November 28, 2012 - HALIFAX, NOVA SCOTIA- Ucore Rare Metals Inc. (TSX VENTURE:UCU)(OTCQX:UURAF) ("Ucore" or "the Company") is pleased to report very strong results of the Preliminary Economic Assessment (PEA) completed by Tetra Tech of Vancouver, BC, regarding the Dotson Ridge Zone of the Company's Bokan Mountain heavy rare earth property in Southeast Alaska.

 

Highlights of the PEA Include:

  • Net Present Value (NPV): $577M at a 10% discount rate, pre-tax.
  • Internal Rate of Return (IRR): 43%.
  • Payback Period: 2.3 years.
  • Capital Cost: $221M, including a complete on-site rare earth oxide (REO) separation plant, and a contingency provision in the amount of $25M. Among the lowest capital outlays in the rare earth mining sector.
  • Mining Rate: 1,500 tonnes per day (TPD), 75% of mill feed is eliminated via the use of Dual Energy X-Ray Transmission (DEXRT) sorting and magnetic separation, netting approximately 375 TPD to feed the leach circuit.
  • Average Total Rare Earth Recoveries: 81.6%
  • Production of REOs at site: Deployment of Solid Phase Extraction (SPE) technology to generate high purity individual rare earth oxides at the site.
  • REO Production: Averaging 2,250 tonnes per year (TPY) during the first five years at full production, including 95 tonnes of dysprosium oxide, 14 tonnes of terbium oxide, and 515 tonnes of yttrium oxide.
  • Mine Life: 11 years, based on existing Inferred Mineral Resource Estimate (April 21, 2011), excluding highly prospective expansion at depth, along strike, and other exploration targets at the I&L Zone and beyond.
  • Direct Employment: 170 employees.
  • Ease of Shipping Access: Only rare earth project with immediate deep water shipping facilities, resulting in prospective mine-mouth shipping rates among the lowest in the industry.
  • Elimination of Tailings on Surface at Closure: Only known mine to eliminate tailings on surface at closure. All tailings will be placed underground via cemented paste backfill. The processing plant will generate approximately 735 TPD of tailings, significantly less than the mine requirement of approximately 1,030 TPD backfill.
  • Recycling of Nitric Acid: Nitric acid that is not consumed in the leach circuit will be recycled through the use of diffusion dialysis, greatly reducing acid consumption by more than 75%, resulting in significant financial and environmental benefits.
  • Near Term, High Value Production: Relative high percentage of rare earth metals strategically critical to the US defence, clean energy, aerospace, supercomputing and transportation sectors: including Tb, Dy and Y.
  • Excellent Geopolitical Support: Offset of completion risk through strong legislative and financial support at state and federal levels.

"The completion of this PEA is a key milestone in Ucore's march to near term HREE production," said Jim McKenzie, President & CEO of Ucore. "Bokan's unique features have generated a CAPEX that is among the absolute lowest in the industry, remarkably including full downstream separation facilities that promise to render high purity oxides both economically and on-site. In turn, the Bokan PEA has delivered highly robust IRR and NPV calculations. Beyond all of this, the Bokan facility will have little in the way of direct domestic competition. The facility will generate critical technology metals that are indispensable and increasingly difficult to obtain for applications that are the lifeblood of US competitiveness, including defense sector, clean technology, supercomputing, transportation and advanced aerospace. Our thanks to the many researchers, scientists, engineering specialists and contractors who made this document possible."

 

Overview of Bokan Project and PEA

 

Ucore's Bokan Mountain project is located on Prince of Wales Island, Alaska, approximately 60 km southwest of Ketchikan, Alaska and 140 km northwest of Prince Rupert, British Columbia, with direct ocean access to the western seaboard and the Pacific Rim. The project is situated in the Tongass National Forest, within an area set aside for natural resource development.

 

The PEA has been completed based on the Inferred Resource Estimate Technical Report filed on April 21st, 2011 by Ucore, with the exclusion of the I&L Zone. The resource was estimated by R. J. Robinson of Aurora Geosciences. The resource incorporated into the current mine plan totals 5.3 million tonnes, with an average grade of 0.65% total rare earth oxides (TREO), at a cut-off grade of 0.4% TREO. Of the TREO, approximately 40% are comprised of heavy rare earth oxides. A summary of the operating assumptions and financial model for the project is as follows:

 

Item
Units
Year 1
Year 2
Annual for 
balance of 
mine life
Tonnes Mined
Mt
198,000
470,900
540,000
Tonnes Processed
Mt
198,000
470,900
540,000
Mined Grade TREO   
0.416%
0.511%
0.473%
Recovery   
81.6%
81.6%
81.6%
  
(million $US)
Total Revenue
$2,546
Initial Capital Expenditure
$221
Sustaining Capital
$145
Total Before-Tax Cash Flow (undiscounted)
$1,516
Before-tax NPV @ 8%
$697
Before-tax NPV @ 10%
$577
Before-tax NPV @ 12%
$478
Before tax IRR (%)
43%

 

Geology

 

The Dotson Ridge deposit is a well delineated rare earth element (REE) mineralized vein-dike system related to the Mesozoic Bokan peralkaline granitic complex. The mineralized system is a tabular body exposed at the surface for a strike length of 3.5 km. The deposit was drilled to a depth of 450 m, and remains open both along strike and at depth. The system outcrops along the ridge so that it is readily accessible for drilling and bulk sampling. The REE-bearing veins can be visually identified from the surrounding host rock and the material is amenable to DEXRT sorting, as noted below. An existing road network provides access to all main target areas. There are a number of other occurrences of REE mineralization located within, or at the margins of the Bokan complex which remain highly prospective exploration targets.

 

Proposed Mining Plan

 

The underground mine design was completed by Stantec of Tempe, AZ. The design contemplates trackless mining with adit access and blasthole stoping with paste backfill as the preferred mining method for the project. This mining approach will result in a production rate of 1,500 tonnes per day, at a 0.4% TREO cut-off grade.

The mine plan proposes the use of mill tailings as cemented paste backfill to fill the mined out areas of the underground workings. At full production, the mill will produce approximately 735 TPD of tailings and the mine will require 1,030 TPD of backfill. This will result in all tailings being placed underground as backfill, thereby eliminating the need for a tailings facility at surface upon mine closure. Waste rock will be utilized for the remainder of the backfill.

 

Proposed Beneficiation and Processing Plan

 

The proposed processing flow sheet consists of three areas: physical beneficiation, leaching and downstream REO separation..

 

    i) Physical Beneficiation

 

The mine will produce 1,500 TPD of mineralized material which will be crushed and split into four size ranges. The fines will by-pass the sorters and each of the other size ranges will feed one of three sorters utilizing dual energy x-ray transmission. This circuit will reject approximately 50% of the feed as waste. The concentrated mineralized material will then be further crushed and ground in a rod mill. The resultant material will be processed by magnetic separators, which will reject a further 50% of their feed as waste.

 

In total, approximately 75% of non-REE bearing material will be discarded through the physical beneficiation process. The remaining 375 TPD of concentrated mineralized material is further ground to -40 um and then fed to the leaching circuit.

The physical beneficiation circuit results in significant savings in terms of initial capital expenditure and ongoing operating costs, due to reduced power and acid consumption during the leaching and separation process.

 

    ii) Leaching Circuit

 

The leaching circuit consists of a nitric acid leach process. The concentrated mineralized material is leached utilizing nitric acid heated to a temperature of 90� C. The resultant slurry is filtered, with solids then submitted to the backfill plant to be placed underground as cemented paste backfill. Prior to the pregnant solution continuing on to the separation circuit it is treated by diffusion dialysis in order to recover the unconsumed nitric acid. The recovered acid is then recycled into the leach circuit, resulting in significant operating cost savings.

 

    iii) REO Separation Circuit

 

The separation of individual rare earth oxides is achieved through the use of Solid Phase Extraction (SPE), a technology developed by IntelliMet LLC of Montana, in conjunction with Ucore. The pregnant leach solution generated by the nitric acid leach is introduced into a series of purpose-built SPE columns. The first stage of this process removes nuisance materials such as thorium, uranium, and iron from the solution. A subsequent series of columns then separates the rare earths into the following lanthanide sub-classes, Ce-La; Pr-Nd; Y; Sm-Eu-Gd; Tb-Dy; and Ho-Er-Tm-Yb-Lu. The final circuit of columns then separates the subclasses into individual rare earth chlorides, which can then be precipitated to generate individual purified rare earth oxides.

 

The SPE process produces chemical transfers of selective elements from the pregnant solution to a solid phase within a matter of seconds, giving the columns the capacity to process a large volume of solution in relatively small flow-through extraction units. The result is a relatively low initial capital cost for the SPE circuits. Waste products from the separation process will be returned underground as part of the cemented backfill.

 

Capital Cost Estimate

 

Initial capital cost estimates for the project are as follows:

 

Item Total Cost
(million $US)
Direct Capital Cost
Site development 6.1
Mine underground 18.9
Mine surface facilities 23.8
Process 62.9
Tailings and waste rock management 10.1
Utilities 3.4
Buildings 3.0
Temporary facilities 5.2
Plant mobile equipment & misc. 1.4
Subtotal 134.7
Indirect Capital Cost
Indirect construction costs 51.1
Owner's costs 10.9
Contingency 24.5
Subtotal 86.5
Total Capital Cost 221.3

 

Initial capital costs include all costs required to bring the facility to production. The ongoing sustaining capital costs are estimated to be $145M over the 11 year mine life.

 

Operating Cost Estimate

 

Item
Average 
Unit Cost 
($US/t mined)
Mining 41.69
Processing
54.83
G&A
13.56
Power
11.78
Misc.
0.93
Total Operating Cost
122.78

 

REE Pricing Considerations

 

In developing rare earth pricing assumptions, a number of sources were considered by both Ucore and Tetra Tech. Price forecasts generated by analysts and Ucore's rare earth peer group vary widely. In selecting pricing assumptions, efforts were made to incorporate assumptions that were independent, supportable, and conservative. As a result, Tetra Tech has used a three-year trailing average of China FOB prices from October, 2009 to October, 2012 to establish prices for the rare earth oxides, except Ho, Lu, Yb & Er oxides, where two-year trailing averages were used due to limited Chinese market data. These prices are displayed in "Scenario 1" below. The Company also considered the impact of pricing REO's based on a 6-month trailing average and a 3-month trailing average. These results are displayed in "Scenario 2" and "Scenario 3" below, respectively.

 

  
Pricing Scenario 1 
3-Year trailing 
average
Pricing Scenario 2 
6-Month trailing 
average
Pricing Scenario 3 
3-Month trailing 
average
REO
$US/kg
$US/kg
$US/kg
La2O3
48.69
20.85
18.42
Ce2O3
47.21
21.38
19.23
Pr2O3
113.10
110.00
103.08
Nd2O3
126.70
108.96
101.58
Sm2O3
57.74
71.79
61.42
Eu2O3
1,834.94
2,185.00
2010.00
Gd2O3
81.70
99.42
96.35
Tb2O3
1,520.83
1,907.12
1,840.38
Dy2O3
845.80
1,009.42
948.08
Ho2O3
211.39
107.25
107.05
Er2O3
88.20
153.61
140.08
Tm2O3
N/A
N/A
N/A
Yb2O3
102.79
124.07
110.51
Lu2O3
1,036.40
1,420.79
1,427.56
Y2O3
80.41
100.75
85.12
           
NPV @ 10%
Discount
$577M
$620M
$513M

 

Economic Analysis and Sensitivity Analysis

 

The economic analysis was based on the mineral resource estimate filed by Ucore in April of 2011, totalling 5.3 million tonnes at an average grade of 0.65% TREO in the Inferred category. This resource is adequate to allow for an 11 year mine life, based on current mining assumptions including a mining rate of 1,500 TPD. TREO recoveries are expected to average 81.6%.

 

These assumptions, together with capital cost and operating cost estimates noted above, result in a before tax NPV, at a 10% discount rate, of $577 million. The payback period for the project is 2.3 years from the start of production. The project generates a pre-tax IRR of 43%.

 

A sensitivity analysis was performed, to test the impact of changes to several key assumptions included in the economic model, with the following results:

 

Changes to selling price of REOs NPV at 10%,
$US million
IRR, %
        
Increase of 20% 802 52%
Increase of 10% 690 47%
Base Case 577 43%
Decrease of 10% 464 38%
Decrease of 20% 352 33%
Changes in operating costs NPV at 10%,
$ US million
IRR, %
        
Increase of 20% 519 40%
Increase of 10% 548 42%
Base Case 577 43%
Decrease of 10% 606 44%
Decrease of 20% 635 45%
Change in initial capital expenditure NPV at 10%,
$ US million
IRR, %
        
Increase of 20% 526 37%
Increase of 10% 552 40%
Base Case 577 43%
Decrease of 10% 602 46%
Decrease of 20% 627 51%

 

Environmental Assessment

 

Ucore is currently conducting environmental baseline studies to prepare for the forthcoming permitting process at the Dotson Ridge Project. The project plan is being developed in consultation with local stakeholders as well as state and federal regulators. A Plan of Operations, which will be based upon engineered facility designs advanced from the concepts presented in the PEA, will be submitted to the US Forest Service (USFS) to initiate a National Environmental Policy Act (NEPA) review. Permitting advantages for the project include the elimination of a permanent surface tailings storage facility, due to the use of x-ray sorting technology, which will allow for 100% of the mill tailings to be placed in mined out areas underground as cemented paste backfill. The study includes cost estimates for site water management and treatment.

 

Qualified Persons

 

The technical disclosures in this press release have been reviewed and approved by Kenneth W. Collison, P. Eng. a consultant to and COO of Ucore together with the following independent qualified persons;

  • R. J. Robinson, consultant, Aurora Geosciences Inc. for geology and mineral resource
  • S. Annavarapu, consultant, AMEC (formerly Stantec) for mine planning.
  • E. Bentzen, consultant, Lyntek for physical benefication processes.
  • R. Hammen, consultant, IntelliMet for leaching and SPE processes.
  • H. Ghaffari, consultant, Tetra Tech for cost estimating.
  • S. Hafez, consultant, Tetra Tech for economic analysis.

Cautionary Notes

 

Please note that the PEA is preliminary in nature, that it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

 

About Ucore Rare Metals Inc.

 

Ucore Rare Metals Inc. is a development-phase mining company focused on establishing rare metal resources with near term production potential. With multiple projects across North America, Ucore's primary focus is the 100% owned Bokan - Dotson Ridge REE property in Alaska. The Bokan - Dotson Ridge REE project is located 60 km southwest of Ketchikan, Alaska and 140 km northwest of Prince Rupert, British Columbia and has direct ocean access to the western seaboard and the Pacific Rim, a significant advantage in developing near term production facilities and limiting the capital costs associated with mine construction.

 

The Bokan property is particularly enriched with heavy rare earth elements, including the critical elements dysprosium, terbium and yttrium. Approximately 40% (by weight) of the rare earth elements contained on the Dotson Ridge property are heavy rare earth elements, as disclosed in the Company's NI43-101 resource estimate technical report, filed on April 21st, 2011. The resource was completed by R. J. Robinson, a consultant from Aurora Geosciences..

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

 

This press release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address future exploration drilling, exploration activities and events or developments that the Company expects, are forward looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in forward-looking statements.. Factors that could cause actual results to differ materially from those in forward-looking statements include exploitation and exploration successes, continued availability of financing, and general economic, market or business conditions.  

 

 

Follow us on Twitter  Like us on Facebook

 

http://ucore.com

  

 

This email was sent to .com by info@ucore.com |  
Update Profile/Email Address | Instant removal with � | Privacy Policy.
Ucore Rare Metals Inc. | 454 Voyageur Way | Hammonds Plains | Nova Scotia | B4B 2A7 | Canada
Data and Statistics for these countries : Canada | China | All
Gold and Silver Prices for these countries : Canada | China | All

Ucore Rare Metals Inc.

EXPLORATION STAGE
CODE : UCU.V
ISIN : CA90348V1031
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Ucore Rare Metals is a uranium exploration company based in Canada.

Ucore Rare Metals holds various exploration projects in Canada.

Its main exploration properties are BOKAN MOUNTAIN, LOST POND, SANDYBEACH LAKE (SLP), GREATER NEWFOUNDLAND and GROUWLAND MOUNTAIN in Canada.

Ucore Rare Metals is listed in Canada and in United States of America. Its market capitalisation is CA$ 186.4 millions as of today (US$ 135.6 millions, € 127.4 millions).

Its stock quote reached its lowest recent point on December 24, 2008 at CA$ 0.03, and its highest recent level on February 19, 2021 at CA$ 2.97.

Ucore Rare Metals has 270 140 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Ucore Rare Metals Inc.
5/27/2008Announces $4.0 Million Private Placement
Nominations of Ucore Rare Metals Inc.
2/18/2014Ucore Appoints Johnson to Advisory BoardCc:
10/31/2013Ucore Appoints Clarke as Board Member
10/31/2013Appoints Clarke as Board Member
8/13/2012Ucore Appoints Hammen to Advisory Board
5/14/2012Ucore Appoints Ryan as Board Member
1/4/2012Ucore Appoints Collison as Chief Operating Officer
Project news of Ucore Rare Metals Inc.
10/21/2013Ucore Announces Resource Upgrade for Bokan Dotson-Ridge
1/15/2013Ucore Files Preliminary Economic Assessment 43-101 Technical...
1/15/2013Files Preliminary Economic Assessment 43-101 Technical Docum...
7/13/2012Ucore Applauds Rep. Young's Commitment to Mining Alaskan Nat...
6/14/2012Ucore Initiates Bulk Sample in Preparation for Production Sc...
4/18/2012Ucore Completes Underground Mine Design for Bokan Project
1/23/2012Ucore Releases 2011 Bokan Drill Results Pending Augmented Re...
1/16/2012Ucore Confirms Widespread Rare Earth Mineralization In Centr...
10/3/2011Ucore Reports 85-90% Recovery of Rare Earths in Bokan Metall...
7/19/2011(Bokan Mountain)Reports on 2011 Bokan Field Program
5/10/2011(Bokan Mountain)Releases 2011 Mine Scoping and Resource Development Plan
4/5/2011(Bokan Mountain)Recovers Over 4000 Metres of Historical Drill Core
3/7/2011Ucore Releases NI 43-101 Compliant Resource for Bokan
2/15/2011Ucore Completes Washington Meetings & Sets Out Strategy for ...
7/15/2010(Bokan Mountain)Drilling Commences at Ucore's Bokan - Dotson Ridge Heavy Rar...
4/20/2010(Bokan Mountain)State of Alaska Announces Support for Expedited Permitting a...
12/14/2009(Bokan Mountain)Deep Drilling at Dotson Trend Shows Heavy Rare Earth Mineral...
10/20/2009(Bokan Mountain)Provides Update on Bokan Drill Program
9/16/2008(Lost Pond)Ucore Uranium Options 50% Interest in Lost Pond Property to ...
7/16/2008(Lost Pond)Reports High Grade Rare Earth Drill Results from Lost Pond
5/15/2008(Bokan Mountain)Bokan Mountain Drill Mobilization Underway
4/10/2008(Bokan Mountain)Receives 2008 Drill Permit for Bokan Mountain
2/6/2008(Bokan Mountain) Reports 15.2 Meters Grading 0.42% U3O8 from Bokan Mountain
Corporate news of Ucore Rare Metals Inc.
8/2/2016Ucore Announces Sudden Passing of Chief Operating Officer Ke...
7/29/2016Ucore Announces Closing of Royalty Conversion
7/7/2016Ucore Announces Conversion of Royalty
7/5/2016Ucore Separates Dy and Ho Sub-Groups at 99%+ Purity via Supe...
6/7/2016Ucore Separates HREE and LREE Classes at 99%+ Purity via Sup...
5/30/2016Ucore Announces Increase of Shareholder Investment to $7.3 M...
5/24/2016Ucore Separates Scandium at 99%+ Recovery via SuperLig®-One ...
5/9/2016Ucore Updates on Early-Stage Performance of SuperLig®-One Pi...
4/19/2016Högel Joins Ucore Advisory Board
1/18/2016Ucore Comments on Royalty Conversion and Positive Outlook of...
1/18/2016Ucore Rare Metals Announces Corporate Developments
1/15/2016Ucore Rare Metals Announces Corporate Developments
12/14/2015Ucore Closes $6.9 Million Royalty Financing with Option to I...
9/11/2015Ucore Grants Incentive Stock Options
8/17/2015Ucore Rare Metals Enters Into Second Royalty Agreement to Ra...
7/8/2015Ucore Commissions Design and Construction of SuperLig(R)-One...
6/26/2015Ucore Adopts Advance Notice By-Law
3/11/2015The REE Basket Price Deception and the Clarity of OPEX
3/3/2015IIROC Trading Resumption - UCU
3/3/2015Ucore Secures Rights to SuperLig(R) Molecular Recognition Te...
3/3/2015IIROC Trading Halt - UCU
3/2/2015Ucore Successfully Separates Entire Suite of Individual Rare...
2/3/2015Ucore Releases Complete 2014 Drill Assays in Preparation for...
1/28/2015Ucore Extends Bokan Mineralization at Significant Depth
1/14/2015Ucore Engages Ausenco for Preparation of Feasibility Study f...
1/14/2015Engages Ausenco for Preparation of Feasibility Study for Bok...
11/12/2014IIROC Trading Resumption - UCU
11/12/2014Ucore Uses Molecular Recognition Technology to Generate 99%+...
11/12/2014IIROC Trading Halt - UCU
10/16/2014Ucore's McKenzie to Deliver Presentation to Rare Earths Conf...
10/15/2014Ucore Issues RFP for Bankable Feasibility Study
10/7/2014Ucore Updates on Research by University of Alaska Fairbanks
8/11/2014Dostal's Paper on Bokan Mineralization Accepted by Leading I...
8/7/2014Ucore Applauds Senator Murkowski and National Mining Associa...
7/30/2014Ucore Reports That USGS Research Continues at Bokan Heavy RE...
7/23/2014Ucore Provides Operational Update on Bokan - Dotson Ridge Pr...
2/19/2014Alaska Legislation Sets Out $145 Million Bond Funding for Uc...
1/13/2014Ucore Comments on Escalating HREE Supply Concerns in US Capi...
12/31/2013Ucore Announces Completion of Private PlacementCc:
10/21/2013Announces Resource Upgrade for Bokan Dotson-Ridge
9/16/2013Ucore Receives USFS Permitting for Bokan - Dotson Ridge Fiel...
9/16/2013Receives USFS Permitting for Bokan - Dotson Ridge Field Prog...
7/16/2013Ucore Announces Commissioning of Plan of Ops
7/16/2013Announces Commissioning of Plan of Ops
6/25/2013Ucore Announces Augmented Results of Large Scale XRT Ore Sor...
6/25/2013Announces Augmented Results of Large Scale XRT Ore Sorting
6/13/2013Ucore Comments on House Armed Services Committee Dysprosium ...
6/11/2013Ucore Grants Incentive Stock Options
6/11/2013Grants Incentive Stock Options
6/11/2013Grants Incentive Stock Options
5/13/2013Announces Closing of Offering
4/23/2013Announces Filing of Final Prospectus
3/15/2013Announces Filing of Preliminary Short Form Prospectus
3/11/2013Rare Earth Expert Jack Lifton Names Ucore on HREE Producer S...
2/1/2013BNN Interviews Jim McKenzie, President/CEO, Ucore Rare Metal...
1/25/2013Bokan Top 10 Advantages [Updated]
1/25/2013Bokan Top 10 Advantages
10/3/2012Ucore Reports Dysprosium Separation Breakthrough
10/1/2012US Department of Defense Contracts With Ucore for Metallurgi...
10/1/2012US Department of Defense Contracts With Ucore for Metallurgi...
9/25/2012Ucore Welcomes Alaska State Initiative to Support Bokan Meta...
9/25/2012Welcomes Alaska State Initiative to Support Bokan Metallurgi...
8/20/2012Profit from Ucore's Astonishing "Spider Web" Technology - En...
8/13/2012Ucore Confirms Effectiveness of SP Technology to Remove 99% ...
8/13/2012Ucore Confirms Effectiveness of Solid Phase Technology to Re...
7/4/2012Ucore Comments on The Announcement Of A Chinese Rare Earth S...
5/31/2012Media Update
5/3/2012Media Update
4/6/2012Media Update
3/6/2012Ucore Confirms Effectiveness of XRT Ore Sorting at Productio...
3/5/2012Media Update
2/2/2012Ucore Releases Rare Earth Mobile Applications
10/25/2011Media Update
10/11/2011Media Update
9/20/2011Media Update
8/19/2011Media Update
8/10/2011Ucore Hosts 2011 Alaska Rare Earth Conference
8/3/2011Ucore Receives Priority Permitting Assistance from US Dept o...
8/2/2011Media Update
7/19/2011Ucore Reports on 2011 Bokan Field Program
6/15/2011Ucore Comments on Dysprosium Price Gains
6/15/2011Comments on Dysprosium Price Gains
6/6/2011Ucore Acquires New Strategic Rare Earth Properties in Alaska
5/10/2011Ucore Releases 2011 Mine Scoping and Resource Development Pl...
4/5/2011Ucore Recovers Over 4000 Metres of Historical Drill Core
2/15/2011Completes Washington Meetings & Sets Out Strategy for Heavy ...
6/28/2010Changes Name to Ucore Rare Metals Inc.
9/25/2008Reports Favourable Light and Heavy Rare Earth Assays from Bo...
7/30/2008Reports 2.57 Metres Grading 0.50% U3O8 from Bokan Mountain
6/19/2008Bokan Mountain Drill Program in Progress
6/10/2008Updates Board at Annual Meeting
4/15/2008Featured in Online Podcast Interview
3/18/2008Hole 1 at Bokan Returns 50 Metres Grading 0.47% U3O8
1/7/2008THREE NEW URANIUM MINERALIZED ZONES IDENTIFIED
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (UCU.V)OTHER OTC (UURAF)
0.690+1.47%0.481-3.02%
TSX-V
CA$ 0.690
04/19 14:27 0.010
1.47%
Prev close Open
0.680 0.690
Low High
0.680 0.690
Year l/h YTD var.
0.680 -  0.940 -23.33%
52 week l/h 52 week var.
0.580 -  1.25 -40.52%
Volume 1 month var.
10,150 -17.86%
24hGold TrendPower© : -38
Produces
Develops
Explores for Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-8.00%
202310.29%1.570.69
2022-15.00%1.250.53
2021-32.20%2.970.71
2020424.44%1.210.07
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :