Avnel Gold Mining Ltd.

Published : October 05th, 2015

Avnel Reports That Measured Plus Indicated Resource Increases to 2.81 Million Ounces of Gold at a Diluted Grade of 2.85 g/t at Kalana Main Deposit at $1,100/oz

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Diamond | Gold | Gold Production | Guernsey | Mali | Silver |

Avnel Reports That Measured Plus Indicated Resource Increases to 2.81 Million Ounces of Gold at a Diluted Grade of 2.85 g/t at Kalana Main Deposit at $1,100/oz

Avnel Reports that Measured plus Indicated Resource Increases to 2.81 Million Ounces of Gold at a Diluted Grade of 2.85 g/t at Kalana Main Deposit at $1,100/oz



Avnel Reports that Measured plus Indicated Resource Increases to 2.81 Million Ounces of Gold at a Diluted Grade of 2.85 g/t at Kalana Main Deposit at $1,100/oz


ST. PETER PORT, GUERNSEY, OCTOBER 5, 2015 - Avnel Gold Mining Limited ('Avnel' or the 'Company') (TSX:AVK) is announcing an updated Mineral Resource estimate ('MRE') for the Kalana Main Project in south-western Mali. The Company is also announcing that the completion of the Definitive Feasibility Study ('DFS') and approval of the Environmental and Social Impact Assessment ('ESIA') are expected by the end of the first quarter of 2016.


Highlights:


  • Measured plus Indicated ('M+I') Mineral Resource of 2.81 million ounces at a diluted grade of 2.85 g/t Au for the Kalana Main deposit at a gold price of $1,100 per ounce

  • 46% of the M+I Mineral Resource classified as Measured

  • DFS scheduled for completion by the end of the first quarter of 2016

  • ESIA approval expected by the end of the first quarter of 2016


    Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade1,2

    Mineral Resource Classification

    Tonnes (Mt)

    Grade (g/t Au)

    Contained Gold (Moz)

    Measured

    13.6

    2.92

    1.28

    Indicated

    17.0

    2.80

    1.53

    Measured + Indicated

    30.6

    2.85

    2.81

    Inferred

    1.3

    2.93

    0.12

  • - Mineral Resources are disclosed on a total project basis at 100%. Avnel owns an 80% equity interest in SOMIKA, the Malian company

    that owns the Kalana Exploitation Permit.

  • - Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.


'I am delighted to report that the M+I Mineral Resource for the Kalana Main deposit has increased to

  1. million ounces at a diluted grade of 2.85 grams per tonne. With this new resource, the Kalana Main Project stands out as one of West Africa's highest grade, multi-million-ounce, open-pit development projects with significant exploration upside,' stated Howard Miller, Avnel's Chairman and CEO.


    'The increase to the Mineral Resource is a direct result of the drill program that we completed last quarter. In addition to demonstrating the continuity of mineralisation and improving confidence in the geological model, this drilling has upgraded a significant portion of the Inferred Mineral Resource and added to the Mineral Resource by defining new zones of mineralisation and extensions to known vein packages. This drilling also defined thick corridors of lower grade mineralisation that are being reassessed as part of the DFS to determine if they are amenable to a lower cost bulk mining approach.'


    'The DFS remains on track for completion by the end of first quarter of 2016 and we continue to expect for the updated Mineral Resource to positively impact several key performance indicators. For example, it is worth noting that within the M+I Mineral Resource that approximately 730,000

    ounces are contained within the favourable saprolite and saprock horizons at an average diluted grade of 3.05 grams per tonne. This is expected to generate high gold production at lower mining and processing costs in the initial years of the DFS's mine plan.'


    'In parallel with the DFS, we are preparing a new ESIA that will satisfy the requirements of the Equator Principles with the intention of pursuing international financing. The public participation process for the ESIA is nearing completion and we plan to submit the draft ESIA for review by the Malian authorities in December. Following the review period, we will submit the final ESIA for approval in early 2016, which we anticipate receiving by the end of the first quarter of 2016. The Kalana Exploitation Permit was awarded to Avnel in 2003 and pursuant to our Foundation Agreement with the Government of Mali, the only significant approval required to develop new mines is an ESIA.'


    Kalana Main September 2015 Mineral Resource Estimate

    Kalana Main In Situ Mineral Resource Estimate


    The September 2015 MRE is based upon information from a total of 170,080 m of drilling from 989 holes. Information added to the database since the March 2015 MRE includes 28 Diamond drill holes, 137 RC drill holes, and 16 combined RC-Diamond drill holes that were drilled in 2015. A comparison between the September 2015 in situ MRE and the March 2015 in situ MRE for the Kalana Main deposit is presented in the following table:


    Total in situ Mineral Resources for the Kalana Main Deposit September 2015 MRE vs. March 2015 MRE1,2,3

    (100% Project Basis Reported Above a 0.9 g/t Au Cut-off Grade)


    Resource Category

    September 2015 MRE4 ($1,100/oz Au)

    March 2015 MRE5 ($1,100/oz Au)

    Change (%)

    Tonnes

    (Mt)

    Grade

    (g/t Au)

    Ounces

    (Moz)

    Tonnes

    (Mt)

    Grade

    (g/t Au)

    Ounces

    (Moz)

    Tonnes

    (%)

    Grade

    (%)

    Ounces

    (%)

    Measured Indicated

    9.0

    10.9

    4.24

    4.19

    1.23

    1.46

    - 14.5

    - 4.52

    - 2.11

    - (25%

    - (7%)

    - (31%)

    M + I

    19.9

    4.21

    2.69

    14.5

    4.52

    2.11

    37%

    (7%)

    27%

    Inferred

    0.8

    4.59

    0.11

    1.8

    5.28

    0.31

    (56%)

    (13%)

    (65%)

  2. - Mineral Resources are disclosed on a total project basis at 100%. Avnel owns an 80% equity interest in SOMIKA, the Malian company that

    owns the Kalana Exploitation Permit.

  3. - Some figures in this table may not compute due to rounding and truncation.

  4. - Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

  5. - A summary of the in situ September 2015 MRE is presented in Table 1 at the end of this news release.

  6. - A summary of the in situ March 2015 MRE is presented in Avnel's Annual Information Form ('AIF') for the year ended 2014.


The increase to the in situ Mineral Resource is largely attributable to the expansion of the pit shell as a result of the inclusion of new mineralisation that was defined in the 2015 drill program. In addition to demonstrating the continuity of mineralisation and improving confidence in the geological model, this drilling resulted in an increase to the Mineral Resource by defining new zones of mineralisation, extensions to known vein packages, and thick corridors of lower grade sub-vertical mineralisation, albeit often at a lower average grade than the core of the Kalana Main deposit.

For example, the inclusion of the thick corridors of lower grade mineralisation into the Mineral Resource contributed to a reduction in the average grade of the deposit relative to prior estimates. These corridors are typically defined by sub-vertical veins that overprint the primary, shallow dipping, high-grade quartz vein packages. This is significant because it has resulted in longer composites of mineralisation, albeit at a lower average grade, compared to other portions of the deposit. As a result, these corridors are being reassessed as potential bulk tonnage targets that may be amenable to lower cost bulk mining methods relative to the selective mining approach previously envisioned. Consequently, bulk mining in these portions of the deposit has the potential to offset the localised reductions in grade and positively impact the waste-to-ore ratio and other key performance indicators in the DFS.


The upgrading of a portion of the Inferred Mineral Resource also contributed to the increase in the M+I Mineral Resource. Furthermore, 46% of the M+I Resource is classified as Measured and demonstrates a significant increase to the overall confidence in the Mineral Resource.


An updated MRE statement for the Kalana Project is presented in Table 1 at the end of this news release. A map of the Kalana Exploitation Permit is presented in Figure 1.


Kalana Main Diluted Mineral Resource Estimate


An important contribution to the Mineral Resource estimation process since the Preliminary Economic Assessment for the Kalana Main Project (the 'PEA') is an improvement to the estimation of dilution. The addition of estimated local dilution compared to the global dilution assumption of 50% utilised in the PEA has resulted in the exclusion of some lower grade and narrow mineralisation with the diluted grades falling below the 0.9 g/t Au cut-off grade. As detailed in the tables below, the pit-constrained diluted M+I Mineral Resource above the diluted cut-off grade is currently estimated at 30.6 million tonnes at a diluted grade of 2.85 g/t Au containing 2.81 million ounces with an estimated global dilution of 54%:


Kalana Main Measured Mineral Resource Dilution Estimate as at 30 September 20151,2,3

Resource Tonnes


(Mt)

Resource Grade


(g/t Au)

Internal Dilution


(%)

External Dilution


(%)

Grade Internal Dilution (g/t Au)

Grade External Dilution (g/t Au)

Diluted Tonnes


(Mt)

Diluted Grade


(g/t Au)

Contained Gold


(Moz)

Measured

9.0

4.24

21%

24%

0.40

0.28

13.6

2.92

1.28

Indicated

10.9

4.19

19%

31%

0.40

0.31

17.0

2.80

1.53

M + I

19.9

4.21

20%

28%

0.40

0.30

30.6

2.85

2.81

Inferred

0.8

4.59

20%

40%

0.36

0.49

1.3

2.93

0.12

  1. - Mineral Resources are disclosed on a total project basis at 100% as at 30 September 2015. Avnel owns an 80% equity interest in SOMIKA, the

    Malian company that owns the Kalana Exploitation Permit.

  2. - Some figures in this table may not compute due to rounding and truncation.

  3. - Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.


    A breakdown of the diluted Mineral Resource by classification and oxidation state is presented in the following table:

    Kalana Main Deposit Diluted Mineral Resource Above a 0.9 g/t Au Cut-off Grade1,2,3

    Tonnes (Mt)

    Grade (g/t Au)

    Contained Gold (Moz)

    MEASURED MINERAL RESOURCE

    Saprolite


    2.7


    3.11


    0.27

    Saprock

    1.0

    3.63

    0.12

    Fresh

    9.9

    2.80

    0.89

    TOTAL

    13.6

    2.92

    1.28


    INDICATED MINERAL RESOURCE

    Saprolite


    2.6


    2.86


    0.24

    Saprock

    1.1

    2.80

    0.10

    Fresh

    13.4

    2.78

    1.20

    TOTAL

    17.0

    2.80

    1.53

    MEASURED + INDICATED MINERAL RESOURCE

    Saprolite

    5.3

    2.99

    0.51

    Saprock

    2.1

    3.21

    0.22

    Fresh

    23.2

    2.79

    2.08

    TOTAL M+I

    30.6

    2.85

    2.81

    INFERRED MINERAL RESOURCE

    Saprolite


    0.16


    2.51


    0.01

    Saprock

    0.03

    2.08

    0.00

    Fresh

    1.11

    3.02

    0.11

    TOTAL

    1.30

    2.93

    0.12


  4. - Mineral Resources are disclosed on a total project basis at 100% as at 30 September 2015. Avnel owns an 80% equity interest in SOMIKA, the Malian company that owns the Kalana Exploitation Permit.

  5. - Some amounts in this table may not compute due to rounding and truncation.

  6. - Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.


  7. The Kalana Main deposit's diluted M+I Mineral Resource of 2.81 million ounces combined with the

    0.04 million ounces of Indicated Mineral Resource from historic tailings (0.7 million tonnes at a grade of 1.75 g/t Au) results in a total M+I Mineral Resource of 2.85 million ounces (31.3 million diluted tonnes at a diluted grade of 2.82 g/t Au).


    Mineral Resource Classification


    All Mineral Resources are classified as Measured, Indicated, or Inferred Resources in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ('CIM') Standards on Mineral Resources and Reserves, Definitions, and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council. Classification of parts of the Mineral Resource was applied based upon data quality, confidence in the geological interpretation, and grade and geological variability. Parts of the resource model classified as a part of the Mineral Resource exceed a diluted cut-off grade of 0.9 g/t Au and fall within a Whittle4X evaluation shell that was used to test for the reasonableness of economic extraction.


    Classification was applied based on data quality, confidence in the geological interpretation, grade and geological variability, and confidence in the grade-tonnage estimates. Those parts of the

    resource model classified as a part of the Mineral Resource exceed a diluted cut-off grade of 0.9 g/t Au and are contained within a Whittle4X evaluation shell that was used to test for the reasonableness of economic extraction. Areas informed by drill data with a maximum spacing of approximately 35 m, where the geological and grade continuity have been well established, and were estimated with a minimum of eight samples have been classified as Measured Resource. Areas informed by 25 m by 50 m spaced drilling (approximate dimensions), where there is a reasonable level of confidence in the geological and grade estimate, and were estimated with a minimum of eight samples have been classified as Indicated Resource. The small amount of Inferred Resource is the remainder of the Mineral Resource estimate contained within the Whittle shell. Areas where there is no informing data, that contain lower grade material that is outside of the mineralised interpretation, or are not contained within the Whittle shell are not classified as a part of the Mineral Resource.


    Kalana Main DFS and ESIA On Track for the First Quarter of 2016


    The Company continues to expect that the DFS for the Kalana Main Project will be completed by the end of the first quarter of 2016 as engineering related to the process plant, infrastructure, and mine design is well advanced.


    In parallel with the DFS, the Company is preparing a new ESIA to satisfy the requirements of the Equator Principles with the intention of pursuing international financing for the construction of an open pit mine at Kalana Main. The ESIA is being prepared to conform to the requirements of the International Finance Corporation's Performance Standards, the World Bank Group's Environment, Health, and Safety guidelines, and other financial institutions that are signatories to the Equator Principles. The requisite baseline environmental, health and safety, and socio-economic studies for the ESIA were completed during the second quarter of 2015.


    The formal Public Participation Process for the ESIA has commenced and is expected to conclude in December 2015. The draft ESIA and other associated documentation, including a draft Community Resettlement Action Plan for a portion of the Village of Kalana, is scheduled to be submitted to the Malian authorities in December 2015. Following the review of the draft ESIA, the Company expects to submit the final ESIA for approval in early 2016. Accordingly, the Company continues to anticipate receiving approval of the ESIA and a new Environmental and Mining Permit by the end of the first quarter of 2016. The Kalana Exploitation Permit was awarded to Avnel in 2003 with an initial term of 30 years and pursuant to the Company's Foundation Agreement with the Government of Mali, the only significant approval required to develop new mines is an ESIA.


    As a result of these activities, the Kalana Main Project is expected to be sufficiently advanced for the Company to consider a construction decision during 2016, subject to receipt of a positive DFS, approval of the ESIA from the Malian authorities, and the availability of project financing.


    Qualified Persons


    The Mineral Resource estimates reported in this news release were prepared by Mr. Ivor Jones, (BSc. Hons), MSc, FAusIMM, CP Geo., of Denny Jones Pty Ltd., who is an independent Qualified Person as defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ('NI 43-

    101'). All Mineral Resources reported have been prepared in accordance with the CIM Standards on Mineral Resources and Reserves, Definitions, and Guidelines. Mr. Jones has reviewed and approved the contents of this news release.


    Mr. Allan Earl, Associateship in Mining Engineering, FAusIMM of Snowden Mining Industry Consultants is an independent Qualified Person as defined by NI 43-101. Mr. Earl has reviewed and approved the contents of this news release.


    Mr. Roy Meade, BSc (Honours) Mining Engineering and Professional Engineer (UK), President of Avnel Gold Mining Limited is a Qualified Person as defined by NI 43-101. Mr. Meade has reviewed and approved the contents of this news release.


    Dr. Olivier Féménias, MSc, PhD, EurGeol 1115, Vice-President, Geology for Avnel Gold Mining Limited is a Qualified Person as defined by NI 43-101. Dr. Féménias has reviewed and approved the contents of this news release.


    ABOUT AVNEL GOLD


    Avnel Gold is a TSX-listed gold mining, exploration and development company with operations in south-western Mali in West Africa. The Company's focus is to develop its 80%-owned Kalana Main Project from a small underground mine into a low-cost, open-pit mining operation. The Company is also advancing several nearby satellite deposits on the 387 km2 30-year Kalana Exploitation Permit.


    On March 31, 2014, the Company reported a Mineral Resource estimate and the results of a Preliminary Economic Assessment ('PEA') prepared by Snowden Mining Industry Consultants. The PEA outlines a 14-year open-pit mine life at the Kalana Main Project recovering 1.46 million ounces of gold at an average 'on-site all-in sustaining cost' of $577 per ounce with an initial capital cost of

    $149 million. Utilising a gold price of $1,110 per ounce and a 10% discount rate, the PEA reported a net present value ('NPV') of $194 million after-tax and imputed interest, and an internal rate of return ('IRR') of 53% on a 100% project basis. The Company is now advancing the project to Definitive Feasibility, which is scheduled to be completed in the first quarter of 2016.


    For further information, please contact:


    Howard Miller

    CEO and Chairman Phone: +44 207 589 9082

    UK Mobile: +44 07768 696129

    Canadian Mobile: +1 (416) 726 8174 Email: [email protected]

    Jeremy Link

    Vice-President, Corporate Development Phone: +1 (647) 692-5460

    Email: [email protected]


    www.avnelgold.com


    No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

    CAUTIONARY STATEMENTS


    Preliminary Economic Assessment

    The Kalana Main Preliminary Economic Assessment ('PEA') is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorised as Mineral Reserves; thus, there is no certainty that the economic benefits indicated in the PEA will be realised. The PEA is subject to a number of assumptions, including, among others that an Environmental and Social Impact Assessment ('ESIA') will be completed within the required timeline, all required permits will be obtained in a timely manner, the company will continue to have the support of local community, a constant regulatory environment and no material increase occurs to the estimated costs. The Kalana Main PEA is based upon an 8.54 million tonne Indicated Mineral Resource grading 4.53 g/t Au containing 1.25 million ounces and a 2.09 million tonne Inferred Mineral Resource grading 3.76 g/t Au containing 0.25 million ounces utilising a cut-off grade of 0.9 g/t Au. The PEA also includes 0.66 million tonnes of tailings grading 1.80 g/t Au that are classified as an Indicated Mineral Resource. Investors are cautioned not to assume that all or any portion of the Mineral Resource will ever be converted into a Proven and Probable Mineral Reserve. The NI 43-101-compliant technical report for the PEA and the Mineral Resource Estimate was prepared by Allan Earl, Executive Consultant, and Ivor Jones, Executive Consultant, of Snowden Mining Industry Consultants, each of whom are independent Qualified Persons, as defined in NI 43-101. The PEA was filed on SEDAR (www.sedar.com) on March 31, 2014.


    Forward-Looking Statements

    This news release includes certain 'forward-looking statements'. All statements, other than statements of historical fact, included in this release, including the future plans and objectives of Avnel Gold, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Avnel Gold's expectations include, among others, risks related to international operations, the actual results of current exploration activities, conclusions of economic evaluations and changes in project parameters as plans continue to be refined as well as future prices of gold and silver, as well as those factors discussed in the section entitled 'Risk Factors' in Avnel Gold's Annual Information Form, which is available on SEDAR (www.sedar.com). Although Avnel Gold has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.


    Non-IFRS Measures

    'On-site All-in Sustaining Cost Per Ounce' is a non-GAAP and non-IFRS measure that does not have a standardised meaning prescribed by GAAP or IFRS and there may be some variation in the method of computation to other similarly titled measures of other gold mining companies. In the PEA, Snowden defines 'All-in Sustaining Cost' as mine site cash operating costs, which includes costs such as mining, processing, administration, but excludes non-site costs (transport and refining of metals and royalties), plus sustaining capital costs, which includes community and environmental costs, plus closure costs. These costs are then divided by the number of ounces of expected production to arrive at 'On-site All-in Sustaining Cost Per Ounce'.


    Figure 1: Kalana Exploitation Permit

    Table 1: Kalana Project in situ Mineral Resources Statement (30 September 2015)


    Kalana Project in situ Mineral Resource Statement as at 30 September 2015

    (100% Project Basis Reported at a 0.9 g/t Au cut-off utilising a $1,100/oz gold price)

    Tonnes

    (Mt)

    Grade

    (g/t Au)

    Contained Gold

    (Moz)

    MEASURED MINERAL RESOURCES

    Kalana Main

    9.0

    4.24

    1.23

    Total

    9.0

    4.24

    1.23

    INDICATED MINERAL RESOURCES

    Kalana Main

    10.9

    4.19

    1.47

    Kalana Main Tailings

    0.7

    1.75

    0.04

    Total

    11.6

    4.04

    1.51

    MEASURED + INDICATED MINERAL RESOURCES

    Kalana Main

    19.9

    4.20

    2.69

    Kalana Main Tailings

    0.7

    1.75

    0.04

    Total

    20.6

    4.12

    2.73

    INFERRED MINERAL RESOURCES

    Kalana Main

    0.8

    4.59

    0.11

    Kalanako

    0.4

    5.33

    0.07

    Total

    1.2

    4.83

    0.18


    Notes on Mineral Resources:

    1. The Kalana Main pit and the historic Kalana Main tailings Mineral Resource estimates are as at 30 September 2015. The Kalanako pit Mineral Resource estimate is as at 19 March 2015. Mineral Resources are disclosed on a total project basis at 100%. Avnel Gold owns an 80% equity interest in SOMIKA, the Malian company that holds the Kalana Exploitation Permit.

    2. The determination of pit-constrained Mineral Resources at Kalana Main are based upon a gold price of $1,100 per ounce and a 1.2 million tonne per annum mining operation; pit slope angles ranging from 32 degrees in saprolite to 55 degrees in fresh rock; estimated bulk mining cost beginning at surface ranging from $2.26 to $2.57 per tonne mined (averaging $3.10 for the selected pit); estimated processing, grade control incremental ore costs, mining overheads, and G&A costs ranging from $22.38 to $30.32 per tonne of ore; and a range of gold recoveries averaging 94%.

    3. Unless stated otherwise, tonnages are metric tonnes and are rounded to the closest '0.0' million tonnes, grades are rounded to the closest '0.00', and contained gold rounded to the closest '000' and are reported as troy ounces. All reported grades and tonnes are prior to dilution. Mineral Resources for the Kalana Main deposit are reported following depletion from historical production.

    4. Mineral Resources for the Kalana Main and Kalanako deposits are reported above a cut-off grade of 0.9 g/t Au and were estimated by Ivor W.O. Jones, who is recognised as a Qualified Person for the purposes of NI 43-101. No cut-off has been applied to the tailings as all tailings are proposed to be treated. Grades were estimated using Multiple Indicator Kriging (MIK), with the exception of the historical tailings grade, which is estimated from historical production.

    5. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant factors. These Mineral Resources are reported using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council.

    6. The quantity and grade of reported Inferred Resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Mineral Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Guernsey | Mali | All
Gold and Silver Prices for these countries : Guernsey | Mali | All

Avnel Gold Mining Ltd.

EXPLORATION STAGE
CODE : AVK.TO
ISIN : GB00B09Y5410
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Avnel Gold Mining is a gold producing company based in United kingdom.

Its main exploration properties are KALANA GOLD MINE and FOUGADIAN PERMIT in Mali.

Avnel Gold Mining is listed in Canada. Its market capitalisation is CA$ 162.1 millions as of today (US$ 133.0 millions, € 111.4 millions).

Its stock quote reached its highest recent level on December 13, 2006 at CA$ 1.25, and its lowest recent point on December 19, 2008 at CA$ 0.02.

Avnel Gold Mining has 376 989 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Avnel Gold Mining Ltd.
Announces 2007 Annual Results - Period Ended December 31, 20...
Nominations of Avnel Gold Mining Ltd.
11/25/2013appoints Dr. Olivier Féménias as Vice President Geology
5/23/2013announces election of directors
8/5/2008Announces Appointment of Chief Financial Officer
3/27/2008Announces Appointment of Chief Operating Officer
10/16/2007Announces Appointment of VP Exploration
Financials of Avnel Gold Mining Ltd.
8/14/2008Announces Second Quarter 2008 Results
5/15/2008Announces First Quarter 2008 Results - Period ended March 31...
11/14/2007Announces Third Quarter 2007 Results
8/13/2007Announces Second Quarter 2007 Results - Period ended June 30...
5/14/2007Announces First Quarter 2007 Results
Project news of Avnel Gold Mining Ltd.
3/24/2014Avnel Announces new mineral resource estimate preliminary ec...
1/21/2011(Kalana Gold Mine)- KALANA UPDATE
3/26/2008(Fougadian Permit) has commenced drilling program on the major gold anomaly di...
Corporate news of Avnel Gold Mining Ltd.
5/26/2016Avnel Reports Results of Annual General Meeting
5/11/2016Avnel Reports Files First Quarter 2016 Financial Statements ...
5/6/2016Avnel Gold Files NI 43-101 Technical Report for the Kalana M...
3/30/2016Avnel Announces Definitive Feasibility Study Results for Kal...
3/30/2016Avnel Announces Filing of AIF and Year-End Consolidated Fina...
10/5/2015Avnel Reports That Measured Plus Indicated Resource Increase...
9/15/2015Avnel Successfully Concludes its 30,143 m Over 181 Holes Dri...
8/12/2015Avnel Reports Second Quarter 2015 Financial Results
7/20/2015Avnel Drills 174.0 g/t over 3 m, 6.0 g/t over 15 m, and 7.8 ...
7/16/2015Avnel Drills 174.0 g/t over 3 m, 6.0 g/t over 15 m, and 7.8 ...
4/17/2015Avnel Gold Mining Limited Announces C$12 Million Bought Deal...
4/17/2015IIROC Trade Resumption - CWT.UN; AVK
4/16/2015IIROC Trading Halt - AVK
3/31/2015Avnel Confirms Commencement of Drilling at Kalana Main and A...
3/30/2015Avnel Appoints Mr. Andrew King and Mr. Keith McCandlish to t...
3/26/2015Avnel Reports that Diluted Pit-Constrained Indicated Resourc...
3/26/2015Reports That Diluted Pit-Constrained Indicated Resources Inc...
2/5/2015Avnel Gold Announces Commencement of Definitive Feasibility ...
11/13/2014Avnel Gold Provides Kalana Main PFS Update and Reports Third...
11/13/2014Avnel Gold Provides Kalana Main PFS Update and Reports Third...
10/30/2014TSX Delisting Review - Avnel Gold Mining Limited (Symbol: AV...
10/15/2014Avnel Gold Reports that Indicated Resources Increased 55% to...
7/17/2014Avnel Announces Closing of Approximately C$9.9 Million Priva...
7/7/2014TSX Delisting Review - Avnel Gold Mining Limited (Symbol: AV...
6/26/2014Avnel Announces Proposed Private Placement of up to C$13.5 M...
5/23/2014Avnel Gold Announces 2014 AGM Results
5/14/2014Avnel Gold Mining Limited (AVK: TSX) announces first quarter...
4/1/2014Avnel Gold Mining (TSX:AVK) Files NI 43-101 Technical Report...
3/31/2014Avnel Gold Mining Limited (AVK: TSX) Announces 2013 Annual R...
3/24/2014Announces New Mineral Resource Estimate and Preliminary Econ...
3/24/2014Avnel Announces New Mineral Resource Estimate and Preliminar...
10/16/20072007 Toronto Resource Investment Conference
10/15/2007 Receives Recommendations for Extensive Drill Program to Inv...
9/17/2007Announces Strategic Review
7/18/2007Announces Exceptional Soil Geochemistry Results at its Fouga...
4/2/2007Production at the Kalana Gold mine increases
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (AVK.TO)
0.430-2.27%
TORONTO
CA$ 0.430
09/15 14:58 -0.010
-2.27%
Prev close Open
0.440 0.440
Low High
0.430 0.440
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.430 -%
Volume 1 month var.
200,500 -%
24hGold TrendPower© : 24
Produces
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/25/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :