Tiger Resources Limited

Published : July 06th, 2016

Tiger Examines Viability of Cobalt Production at Kipoi

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Cobalt |

Tiger Examines Viability of Cobalt Production at Kipoi

Microsoft Word - 20160706 ASX announcement - cobalt viability study.docx

ABN 52 077 110 304

7 July 2016

TIGER EXAMINES VIABILITY OF COBALT PRODUCTION AT KIPOI

Perth, Western Australia: Tiger Resources Limited (ASX: TGS) ("Tiger") is pleased to announce it has commissioned a study by independent consultant, Mintrex Pty Ltd to investigate the economic viability of producing cobalt at its Kipoi Project in the Democratic Republic of Congo (DRC).

Tiger has a resource of 40,400 tonnes of Measured and Indicated and 5,600 tonnes of Inferred cobalt across the Kipoi Central, Kipoi North, Kileba and Judeira deposits at its Kipoi project. There are additional cobalt resources at the nearby Sase Central deposit, where Tiger has defined 5,000 tonnes of Indicated and 1,000 tonnes of Inferred cobalt. Appendix 1.

The Mintrex study is expected to take 3 months to complete and will examine Tiger's potential processing pathways, with Mintrex to recommend options for future metallurgical testwork.

Tiger Chief Executive Officer Michael Griffiths said the growing global demand for cobalt had encouraged the Company to examine if it could economically convert its resources to a saleable product.

"Cobalt is used in many industries, but its demand is increasing mostly due to its use in batteries and super alloys," he said.

"Tiger is in a position to capitalise on this with our known resource at Kipoi and a strong operating and production record."

Tiger currently produces ~26,000 tonnes of copper cathode per year from the Kipoi project and is currently undertaking debottlenecking works at the plant to increase production capacity at Kipoi to 32,500 tonnes per year.

For further information in respect of the Company's activities, please contact:

Michael Griffiths Chief Executive Officer Tel: (+61 8) 6188 2000

Email: [email protected]

Nathan Ryan

Media

Tel: (+61 0)420 582 887

Email: [email protected]

Company website: www.tigerresources.com.au

Caution Regarding Forward Looking Statements and Forward Looking Information: Reports contain forward looking statements and forward looking information, which are based on assumptions and judgments of management regarding future events and results. Such forward-looking statements and forward looking information, including but not limited to those with respect to the operations of Stage 2 SXEW plant at Kipoi Central, involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the actual market prices of copper, cobalt and silver, the actual results of current exploration, the

Level 1, 1152 Hay Street, West Perth, WA 6005 - PO Box 379, West Perth, WA 6872

T: +61 (0)8 6188 2000 F: +61 (0)8 6188 2099 E: [email protected] W: www.tigerresources.com.au

availability of debt financing, the volatility in global financial markets, the actual results of future mining, processing and development activities and changes in project parameters as plans continue to be evaluated.

Appendix 1

The information in this report that relates to the Mineral Resources was first reported by the Company in compliance with JORC 2012 in market releases dated as follows:

Kipoi Central, Kipoi North and Kileba Mineral Resources - 16 April 2015; and Sase Central Mineral Resource - 12 July 2013.

The Company confirms that it is not aware of any new information or data that materially affects the information included in the market announcements referred to above and further confirms that all material assumptions and technical parameters underpinning the mineral resource estimates contained in those market releases continue to apply and have not materially changed.

KIPOI COPPER PROJECT, KATANGA PROVINCE, SOUTH-EAST DEMOCRATIC REPUBLIC OF CONGO (TIGER 95% AT 31 March 2016)

Table A: Kipoi Mineral Resource

Kipoi Mineral Resource

Mining depleted to 31 December 2015

Kipoi Central grade tonnage reported above a cut off of 0.3% Copper

Kileba, Kipoi North and Judeira grade tonnage reported above a cut off of 0.5% Copper

Tonnes Cu Grade

Classification Deposit

(MT) (%)

Co Grade (%)

Copper (000'T)

Cobalt (000'T)

Measured

Kipoi Central

5.9

2.3

0.14

136

8.1

Indicated

Kipoi Central

40.4

1.1

0.06

443

25.9

Indicated

Kipoi North

4.0

1.3

0.05

54

1.8

Indicated

Kileba

8.6

1.5

0.05

128

4.6

Total Measured &

Indicated

58.9

1.3

0.07

761

40.4

Inferred

Kipoi Central

2.9

0.8

0.07

23

2.1

Inferred

Kipoi North

1.0

1.1

0.03

12

0.4

Inferred

Kileba

2.2

1.2

0.04

27

0.9

Inferred

Judeira

6.1

1.2

0.04

71

2.2

Total Inferred

12.2

1.1

0.05

133

5.6

Total

71.1

1.3

0.06

894

46.0

LUPOTO COPPER PROJECT, KATANGA PROVINCE, SOUTH-EAST DEMOCRATIC REPUBLIC OF CONGO (TIGER 95%)

Table B: SASE Central Mineral Resources

SASE Central Mineral Resources July 2013

Grade tonnage reported above a cut off of 0.5% Copper

Tonnes Cu Grade

Classification

(MT) (%)

Co Grade (%)

Copper (000'T)

Cobalt (000'T)

Indicated

9.6

1.39

0.05

134.0

5.0

Inferred

2.8

1.21

0.03

34.0

1.0

2|P a g e

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Tiger Resources Limited

DEVELOPMENT STAGE
CODE : TGS.AX
ISIN : AU000000TGS2
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Tiger Res. is a copper exploration company based in Australia.

Tiger Res. develops copper and cobalt in Congo Dem. Rep. of, and holds various exploration projects in Congo Dem. Rep. of.

Its main asset in development is KIPOI in Congo Dem. Rep. of.

Tiger Res. is listed in Australia and in Germany. Its market capitalisation is AU$ 97.6 millions as of today (US$ 65.4 millions, € 58.9 millions).

Its stock quote reached its highest recent level on April 29, 2011 at AU$ 0.64, and its lowest recent point on October 28, 2016 at AU$ 0.02.

Tiger Res. has 1 992 270 080 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Project news of Tiger Resources Limited
10/23/2015Tiger Resources' Congo copper mine gets $160 mln investment
4/15/2015Tiger Resources increases Stage 2 ore reserves to 689,000 to...
3/31/2008(Kipoi)Resource Drilling Updates For Kipoi North And Kipoi Central ...
6/8/2007Drilling Results Confirm Potential For High Grade Cobalt Dep...
Corporate news of Tiger Resources Limited
7/6/2016Tiger Examines Viability of Cobalt Production at Kipoi
6/30/2016Tiger appoints Non Executive Directors
1/20/2016Tiger completes retail component of capital raising
1/5/2016Tiger Extends Closing Date for Retail Entitlement Offer
12/31/2015Tiger gibt Ernennung eines neuen Chairman bekannt
12/31/2015Tiger Announces Appointment of New Chairman
12/17/2015Retail Offer Booklet
12/17/2015Tiger completes institutional component of capital raising
12/15/2015Tiger Announces Funding Package and Operations Update
10/22/2015Taurus and IFC to provide USD162.5M Kipoi Financing
10/13/2015Tiger appoints Mark Connelly to the Board
9/2/2015African Down Under Presentation
8/28/2015Tiger's 2015 Half-Yearly Report
8/16/2015Resignation of Chief Executive Officer
7/31/2015Positive Results for Kipoi Debottlenecking Study
4/24/2015Notice of Annual General Meeting and Explanatory Memorandum ...
4/24/20152014 Annual Report
4/10/2015Timing of 2015 AGM
3/31/20152014 Annual Financial Statements
1/29/2015Kipoi 2015 guidance and outlook presentation
12/7/2014Kipoi Expansion and Funding Update
10/21/2014September 2014 Quarterly Report
11/2/2007Further significant drill results at Kipoi Central, includin...
9/11/2007Drill Results Confirm Significant New Zones of Copper and Si...
9/11/2007Contractual Arrangements - Kipoi Project, DRC
8/1/20074th Quarter Report 2006/2007
6/30/2007General Meeting: Outcome Of Resolutions
6/25/2007Board Resignation
5/10/2007Closes A$ 18,000,000 Financing To Fund DRC Exploration And D...
4/10/2007A$ 17,500,000 Financing To Fund DRC Exploration And Developm...
3/27/2007Further significant results received from resource drilling ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (TGS.AX)FRANKFURT (RH8.F)
0.049+0.00%0.037+0.00%
AUSTRALIA
AU$ 0.049
01/31 09:30 -
0%
Prev close Open
0.049 0.049
Low High
0.049 0.049
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.049 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 12
Produces
Develops Cobalt - Copper
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20200.00%0.050.05
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :