Chart eurGOLD   Chart eurSILVER  
 
Food for thought
Financial genius is a rising market
.  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1346.300.22
Silver 21.260.06
Platinum 1409.501.50
Palladium 687.50-2.60
WORLD MARKETS
DOWJONES 15112-203
NASDAQ 3443-39
NIKKEI 13072-174
ASX 484247
CAC 40 3839-21
DAX 8197-32
HUI 246-8
XAU 1030
CURRENCIES (€)
AUS $ 1.4318
CAN $ 1.3653
US $ 1.3276
GBP (£) 0.8588
Sw Fr 1.2315
YEN 128.3140
CURRENCIES ($)
AUS $ 1.0786
CAN $ 1.0281
Euro 0.7532
GBP (£) 0.6469
Sw Fr 0.9275
YEN 96.6410
RATIOS & INDEXES
Gold / Silver63.33
Gold / Oil13.79
Dowjones / Gold11.22
COMMODITIES
Copper 3.12-0.02
WTI Oil 97.66-0.58
Nat. Gas 3.96-0.01
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

Osisko Reports Preliminary Metallurgical Results on Barnat

MONTREAL, QUEBEC -- Feb. 26, 2009 - Osisko Mining Corp. (TSX: OSK) (FRANKFURT: EWX) is pleased to report the following preliminary results from the metallurgical program on the South Barnat deposit, located northeast of its 100% owned Canadian Malartic gold deposit. A NI 43-101 compliant inferred resource of 2.03 million ounces of gold (36.3 Mt grading 1.74 g/t Au) was recently announced for South Barnat (see January 26, 2009 press release).

Overall recovery from 42 individual leach tests of the direct whole ore cyanidation process is confirmed at an average of 92% (range of 86.6% to 97.2%) from composite samples representing the main lithologies of the deposit at an average head grade of 1.92 g/t Au (range of 0.74 to 7.64 g/t Au) and prepared to 80% minus 60 microns grind size. The table below summarizes the results for the various lithological composites (averages for 6 composites per lithology):

Composite type

Reagent Consumption kg/tonne

Average       Au Extraction

Residue

Head

(Avg. 6 composites)

NaCN

CaO

%

Au g/t

Au g/t

Pich� porphyry 1

0.37

0.21

89.4

0.19

1.80

Pich� porphyry 2

0.42

0.21

91.3

0.08

0.98

Pich� porphyry 3

0.25

0.23

93.6

0.23

4.24

Pich� mixed

0.50

0.16

94.5

0.12

2.16

Pich� ultramafic 1

0.40

0.38

93.9

0.09

1.41

Pich� ultramafic 2

0.19

0.26

93.9

0.06

0.95

Pontiac mixed

0.49

0.28

87.0

0.25

1.90

The Piche composites refer to mineralized porphyry and serpentinized ultramafics located within the Cadillac fault zone; the mixed composites consisted of 35% porphyry and 65% ultramafics. The Pontiac mixed composites refer to 70% mineralized metasediments and 30% porphyry, all located south of the fault. Overall recoveries are thus far superior to those obtained in the Canadian Malartic deposit (average of 84% for head grade of 1.0 g/t Au), which was anticipated since pyrite-gold mineralization appears coarser grained at Barnat. Petrographic studies have been initiated on mineralized samples to establish specifics of gold mineralization at South Barnat and confirm the preliminary metallurgical results that indicate South Barnat ore will be compatible with the processing circuit at Canadian Malartic.

Preliminary grinding tests on Barnat composites indicate a Bond Working Index (BWI) of 16.6 kwh/t for Pontiac mineralized metasediments and a BWI of 14.4 kwh/t for Piche mineralized porphyry (average BWI of 15.0). This compares well with an average BWI of 15.7 kwh/t for Canadian Malartic ore, as reported in the published Feasibility Study.

Additional metallurgical test work will focus on Pontiac mineralized metasediments, especially silicified sediments, as these are now known to contain a significant proportion of the inferred resource at South Barnat.

Sean Roosen, President and CEO of Osisko, commented: "These encouraging metallurgical test results at South Barnat are the foundation for another significant milestone in the development of the Canadian Malartic project. The results to date indicate that South Barnat mineralization would yield satisfactory, if not superior, recoveries if blended into the processing circuit designed for the Canadian Malartic deposit. Additional definition work is ongoing at South Barnat, both on the resource front and the metallurgical front, with the objective of establishing a Measured and Indicated resource as well as definitive gold recoveries at South Barnat by mid-Q2 2009."

All metallurgical and grinding test work is being carried out by SGS Lakefield Research on composite samples prepared from fresh NQ core taken throughout the deposit to provide representative combination of all ore types and lithologies that will be encountered in the actual mining operation.

Osisko Mining Corp. is currently developing the Canadian Malartic gold deposit and adjacent mineralized zones into a large-scale open pit, bulk-tonnage mining operation. The Company is well-funded and is carrying out an aggressive definition drilling and exploration campaign. Eight drills are currently working on the property, with five dedicated to completing the 130,000 metre infill drilling on the South Barnat Zone by the end of February.

A NI 43-101 compliant, 7.7 million ounce gold Measured and Indicated global resource on the main Canadian Malartic gold deposit was released on September 8, 2008 and the technical report has been filed on SEDAR. This includes a NI 43-101 compliant, 6.3 million ounce gold Reserve estimate released in the Feasibility Study on the main Canadian Malartic gold deposit on November 25, 2008, for which the technical report has been filed on SEDAR. These estimates did not include the South Barnat Zone or any other mineralized zone located outside the main deposit that is currently being evaluated by Osisko. The NI 43-101 compliant inferred resource estimate for South Barnat was released on January 26, 2009 and the technical report has been filed on SEDAR on February 17, 2009.

Mr. Denis Cimon, Eng. M.Sc. and Manager of Mineral Processing for Osisko, and Mr. Robert Wares, P. Geo. and Executive Vice-President of Osisko, are the Qualified Persons who have reviewed this news release and are responsible for the technical information reported herein, including verification of the data disclosed including the sampling, analytical and test data underlying the technical information.

Forward Looking Statements

Certain statements contained in this press release may be deemed "forward-looking statements". All statements in this release, other than statements of historical fact, that address events or developments that the Corporation expects to occur, are forward looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential", "scheduled" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Corporation believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, including, without limitation that all technical, economical and financial conditions will be met in order to put the Canadian Malartic Project into commercial production, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include gold prices, access to skilled consultants, mining development and mill production personnel, results of exploration and development activities, the Corporation's limited experience with production and development stage mining operations, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment, timeliness of government approvals, actual performance of facilities, equipment and processes relative to specifications and expectations, unanticipated environmental impacts on operations market prices, continued availability of capital and financing and general economic, market or business conditions. These factors are discussed in greater detail in the Corporation's most recent Annual Information Form filed on SEDAR, which also provides additional general assumptions in connection with these statements. The Corporation cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on the Corporation's forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. The Corporation believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release.

CONTACT INFORMATION:

Osisko Mining Corporation

John Burzynski
Vice-President Corporate Development
514-735-7131
www.osisko.com

or

Osisko Mining Corporation
Daniel Boase
Investor Relations
416-742-5600
Toll Free: 1-866-580-8891

Renmark Financial Communications Inc.
Eric St-Pierre : estpierre@renmarkfinancial.com
Dan Symons : dsymons@renmarkfinancial.com
Montreal - Tel.: 514 939-3989 / Fax: 514 939-3717
Toronto - Tel.: 416 644-2020 / Fax: 416 644-2021
www.renmarkfinancial.com

<
Tweet

Osisko Mining Corp.

PRODUCER
CODE : OSK.TO
ISIN : CA68827N1078
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Osisko Mining Corp.
7/6/2012Osisko Mining doubles quarterly gold output
10/22/2011Production Uncertainty Hits Osisko Mining
4/29/2011Osisko Mining extends Malartic mine life to 16 years
3/4/2010Osisko Mining says mining equipment costs, particularly tire...
3/3/2010Sees savings on tires at Quebec mine
11/27/2008Finance a likely problem for Canada's largest open pit gold ...
Annual reports of Osisko Mining Corp.
2008 Annual report
2007 Annual report
Financings of Osisko Mining Corp.
8/31/2011Announces an Increase in Caterpillar Lease Financing Facilit...
12/31/2010Osisko Draws $75 Million On CPPIB Credit Investments Inc. Cr...
12/31/2010Draws $75 Million on CPPIB Credit Investments Inc. Credit Fa...
11/18/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
6/30/2009Closes $10.64 Million Flow-Through Financing
4/17/2006Announces C10$ million "bought deal" financing
Nominations of Osisko Mining Corp.
4/17/2012Nominates Michele Darling to Board of Directors
3/14/2012Appoints Gary Sugar to Board of Directors
2/2/2012Board Member Resigns
9/15/2011Appoints Richard Ross to Board of Directors
8/22/2011Director Resigns
Financials of Osisko Mining Corp.
5/9/2013Reports First Quarter 2013 Results
11/13/2012Reports Third Quarter 2012 Results
8/9/2012Reports Second Quarter 2012 Results
7/5/2012Produces 92,003 Ounces Au in Second Quarter
5/9/2012Provides Notice of First Quarter 2012 Financial Results Rele...
2/27/2012Q4 2011 Net Profit of $37.8 Million
1/16/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
11/11/2011Reports Third Quarter 2011 Results Net Profit of $9.3 Millio...
10/17/2011Deposits the First Tranche of Its Financial Guarantee Coveri...
8/11/2011Releases Second Quarter 2011 Results
2/28/2011Releases Year-End Financial Results and Review of 2010
11/6/2009Releases Third Quarter 2009 Results
8/11/2009Releases Second Quarter 2009 Results
Project news of Osisko Mining Corp.
1/30/2012(Famatina)s Status of Famatina Exploration Project
11/17/2011(Malartic)Releases 2012 Canadian Malartic Mine Schedule
11/7/2011(Hammond Reef)Releases Inferred Resource Update for the Hammond Reef Proje...
9/29/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
9/8/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
8/11/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
6/21/2011(Malartic)Declares Commercial Production at Canadian Malartic
6/14/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
6/13/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
6/13/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
6/1/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
5/2/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
4/21/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
4/13/2011(Malartic)Pours First Gold at Canadian Malartic Mine
3/31/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
3/29/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
2/28/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
2/24/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
1/29/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
1/26/2011(Duparquet)and Clifton Star Report New Results From Duparquet Including...
1/25/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
12/10/2010(Hammond Reef)Regional First Nations-Osisko Mining Corporation Sign Hammon...
12/6/2010(Duparquet)and Clifton Star Intersect 42 Metres Averaging 3.38 g/t Au a...
11/24/2010(Malartic)Osisko Intersects 72 Metres Grading 2.02 g/t Gold at the Jef...
11/24/2010(Malartic Chl Gold Property)Intersects 72 Metres Grading 2.02 g/t Gold at the Jeffrey Zo...
11/18/2010(Goldboro)Orex & Osisko: Reverse Circulation Drilling Results on Goldb...
10/14/2010(Malartic)Osisko Reports 2.14 g/t Au Over 107 Meters at New Barnat Ext...
12/21/2009(Malartic)Provides Update on Construction and Development Progress at ...
12/14/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
10/20/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
9/14/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
9/1/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
8/20/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
2/26/2009(Malartic) Preliminary Metallurgical Results on Barnat
12/3/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
10/31/2006(Malartic)Intersects 131 Metres Averaging 1.34 g/t Au in Sladen Extens...
Corporate news of Osisko Mining Corp.
3/1/2012Announces Record Date for Annual Meeting
1/12/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
10/8/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
2/9/2011Goldcorp Sells Osisko Investment
11/11/2010Options Gold Properties From Sparton Resources Inc.
11/11/2010Options Gold Properties From Sparton Resources Inc.
12/22/2009Donates Shares to McGill University
12/11/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
11/13/2009Options Goldboro Gold Property From Orex Exploration
9/28/2009 Signs Option Agreement With Claim Post Resources for the Mo...
9/24/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
8/11/2009Signs Option Agreement With Midland Exploration for the Dunn...
7/10/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
7/3/2009Osisko Mining Corporation Completes Strategic Investment
6/18/2009Comments on Trading of Common Shares
5/21/2009Discovers New Mineralized Zone Adjacent to South Barnat
5/19/2009Makes Strategic Investment
4/29/2009Annual General Meeting of Shareholders
3/25/2009Year-End Results
3/16/2009 to Be Included in S&P/TSX Indices
1/13/2009 Extends South Barnat to 1200 Metres Length
12/4/2008 Recognized for Strong Sustainability Performance
11/27/2006Wins Quebec "Prospector of the Year" Award
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3.91-2.98%2.43-1.62%
TORONTO
CA$ 3.91
06/19 16:00 -0.120
-2.98%
Prev close Open
4.03 4.08
Low High
3.89 4.08
Year l/h YTD var.
3.49 -  8.32 -53.00%
52 week l/h 52 week var.
3.49 -  10.40 -51.67%
Volume 1 month var.
3,248,574 2.09%
24hGold TrendPower© : -34
Produces Gold
Develops
Explores for Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-60.90%
20120.20%9.9410.14
2011-30.79%15.8610.32
201070.25%9.5510.03
2009142.00%9.242.66
 
5 years chart
 
3 months chart
 
3 months volume chart