MDN Inc

Published : May 04th, 2010

The Ikungu Project Continues to ShowGood Gold Intersections and Continuity Over

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Gold Mine |

Marketwire

 

 

 

 

MDN Inc.

TSX:

MDN

 

 

 

 

Other Recent News

 

May 4, 2010

MDN: The Ikungu Project Continues to Show Good Gold Intersections and Continuity Over 2.5 km

MONTREAL, QUEBEC--(Marketwire - May 4, 2010) -

 
IKD-36 intersects 13.22 g/t Au over 4.1m (true width)
IKD-32 intersects 8.02 g/t Au over 2.4 m (true width)
IKD-34 intersects 6.63g/t Au over 2.0 m (true width)

 

MDN Inc. ("MDN") (TSX:MDN) is pleased to announce that all the assay results for the Ikungu project are now available. The results for the second part of the drilling program, which resumed on January 28, 2010 and was completed on March 17, show multiple mineralized intersections grading over 5 g/t and as high as 54.3 g/t Au. The mineralized zones lie along the known gold-bearing horizon that extends more than 2.5 km, and will be tested for vertical continuity by the next drilling program, now in the planning stage.

"Our experience at the Tulawaka gold mine and our knowledge of Archean greenstone belts lead us to believe that we are looking at a very large mineralized system. This 2.5 km gold-bearing structure contains multiple zones with sample grading over 10 g/t Au", stated Marc Boisvert, P.Eng. Vice President Exploration for MDN

The entire MDN program (IKD-17 to IKD-37) was carried out from October 2009 to March 2010 and consisted of 21 diamond drill holes for a total of 4,369 m of drilling. Between the month of October and December 2009, MDN drilled 10 diamond drill holes (IKD-17 to IKD-26) totalling 2,024 metres that indicated the potential of the continuity of the gold-bearing mineralization over at least 2.5 km (news release dated March 5, 2010). The program was suspended in December and resumed in late January 2010 to identify high-grade zones along this horizon. Subsequently, eleven holes (IKD-27 to IKD-37) were drilled from the time that activities resumed until March 18. The mineralized horizon was thus tested over a distance of 2.5 km by holes drilled about 70 m apart, with only two of these drilled deeper than 100 metres.

Holes IKD-34, 36 and 37 confirm the presence of a higher-grade mineralized zone in the east sector between sections 3190 E and 3790 E. The same applies to holes IKD-32 and IKD -35 in the central sector, for a second zone between sections 2435 E and 2770 E. Hole IKD-33 returned an intersection of 2.66 g/t Au over 5.36 m at the western end, indicating that the mineralized horizon traced over 2.5 km remains open to the west.

Assay results for IKD-31 to IKD-37 (IKD-17 to IKD-30 were released March 5, 2010):

 
--------------------------------------------------------
 Hole    Section    From     To   Length    True     Au  
   #          (m)     (m)    (m)      (m)  width   (g/t)
--------------------------------------------------------
IKD-31      3190E 137.00  141.00    4.00      3.06  2.49
--------------------------------------------------------
                                                      
--------------------------------------------------------
IKD-32      2560E  83.00   86.75    3.75      2.41  8.02
--------------------------------------------------------
                                                      
--------------------------------------------------------
IKD-33      1810E 108.00  113.00    5.00      3.83  2.50
--------------------------------------------------------
                  141.60  145.00    3.40      2.60  2.26
--------------------------------------------------------
                  154.00  161.00    7.00      5.36  2.66
--------------------------------------------------------
                                                      
--------------------------------------------------------
IKD-34      2890E  97.20   99.80    2.60      1.99  6.63
--------------------------------------------------------
       Including:  98.10   98.85    0.75           20.15
--------------------------------------------------------
                                                      
--------------------------------------------------------
IKD-35      2650E  61.84   64.26    2.42      1.85  2.76
--------------------------------------------------------
                   72.50   81.00    8.50      6.51  2.79
--------------------------------------------------------
                                                      
--------------------------------------------------------
IKD-36      3610E  51.60   56.94    5.34      4.09 13.22
--------------------------------------------------------
       Including:   53.5    54.0     0.5           21.00
                 ---------------------------------------
                    55.5    56.0     0.5            9.82
                 ---------------------------------------
                    56.0    56.5     0.5           40.45
                 ---------------------------------------
                    56.5    56.9     0.4           54.30
--------------------------------------------------------
                                                      
--------------------------------------------------------
IKD-37      3730E 276.50  281.70    5.20      3.98  5.39
--------------------------------------------------------
       Including:  278.1   278.8    0.70           15.20
                 ---------------------------------------
                   280.7   281.7    1.00            11.3
--------------------------------------------------------

 

Intersections indicating the presence of high-grade zones:

 
---------------------------------------------------------
 IKD08     2010E   34.50   37.50    2.60    1.99    10.95
---------------------------------------------------------
                                     
---------------------------------------------------------
 IKD04     2435E  226.04  230.88    4.84    2.42     6.74
---------------------------------------------------------
IKD-32     2560E   83.00   86.75    3.75    2.41     8.02
---------------------------------------------------------
IKD-18     2770E  242.00  245.00    3.00    2.30     5.79
---------------------------------------------------------
                                     
---------------------------------------------------------
IKD-34     2910E   97.20   99.80    2.60    1.99     6.63
---------------------------------------------------------
IKD-28     3400E  142.17  144.77    3.00    2.30    10.95
---------------------------------------------------------
IKD-36     3610E   51.60   56.94    5.34    4.09    13.22
---------------------------------------------------------
IKD-37     3730E  276.50  281.70    5.20    3.98     5.39
---------------------------------------------------------
  SIK1     3760E  140.84  144.68    3.84    1.91    24.54
---------------------------------------------------------
  SIK8     3760E  206.90  212.81    5.91    2.94    11.50
---------------------------------------------------------

 

The assay results received to date confirm that the mineralization is continuous over more than 2.5 km, with a minimum thickness of 2 metres and sample grades above 1.2 g/t Au. This gold-bearing horizon hosts higher-grade zones 2 to 4 metres thick ranging from 5 g/t Au to 11.5 g/t Au, including sections of up to 54.3 g/t over 0.4 m. The gold-bearing intersections for holes IKD-08, IKD-28, IKD-36, IKD-37, SIK1 and SIK 8 are good examples of these higher-grade zones. A concentration of such zones has been identified in the central and eastern sectors, with a higher occurrence of zones with average sample grade over 10 g/t Au toward the east.

Compilation table for all the holes that intersected the mineralized horizon:

East Sector

 
--------------------------------------------------------
 Hole    Section    From     To   Length    True     Au  
   #          (m)     (m)    (m)      (m)  width   (g/t)
--------------------------------------------------------
                                                      
--------------------------------------------------------
  SIK1     3760E  140.84  144.68    3.84    1.91   24.54
--------------------------------------------------------
  SIK8     3730E   189.9   193.8     3.9    1.94     2.1
--------------------------------------------------------
  SIK8     3730E   206.9  212.81    5.91    2.94    11.5
--------------------------------------------------------
 IKD02     3745E   95.21    98.1    2.89     2.2    3.63
--------------------------------------------------------
IKD-37     3730E   276.5   281.7     5.2    3.98    5.39
--------------------------------------------------------
IKD-36     3610E    51.6   56.94    5.34    4.09   13.22
--------------------------------------------------------
 IKD03     3550E    66.5   69.15    2.65    2.02    2.08
--------------------------------------------------------
IKD-28     3400E      59      62       3     2.3    2.52
--------------------------------------------------------
IKD-28     3400E  142.17  144.77       3     2.3   10.95
--------------------------------------------------------
 IKD06     3320E   65.81   68.81       3     2.3    3.77
--------------------------------------------------------
IKD-30     3250E      77      80       3     2.3    2.37
--------------------------------------------------------
IKD-31     3190E     241     243       2    1.53    1.24
--------------------------------------------------------
IKD-26     3190E    64.6    70.6       6     4.6    3.67
--------------------------------------------------------
IKD-31     3190E     137     141       4    3.06    2.49
--------------------------------------------------------
IKD-26     3190E   173.6   175.6       2    1.53    3.18
--------------------------------------------------------
                                                      
--------------------------------------------------------
IKD-29     2980E    87.2   90.07    2.87     2.2    3.35
--------------------------------------------------------
IKD-29     2980E   174.1   176.7     2.6    1.99    2.79
--------------------------------------------------------
IKD-34     2890E    97.2    99.8     2.6    1.99    6.63
--------------------------------------------------------
IKD-34     2890E   138.1   141.7     3.6    2.76    2.85
--------------------------------------------------------
 IKD13     2850E   44.08   46.88     2.8    2.14     3.8
--------------------------------------------------------

 

Central Sector

 
--------------------------------------------------------
 Hole    Section    From     To   Length    True     Au  
   #          (m)     (m)    (m)      (m)  width   (g/t)
--------------------------------------------------------
IKD-27     2830E    75.4   78.4        3     2.3   2.53
--------------------------------------------------------
IKD-27     2830E    91.3   94.3        3     2.3   1.05
--------------------------------------------------------
IKD-18     2770E   100.5  103.5        3     2.3   2.04
--------------------------------------------------------
IKD-18     2770E   138.5  141.5        3     2.3   1.31
--------------------------------------------------------
IKD-18     2770E     242    245        3     2.3   5.79
--------------------------------------------------------
IKD-35     2650E   61.84  64.26     2.42    1.85   2.76
--------------------------------------------------------
IKD-35     2650E    72.5     81      8.5    6.51   2.79
--------------------------------------------------------
 IKD16     2545E    44.8  48.06     3.26     2.5   2.12
--------------------------------------------------------
 IKD16     2545E    65.5  67.25     1.75    1.34   4.11
--------------------------------------------------------
IKD-32     2545E      83  86.75     3.75    2.41   8.02
--------------------------------------------------------
IKD-32     2545E   103.5  108.5        5    3.21   2.47
--------------------------------------------------------
IKD-25     2470E      97    100        3     2.3   1.51
--------------------------------------------------------
IKD-25     2470E     109    112        3     2.3   1.71
--------------------------------------------------------
IKD-25     2470E     115    119        4    3.06    1.6
--------------------------------------------------------
 IKD04     2380E  206.72 211.19     4.47    2.24   2.27
--------------------------------------------------------
 IKD04     2380E  226.04 230.88     4.84    2.42   6.74
--------------------------------------------------------

 

West Sector

 
--------------------------------------------------------
 Hole    Section    From     To   Length    True     Au  
   #          (m)     (m)    (m)      (m)  width   (g/t)
--------------------------------------------------------
 IKD08     1960E    34.5   37.5      2.6    1.99  10.95
--------------------------------------------------------
 IKD08     1960E  133.55 136.15      2.6    1.99   1.07
--------------------------------------------------------
 SIK5      1930E     115    119        4    1.98    1.1 
--------------------------------------------------------
IKD-24     1870E     160    163        3     2.3   2.58
--------------------------------------------------------
 IKD07     1795E     177    180        3     2.3   2.72
--------------------------------------------------------
 IKD07     1795E  196.24 199.63     3.39     2.6   1.48
--------------------------------------------------------
IKD-33     1750E     108    113        5    3.83    2.5 
--------------------------------------------------------
IKD-33     1750E   141.6    145      3.4     2.6   2.26
--------------------------------------------------------
IKD-33     1750E     154    161        7    5.36   2.66
--------------------------------------------------------

 

The samples were analysed by fire assay at the SGS Laboratory of Mwanza, Tanzania, which is a certified facility according to international standards. A rigorous quality analysis verification program implemented by MDN included 20% control samples. The technical and scientific information contained in this press release has been reviewed by Marc Boisvert, P.Eng. MDN's Vice President, Exploration, who acts as a qualified person in accordance with National Instrument 43-101.

About MDN

MDN Inc.(TSX:MDN) is a mining exploration and development company with adequate financial resources to develop its exploration projects in Quebec and in Tanzania. MDN also remains active in the search for new business opportunities that can raise shareholder value. In addition to its 30% participating interest in the Tulawaka Gold Mine, MDN is the operator and owner of a majority interest in mineral licenses totalling 715 sq km around the Tulawaka gold mine in Tanzania. The company also owns a 67.5% interest in Crevier Minerals Inc. which owns a property with a 25.8 M tonne NI 43-101 niobium and tantalum resource located in the Lac St-Jean area of Quebec. MDN has an option to increase its equity participation in Crevier Minerals Inc. up to 87.5%. Additional information is available on MDN's website at www.mdn-mines.com.

Forward looking statements

All statements in this release, other than statements of historical fact, that address events or developments that the Company expects to occur, are forward looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements are discussed in greater detail in the Company's most recent Annual Information Form filed on SEDAR, which also provides additional general assumptions in connection with these statements. Investors and others who base themselves on the Company's forward-looking statements should carefully consider the factors mentioned in the Annual Information Form as well as the uncertainties they represent and the risk they entail. The Company believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release.

 

CONTACT INFORMATION:

MDN Inc.
Serge Bureau, P.Eng.
President and CEO
514-866-6500, ext. 221

or

MDN Inc.
Marc Boisvert, P.Eng.
Vice President, Exploration
514-866-6500, ext. 227

or

Sun International Communications
Nicole Blanchard
Investor Relations
450-973-6600
Nicole.blanchard@isuncomm.com

INDUSTRY: Manufacturing and Production - Mining and Metals

 

 

Footer


MDN Inc

PRODUCER
CODE : MDN.TO
ISIN : CA55276L1040
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

MDN. is a gold and copper producing company based in Canada.

MDN. holds various exploration projects in Canada.

Its main asset in production is TULAKAWA MINE in Tanzania and its main exploration properties are LAC SHORTT, DES MÉLOIZES, CLAIRY, LE TAC, LESPERANCE, MATAGAMI, MCGOLD and CREVIER in Canada and IKUNGU in Tanzania.

MDN. is listed in Canada. Its market capitalisation is CA$ 5.2 millions as of today (US$ 4.0 millions, € 3.5 millions).

Its stock quote reached its highest recent level on October 11, 1996 at CA$ 2.15, and its lowest recent point on December 24, 2015 at CA$ 0.01.

MDN. has 114 660 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of MDN Inc
12/21/2007Received $2 Million on Exercise of Warrants
Nominations of MDN Inc
2/23/2010Appoints Serge Bureau as CEO
9/12/2008Marc Boisvert Becomes MDN Inc.-Vice President-Exploration
Financials of MDN Inc
8/9/2013Reports Its Financial Results for the First Quarter of 2013
5/10/2013Reports its Financial Results for the First Quarter of 2013
3/27/2013Reports Its Financial Results for the Fiscal Year Ended Dece...
11/12/2012Reports Its Financial Results for the Third Quarter of 2012
11/12/2012Reports Its Financial Results for the Third Quarter of 2012
11/12/2012Reports Its Financial Results for the Third Quarter of 2012
8/13/2012Reports Its Financial Results for the Second Quarter of 2012
7/23/2012.-Tulawaka 2012 Second Quarter Results
5/11/2012Reports its Financial Results for the First Quarter of 2012
4/19/2012.: Tulawaka First Quarter Results
3/23/2012Reports its 2011 Financial Results
5/26/2011Reports Its Financial Results for the First Quarter of 2011
3/24/2011Reports its 2010 Financial Results
4/1/2010Posts 2009 Financial Results
10/19/2009(Tulakawa Mine)Tulawaka Mine Produces 29,489 Ounces of Gold During the Thir...
7/20/2009(Tulakawa Mine)Tulawaka Mine Produces 24,561 Ounces of Gold during the seco...
11/13/2008Third Quarter Ended 2008
7/16/2008(Tulakawa Mine)TULAWAKA MINE PRODUCES 67,032 OUNCES OF GOLD DURING THE SECO...
4/23/2008(Tulakawa Mine)Produces 62,085 Ounces of Gold During the First Quarter of 2...
1/17/2008(Tulakawa Mine) Tulawaka Mine Achieves Record Gold Production and Strong Fi...
10/17/2007 TULAWAKA MINE PRODUCES 41,817 OUNCES OF GOLD DURING THE THI...
7/25/2007Tulawaka Mine Produces 42,893 Ounces of Gold in the Second Q...
Project news of MDN Inc
10/15/2013(Ikungu)Ikungu Project: MDN Signs a Letter of Intent with Tanzania M...
5/15/2013(Ikungu)Terminates Its Agreement With Metalinvest for the Ikungu Pro...
2/25/2013(Ikungu)Ikungu Project: MDN Signs an Option Agreement With Metalinve...
10/2/2012(Ikungu)Identifies 4 Important Gold Anomalies on its Ikungu Property...
3/14/2012(Ikungu)Acquires Ground at the Ikungu Gold Project in Tanzania
2/9/2012(Crevier)./Update on Metallurgical Work at the Crevier Project: Posit...
2/9/2012(Crevier)./Update on Metallurgical Work at the Crevier Project: Posit...
9/6/2011(Ikungu)Ongoing Investment in Exploration Increases MDN's Interest i...
7/26/2011.: Tulawaka had a 49% Increase in Gold Production During the...
6/14/2011(Crevier)Stakes 98 km2 of Strategic Ground Southeast of Crevier
5/13/2011(Crevier)Seeking a Strategic Partner for the Crevier Project
4/12/2011(Ikungu)Provides an Update on Ikungu and Assesses the Mineral Potent...
2/3/2011(Crevier)Confirms That the Niobium-Tantalum Mineralization Extends Mo...
5/4/2010(Ikungu)The Ikungu Project Continues to ShowGood Gold Intersections ...
5/3/2010(Tulakawa Mine)Exploration Drilling at Tulawaka Mine Identify a New Gold Zo...
3/5/2010(Ikungu)Exploration Update, Ikungu Property, Tanzania
11/6/2009(Isambara) Isambara Project Update: Drill Hole Intersects an Alteratio...
11/2/2009(Tulakawa Mine)Preliminary Results on Tulawaka's Underground Drilling
7/28/2009(Isambara)Operational Update: Drilling Program has Begun at Isambara
2/26/2009(Ikungu)High-Grade Gold Samplings for Ikungu Project
1/27/2009(Tulakawa Mine) Tulawaka Gold Mine Achieves Record production of 211,373 ou...
9/15/2008 Proves Extensions to the High-Grade Zones at Isambara
5/22/2008(Tulakawa Mine): First Results of the 2008 Isambara Drilling Program
4/2/2008(Tulakawa Mine)Tulawaka Gold Mine expects to produce 180,000 ounces of gold...
Corporate news of MDN Inc
3/16/2016MDN Lists on the TSX Venture Exchange
3/4/2016IIROC Trade Resumption - MDN
3/4/2016MDN Signs a LOI for the Acquisition of the Argor Niobium Dep...
3/4/2016IIROC Trading Halt - MDN
2/19/2016MDN Terminates Prairie Lake Option
1/11/2016IIROC Trade Resumption - MDN
1/11/2016MDN Inc.: XINYE Intends to Proceed With JV in Tanzania
1/11/2016IIROC Trading Halt - MDN
9/8/2015IIROC Trade Resumption - MDN
9/8/2015MDN Signs an Agreement for a Joint Venture on the Ikungu Pro...
9/8/2015IIROC Trading Halt - MDN
4/16/2015MDN Receives Cash From Dispute Settlement
2/24/2015MDN Acquires 20 Blocks of High Grade Niobium Claims in Ontar...
1/30/2015MDN Inc.: Start of Drilling Program on Samaqua
12/15/2014MDN Inc.: Update on the Exploration Program on Samaqua
10/15/2014MDN Identifies Three Large Exploration Targets on Samaqua
10/6/2014MDN Welcomes Positively the Change of Partner in the Crevier...
8/19/2014MDN Announces the Start of the Exploration Program on Samaqu...
7/15/2014MDN Announces Closing of Private Placement
6/18/2014MDN Announces an Exploration Program on the Samaqua Property
6/12/2014Jean-Sebastien David and Claude Dufresne are Joining the Boa...
5/14/2014MDN Inc.: Ikungu East Exploration Results Update
5/12/2014Claude Dufresne Appointed President and Chief Executive Offi...
3/31/2014MDN Inc. Reports Increasing Evidence of a Large Gold-Bearing...
4/26/2013Metalinvest Requests an Extension for Payment of the Initial...
2/13/2013Announces Tulawaka Year-End 2012 Operational Results
1/28/2013Corporate Restructuring Focused on Exploration in Tanzania
10/26/2012.: Tulawaka 2012 Third Quarter Results/Focus on Mine Life Ex...
9/11/2012(Ikungu).: Presence of a Volcanic Belt of More Than 15 km on Ikungu ...
8/23/2012Confirms Discovery on Nikonga
3/6/2012. Receives Payment of US $6.17 Million
2/28/2012(Mcgold)and SOQUEM Demonstrate That Gold Mineralization at the MCGol...
2/16/2012Announces Tulawaka Year-End 2011 Operational Results
1/26/2012Begins Drilling at the Nikonga Project in Tanzania
1/18/2012.: Fourth Quarter Operation Results at the Tulawaka Gold Min...
8/4/2011Reports its Financial Results for the Second Quarter of 2011...
4/21/2011Announces First Quarter Production of 19,606 Ounces of Gold ...
2/16/2011Announces Tulawaka Year-End 2010 Operational Results
2/16/2010 Increases its Participation in Mineraux Crevier to 67.5%
12/16/2009Announces Important Changes to Senior Management
11/12/2009Net Income for the 7th Consecutive Quarter
10/21/2009 Provides an Update on Anita
8/13/2009Net Income of $1,153,330 or $0.012 Per Share
6/2/2009Confirms an Investment in a Niobium and Tantalum Deposit
5/25/2009Corporate Update of MCI's Acquisition Project
5/15/2009Net Income of $794,214 or $0.01 Per Share
12/18/2008 Provides Corporate Development Update
9/19/2008Overwhelming Acceptance Rate For MDN's Warrant Exchange Offe...
9/4/2008Warrant Exchange Offer Extended
8/12/2008NET EARNINGS OF $6.6 MILLION OR $0.073 PER SHARE
8/1/2008Announces a Warrant Exchange Offer
6/5/2008Shareholders Approve the Shareholders Rights Plan
5/15/2008Net Earnings of $1.8 Million or $0.02 Per Share
4/23/2008Adopts Shareholder Rights Plan
10/3/2007DISCOVERY OF A NEW MINERALIZED ZONE ON ISAMBARA
9/11/2007Retains the Services of Evolution Group
8/23/2007Acquisition in Normetal Area-Abitibi
8/3/2007Tanzanian Royalty Receives Assay Results From MDN for Mnezek...
5/24/2007Northern Mining Explorations Ltd. Changes its Name to MDN IN...
5/16/2007First Drilling Phase Completed With Success on Isambara
4/4/2006(Isambara)First drilling in Eritrea
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (MDN.TO)
0.045+0.00%
TORONTO
CA$ 0.045
03/30 11:23 -
0%
Prev close Open
0.045 0.040
Low High
0.035 0.045
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.045 -10.00%
Volume 1 month var.
389,000 -10.00%
Produces Gold
Develops
Explores for Copper - Gold - Niobium - Silver - Tantalum - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 6/10/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :