In the same category
U.S. Silver & Gold reports first quarter financial and operational results
Published : May 14, 2014
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

U.S. Silver & Gold reports first quarter financial and operational results

TORONTO, May 14, 2014 /CNW/ - U.S. Silver & Gold Inc. (TSX: USA, OTCQX: USGIF) ("U.S. Silver & Gold" or the "Company") today reported financial and operational results for the first quarter of 2014.

This earnings release should be read in conjunction with the Company's MD&A, Financial Statements and Notes to Financial Statements for the corresponding period, which have been posted on SEDAR at www.sedar.com and are also available on the Company's website at www.us-silver.com. All figures are in U.S. dollars unless otherwise noted.

Highlights of First Quarter

  • Revenues of $8.1 million and a net loss of $2.9 million in Q1, 2014 compared with revenues of $22.9 million and a net loss of $3.4 million in Q1, 2013. The revenue declines are attributable to a reduction in the price of silver, lower production at the Galena Complex and the discontinuation of operations at the Drumlummon Mine.

  • 2014 guidance remains at 2.0 – 2.4 million silver ounces at cash costs of $14.50$15.50 per ounce and all-in cash costs of $18.00 – 19.00 per ounce, with Q2, 2014 production guidance of approximately 500,000 silver ounces and 600,000 silver equivalent ounces.

  • First quarter production of 460,490 silver equivalent ounces[1] including 385,503 silver ounces, a decrease of 33% over silver production in Q1, 2013; however, the Company forecasted the first quarter to be the lowest production and highest cost quarter of the year.  

  • Cash costs of $18.64 per ounce silver and all-in sustaining costs of $23.95, which represent reductions of 9% and 15% respectively over Q1, 2013.

  • As of March 31, 2014, the Company had a cash balance totalling approximately $7.3 million.

"Despite the expected 30% production decline in the first quarter this year, our cost cutting initiatives have continued to help us improve the bottom line compared to the first quarter of 2013," said Darren Blasutti, President and CEO of U.S. Silver & Gold. "With continued cost discipline, and as projected production increases occur in the second quarter and throughout the remainder of this year, we expect to see a further significant decline in our cash costs in comparison to last year and the first quarter of 2014."

Production and Operating Costs
As reported in the April 30, 2014 press release, Galena Complex production for Q1, 2014 totalled 385,503 silver ounces at a grade of 10.43 ounces per ton (compared with a grade of 9.55 ounces per ton in Q1, 2013).  Production decreased by 33% due to planned sand cycles which made a number of high-grade silver/copper stopes unavailable for the majority of the quarter and the transition of personnel from lower grade silver/copper production areas to develop wider, more profitable high-grade silver/lead stopes for the remainder of the year.  In addition, silver/lead stopes on the 5200 level were inaccessible as work continued toward the resolution of citations related to ongoing maintenance in the #3 Shaft.

_______________________
1 Silver equivalent calculation is based on prices of $20 per ounce silver, $0.95 per pound lead and $3.00 per pound copper.

These stopes will be available during the second quarter and for the remainder of the year.  Silver cash costs improved to $18.64 per ounce (compared with $20.48 per ounce in Q1, 2013) despite a material drop in year-over-year production. The improvement was due primarily to the implementation of a Company-wide cost containment strategy outlined last year in the Small Mine Plan. 

A net loss of $2.9 million was recorded for the quarter, compared with a net loss of $3.4 million for the first quarter of 2013.  This decrease was due to reductions in general and administration expenses, exploration costs, stock-based compensation and depreciation, depletion and amortization. Cost decreases were partially offset by lower metal prices, lower period-over-period production and higher finance costs.

Table 1
Galena Production Details


Q1 2014

Q1 2013

Total Ore Processed (tons milled)

38,646

62,826

    Silver – Copper

26,092

44,887

    Silver – Lead

12,554

17,939

Silver produced (ounces)

385,503

577,095

Lead produced (pounds)

1,020,285

1,772,256

Copper produced (pounds)

176,825

261,618

Silver recoveries (percent)

95.5

96.2

Lead recoveries (percent)

93.6

92.7

Copper recoveries (percent)

94.7

95.9

Silver head grade (ounces per ton)

10.45

9.55

      Silver - Copper

11.43

10.83

      Silver – Lead

8.41

6.34

Lead head grade (percent)

4.34

5.33

Copper head grade (percent)

0.36

0.30

Silver sold (ounces)

345,874

568,401

Lead sold (pounds)

915,027

1,769,304

Copper sold (pounds)

182,464

259,728

Realized silver price ($ per ounce)2

$20.98

$30.40

Realized lead price ($ per pound)2

$0.95

$1.03

Realized copper price ($ per pound)2

$3.18

$3.68

Silver cash costs ($ per ounce)

$18.64

$20.48

All-in sustaining Costs ($ per ounce silver)

$23.95

$28.29

_______________________
2 Realized metal prices represent the weighted average metal prices on amounts settled from smelters on final outrun of metals during the period. Management uses these measures internally to better assess performance trends and understands that a number of investors and others who follow the Company's performance also assess performance in this manner. These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

Exploration Update
The 2014 exploration budget was designed to develop near-term resources, provide information to help refine the highest grade areas in proximity to existing infrastructure for mining, complete block modelling on priority veins, and evaluate drill results from 2013. The budget is projected at $1.7 million for the year of which $0.4 million was spent in the first quarter of 2014.

The Company drilled 5,522 feet underground during the first quarter with two drill crews operating.  Year-to-date the Company has logged over 10,000 feet of current and backlogged drill core and the backlog has been reduced from over 15,000 feet to approximately 9,000 feet.  Selected silver/lead drilling results are provided below.  Drilling results will be available at www.us-silver.com.

Table 2

Recent Exploration Drill Results

Hole

No.

From

(ft)

To

(ft)

Width

(ft)

Ag

(oz/ton)

Pb

(%)

Ag

Equivalent

(oz/ton)

Ag

Equivalent

(g/t)

37-290

48.3

61.5

13.2

8.27

10.90

18.61

621

40-357

182.5

187.3

4.8

6.86

15.12

21.22

728

49-337

376.5

381.3

4.8

10.18

11.80

21.38

733

49-339

162.5

181.6

19.1

5.69

8.73

13.98

479

49-339

247.8

301.8

54.0

5.74

8.03

13.37

458

49-344

245.0

258.3

13.3

7.79

9.45

16.77

559

Drill holes were completed from different drill stations and intersect the veins at various angles. Recovered intersections may not reflect true widths.

As anticipated, drilling on the 4900 Level successfully intersected the upward extension of the 175 Vein.  Mining is currently taking place on the 175 Vein between the 5200 and 5500 Levels.  This new information provides confidence that capital development currently underway will generate additional returns and support the Company's transition toward silver/lead dominant production.

Preliminary block-modeling of a newly re-evaluated series of veins in the upper part of the mine provided a good picture of potentially high-grade, minable silver/lead veins in the 3000 to 3700 Level horizon. Five of these veins have been delineated and drilling is underway to validate the model and investigate continuation at depth to the 4000 Level.  Collectively referred to as the Upper Country Silver Lead (UCSL) Veins, these veins underwent limited historical development prior to the mine's decades-long exclusive focus on silver/copper ore.  As a result, only a small amount of production mining took place and the resource was left readily available via established development and infrastructure.  Initial work has commenced in preparation for renewed mining in these new areas.  Meaningful production is expected to begin as early as the fourth quarter, but efforts will be accelerated if justified by continued exploration success.  The proposed exploration program for the next 9 months is largely focused on drilling UCSL Veins on the 3700 Level.

Financial Position
The Company's cash and cash equivalents at March 31, 2014 totaled $7.3 million compared to $7.2 million at December 31, 2013, while net working capital totaled $12.5 million and $12.2 million respectively for the same dates.

On March 21, 2014, the Company completed a private placement of 8,103,497 Units and 3,448,280 Subscription Receipts at a price of C$0.58 per Unit and C$0.58 per Subscription Receipt for aggregate gross proceeds of approximately C$6.7 million.  The C$2.0 million gross proceeds from the Subscription Receipts are held in escrow pending the satisfaction of certain regulatory and shareholder approvals. The Company intends to seek shareholder approval for the exchange of the Subscription Receipts for Units in May 2014.

Quality Assurance / Quality Control ("QA/QC")
U.S. Silver & Gold maintains a QA/QC Program for all assays, including the use of standards, blanks and duplicates.  All QA/QC results are routinely evaluated using a program of QA/QC monitoring.  Details of the program are provided in the Company's NI 43-101 compliant Technical Report on the Galena Project dated March 22, 2013.

About U.S. Silver & Gold Inc.
U.S. Silver & Gold is a silver and gold mining company focused on growth from its existing asset base and execution of targeted accretive acquisitions. It owns and operates the Galena Mine Complex in the heart of the Silver Valley/Coeur d'Alene Mining District, Shoshone County, Idaho which produces high-grade silver and is the second most prolific silver mine in U.S. history, delivering over 200 million ounces to date. The Caladay Zone is being evaluated for bulk mining development. U.S. Silver & Gold also owns the Drumlummon Mine Complex in Lewis and Clark County, Montana.

Mr. Daren Dell, Vice President, Technical Services and a Qualified Person under Canadian Securities Administrators guidelines, has approved the applicable contents of this news release.

For further information please see SEDAR or www.us-silver.com.

Cautionary Statement Regarding Forward Looking Information:

This news release contains "forward‐looking information" within the meaning of applicable securities laws. Forward‐looking information includes, but is not limited to, the Company's expectations intentions, plans, and beliefs with respect to, among other things, the Galena Complex and the Drumlummon Mine. Often, but not always, forward‐looking information can be identified by forward‐looking words such as "anticipate", "believe", "expect", "goal", "plan", "intend", "estimate", "may", and "will" or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions, or statements about future events or performance. Forward‐looking information is based on the opinions and estimates of the Company as of the date such information is provided and is subject to known and unknown risks, uncertainties, and other factors that may cause the actual results, level of activity, performance, or achievements of the Company to be materially different from those expressed or implied by such forward looking information. This includes the ability to develop and operate the Galena and Drumlummon properties, risks associated with the mining industry such as economic factors (including future commodity prices, currency fluctuations and energy prices), failure of plant, equipment, processes and transportation services to operate as anticipated, environmental risks, government regulation, actual results of current exploration activities, possible variations in ore grade or recovery rates, permitting timelines, capital expenditures, reclamation activities, social and political developments and other risks of the mining industry. Although U.S. Silver & Gold has attempted to identify important factors that could cause actual results to differ materially from those contained in forward‐looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. Readers are cautioned not to place undue reliance on such information. By its nature, forward‐looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific those contribute to the possibility that the predictions, forecasts, and projections of various future events will not occur. The Company undertakes no obligation to update publicly or otherwise revise any forward‐looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.

SOURCE U.S. Silver & Gold Inc.

For further information: Darren Blasutti, President and CEO, 416-848-9503; Nicole Richard, Investor Relations, 416-848-9503

Americas Silver

PRODUCER
CODE : USA.TO
ISIN : CA03063L1013
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Americas Silver is a silver producing company based in Canada.

Americas Silver produces silver, copper, gold and lead in USA.

Its main assets in production are COEUR MINE and GALENA MINE in USA and its main exploration properties are DAYROCK MINE and CALADAY in USA.

Americas Silver is listed in Canada and in Germany. Its market capitalisation is CA$ 14.9 millions as of today (US$ 10.9 millions, € 10.2 millions).

Its stock quote reached its lowest recent point on February 05, 2016 at CA$ 0.06, and its highest recent level on September 08, 2017 at CA$ 6.07.

Americas Silver has 39 770 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Americas Silver
11/3/2008Thinking Canadian(s)
Annual reports of Americas Silver
Annual report 2007
Financings of Americas Silver
9/1/2011U.S. Silver Announces Exercise of Warrants from September 20...
7/29/2011U.S. Silver Issues Warrant Acceleration Notice to holders fr...
Option Grants of Americas Silver
9/19/2011U.S. Silver Announces Stock Option Grant
6/27/2011U.S. Silver Announces Stock Option Grants
Nominations of Americas Silver
2/6/2012U.S. Silver Announces Board of Directors Appointment
1/26/2012U.S. Silver Announces Management Changes and Personnel Addit...
9/9/2011U.S. Silver Announces Appointment of Executive Chairman
4/5/2011U.S. Silver Announces Changes to the Board of Directors
6/29/2010Appoints Christopher J. Hopkins Chief Financial Officer
10/8/2009U.S. Silver Reports on a New Mine Manager, Safety Milestones...
2/19/2009Announces Executive Appointment
11/12/2008Corporation Appoints Three New Directors
Financials of Americas Silver
2/12/2016Americas Silver Corporation Announces Closing of U.S. $2.9 M...
2/9/2016Americas Silver Corporation Begins Trading Under New Symbols...
8/12/2014U.S. Silver & Gold reports second quarter financial and oper...
5/14/2014U.S. Silver & Gold reports first quarter financial and opera...
3/24/2014U.S. Silver & Gold reports fourth quarter and year-end 2013 ...
1/20/2014U.S. Silver & Gold announces fourth quarter and 2013 full ye...
3/28/2013U.S. Silver - U.S. Silver & Gold Reports Fourth Quarter and ...
11/2/2012Notice of U.S. Silver & Gold 2012 Third Quarter Financial Re...
8/16/2011U.S. Silver Reports Record Second Quarter 2011 Results
6/17/2011U.S. Silver Reports 1st Quarter 2011 Results -- Cash flow fr...
4/30/2011(Galena Mine)U.S. Silver Reports Year End 2010 Results - 270% increase in...
4/30/2011U.S. Silver Reports Year End 2010 Results - 270% increase in...
8/19/2010U.S. Silver Reports Second Quarter 2010 Results
5/11/2010First Quarter 2010 Production
5/11/2010U.S. Silver Reports 2009 Financial Results
8/26/2009U.S. Silver Reports Second Quarter 2009 Results
11/28/2008Reports Third Quarter 2008 Financial Results & Executive Opt...
6/2/2008 Achieves Profit in First Quarter 2008 Financial Results
Project news of Americas Silver
4/12/2016Americas Silver Corporation Provides First Quarter Productio...
3/30/2016(San Raphael Cosala)Americas Silver Corporation Announces San Rafael Pre-Feasibi...
12/19/2013(Galena Mine)U.S. Silver & Gold re-opens #3 Shaft at Galena Mine Complex
12/12/2013(Galena Mine)Temporary shutdown of the #3 shaft at U.S. Silver & Gold Gal...
12/12/2013(Galena Mine)Temporary shutdown of the #3 shaft at U.S. Silver & Gold Gal...
6/4/2012(Galena Mine)U.S. Silver Announces Results of Ongoing Diamond Drill Activ...
9/19/2011(Galena Mine)U.S. Silver Announces Exploration Drill Results
9/19/2011(Coeur Mine)U.S. Silver Announces Exploration Drill Results
9/19/2011(Coeur Mine)U.S. Silver Announces Exploration Drill Results
6/21/2010(Galena Mine)Fatality at the Galena Mine
5/26/2010(Galena Mine)Drilling Proves High-grade Ore Extensions
2/28/2009(Coeur Mine)Reports NI 43-101 Proven and Probable Reserves Increase by 2...
11/3/2008(Galena Mine)Announces Management Changes and Reports a Strategic Review ...
6/30/2008(Galena Mine)Files New NI 43-101 Technical Report on the Galena Mine
5/26/2008(Galena Mine)Drills 4.1 Feet of 141 Ounce Per Ton Silver at the Galena Mi...
Corporate news of Americas Silver
6/14/2016Americas Silver Corporation Announces Closing of the Concurr...
6/9/2016Americas Silver Corporation Announces Closing of C$20 Millio...
5/26/2016Americas Silver Corporation Announces Alex Davidson Appointe...
5/24/2016Americas Silver Corporation Announces Concurrent Financing
5/20/2016Americas Silver Corporation Announces C$20 Million Financing...
5/12/2016Americas Silver Corporation Reports First Quarter 2016 Finan...
2/25/2016Americas Silver Corporation to Present at the BMO Capital Ma...
12/23/2014U.S. Silver & Gold Inc. and Scorpio Mining Corporation annou...
12/18/2014Scorpio Mining Corporation and U.S. Silver & Gold Inc. recei...
12/11/2014Leading independent advisory firms ISS and Glass Lewis suppo...
11/10/2014New Gold to buy Bayfield; Scorpio and US Silver & Gold to me...
11/7/2014Scorpio Mining and U.S. Silver & Gold Announce Business Comb...
10/22/2014U.S. Silver & Gold provides third quarter production update
7/14/2014U.S. Silver & Gold provides second quarter production update
6/12/2014U.S. Silver & Gold Announces Ratification Of Union Agreement
4/30/2014U.S. Silver & Gold provides first quarter production update
11/11/2013Notice of U.S. Silver & Gold's 2013 Third Quarter Results Co...
10/22/2013U.S. Silver & Gold Provides Third Quarter Production Update;...
8/22/2013U.S. Silver & Gold Inc. Announces Completed Private Placemen...
7/16/2013U.S. Silver & Gold provides second quarter production and co...
5/9/2013Notice of U.S. Silver & Gold's 2013 First Quarter Financial ...
4/24/2013First Quarter Production Results and Corporate Update
3/25/2013Notice of U.S. Silver & Gold's 2012 Fourth Quarter and Year-...
1/31/2013(Caladay)U.S. Silver - U.S. Silver & Gold announces 2012 production t...
12/11/2012U.S. Silver & Gold Adopts Shareholder Rights Plan
11/13/2012U.S. Silver & Gold Reports Adjusted net income of $3.7 milli...
8/15/2012U.S. Silver & Gold shares commence trading on TSX
8/13/2012U.S. Silver and RX Gold & Silver announce closing of combina...
8/9/2012U.S. Silver and RX Gold & Silver receive final orders to pro...
8/1/2012Chairman Responds to Hostile Offer on BNN
8/1/2012ISS Proxy Advisory Services and Glass Leweis & CO. recommend...
7/30/2012U.S. Silver Board recommends rejection of Hecla offer and re...
5/10/2012U.S. Silver Reports Q1 Results and Completion of Hoist Upgra...
4/19/2012U.S. Silver Provides Update
3/30/2012U.S. Silver Reports Year End 2011 Results ? Pre tax Earnings...
3/29/2012U.S. Silver Reports Fifth Consecutive Year-End Increase in P...
3/19/2012U.S. Silver Receives Final Listing Approval from NYSE Amex
2/14/2012U.S. Silver Announces Normal Course Issuer Bid
1/31/2012(Coeur Mine)U.S. Silver Announces 2012 Production Forecast, Coeur Mine R...
1/26/2012U.S. Silver Announces Effective Date of Consolidation as Jan...
1/24/2012U.S. Silver Update on U.S. Stock Exchange Listing Applicatio...
8/5/2011U.S. Silver Announces Union Agreement
5/3/2011U.S. Silver Reports Year-End Increase in Proven and Probable...
7/20/2010Q2 2010 Production
5/5/2010Application for Management Cease Trade Order
5/3/20102009 Financial Statements Delayed One Week
4/17/2010Reserves Update & Option Grant
1/13/2010Record Production in Q4 09
1/7/2010U.S. Silver Hires German IR Firm & Grants Options
7/17/2009First Half Production, Costs & Repairs
7/16/2009U.S. Silver Announces Option Grants
5/29/2009U.S. Silver Reports 1Q 2009 Strongest Quarter Since Inceptio...
5/22/2009Q1 2009 Production Costs
2/26/2009Announces Debt Financing Facility
1/16/2009Reports Cost Saving Measures & Director Resignation
11/17/2008Announces Board Changes
9/16/2008Reports August Silver Production Up 38% Over 2nd Quarter 200...
8/25/2008Reports July Silver Production Up 30% Over 2nd Quarter 2008
7/28/2008Reports June Silver Production Up 37% Over 1st Quarter
7/24/2008Begins Repair Activity in the Caladay Mine
7/9/2008Announces Management Changes and Stock Option Grants
5/27/2008Retraction of Option Repricing Proposal
5/14/2008Announces Normal Course Issuer Bid
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (USA.TO)FRANKFURT (QE2.F)
0.375+2.74%0.191-1.55%
TORONTO
CA$ 0.375
04/26 16:59 0.010
2.74%
Prev close Open
0.365 0.375
Low High
0.360 0.385
Year l/h YTD var.
0.280 -  0.395 17.19%
52 week l/h 52 week var.
0.280 -  0.760 -43.18%
Volume 1 month var.
49,972 33.93%
24hGold TrendPower© : 34
Produces Copper - Lead - Silver
Develops
Explores for Lead - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-30.56%
2023-29.87%0.930.45
2022-29.03%1.660.50
2021-73.41%4.400.85
2020-4.90%5.121.39
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :