Pacific Rim Mining Corp

Published : March 27th, 2007

Zamora Project Yields High Grade Gold in Surface Trenching

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Re:        2007 News Releases - Tuesday, March 27, 2007
Title:     Pacific Rim Mining's Zamora Project Yields High Grade Gold in Surface Trenching

News Release #07-04

Surface mapping and sampling at Pacific Rim Mining Corp.'s ("Pacific Rim" or "the Company") Zamora gold project in El Salvador has greatly expanded the size of the epithermal vein system on this project and identified bonanza gold grades of up to 31.9 g/t gold over 2.1 meters.

The Zamora epithermal vein system has been traced over a strike length of approximately 21 kilometers, with high grade gold identified locally on surface along its entire length. This system is comparable in dimension to Pacific Rim's El Dorado project approximately 150 kilometers to the east, where the Company has recently made a number of exciting gold discoveries that will expand the current measured and indicated resource of 3.7 million tonnes at an average gold equivalent grade of 10.24 g/t, for a total of 1.2 million gold equivalent ounces (1.1 million ounces of gold at 9.35 g/t and 7.4 million ounces of silver at 62.24 g/t). Readers are directed to the Company's website www.pacrim-mining.com and SEDAR filings www.sedar.com for details of the July 2006 El Dorado resource estimate, and complete National Instrument 43-101 disclosure.

The Zamora epithermal system was acquired in 2006 after Pacific Rim recognized the area's exceptional geological potential for hosting gold-bearing epithermal systems. This recognition was based on proprietary information the Company had generated regarding the geological age of bonanza mineralizing events in El Salvador. This geological advantage has led the Company to a number of outstanding gold discoveries in El Salvador over the past two years and regional exploration for additional projects continues at present.
Zamora Project Bonanza-Grade Surface Sampling Results(i)
-------------------------------------------------------------------
                     Vein Width
Sample Type(ii)      (if applicable)      Gold (g/t)    Silver (g/t)
-------------------------------------------------------------------
Channel              1.3 meters                17.4              15
-------------------------------------------------------------------
Channel              1.2 meters                21.2              75
-------------------------------------------------------------------
Channel              0.15 meters              119.0             124
-------------------------------------------------------------------
Channel              2.1 meters                31.9              34
-------------------------------------------------------------------
Grab                                           11.4             173
-------------------------------------------------------------------
Grab                                           24.0             167
-------------------------------------------------------------------
Grab                                           10.1            3768
-------------------------------------------------------------------
Grab                                            8.1             634
-------------------------------------------------------------------
Grab                                           27.2              62
-------------------------------------------------------------------
(i)  Complete sampling results from the Zamora project range from
     less than 1 g/t gold to values presented in table, as is
     typical of regional sampling programs. Only bonanza sample 
     results are provided in this table.
(ii) Grab samples are samples of rock outcrop or float that are 
     representative of the rock being sampled but do not 
     necessarily include material from the entire exposure. Channel
     samples are samples of rock outcrop or float that include
     material from the entire width of the rock or vein being
     sampled.
Pacific Rim is continuing its surface mapping and sampling of the extensive Zamora epithermal system, which will lead to the prioritization of drill targets. The Company is in the process of completing a baseline environmental assessment of the Zamora project and will apply for permits to drill test this exciting gold discovery in due course.

Tom Shrake, President and CEO states "The Zamora project is proving to be an extensive epithermal system with bonanza gold grades. Though we are still early in our understanding of the details of the Zamora system, we are extremely pleased with the results generated there to date and look forward to continuing to map out this extremely large target. The geological basis for our El Salvador regional exploration program is clearly bearing fruit and we are continuing to capitalize on this opportunity by scouting for additional projects in our areas of interest throughout El Salvador."

San Francisco Project Joint Venture Signed
Pacific Rim has signed a joint venture agreement with APEX Silver Mines Ltd. ("APEX") whereby APEX has the opportunity to earn a 60% interest in the Company's San Francisco project located in Jujuy Province, Argentina. In order to earn this interest under the terms of the agreement, APEX must spend US $2.5 million on exploration and development expenditures, and make Periodic Payments to Pacific Rim totaling US $250,000 as per the following schedule:
------------------------------------------------------------------
                                Exploration 
                               & Development
                                Expenditures    Periodic Payments
Period                           (US dollars)         (US dollars)
------------------------------------------------------------------
February 27, 2007 - 2008            $200,000              $20,000
------------------------------------------------------------------
February 27, 2008 - 2009            $300,000              $30,000
------------------------------------------------------------------
February 27, 2009 - 2010            $500,000              $50,000
------------------------------------------------------------------
February 27, 2010 - 2011            $700,000              $70,000
------------------------------------------------------------------
February 27, 2011 - 2012            $800,000              $80,000
------------------------------------------------------------------
The San Francisco project was staked by Pacific Rim in 1998. Surface sampling and limited drilling at San Francisco by the Company in 1999 demonstrated the presence of an epithermal system with enriched silver, zinc and gold.

About Pacific Rim Mining Corp.
Pacific Rim is a growth-oriented, revenue-generating, environmentally and socially responsible gold exploration company with operational and exploration assets in North, Central and South America. The Company is expanding and developing its advanced-stage, high grade El Dorado gold project in El Salvador and is actively exploring a pipeline of grassroots gold projects. Pacific Rim's goal is to become a socially and environmentally model, low cost, intermediate level gold producer.

On behalf of the board of directors,

"Thomas C. Shrake"

Thomas C. Shrake
President and CEO

Inquiries regarding this news release or Pacific Rim Mining can be directed to
Barbara Henderson, VP Investor Relations, at (604) 689-1976 or 1-888-775-7097.

NI 43-101 Disclosure
Mr. David Ernst, Chief Geologist, supervises Pacific Rim's project generation initiatives, including exploration work on the Zamora project. Mr. Ernst is a professional geologist licensed by the State of Washington, an employee of Pacific Rim Mining Corp. and a Qualified Person as defined in National Instrument 43-101. Mr. Ernst has verified that the assay results presented above have been accurately summarized from the official assay certificates provided to the Company. Pacific Rim's sampling procedures follow the Exploration Best Practices Guidelines outlined by the Mining Standards Task Force and adopted by The Toronto Stock Exchange. Samples have been analyzed using fire assay with a gravimetric finish on a 30-gram split. Quality control measures, including check- and sample standard-assaying, are being implemented. Samples were assayed by Inspectorate America Corporation in Reno, Nevada USA, an ISO 9002 certified laboratory, independent of Pacific Rim Mining Corp.

The July 2006 El Dorado resource estimate was prepared by Mr. Steve Ristorcelli, P.Geo. of Mine Develoment Associates, Reno, Nevada. Mr. Ristorcelli is an independent Qualified Person as defined in NI 43-101. The resource estimate conforms to current CIM Standards on Mineral Resources and Reserves. A technical report in support of the updated El Dorado resource estimate presented above was filed with SEDAR on July 31, 2006. The report was co-authored by Mr. Steve Ristorcelli, P.Geo. and Mr. Peter Ronning, P.Eng., each of whom are independent Qualified Persons as defined in NI 43-101.

Cautionary Note Regarding Forward-Looking Information
Information set forth in this document includes forward-looking statements. By their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond Pacific Rim's control, including but not limited to: the tenor of future mapping and sampling results from the Zamora project; the execution and outcome of current or future exploration activities; the process, timing and outcome of baseline environmental studies at the Zamora project; the eventuality and timing of receipt of permits required to drill test the Zamora project; and other factors detailed in the Company's filings with the U.S. securities and Exchange Commission.

Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. Pacific Rim's actual results, programs and financial position could differ materially from those expressed in or implied by these forward-looking statements.

The TSX and the AMEX have neither reviewed nor accept responsibility for the adequacy or accuracy of this release.

Copyright © 2007 PACIFIC RIM MINING CORP. (PMU) All rights reserved. For more information visit our website at http://www.pacrim-mining.com/ or send email to info@pacrim-mining.com ..
Message sent on Tue Mar 27, 2007 at 8:04:42 AM Pacific Time
Data and Statistics for these countries : Argentina | El Salvador | All
Gold and Silver Prices for these countries : Argentina | El Salvador | All

Pacific Rim Mining Corp

PRODUCER
CODE : PMU.TO
CUSIP : 694915208
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Pacific Rim Mining is a gold and silver development stage company based in Canada.

Pacific Rim Mining holds various exploration projects in El Salvador.

Its main assets in production are DENTON RAWHIDE and DENTON-RAWHIDE in USA and its main exploration properties are SANTA RITA, ZAMORA AND CERRO COLORADO, EL DORADO PROJECT - BALSAMO, EL DORADO EL SALVADOR, EL DORADO PROJECT - SOUTH MINITA, EL DORADO PROJECT - MINITA, EL DORADO PROJECT - NANCE DULCE, EL DORADO PROJECT - COYOTERA and EL DORADO PROJECT - NUEVA ESPERANZA in El Salvador.

Pacific Rim Mining is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 14.8 millions as of today (US$ 13.9 millions, € 10.2 millions).

Its stock quote reached its highest recent level on December 31, 2003 at CA$ 2.39, and its lowest recent point on October 11, 2013 at CA$ 0.04.

Pacific Rim Mining has 210 952 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Pacific Rim Mining Corp
10/4/2012Closes Private Placement Financing
4/20/2011Financing Increased
4/7/2011Undertaking Financing
1/14/2010Closes Private Placement Financing
8/28/2009Resolution to Extend Expiration Date of Warrants Passed at P...
2/29/2008 Closes Private Placement Financing
Nominations of Pacific Rim Mining Corp
3/7/2012Announces Changes to Board of Directors
Financials of Pacific Rim Mining Corp
7/25/2013Announces Fiscal 2013 Year End Results
12/11/2012Announces Fiscal 2013 Second Quarter Results
9/7/2012Announces Fiscal 2013 First Quarter Results
7/27/2012Announces Fiscal 2012 Year End Results
3/5/2012Announces Fiscal 2012 Third Quarter Results
12/13/2011Announces Fiscal 2012 Second Quarter Results
9/15/2011Announces Fiscal 2012 First Quarter Results
7/27/2011Announces Fiscal 2011 Year End Results
3/16/2010Announces Fiscal 2010 Third Quarter Results
12/7/2009Announces Fiscal 2010 Second Quarter Results
9/10/2009Announces Fiscal 2010 First Quarter Results
12/15/2008Announces Fiscal 2009 Second Quarterly Results
9/12/2008Announces Fiscal 2009 First Quarterly Results
3/11/2008Announces Fiscal 2008 Third Quarter Results
12/11/2007 Announces Fiscal 2008 Second Quarter Results
9/11/2007Announces Fiscal 2008 First Quarter Results
3/13/2007Pacific Rim Announces Fiscal 2007 Third Quarter Results
Project news of Pacific Rim Mining Corp
7/3/2008(El Dorado El Salvador)Suspends Further Drilling in El Salvador Until Mining Permit...
1/23/2008Surface Trenching at Santa Rita Project Reveals High Grade G...
1/17/2008(El Dorado El Salvador)El Dorado Gold Project M&I Resources Top 1.4 Million Gold Eq...
8/2/2007(El Dorado Project - South Minita)'s Balsamo Gold Deposit Delineation Nearing Completion; Anot...
4/10/2007(El Dorado - Pacific Rim)Balsamo Gold Zone on Pacific Rim Mining's El Dorado Project ...
3/27/2007Zamora Project Yields High Grade Gold in Surface Trenching
Corporate news of Pacific Rim Mining Corp
12/2/2013Shareholders Approve Plan of Arrangement and Final Court App...
11/27/2013OceanaGold and Pacific Rim Mining Complete Plan of Arrangeme...
11/12/2013ISS And Glass Lewis Recommend Pacific Rim Mining Shareholder...
10/28/2013Mails Information Circular in Connection With Special Meetin...
10/8/2013OceanaGold Agrees to Acquire Pacific Rim Mining
9/16/2013Announces Results of Annual General Meeting of Shareholders
6/7/2013Adopts Advance Notice and Majority Voting Policies
6/7/2013Adopts Advance Notice and Majority Voting Policies
5/6/2013Announces Termination of the Hog Ranch Option Agreement and ...
4/1/2013Statement Filed in Arbitration Case Against El Salvador; Pac...
3/13/2013Announces Fiscal 2013 Third Quarter Results
10/25/2012Negotiates Set Fee Structure for Final Phase of ICSID Arbitr...
9/25/2012OceanaGold Corporation Takes Placement in Pacific Rim Mining...
6/4/2012World Bank Tribunal Allows Pacific Rim Subsidiary to Continu...
6/4/2012World Bank Tribunal Allows Pacific Rim Subsidiary to Continu...
4/30/2012Provides a Progress Report on Activities in El Salvador and ...
6/14/2011Finalizes Hog Ranch Property Joint Venture Acquisition
5/2/2011CAFTA Hearing on Jurisdiction Objection Underway
3/30/2011Signs Letter of Intent to Acquire Majority Interest in Hog R...
3/22/2011Upcoming CAFTA Hearings Delayed
8/19/2010Notifies NYSE Amex of its Intent to Delist
8/3/2010ICSID Tribunal Rejects Government of El Salvador's Prelimina...
5/31/2010Cafta Hearing On Preliminary Objection Underway
3/4/2010Provides Update on Exploration Focus and CAFTA Proceedings
2/11/2010NYSE Amex Accepts Pacific Rim Mining's Compliance Plan
12/11/2009Undertaking Financing
11/19/2009CAFTA Proceedings Begin as Tribunal Constituted
11/12/2009Receives NYSE Amex Notification
7/24/2009Announces Fiscal 2009 Year End Results
2/12/2009Defers Completion of El Dorado Fesibility Study
12/9/2008Files Notice of Intent to Seek CAFTA Arbitration
9/19/2008Announces Head Office Cutbacks
7/22/2008Announces Fiscal 2008 Year End Results
2/14/2008 Financing Increased to 6,711,000 Units
2/6/2008Undertaking Financing
11/7/2007Denton-Rawhide Land Sale Closing Date Extended
10/25/2007 Contact Information Update
7/23/2007Announces 2007 Year-End Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (PMU.TO)FRANKFURT (PRM.F)
0.070+0.00%9.92+0.43%
TORONTO
CA$ 0.070
12/02 15:48 -
0%
Prev close Open
0.070 0.070
Low High
0.070 0.070
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.070 -%
Volume 1 month var.
100,000 -%
24hGold TrendPower© : 24
Produces Gold - Silver
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.69-0.77%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :