Timberline Resources Corporation

Published : January 27th, 2015

Timberline Announces Authorization for Construction and Operation of Butte Highlands Underground Gold Mine

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Timberline Announces Authorization for Construction and Operation of Butte Highlands Underground Gold Mine

01/27/15

Coeur d'Alene, Idaho - January 27, 2015- Timberline Resources Corporation (NYSE MKT: TLR; TSX-V: TBR) ("Timberline" or the "Company") announced today that the Montana Department of Environmental Quality ("MDEQ") has authorized Butte Highlands Joint Venture ("BHJV") to construct and operate its proposed underground gold mine south of Butte, Montana by publishing its Record of Decision ("ROD") on the Final Environmental Impact Statement ("EIS") for the project.  The MDEQ, which was tasked with evaluating and selecting a plan for operating the mine, has selected the Agency Mitigated Alternative authorizing BHJV to construct and operate the proposed mine with certain modifications to some aspects of BHJV's proposed plan. 

In announcing its decision in the ROD, the MDEQ noted, "The DEQ has selected the Agency Mitigated Alternative, authorizing BHJV to construct and operate the proposed underground gold mine.  A detailed description of the Agency Mitigated Alternative is set forth on pages 51 through 62 of the Final EIS. This alternative meets the purpose and need for the proposal and complies with the substantive requirements of the Metal Mine Reclamation Act, the Montana Air or Water Quality acts, and the Montana Public Water Supply Act. The Agency Mitigated Alternative includes reasonable mitigation measures addressing compliance issues associated with protecting water resources as required by Section 82-4-336(10), MCA. While some of these mitigation measures were not included in the Draft Permit, they were developed in consultation with BHJV and are included in the Final Permit with the consent of BHJV."

The MDEQ added, "The Agency Mitigated Alternative includes modifications to some aspects of the Proposed Action. Under the Agency Mitigated Alternative, DEQ would require additional water quality monitoring, mitigations for reductions in flows during groundwater recharge after mining ceases, and flow augmentation in Fish Creek."   

Timberline owns a 50-percent carried-to-production interest in BHJV, which owns the Butte Highlands Gold Project where mining is expected to commence following the issuance of the final hard rock operating permit ("Final HROP") and the U.S. Forest Service ("USFS") approval of a road-use plan of operations for material haulage.  Timberline's joint venture partner is funding all mine development costs through to commercial production with Timberline's share of those costs to be repaid from proceeds of future mine production.    

Kiran Patankar, Timberline's President and CEO, commented, "It is gratifying for the BHJV team to have achieved this key permitting milestone after a very lengthy process since submitting the Draft EIS for the project. We are pleased with the consultation between the MDEQ and BHJV, with critical input from Montana Fish, Wildlife, and Parks, and Butte-Silver Bow.  This cooperation has led to a sensible 'win-win' mitigation plan for the project, which provides for restoration of the site to pre-historic mining conditions in order to improve fisheries and provide significant economic benefits to the community.  We now look forward to the USFS completing the road permit and ongoing cooperation with the regulatory agencies and the city and county of Butte-Silver Bow."   

The ROD includes a final Basin Creek Stream Flow Nonsignficance Determination which concludes that reduced stream flow in upper Basin Creek that would result from plugging of the historic Highland Mine adit does not constitute significant degradation to the environment.  The complete text of the ROD may be viewed at http://deq.mt.gov/eis.mcpx.      

With a positive ROD now issued, the DEQ is currently calculating the amount of a reclamation bond for the project.  Key elements in that calculation have already been completed including estimates for plugging of the historic Highland Mine adit.  The Final HROP can be issued once BHJV posts the reclamation bond.   

Other critical permits required to allow mining to begin have already been issued including the Montana Pollutant Discharge Elimination System ("MPDES") Permit, MDEQ Air Quality Permit, EPA Underground Injection Control Permit, Conservation District 310 Permit, and an Army Corp of Engineers 404 Nationwide Permit.  In addition, Butte-Silver Bow County has approved BHJV as a commercial water customer to support mitigation measures identified in the ROD.   

The Company also today announces a revised schedule for completion of the National Environmental Policy Act ("NEPA") environmental review by the USFS Beaverhead-Deerlodge National Forest on the proposed Plan of Operations for the Butte Highlands Mine Haul Road.  The USFS issued a draft Environmental Assessment ("EA") in March, 2014 and now schedules release of a draft decision for public comment on March 18, 2015.  The final decision is scheduled for May 11, 2015.   

About Timberline Resources  

Timberline Resources Corporation is focused on advancing and developing its 23 square mile Eureka project lying on the Battle Mountain-Eureka gold trend in Nevada.  The Company continues to advance the NI 43-101 resource of 508,000 ounces (M&I) and 141,000 ounces (Inferred) of gold at the Lookout Mountain project area in addition to advancing the exploration target of 180,000 - 200,000 ounces of gold at the Windfall project area into NI 43-101 compliance.  Exploration potential across the project area is lying along three separate structural trends defined by distinct geochemical gold anomalies.  The majority of the project area has yet to be drill tested.  Historic production from heap leach mines took place at Lookout Mountain and Windfall mines, both located on the Company's Eureka property.  Timberline also owns the Seven Troughs property in northern Nevada, known to be one of the state's highest grade, former producers, as well as a carried-to-production interest in the Butte Highlands high-grade underground gold project in Montana.  

Timberline is listed on the NYSE MKT where it trades under the symbol "TLR" and on the TSX Venture Exchange where it trades under the symbol "TBR".      

Mr. Steven Osterberg, Ph.D., P.G., Timberline's Vice-President of Exploration, is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved disclosure of the technical contents of this news release.  

Cautionary note to U.S. investors concerning estimates of measured and indicated resources: This press release uses the terms "measured resources", "indicated resources" and "measured & indicated resources." We advise U.S. investors that while these terms are defined in and required by Canadian regulations, these terms are not defined terms under United States Securities and Exchange Commission ("SEC") Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the SEC. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves" as in-place tonnage and grade without reference to unit measures.  The term "contained gold ounces" used in this press release is not permitted under the rules of the SEC.  U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into SEC Industry Guide 7 reserves.

Cautionary note to U.S. investors concerning estimates of inferred resources: This press uses the term "inferred resources". We advise U.S. investors that while this term is defined in and required by Canadian regulations, this term is not a defined term under SEC Industry Guide 7 and is normally not permitted to be used in reports and registration statements filed with the SEC. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred resource will ever be upgraded to a higher category. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves" as in-place tonnage and grade without reference to unit measures.  The term "contained gold ounces" used in this press release is not permitted under the rules of the SEC.  U.S. investors are cautioned not to assume that any part or all of an inferred resource exists or is economically or legally minable.  

Cautionary Note  

The Company clarifies that BHJV has decided to advance the Butte Highlands Gold Project into production without first establishing NI 43-101 compliant mineral resources supported by an independent technical report or completing a feasibility study.  A production decision without the benefit of a technical report independently establishing mineral resources or reserves and any feasibility study demonstrating economic and technical viability creates increased uncertainty and heightens economic and technical risks of failure associated with the Butte Highlands Project.  

Forward-looking Statements  

Statements contained herein that are not based upon current or historical fact are forward-looking in nature and constitute forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Such forward-looking statements reflect the Company's expectations about its future operating results, performance and opportunities that involve substantial risks and uncertainties.  These statements include but are not limited to statements regarding the Company's expected permits and timing of permits by the MDEQ and/or USFS at Butte Highlands, progress and timing of evaluations, including the Final EA , being done by the USFS, timing, schedule and signing of the the Final Hard Rock Operating Permit, timing, calculation, and remittance of the required bond at Butte Highlands, timing of the completion of the Final EA by the USFS, sufficiency of the proposed mitigation measures, the estimated timing for flow augmentation, the level of post-mining groundwater elevations and enhanced spring development to support stream flows, commencement and timing of construction and operating production at Butte Highlands, use of the Highland Road for material haulage, timing and information regarding a revised schedule from MDEQ and/or USFS, restoration of the site to pre-historic conditions, improvement of fisheries and economic benefits to the community, and the continuation of development and funding by the Company's JV partner at Butte Highlands. When used herein, the words "anticipate," "believe," "estimate," "upcoming," "plan," "target", "intend" and "expect" and similar expressions, as they relate to Timberline Resources Corporation, its subsidiaries, or its management, are intended to identify such forward-looking statements. These forward-looking statements are based on information currently available to the Company and are subject to a number of risks, uncertainties, and other factors that could cause the Company's actual results, performance, prospects, and opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, whether or not the Company completes the acquisition of Wolfpack US, risks related to obtaining shareholder and regulatory approvals, market risks, risks and uncertainties related to mineral estimates, risks related to the inherently dangerous activity of mining, and other such factors, including risk factors discussed in the Company's Annual Report on Form 10-K for the year ended September 30, 2013.  Except as required by Federal Securities law, the Company does not undertake any obligation to release publicly any revisions to any forward-looking statements.  

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

For Further Information Please Contact:  

Kiran Patankar
President and Chief Executive Officer
Tel: 208-664-4859
E-mail: [email protected]
Website: www.timberline-resources.com


Read the rest of the article at www.noodls.com

Timberline Resources Corporation

DEVELOPMENT STAGE
CODE : TLR
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Timberline Res. is a gold exploration company based in United states of america.

Timberline Res. holds various exploration projects in USA.

Its main assets in development are SOUTH EUREKA and LOOKOUT MOUNTAIN in USA and its main exploration properties are SOUTH RATTO RIDGE, SECRET CANYON, ICBM, EAST BULL, LUCKY LUKE, MINTON PASS, STANDARD CREEK, SANTA ROSA CALIFORNIA, WINDFALL-HOOSAC and BUTTE HIGHLANDS in USA.

Timberline Res. is listed in United States of America. Its market capitalisation is US$ 3.2 millions as of today (€ 2.9 millions).

Its stock quote reached its highest recent level on August 26, 2011 at US$ 9.96, and its lowest recent point on December 21, 2018 at US$ 0.05.

Timberline Res. has 36 027 819 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Timberline Resources Corporation
Annual report 2007
Financings of Timberline Resources Corporation
3/3/2011(Lookout Mountain)Closes $5-Million Offering, Fast-Track Exploration to Contin...
2/28/2011Announces US$5 Million Offering of Common Stock
Nominations of Timberline Resources Corporation
10/3/2009Appoints Executive Chairman and Nears Completion of 2009 Sur...
Financials of Timberline Resources Corporation
8/10/2010Announces Third Quarter 2010 Financial Results
8/15/2009Third Quarter Financial Results, Consolidated Profit, Contin...
5/14/2009Announces Second Quarter Financial Results, Provides Operati...
2/17/2009Announces First Quarter Financial Results and Provides Corpo...
Project news of Timberline Resources Corporation
1/26/20168:24 am Timberline Resources provides corporate update, will...
4/20/20158:35 am Timberline Resources announces positive drill result...
4/6/2011Drills 10.2 metres of 56.5 g/t Gold (33.6 Feet of 1.65 opt) ...
3/23/2011(Lookout Mountain)Completes Successful Drill Program at Lookout Mountain
5/6/2010(Butte Highlands)Submits Operating Permit Application for Butte Highlands Joi...
4/7/2010(Butte Highlands)Advances Toward Underground Drilling at Butte Highlands
11/18/2009(Butte Highlands)Announces Positive Metallurgical Test Results From Its Butte...
9/25/2009(Butte Highlands)Provides Economic Update on Butte Highlands Gold Project, An...
8/25/2009(Butte Highlands)Receives Permit to Begin Development at its Butte Highlands ...
8/14/2009(South Doughstick)Reports Independent NI 43-101 Uranium Resources on South Do...
1/12/2009(Butte Highlands)Receives Positive Hydrogeologic Test Results at Its Butte Hi...
Corporate news of Timberline Resources Corporation
7/11/2016Timberline Resources Adds Finance and Development Expertise ...
6/14/2016Timberline Resources Closes Second Tranche of Equity Financi...
5/31/2016Timberline Resources Closes First Tranche of Equity Financin...
5/27/2016Timberline Resources Announces Increase to Private Placement
5/16/2016Timberline Announces Second Quarter 2016 Financial Results
5/11/2016Timberline Resources Announces Private Placement Offering of...
5/2/2016Timberline Resources Announces Resignation of Director
2/1/2016New Jersey Mining Company Completes Purchase of 50-Percent I...
1/26/2016Timberline Resources Announces Asset Sale and Provides Corpo...
1/26/2016Timberline Resources Receives Audit Opinion with Going Conce...
1/26/2016New Jersey Mining Company Signs Binding Letter of Intent to ...
1/19/20163:17 am Timberline Resources confirms audit opinion with 'Go...
1/16/2016Timberline Resources Receives Audit Opinion With Going Conce...
1/13/20168:03 am Timberline Resources appoints Steven Osterberg as ne...
10/12/2015Timberline Announces Positive Final Decision by US Forest Se...
9/23/2015Timberline Resources Announces Closing of Non-Brokered Priva...
9/15/2015Timberline Announces Non-Binding Letter Agreement for Acquis...
8/10/201510-Q for Timberline Resources Corp.
8/7/2015Timberline Announces Third Quarter 2015 Financial Results
5/16/201510-Q for Timberline Resources Corp.
4/20/2015Timberline Completes Successful Eureka Drill Program
4/1/2015Timberline Closes Transaction to Acquire Talapoosa Project O...
3/18/2015Timberline Announces Positive Decision on Butte Highlands Mi...
3/17/2015Timberline Acquires Option For 100% of Talapoosa Project in ...
2/16/2015Timberline Announces First Quarter 2015 Financial Results
2/13/2015Timberline Announces First Quarter 2015 Financial Results
2/13/201510-Q for Timberline Resources Corp.
2/12/2015Timberline Resources Announces New Board Appointment
1/27/2015Timberline Announces Authorization for Construction and Oper...
1/14/2015Timberline Resources Drilling Identifies New Zone of Gold Mi...
12/29/2014Timberline Resources Announces 2014 Financial Results
12/23/2014Timberline Resources Announces 2014 Financial Results
12/22/2014Timberline Announces Release of Final EIS for Butte Highland...
12/19/2014Timberline Resources Enhances Management Team with New Chief...
12/18/2014Timberline Resources Commences Drilling at Eureka
11/25/2014Timberline Resources Receives NYSE MKT Compliance Letter
10/24/2014Timberline Announces Terms of Reverse Stock Split
10/20/2014Timberline Releases Schedule for Publication of Final Enviro...
4/20/2011(Butte Highlands)Reports Additional High-Grade Intercepts from Underground Dr...
8/4/2010Commences Drill Program at South Eureka Project in Nevada
7/26/2010Joins Russell Microcap Index
6/25/2010Announces Extension of Due Date on Convertible Loan
6/1/2010Shareholders Approve Acquisition of Staccato Gold Resources
5/24/2010Staccato Securityholders Approve Acquisition by Timberline R...
5/5/2010Updates Progress on its Acquisition of Staccato Gold Resourc...
3/23/2010Agrees to Acquire Staccato Gold with Potential Near-Term Nev...
3/8/2010Advances Underground Development at Butte Highlands
5/1/2008Approved for Listing On the American Stock Exchange
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AMEX (TLR)
0.090+12.50%
AMEX
US$ 0.090
02/08 15:59 0.010
12.5%
Prev close Open
0.080 0.130
Low High
0.090 0.130
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.090 -%
Volume 1 month var.
1,400 -%
24hGold TrendPower© : -6
Produces
Develops Gold
Explores for Copper - Gold - Lead - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.84+0.80%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :