MINEFINDERS UPDATES DOLORES MINE ECONOMICS AND RESERVES

February 14, 2008

February 14, 2008 - Vancouver, British Columbia - Minefinders Corporation Ltd. (the "Company") (TSX: MFL / AMEX: MFN) today reported an updated economic forecast and independently prepared reserve estimate for its Dolores gold and silver mine in Chihuahua, Mexico.

"Perhaps the most important finding of the new study, given the global environment of cost escalation, is that the economics for the Dolores Mine remain robust," said Mark Bailey, Minefinders' President and CEO. "Looking ahead, there is significant upside potential from optimization efforts currently underway, with results expected later this year."

Update Highlights (all dollar amounts are in US$)

  • Proven and probable reserves have increased 37% from the February 2006 Dolores feasibility study (the "2006 feasibility study") to 99.3 million tonnes containing 2.44 million ounces of gold and 126.64 million ounces of silver, increases of 24.8% and 22.1% respectively;
  • Life of mine production has increased to 1,765,606 ounces of gold and 64,354,508 ounces of silver or 3,005,027 ounces of gold and gold-equivalent silver ("gold equivalent ounces") at base case prices;
  • Life of mine average cash operating costs are estimated at $297 per gold equivalent ounce and $32 per gold ounce, net of silver by-product credits;
  • Pre-tax internal rate of return ("IRR") is estimated at 26%, with a pre-tax net present value ("NPV") of $831 million discounted at 0% and a pre-tax NPV of $563 million discounted at 3%, inclusive of capital expenditures to date; and
  • Initial capital costs, including a $10 million contingency, of $192 million, of which $141 million has been spent as at December 31, 2007. Sustaining capital costs are estimated at $50 million with net cash flow from operations of $1.1 billion over the life of the mine. 

An independently prepared report, compliant with Canada's National Instrument 43-101 ("NI 43-101") standard for mineral disclosure, will be filed on SEDAR shortly, providing details of the updated reserve and economic model.

Dolores Mine Economics Update

Base case metal price assumptions of $675 per ounce gold and $13 per ounce silver were used in the economic analysis, with $600 gold and $10 silver used to define the reserve. Net present values and internal rates of return using base case and approximate spot prices for gold and silver are as follows:

 

Base Case

Spot Case

Gold

$675 per ounce

$900 per ounce

Silver

$13.00 per ounce

$17.00 per ounce

 

 

 

NPV 0% discount - pre-tax(1)

$831 million

$1.5 billion

NPV 3% discount - pre-tax(1)

$563 million

$1.0 billion

IRR - pre-tax(1)

26%

43%

(1)Inclusive of $141 million in capital expenditures to December 31, 2007.

The following table provides a comparison of the updated Dolores Mine production and economics to the 2006 feasibility study:

 

Dolores Mine Update

2006 Feasibility Study

 

Mine life

15.5 years

12 years

 

 

 

Production(1):

 

 

  Gold

1.77 million ounces

1.44 million ounces

  Silver

64.35 million ounces

53.2 million ounces

  Gold Equivalent

3.0 million ounces (52:1 Ag:Au)

2.29 million ounces (63:1 Ag:Au)

 

 

 

Average strip ratio

3.7 waste tonnes to 1 ore tonne

3.7 waste tonnes to 1 ore tonne

 

 

 

Life of mine average cash cost per ounce(2):

 

 

  Gold equivalent

$297 per ounce

$228 per ounce

  Gold (silver by-product)

$32 per ounce

$85 per ounce 

 

 

 

Initial capital costs(3)

$192 million

$132 million

Sustaining capital costs

$50 million

$29 million

 

 

 

Base case returns:

 

 

Pre-tax IRR

26%

28.9%

Pre-tax NPV 0% discount

$831 million

$389 million

Pre-tax NPV 3% discount

$563 million

$285 million

(1)Inclusive of incidental production during the commissioning stage.
(2)Excluding royalties of 3.25% on gold ounces produced and 2% on silver ounces produced. Cash operating costs net of revenue from silver production are applied to gold ounces produced in estimating cash cost per ounce of gold net of silver by-product.
(3) Including contingency of $10 million and $5.7 million, respectively.

The updated Dolores Mine economics are based on a comprehensive study incorporating current costs and an updated production schedule for an open pit operation lasting over 15 years. While estimated costs have increased from those in the 2006 feasibility study, economics for the Dolores Mine remain robust. Operating cost escalations having the most significant impact to the mine economics include higher local wage rates, diesel, reagent, and explosives costs. Additional significant cost increases above those in the 2006 feasibility study include costs for equipment maintenance and parts, community relations, security and camp operations. 

Capital cost estimates have been updated to reflect the increase in ore tonnes processed over the mine life, which require additional leach pad space, haul trucks and other equipment, and the cost to complete construction. Increased costs associated with immediate and ongoing improvements in the housing, medical and school infrastructure for the new community of Dolores are also included in the revised estimates. Initial capital expenditures of $141 million have been incurred to December 31, 2007. Remaining initial capital expenditures are estimated at $51 million, which includes a $10 million contingency.  Life of mine sustaining capital is estimated at $50 million.

Dolores Reserves Update

The updated reserve estimation was prepared by Gustavson Associates of Denver, Colorado ("Gustavson"). It is the first independent estimation of reserves at Dolores since the 2006 feasibility study. An audit by Gustavson of the reserve estimation is in progress and will be reported when completed in an NI 43-101 technical report to be filed on SEDAR.

Consistent with the previously reported internally prepared reserve update (see news release dated July 25, 2006 and SEDAR filings for NI 43-101 technical reports), when adjusted for stockpiled material, the open-pit, reserve base at the Dolores Mine has increased to 2.44 million ounces of gold and 126.64 million ounces of silver, or 4.55 million gold equivalent ounces - an increase of 24.8% in contained gold reserve and an increase of 22.1% in contained silver reserve from the 2006 feasibility study.

The new reserves are contained in 99.3 million tonnes of proven and probable ore having an average grade of 0.77 grams per tonne ("gpt") gold and 39.67 gpt silver and using economic gold equivalent cut-off grades ranging from 0.26 gpt to 0.37 gpt for the various ore types.

Dolores Mine - Proven and Probable Reserve Estimate - February, 2008


Reserves(1)(2)

Tonnes (000s)

Gold Grade (gpt)

Gold Ounces Contained

Silver Grade (gpt)

Silver
Ounces Contained

AuEq Grade (gpt)(3)

AuEq Ounces Contained(3)

Proven

56,629

0.80

1,453,946

40.32

73,415,147

1.47

2,677,532

Probable

42,675

0.72

989,713

38.80

53,229,746

1.37

1,876,875

Proven &
Probable

99,305

0.77

2,443,659

39.67

126,644,893

1.43

4,554,407

1.       Proven and probable reserves have been estimated as of December 31, 2007 in accordance with definitions adopted by the Canadian Institute of Mining, Metallurgy and Petroleum on November 14, 2004.  Gustavson has prepared these estimates. William J. Crowl of Gustavson is the "Qualified Person" as defined in NI 43-101 for this mineral reserve statement. Some numbers may not sum due to rounding.

2.       Using $600 per ounce gold; $10.00 per ounce silver.

3.       Gold equivalent ounces ("AuEq") are based on a 60:1 silver to gold ratio, without regard to metallurgical recoveries.

The block model bench height and selective mining unit size were increased to match current mining practice and the mine equipment fleet, resulting in increased dilution from the 2006 feasibility study. Analysis of dilution will continue during production ramp-up.     

Due to the higher assumed metal prices, ore tonnes with lower average recovery rates have been added to the life of mine production. These additional tonnes have decreased average recoveries slightly compared with the 2006 feasibility study; 72.25% from 74% for gold and 50.8% from 51% for silver.

Gustavson's work is based on the previously audited resource model reported by the Company in a news release dated June 12, 2007 and an NI 43-101 technical report filed on SEDAR July 27, 2007. The total measured and indicated resources used for estimation of the mineral reserves at Dolores incorporates data from all drilling up through the end of 2006. The resources are currently estimated at 3.1 million ounces of gold and 148.7 million ounces of silver.
 
An additional 661,000 ounces of gold and 27.5 million ounces of silver, contained in 30.3 million tonnes (at average grades of 0.677 gpt gold and 28.2 gpt silver), are classified as "inferred resources".

Dolores Upside Potential

The Company is undertaking a feasibility study in 2008 to assess the economic viability of adding a flotation mill, which would enhance recoveries from high-grade ore in the open pit, process additional underground ore and increase annual production capacity. Previous flotation mill test work showed recoveries from sulphide ores of 90-92% for gold and 90% for silver.

The open-pit mine plan and updated Dolores Mine economics do not take into account significant high-grade gold and silver mineralization that lies below and up to one kilometer peripheral to the proposed pit or increased gold and silver production that would result from processing high grade open pit ore through a mill.  The completion of the mill feasibility study and evaluation of underground development are examples of the optimization efforts that will continue beyond the start of production from the Dolores open pit mine. 

Construction Update

Construction at Dolores is substantially complete. Local residents have begun relocating to the new village and the village medical facilities will be turned over to government authorities within a week, marking the first time Dolores residents will have local access to health and medical assistance.

Initial commissioning of the primary crusher is expected at the end of the month. Commissioning of the tertiary crushers is expected in March with initial loading of the leach pad now expected in late March or early April"While the delays in commissioning at Dolores have been frustrating for the Company, we believe it is prudent to be thorough in our construction to ensure success when we commence production" stated Mr. Bailey. 

Qualified Person
Mark Bailey MSc., P.Geo., is the "qualified person" with overall responsibility for the Dolores Project and is responsible for the contents of this news release.

About Minefinders

Minefinders is a precious metals mining and exploration company. The Company is in the final stages of building the multi-million ounce Dolores gold and silver mine in Mexico. The mine is expected to have a 15-year life as an open pit mine with additional potential as a high-grade underground mine in the future. The Company continues its exploration efforts on several other prospective projects in Mexico to build a quality pipeline of precious metals projects for future growth.

MINEFINDERS CORPORATION LTD.

"Mark H. Bailey"

Mark H. Bailey
President and Chief Executive Officer

Safe Harbor Statement under the United States Private Securities Litigation Act of 1995: Statements in this release that are forward-looking, including statements relating to the timing of the commencement and completion of the construction of, and the commencement of production from, the Dolores mine, the anticipated costs related to the Dolores mine, the adequacy of the capital and anticipated expenditures for working capital and exploration, and other statements that are based on the estimates, projections and expectations of management are subject to various risks and uncertainties concerning the specific factors identified above and in the Company's periodic filings with the regulatory authorities in Canada and the United States.  Such information contained herein represents management's best judgment as of the date hereof based on information currently available.  The Company does not intend to update this information and disclaims any legal liability to the contrary.

Cautionary Note to U.S. Investors: The SEC permits mining companies to disclose only those mineral deposits that can be extracted or produced economically in their filings with the SEC. This news release uses the term "inferred resource" that the SEC guidelines prohibit from inclusion in filings with the SEC.

Investor contact:
Mike Wills
Minefinders Corporation Ltd.
(604) 687-6263
mike@minefinders.com
www.minefinders.com

 

Minefinders Corporation Ltd.

CODE : MFL.TO
ISIN : CA6029001022
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Minefinders is a gold and silver development stage company based in Canada.

Minefinders is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.1 billions as of today (US$ 1.1 billions, € 851.4 millions).

Its stock quote reached its lowest recent point on December 31, 1999 at CA$ 0.50, and its highest recent level on April 04, 2012 at CA$ 13.45.

Minefinders has 82 976 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Minefinders Corporation Ltd.
5/9/2006Follow up N° 3
Annual reports of Minefinders Corporation Ltd.
2007 Annual Report
Financings of Minefinders Corporation Ltd.
12/20/2011Retires 2011 Convertible Notes
12/11/2008Closes C$40 Million Bought Deal
12/2/2008Announces $40,020,000 Bought Deal
Financials of Minefinders Corporation Ltd.
2/24/2012Minefinders Delivers Solid 2011 Financial and Operating Resu...
10/12/2011Minefinders Announces Third Quarter 2011 Production and Sale...
8/3/2011Announces Second Quarter 2011 Financial and Operating Result...
5/4/2011Announces First Quarter 2011 Financial and Operating Results
4/6/2011Minefinders Announces First Quarter 2011 Production and Sale...
2/25/2011(Dolores Mine)Minefinders Announces 2010 Financial and Operating Results a...
1/13/2009(Dolores Mine)Provides Fourth Quarter 2008 Dolores Production Update
11/17/2008(Dolores Mine)Pours First Gold and Silver at the Dolores Mine and Provides...
8/20/2008(Dolores Mine)Provides Dolores Update And Second Quarter 2008 Results
Project news of Minefinders Corporation Ltd.
3/30/2012Pan American Silver completes acquisition of Minefinders
6/28/2011(La Virginia Gold/silver)Reports 6.46 GPT of Gold-Equivalent Over 67 Metres at La Vir...
5/5/2011(Dolores Mine)Minefinders Provides Reserve and Resource Update for Its Dol...
2/14/2011(La Virginia Gold/silver)Minefinders Reports Additional 2010 Drill Results From the D...
2/14/2011(Dolores Mine)Minefinders Reports Additional 2010 Drill Results From the D...
7/28/2008(Dolores Mine)Reports Delay to First Gold and Silver Pour At Dolores
2/27/2008(Dolores Mine)High-Grade Satellite Deposit Delineated at the Dolores Mine
2/14/2008(Dolores Mine) Updates Dolores Mine Economics and Reserves
Corporate news of Minefinders Corporation Ltd.
3/27/2012Pan American Silver and Minefinders Announce Securityholder ...
3/14/2012Corporate Governance Firms Recommend That Shareholders of Pa...
2/29/2012Minefinders Announces Notice to Holders of 4.50% Convertible...
2/13/2012Minefinders to Release Full Year 2011 Results on February 23
1/23/2012Pan American to Acquire Minefinders and Create the Leading G...
1/9/2012Minefinders Announces Fourth Quarter and Full Year 2011 Prod...
1/5/2012Presenting at the Dahlman Rose & Co. Emerging Miners CEO Con...
12/20/2011Minefinders Retires 2011 Convertible Notes
11/29/2011Presenting at the Scotia Capital Mining Conference
10/25/2011to Release Third Quarter 2011 Results on November 7; Investo...
7/25/2011to Release Second Quarter 2011 Results on August 3; Investor...
7/11/2011Announces Second Quarter 2011 Production and Sales Results
12/2/2008Files Final Base Shelf Prospectus
5/23/2008Subsidiary Commences Binding Arbitration Seeking Us$10 Milli...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (MFL.TO)AMEX (MFN)
13.45-0.15%13.90+0.00%
Last quotes and information before delisting
Prev close Open
13.47 12.97
Low High
12.97 13.45
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  13.45 -%
Volume 1 month var.
415,449 -%
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :