Sign in
or
Join now
Information gathered during the test will be reviewed with the relevant government agencies, including the federal science team, to determine next steps.
The sealing cap system never before has been deployed at these depths or under these conditions, and its efficiency and ability to contain the oil and gas cannot be assured.
During the well integrity test, operations on the first relief well have been temporarily stopped while the well was at 17,840 ft as a precaution. Operations on the second relief well have been temporarily suspended at 15,874 feet to ensure that there is no interference with the first relief well. The relief wells remain the sole means to permanently seal and isolate the well.
BP Press Office London: +44 (0)20 7496 4076BP Press office, US: +1 281 366 0265http://www.bp.com/gulfofmexicoresponse