Jubilee Platinum Plc

Published : March 31st, 2016

Unaudited interim results for the six months ended 31 December 2015

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Chrome | Palladium | Platinum | Rhodium | South Africa |

Unaudited interim results for the six months ended 31 December 2015

BRAEMORE RESOURCES PLC

("Registration number 4459850") AIM share code: JLP

AltX share code: JBL ISIN: GB0031852162


Not for release, publication or distribution in whole or in part in, into or from any jurisdiction where to do so would constitute a violation of the relevant laws or regulations of such jurisdiction.


31 March 2016


Jubilee Platinum Plc ("Jubilee" or "the Company")

UNAUDITED INTERIM RESULTS

FOR THE SIX MONTHS ENDED 31 DECEMBER 2015


The Directors of AIM-quoted and AltX-listed Jubilee, the Mine-to-Metals company, are pleased to announce the unaudited interim results of the Group for the six months ended 31 December 2015.


The interim results of the Group reflect Jubilee's firm focus on the execution of its surface platinum processing projects as it accelerates into a position where it will become a significant producer of platinum group metals. The recently reported corporate transactions and platinum processing agreements are transformational and position Jubilee as a potentially significant player in the platinum arena. Jubilee's mission is strengthened and supported by numerous opportunities for the rapid growth of the Jubilee Mine-to-Metals ambitions.


HIGHLIGHTS


During the period under review


  • 30 September 2015, Jubilee completes the disposal of 100% of the issued shares in Jubilee Smelting and Refining Proprietary Limited ("JSR"), and 70% of the issued shares in Power Alt Proprietary Limited ("PA") to Siyanda Resources Proprietary Limited ("Siyanda") ("Disposal") for a consideration of, in aggregate, ZAR 110.5 million (approximately GBP 5.3 million)


  • 85% of the Disposal consideration received in cash on 9 October 2015


  • Jubilee retains right to construct a 5MW platinum furnace at the Middelburg Operations


  • Jubilee retains rights to participate in any expansion of the Power Plant


  • The Disposal further facilitates Jubilee's fast track approach towards the implementation of the two Platinum Surface Processing projects in 2016


  • Loss per share from continued operations for the period reduced by 62% to a loss of 0.05 (2014: loss of 0.14) pence per share (ZAR 1.11 (2014: ZAR 2.51) cents per share)


  • Loss per share from discontinued operations for the period up to 30 September 2015 ("Closing Date") reduced by 20% to a loss of 0.05 (2014: loss of 0.06) pence per share (ZAR 1.01 (2014: ZAR 1.12) cents per share)

    Post the period under review


  • Both surface processing projects fully funded

  • Secured debt funding of up to USD 10 million (ZAR 155.4 million), unsecured debt funding of up to USD 5 million (ZAR 77.7 million) and equity funding of GBP 2.5 million (ZAR 55.4 million) secured for Jubilee's two platinum surface processing projects. ("Two Projects")

  • First surface processing project commissioned and fully operational with a processing capacity of 25 000 tonnes per month

  • Second surface processing project under construction targeting commissioning end 2016 with a processing capacity of 55 000 tonnes per month


    Chief Executive Leon Coetzer commented:


    "Jubilee has experienced a transformational period over the past 6 months which has continued through the current period. This has been brought about through the sale of its ferrous metals smelting operation and the acquisition of two platinum surface processing projects targeting an annualised production capacity in excess of 900 000 tonnes per annum.


    "Jubilee has brought the first of its surface processing projects on-line with the second project well advanced targeting commissioning at the end of 2016. Jubilee was further successful in securing project funding for the execution and commissioning of both of its platinum surface projects through a combination of debt and equity funding. The equity component of the funding was minimised to balance the requirements of the lender while minimising the dilution of our shareholders."


    OVERVIEW


  • THE DISPOSAL


    The Company, through a series of announcements, the last of which was published on 9 October 2015, announced the completion of the Disposal to Siyanda, through its newly named nominated special purpose vehicle Hornbill Investments Proprietary Limited ("SPV") and receipt of 85% of the purchase consideration in cash. 10% of the remaining purchase consideration is held in escrow (approximately GBP 0.390 million (ZAR 8.9 million)), net of closing adjustments including stock and supplier adjustments. This amount was due from the SPV to Jubilee following the expiry of the first warranty period on 31 December 2015 (90 days after the closing date of 30 September 2015). Payment has however not yet been made and Jubilee has taken the necessary steps to expedite payment. The remaining 5% is due for release 12 months after the closing date, being 30 September 2016.


    The rationale for the Disposal was to release cash to support the Group's ongoing investment into platinum surface processing projects. The release of significant management time spent on the Middelburg Operations also enabled management to focus on bringing the current projects to production and to develop the Group's strategy of processing and producing its own platinum group metals. In executing the Disposal the Group exchanged limited growth medium cash generative assets with potentially high cash generative platinum assets, offering significant growth.


  • PLATINUM SURFACE PROCESSING PROJECTS HERNIC

    Hernic Ferrochrome Proprietary Limited ("Hernic") is the world's 4th largest integrated ferrochrome producer with an estimated 3 million tonnes of platinum containing material at surface while Hernic continues to add further material to the surface stock.


    The Company was selected as the exclusive party to beneficiate the chromite and PGMs contained in the Hernic Surface Material ("the Project") and address the project execution methodology as well as the operational and financial performance targets. The Project is the second of the Company's Two Projects.

    The Hernic Surface Material has been independently fully drilled and assayed for chrome and PGM content. This has resulted in an independent resource statement of 1.7 million tonnes, of which approximately 90% of the resource is classified in the measured category under the internationally recognised SAMREC code. Hernic also has access to secondary surface stocks, which it has internally identified and could increase the surface stocks to in excess of 3 million tonnes through further drilling programmes. The total Project is estimated to contain PGM ounces in excess of 224 000 (3PGM + Au) oz.


    The Project will be the largest PGM beneficiation plant of surface chrome tailings in South Africa and is capable of producing annual revenues of GBP 18.2 million (ZAR 400 million) at an average metal basket price of USD 906 per (3PGM + Au) oz. The financial and operational risks of the Project are significantly mitigated since the material is already at surface and requires neither the cost nor the risk associated with mining.


    An extensive prefeasibility study has been concluded on the Project, which included both pilot scale and full commercial scale trials to confirm the design and operational parameters.


    The Project is to be undertaken in four phases over an 11 month period; namely


  • Phase one - Bankable Feasibility Study and Engineering Design. Completed.

  • Phase two - Construction of the chrome and platinum processing plant ("Processing Plant").

  • Phase three - Commissioning and Ramp up of Processing Plant to design capacity of 55 000 tonnes per month.

  • Phase Four - Stable operation of the Processing Plant.


The Company has targeted a combined processing of platinum containing surface material over the two projects in excess of 900 000 tonnes per annum.


The size of the ZAR based debt funding for both surface projects equates to GBP 11.5 million (ZAR 255 million) before financing costs. The working capital required to bring the Platinum Surface Projects into operation and to achieve positive earnings is estimated at GBP 3.4 million (ZAR 75 million).


ASA


Pollux Investment Holdings Proprietary Limited ("Pollux"), a wholly owned subsidiary of Jubilee, holds the exclusive rights to beneficiate the platinum group metals ("PGMs") from the platinum-containing surface material at Dilokong Chrome Mine Proprietary Limited a subsidiary of ASA Metals Proprietary Limited ("DCM Platinum Project, Processing Agreement").

As previously announced on 14 March 2016, the Company commenced with the commissioning of a Platinum Surface Processing Plant ("Processing Plant") in late February 2016, in-line with the requirements of the processing agreement entered into between the Company's subsidiary Pollux Investments Holdings Proprietary Limited ("Pollux"), ASA Metals Proprietary Limited ("ASA Metals") and its associated mining and processing operations Dilokong ("Processing Agreement") there by qualifying for the incentives offered under the Processing Agreement for the early commissioning of the Processing Plant. The Processing Plant is located at Dilokong to process and recover metals from its surface material.


Jubilee has targeted the recovery of chrome and PGMs capable of processing up to 35 000 tonnes of surface material per month. The Company executed an addendum to the Processing Agreement ("Addendum"), whereby the Company is incentivised to accelerate the construction and commissioning of the New Processing Plant by targeting commencement of commissioning of the front end of the New Processing Plant early 2016. The Addendum significantly enhances and expedites the projected profitability of the project since both the chrome concentrate and platinum containing concentrate will now contribute to the overall profitability of the DCM Platinum Project. The Company successfully concluded commissioning of the Project to qualify for this incentive during February and early March 2016. The Project is the first of the Company's Platinum Projects.

The Company's commissioning and ramp-up reached 85% of design throughput with overall Processing Plant feed rate reaching an extrapolated 21 000 tonnes per month compared to design of 25 000 tonnes per month for the Processing Plant. The commissioning and ramp-up of operations suffered minor

delays beyond the control of the Company due to events relating to ASA Metals but these have now been resolved satisfactorily.


The Company also wishes to further clarify the status of ASA Metals and the related Business Rescue Process ("BR Process"). Jubilee's rights and access to the surface tailings material remains secured. Jubilee has engaged with the both the appointed Business Practitioner and ASA management as the Project provides a number of opportunities to expand Jubilee's operational assistance at ASA which offers value to both ASA and will enhance Jubilee shareholder value in the long term.


  1. EXPLORATION


TJATE PLATINUM CORPORATION (Tjate Project)


During December 2015 the Company's subsidiary, Tjate Platinum Corporation Proprietary Limited ("Tjate") received formal confirmation from the Department of Mineral Resources ("DMR") that its mining right application is progressing. This follows previous communications from the DMR confirming that the mining right application is in an advance stage and requested Tjate to commence with securing of an Environmental Rehabilitation Fund in preparation of an award of a mining right. We remain in regular contact with the DMR to continue requesting status updates.


The Tjate project is located down-dip of Anglo Platinum's Twickenham and Impala Platinum's Marula mines. Tjate's Merensky and UG2 platinum reefs targeted for initial mining lie between 600 meters and 1,000 meters below surface. The property's reefs extend to depths greater than 1,600 meters, offering significant potential to extend or expand production in future.


Tjate Mineral Resource estimate (Samrec Compliant)

Classification

Tonnes (million)

3PGE+Au (g/t)*

3PGE+Au (Moz)

Indicated

11,561,359

5.28

1.964

Inferred

120,919,133

5.24

20.365

Total

132,480,493

5.250

22.329


* 3PGE+Au = platinum, palladium, rhodium plus gold


The Tjate project covers 5,140 hectares over three contiguous farms. The area has been independently appraised to contain a potential net 65 million ounces of platinum group elements (PGEs) and gold. This represents the resource targeted for future exploratory drilling.

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : South Africa | All
Gold and Silver Prices for these countries : South Africa | All

Jubilee Platinum Plc

DEVELOPMENT STAGE
CODE : JLP.L
ISIN : GB0031852162
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Jubilee Platinum is a platinum exploration company based in United kingdom.

Its main asset in development is TJATE in South Africa.

Jubilee Platinum is listed in Germany and in United Kingdom. Its market capitalisation is GBX 8.8 billions as of today (US$ 10.2 billions, € 9.5 billions).

Its stock quote reached its highest recent level on April 07, 2006 at GBX 99.88, and its lowest recent point on November 24, 2017 at GBX 0.04.

Jubilee Platinum has 1 306 527 911 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Project news of Jubilee Platinum Plc
8/18/2016Platinum Projects update
6/30/2015Completion of tranche 2 of the acquisition of 100% of the be...
5/23/2006Tjate Project drill results
Corporate news of Jubilee Platinum Plc
8/19/2016Jubilee Live Interactive Webcast
7/11/2016Platinum Projects quarterly update
6/7/2016Jubilee processing operational update
5/20/2016Dealing in securities
5/12/2016Jubilee Processing operational update
4/29/2016Results of General Meeting
4/8/2016Notice of General Meeting
3/31/2016Unaudited interim results for the six months ended 31 Decemb...
3/22/2016Project Funding for the Execution of Surface Platinum Proces...
12/15/2015Jubilee executes final agreement to process the Hernic surfa...
10/9/2015Jubilee receives cash consideration for disposal of Middelbu...
9/23/2015Update on ASA Surface Platinum Chrome Tailings Project and E...
9/16/2015Jubilee satisfies all conditions for the Disposal of Middelb...
8/18/2015Exercise of Warrants
8/7/2015Result of General Meeting
7/21/2015Update on general meeting and invite to live webcast
7/16/2015Jubilee sells non-platinum assets / Notice of General Meetin...
2/13/2015Funding secured for conclusion of detail design and engineer...
2/7/2015Result of General Meeting
12/29/2014Result of AGM
12/12/2014Change of Adviser
12/10/2014Director dealing
12/5/2014LIVE Webcast: Update shareholders' queries on results and AG...
12/4/2014Notice of AGM and annual report
12/3/2014Issue of equity
12/3/2014Audited results for the year ended 30 June 2014
10/17/2014Third quarter 2014 operations and financial update
4/6/2006and Implats agree joint venture on Ambodifala project, Madag...
1/10/2006 Directorate Changes
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
LSE (JLP.L)BERLIN (JI5.BE)
6.70-1.47%0.064-1.54%
LSE
GBX 6.70
04/24 17:35 -0.100
-1.47%
Prev close Open
6.80 6.81
Low High
6.56 6.90
Year l/h YTD var.
4.97 -  7.46 -1.47%
52 week l/h 52 week var.
4.72 -  9.50 -23.86%
Volume 1 month var.
4,137,601 22.94%
24hGold TrendPower© : 15
Produces
Develops Platinum
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-10.94%
2023-26.82%9.8410.00
2022-36.74%17.9010.00
202127.45%22.0011.62
2020232.90%9.9010.17
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :