on derivative instruments, changes in the fair value of financial instruments, and unrealized foreign currency gains/losses are not necessarily reflective of the underlying operating results for the reporting periods presented.

Three months ended March 31,
($ in thousands, except per share amounts) 2015 2014
Net earnings (loss) (25,206) (9,148)
Unrealized loss (gain) on derivatives 1,751 (2,744)
Unrealized foreign exchange (gain) loss 21,469 8,480
Estimated tax effect of adjustments (448) 702
Adjusted net earnings (loss) (2,434) (2,710)
Adjusted EPS (0.01) (0.01)

EBITDA and adjusted EBITDA

EBITDA represents net earnings before interest, income taxes, and depreciation. EBITDA is presented because it is an important supplemental measure of our performance and is frequently used by securities analysts, investors and other interested parties in the evaluation of companies in the industry, many of which present EBITDA when reporting their results. Issuers of "high yield" securities also present EBITDA because investors, analysts and rating agencies consider it useful in measuring the ability of those issuers to meet debt service obligations. The Company believes EBITDA is an appropriate supplemental measure of debt service capacity, because cash expenditures on interest are, by definition, available to pay interest, and tax expense is inversely correlated to interest expense because tax expense goes down as deductible interest expense goes up; depreciation is a non-cash charge.

Adjusted EBITDA is presented as a further supplemental measure of the Company's performance and ability to service debt. Adjusted EBITDA is prepared by adjusting EBITDA to eliminate the impact of a number of items that are not considered indicative of ongoing operating performance.

Adjusted EBITDA is calculated by adding to EBITDA certain items of expense and deducting from EBITDA certain items of income that are not likely to recur or are not indicative of the Company's future operating performance consisting of:

  • Unrealized gains/losses on derivative instruments;
  • Write down of marketable securities;
  • Unrealized foreign exchange (gain) loss; and
  • Non-recurring transactions.
While some of the adjustments are recurring, gains/losses on the sale of marketable securities do not reflect the underlying performance of the Company's core mining business and are not necessarily indicative of future results. Furthermore, unrealized gains/losses on derivative instruments, foreign currency translation gains/losses and changes in the fair value of financial instruments are not necessarily reflective of the underlying operating results for the reporting periods presented.

Three months ended
March 31,
($ in thousands, except per share amounts) 2015 2014
Net earnings (loss) (25,206) (9,148)
Add:
Depletion and Amortization 10,334 10,735
Amortization of stock-based compensation 206 2,083
Interest expense 6,362 6,647
Interest income (657) (1,122)
Income tax expense (recovery) (3,035) (337)
EBITDA (11,996) 8,858
Adjustments:
Unrealized (gain)/loss on derivative instruments 1,751 (2,744)
Unrealized foreign exchange (gain) loss 21,469 8,480
Adjusted EBITDA 11,224 14,594

Earnings from mining operations before depletion and amortization

Earnings from mining operations before depletion and amortization is earnings from mining operations with depletion and amortization added back. The Company discloses this measure, which has been derived from our financial statements and applied on a consistent basis, to provide assistance in understanding the results of the Company's operations and financial position and it is meant to provide further information about the financial results to investors.

Three months ended March 31,
(Cdn$ in thousands, except per share amounts) 2015 2014
Earnings (loss) from mining operations (7,979) 8,787
Add:
Depletion and amortization 10,308 10,652
Earnings from mining operations before depletion and amortization 2,329 19,439

Site operating costs per ton milled
Three months ended March 31,
(Cdn$ in thousands, except per share amounts) 2015 2014
Direct mining and processing costs (included in cost of sales) 56,180 62,720
Tons milled (thousands) (75% basis) 5,813 5,266
Site operating costs per ton milled $9.66 $11.91


No regulatory authority has approved or disapproved of the information contained in this news release.

This document contains "forward-looking statements" that were based on Taseko's expectations, estimates and projections as of the dates as of which those statements were made. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "outlook", "anticipate", "project", "target", "believe", "estimate", "expect", "intend", "should" and similar expressions.

Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the Company's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. These included but are not limited to:

  • uncertainties and costs related to the Company's exploration and development activities, such as those associated with continuity of mineralization or determining whether mineral resources or reserves exist on a property;
  • uncertainties related to the accuracy of our estimates of mineral reserves, mineral resources, production rates and timing of production, future production and future cash and total costs of production and milling;
  • uncertainties related to feasibility studies that provide estimates of expected or anticipated costs, expenditures and economic returns from a mining project;
  • uncertainties related to our ability to complete the mill upgrade on time estimated and at the scheduled cost;
  • uncertainties related to the ability to obtain necessary licenses permits for development projects and project delays due to third party opposition;
  • uncertainties related to unexpected or ongoing judicial or regulatory proceedings;
  • changes in, and the effects of, the laws, regulations and government policies affecting our exploration and development activities and mining operations, particularly laws, regulations and policies;
  • changes in general economic conditions, the financial markets and in the demand and market price for copper, gold and other minerals and commodities, such as diesel fuel, steel, concrete, electricity and other forms of energy, mining equipment, and fluctuations in exchange rates, particularly with respect to the value of the U.S. dollar and Canadian dollar, and the continued availability of capital and financing;
  • the effects of forward selling instruments to protect against fluctuations in copper prices and exchange rate movements and the risks of counterparty defaults, and mark to market risk;
  • the risk of inadequate insurance or inability to obtain insurance to cover mining risks;
  • the risk of loss of key employees; the risk of changes in accounting policies and methods we use to report our financial condition, including uncertainties associated with critical accounting assumptions and estimates;
  • environmental issues and liabilities associated with mining including processing and stock piling ore; and
  • labour strikes, work stoppages, or other interruptions to, or difficulties in, the employment of labour in markets in which we operate mines, or environmental hazards, industrial accidents or other events or occurrences, including third party interference that interrupt the production of minerals in our mines.

For further information on Taseko, investors should review the Company's annual Form 40-F filing with the United States Securities and Exchange Commission www.sec.com and home jurisdiction filings that are available at www.sedar.com.



You can view the Previous News Releases item: Mon May 11, 2015, Taseko to Release Q1 2015 Results

Server Info

HTTP_X_ORIGINAL_URL: /releases/ID707701
SCRIPT_NAME: /s/releases.asp
QUERY_STRING: reportid=707701
URL: /s/releases.asp

Page Info

Section Name: News
Page Name: News Releases
Page Query: /s/releases.asp

Javascript

Complete Path:/releases/ID707701
Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Taseko Mines Ltd

PRODUCER
CODE : TKO.TO
ISIN : CA8765111064
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Taseko is a copper and gold producing company based in Canada.

Taseko produces copper, gold, molybdenum in Canada, develops copper and gold in Canada, and holds various exploration projects in Canada.

Its main asset in production is GIBRALTAR MINE in Canada, its main asset in development is PROSPERITY in Canada and its main exploration properties are ALLEY and HARMONY in Canada.

Taseko is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 766.6 millions as of today (US$ 613.0 millions, € 537.0 millions).

Its stock quote reached its highest recent level on June 21, 1996 at CA$ 9.50, and its lowest recent point on July 11, 2003 at CA$ 0.25.

Taseko has 226 150 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Taseko Mines Ltd
12/5/2018Taseko to buy out Yellowhead Mining
12/8/2017Canadian federal court rejects Taseko's proposed $1.5bn copp...
11/6/2014Taseko reports 170% increase in niobium mine resources
Financings of Taseko Mines Ltd
10/10/2007 Announces Bought-Deal Public Offering & Private Placement F...
Financials of Taseko Mines Ltd
3/20/2011Announces 2010 Operating Profit of $126 million
8/11/2010to Release Second Quarter 2010 Results on August 12, 2010
11/13/2009Announces Third Quarter Financial Results
Project news of Taseko Mines Ltd
1/15/2015(Prosperity)Government Grants Extension to Taseko's Prosperity Project
1/8/2014announces 35% increase in annual copper production
11/8/2013| Europe's Largest Resource Show | Uranium
10/7/2013announces 30% increase in quarterly copper production
6/20/2013(Prosperity)New Prosperity Project advances to final stage in public pro...
12/12/2012(Gibraltar Mine)announces potential labour disruption at Gibraltar Mine
9/12/2011(Alley)Announces Inferred Resource at Aley Niobium Project
6/7/2011Taseko Mines Ltd has submitted the New Prosperity Gold-Coppe...
2/22/2011Taseko Mines Submits Revised Project Description For The Pro...
2/16/2011(Gibraltar Mine)Announces Additional Capacity Increase At Gibraltar Copper M...
5/9/2008(Gibraltar Mine)ELECTRICAL TRANSFORMER FAILURE AT GIBRALTAR MINE
7/10/2007(Gibraltar Mine)'s Gibraltar Mine Expansion On Schedule
Corporate news of Taseko Mines Ltd
7/26/2016Taseko Reports Second Quarter 2016 Results
7/26/2016Taseko reports 2Q loss
7/13/2016Taseko Reports Annual General Meeting Voting Results
6/27/2016ISS and Glass Lewis Recommend Voting ‘FOR’ Taseko AGM Resolu...
5/16/2016Taseko Announces New Board Appointment
2/1/2016Taseko Completes US$70 Million Secured Credit Facility
1/27/2016Insider Makes Aggressive Purchase
1/26/2016Taseko Mines Responds to Activist Shareholder and Sets Date ...
1/14/2016Taseko Mines Receives Shareholder Meeting Requisition
1/7/2016Taseko Announces 2015 Production Results
10/19/2015Edited Transcript of TKO.TO earnings conference call or pres...
10/7/2015Taseko Announces Multilateral Instrument 62-104 Early Warnin...
10/1/2015Taseko Announces Strong Third Quarter Production Results
8/12/2015Taseko Reports Second Quarter 2015 Results
8/10/2015Taseko to Release Second Quarter 2015 Results
7/28/2015Taseko and Soda Creek Indian Band Sign Participation and Coo...
7/28/2015and Soda Creek Indian Band Sign Participation and Cooperatio...
3/31/2015Gibraltar Wins 2014 John Ash Safety Award
3/25/2015Taseko Reports 2014 Year End Results
3/25/2015Taseko to Release Year End 2014 Results
3/23/2015to Release Year End 2014 Results
3/23/2015Taseko to Release Year End 2014 Results
12/11/2014Taseko Updates Copper Price Protection Program
12/11/2014Taseko Updates Copper Price Protection Program
12/9/2014EPA Issues Draft Underground Injection Control Permit to Flo...
12/9/2014EPA Issues Draft Underground Injection Control Permit to Flo...
11/26/2014Taseko's Aley Niobium Project Enters Environmental Assessmen...
11/26/2014Aley Niobium Project Enters Environmental Assessment Process
11/26/2014Taseko's Aley Niobium Project Enters Environmental Assessmen...
11/20/2014Taseko and Curis Announce Completion of Plan of Arrangement
11/20/2014and Curis announce completion of plan of arrangement
11/20/2014Taseko and Curis announce completion of plan of arrangement
10/29/2014Taseko Announces Third Quarter 2014 Results
10/27/2014Taseko to Release Third Quarter 2014 Results
10/27/2014to release third quarter 2014 results
10/27/2014Taseko to release third quarter 2014 results
9/15/2014Announces 84 Million Tonne Mineral Reserve for Aley Niobium ...
7/28/2014to Release Second Quarter 2014 Results
6/12/2014Reports Annual General Meeting Voting Results
6/6/2014Reminds Shareholders of Voting Cut-Off for Upcoming Sharehol...
5/6/2014to Release Q1 2014 Results
4/4/2014announces record quarterly copper and molybdenum shipments
3/26/2014(Prosperity)files second judicial review on New Prosperity
2/27/2014Feature: TASEKO | Bitcoin | Uranium
2/24/2014to participate at BMO Metals & Mining Conference
2/18/2014to release year end 2013 results
1/20/2014to participate at upcoming CIBC Investment Conference
12/17/2013Week in Review | Uranium | Taseko
12/2/2013Commences Judicial Review Application
11/19/2013| Uranium | Mongolia
11/19/2013Responds to Canadian Environmental Assessment Agency Request
11/19/2013Responds to Canadian Environmental Assessment Agency Request
11/1/2013Issues Statement on Review Panel Report
10/25/2013to release third quarter 2013 results on October 30, 2013
7/8/2013(Gibraltar Mine)announces 21% increase in quarterly copper production at its...
5/31/2013to modify Advance Notice Proposal at June 6, 2013 shareholde...
5/17/2013renews Shareholder Rights Plan
5/6/2013Announces Senior Management Change
5/1/2013to Release First Quarter 2013 Results on May 2, 2013
4/3/2013and Williams Lake Indian Band sign Participation and Coopera...
2/25/2013to Present at Upcoming Conference
2/19/2013to Release 2012 Year End Results on February 21, 2013
10/29/2012to release third quarter 2012 results on October 31, 2012
10/9/2012Announces 2012 Third Quarter Production and Sales Results
9/25/2012Wins Mine Reclamation Award
1/11/2012Confirms 2012 GDP3 Capital and Project Development Program
8/9/2011to release second quarter 2011 results on August 11, 2011
7/11/2011Announces Second Quarter Gibraltar Production Results
6/28/2011ENSURES MINIMUM REVENUE STREAM FOR THE NEXT 18 MONTHS
6/7/2011TO RELEASE FIRST QUARTER 2011 RESULTS ON JUNE 9, 2011
5/6/2011GRANTS EPCM CONTRACT TO AUSENCO FOR GDP3 PROJECT
4/15/2011COMMENTS ON SENIOR NOTES
1/25/2011Provided Clarification on Recent Class Action News Articles
9/1/2009Expansion into Ethiopia 1st September 2009
2/19/2009Presenting February 25Th at BMO's 2009 Global Metals & Minin...
7/28/2008Zips Ahead with Gibraltar Expansion
2/8/2008 TO RELEASE Q1 RESULTS ON FEBRUARY 13, 2008
11/27/2007COMMENTS ON RECENT COURT DECISION REGARDING ABORIGINAL TITLE
10/9/2007HIGHLIGHTS Q4 SALES
10/3/2007Q4 Copper Production Increases By 33% Over Q3 To 16.8 M Poun...
5/17/2007Commences Further Expansion to the Gibraltar Mine
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (TKO.TO)AMEX (TGB)
3.39-1.45%2.45-1.61%
TORONTO
CA$ 3.39
04/15 17:00 -0.050
-1.45%
Prev close Open
3.44 3.50
Low High
3.36 3.59
Year l/h YTD var.
1.74 -  3.44 82.26%
52 week l/h 52 week var.
1.46 -  3.44 43.64%
Volume 1 month var.
829,510 29.39%
24hGold TrendPower© : 34
Produces Copper - Molybdenum
Develops Copper - Gold
Explores for Niobium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/16/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202477.49%
2023-3.54%2.511.61
2022-23.85%3.001.15
202156.63%3.221.50
2020176.67%1.770.31
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.73-1.90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.26-0.53%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56-1.91%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.49-0.40%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.41-1.34%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.72-0.86%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.68-1.39%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+3.03%Trend Power :