Chart yenGOLD   Chart yenSILVER  
 
Food for thought
Gold is a currency when currencies are in a bear market
Jim Sinclair  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1374.98-13.42
Silver 22.35-0.33
Platinum 1456.75-23.75
Palladium 743.000.75
WORLD MARKETS
DOWJONES 1539863
NASDAQ 35059
NIKKEI 1538120
ASX 5156-29
CAC 40 403613
DAX 847216
HUI 255-6
XAU 97-3
CURRENCIES (€)
AUS $ 1.3159
CAN $ 1.3250
US $ 1.2901
GBP (£) 0.8513
Sw Fr 1.2517
YEN 132.2810
CURRENCIES ($)
AUS $ 1.0203
CAN $ 1.0270
Euro 0.7751
GBP (£) 0.6600
Sw Fr 0.9702
YEN 102.5500
RATIOS & INDEXES
Gold / Silver61.52
Gold / Oil14.29
Dowjones / Gold11.20
COMMODITIES
Copper 3.33-0.02
WTI Oil 96.20-0.51
Nat. Gas 4.190.10
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

 

 

 

 

Lake Shore Gold Discovers Significant New Gold Zone at 144 Property, Becomes Company's Fourth Major Project Along Western Extension of Timmins Gold Camp

- Drill results confirm presence of large mineralized system with strong similarities to Thunder Creek Rusk and Porphyry zones with multiple occurrences of visible gold

- Significant gold values intersected within 200 metres of surface, compare favourably to Thunder Creek mineralization at similar shallow depths

- Grades and widths of mineralization increasing with depth, potential for new zones to north and along strike considered excellent

-- Among significant intersections are 2.41 grams per tonne ("gpt") over 19.00 metres ("m"), including 6.61 gpt over 2.20m, 4.96 gpt over 5.40m, including 15.18 gpt over 1.45m, 4.03 gpt over 5.10m, including 7.02 gpt over 2.40m, and 1.16 gpt over 32.20m, including 3.20 gpt over 6.20m

- Drilling up to 800 metres along strike to southwest intersects additional alteration, deformation and gold values in possible faulted offset of new discovery zone, represents large area for potential extensions and additional new discoveries

 
--  Drill results confirm presence of large mineralized system with strong
    similarities to Thunder Creek Rusk and Porphyry zones with multiple
    occurrences of visible gold 
    
--  Significant gold values intersected within 200 metres of surface,
    compare favourably to Thunder Creek mineralization at similar shallow
    depths 
    
--  Grades and widths of mineralization increasing with depth, potential for
    new zones to north and along strike considered excellent 
    
    --  Among significant intersections are 2.41 grams per tonne ("gpt")
        over 19.00 metres ("m"), including 6.61 gpt over 2.20m, 4.96 gpt
        over 5.40m, including 15.18 gpt over 1.45m, 4.03 gpt over 5.10m,
        including 7.02 gpt over 2.40m, and 1.16 gpt over 32.20m, including
        3.20 gpt over 6.20m 
        
--  Drilling up to 800 metres along strike to southwest intersects
    additional alteration, deformation and gold values in possible faulted
    offset of new discovery zone, represents large area for potential
    extensions and additional new discoveries

 

Lake Shore Gold Corp. (TSX:LSG) ("Lake Shore Gold" or the "Company") today announced very encouraging results from the first 12 holes (6,323 metres) of drilling at the Company's 144 property. The 144 property is located immediately to the south of the Thunder Creek project and covers the projected southwest extension of alteration and deformation from Thunder Creek. The new holes being announced cover a broad strike length of approximately 1.2 kilometres and represent a first, high-level phase of testing designed to cover the area on a wide-spaced pattern in order to develop an improved geologic model. The results demonstrate that the overall gold bearing potential of the 144 property is excellent.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "We are extremely pleased with the results from our first drill holes at the 144 property, which establish the property as a new major project for the Company. The new discovery at 144 supports our theory that with projects like Timmins Mine, Thunder Creek, Gold River Trend and now 144, our Timmins West Complex represents the western extension of the Timmins Gold Camp and is, in actuality, one very large mineralized system with the potential to support large-scale mining for a very long time to come. The initial drill results from 144 show strong similarities in geological setting and are in close proximity to Thunder Creek. Given the shallow depth of intersections and dimensions of the geological structures observed to date the new discovery compares very favourably to the Thunder Creek mineralization at similar depths and we look forward to continuing exploration drilling in this area with three drills currently operating and at least one additional drill to be added."

Seven of the new holes being announced (Hwy-10-02, 03, 05, 07, 09, 11 and 12) were drilled to test a 200 metre strike length along the projected southwest extension of the Thunder Creek Alteration and Deformation Zone ("TDAZ"), approximately 1.2 kms from Thunder Creek. The program was successful in confirming the presence of a significant mineralized system extending over the entire area with strong similarities to the Thunder Creek mineralization. Significant results from the new drilling are 2.41 gpt over 19.00m, including 6.61 gpt over 2.20m, 4.96 gpt over 5.40m, including 15.18 gpt over 1.45m, and 14.42 gpt over 0.95m in Hwy-11-12; 5.58 gpt over 1.00m, 11.75 gpt over 0.30m, 9.08 gpt over 0.30m and 3.58 gpt over 1.40m in Hwy-10-03; 4.03 gpt over 5.10m, including 7.02 gpt over 2.40m and 4.87 gpt over 1.50m, in Hwy-11-11; and 1.16 gpt over 32.20m, including 3.20 gpt over 6.20m, 11.05 gpt over 0.50m and 16.75 gpt over 0.30m in Hwy-10-02.

The new intersections were obtained near the south margin of a large Syenite stock which intrudes a sequence of mafic volcanics and pyroxenitic rocks near a distinct northwest trending flexure of the TDAZ. Gold mineralization occurs in multiple zones which trend northeast-southwest and dip moderately to the northwest, with the strongest mineralization being closely associated with increased levels of alteration, quartz veining, coarse pyrite as well as local galena and visible gold. The bulk of the mineralization identified to date is located at depths of less than 200 metres and follows a similar pattern to Thunder Creek where grades and widths are increasing with depth. Due to strong folding near the north side of the flexure it appears that the north-east extension of the mineralization from the flexure lies south of the closest holes drilled and remains open towards Thunder Creek.

In addition to the above, five holes were drilled to test the area southwest of the new discovery zone for possible expansion potential. Holes Hwy-10-01 and Hwy-10-04 were drilled approximately 175 metres southwest of Hwy-10-09 and Hwy-10-02 and intersected a diabase dike near the projected extension of the zones, along with several small lenses of porphyry and low gold values. Based on the above, it is possible that portions of the zone may have been faulted off along the edge of the dike.

Hwy-10-06 and Hwy-10-10 tested 500 and 800 metres, respectively, to the southwest of Hwy-10-01 and identified alteration and mineralization in a northeast trending zone which appears to be the extension of the zone to the north, but offset along a major north south fault marked by diabase. Key intersections include 8.48 gpt over 1.20m in Hwy-10-06 and 3.49 gpt over 1.75m and 4.68 gpt over 0.60m within a broad envelope grading 0.67 gpt over 29.35m in Hwy-10-10. Observations from both holes indicate similar carbonate alteration, lenses of syenite and coarse pyrite and local visible gold as in holes to the north. Given the lack of testing between the two holes or along strike to the north and to depth the potential for new mineralization is considered excellent.

Drilling is continuing at the 144 property with 3 drills but plans are in progress to increase this number to at least 4 drills within the coming months. The overall objective is to drill approximately 50,000 metres at the 144 property in 2011 with the main focus being to identify and evaluate new resource potential southwest of Thunder Creek.

Quality Control

The Company's Qualified Person ("QP") for the ongoing surface drill program at the 144 property is Jacques Samson, P.Geo. As QP, Mr. Samson has prepared or supervised the preparation of the scientific or technical information for the property and has verified the data disclosed in this press release. Mr. Samson is an employee of Lake Shore Gold.

Lake Shore Gold has implemented a quality-control program to ensure best practice in the sampling and analysis of the drill core. NQ size drill core is saw cut, and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. Drill core samples are transported in security-sealed bags to ALS Chemex's Timmins Sample Preparation Facility. Sample preparation is completed in Timmins and the prepared sample pulps are then transported to ALS Chemex's analytical laboratory in Val d'Or, Quebec and less commonly to the Vancouver, BC Lab. Gold grades are obtained on all samples via Fire Assay with Atomic Absorption finish, using 30g aliquots. For samples that return a gold content greater than 3.0 gpt, the sample is re-analyzed via Fire Assay with Gravimetric finish. ALS Chemex is an ISO 9001-200 and ISO 17025 certified laboratory.

About Lake Shore Gold Corp.

Lake Shore Gold is a rapidly growing mining company with a vision to become a mid-tier gold producer through the successful exploration, development and operation of its properties in the Abitibi Greenstone belt in Northern Ontario and Quebec, starting with its strong base in Timmins, Ontario. In Timmins, the Company is in commercial production at the Timmins Mine, has intersected underground, and is developing along, mineralization at the adjacent Thunder Creek deposit and is advancing an underground advanced exploration program at its Bell Creek Mine. Mine production is delivered to the Company's mill (also located in Timmins), which has been refurbished and currently has an operating capacity of 2,000 tonnes per day. The Company continues to invest aggressively in exploration in the Timmins Camp and in its other properties in Northern Ontario and Quebec, and owns a large and prospective land position in Mexico. The Company's common shares trade on the TSX under the symbol LSG.

Forward-looking Statements

Certain statements in this press release relating to the Company's exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" within the meaning of securities legislation. The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in Lake Shore Gold's most recent Annual Information Form and other regulatory filings which are posted on sedar at
www.sedar.com.

There is no guarantee that drill results reported in this news release will lead to the identification of a deposit that can be mined economically, and further work is required to identify resources and reserves.

 
144 Property - Significant assay results                    
--------------------------------------------------------------------------
Hole                          From        To   Interval   Grade    
Number         Section         (m)       (m)        (m)   (gpt)  Comments  
-------------------------------------------------------------------------  
-------------------------------------------------------------------------  
HWY-10-01        7550N      167.20    168.00       0.80    2.24            
                            216.00    216.80       0.80    3.60            
HWY-10-02        7700N       29.80     62.00      32.20    1.16            
                 incl.       29.80     36.00       6.20    3.20            
                 incl.       31.50     32.00       0.50   11.05            
                 incl.       35.30     35.60       0.30   16.75        VG  
HWY-10-03        7850N       37.00     38.00       1.00    5.58            
                             54.30     54.60       0.30   11.75        VG  
                             63.90     64.20       0.30    9.08        VG  
                            105.30    106.70       1.40    3.58        VG  
HWY-10-05        7850N       87.30     87.60       0.30    5.15        VG  
                            185.30    192.70       7.40    1.68            
                 incl.      190.50    192.70       2.20    3.55        VG  
HWY-10-06        7100N      553.00    555.00       2.00    2.54            
                            569.30    570.50       1.20    8.48            
HWY-10-07        7900N      253.75    254.60       0.85    2.45            
                            292.50    294.80       2.30    1.96            
HWY-10-08        7100N      152.00    152.90       0.90    2.68            
HWY-10-09        7700N       47.00     47.40       0.40    2.95        VG  
                            116.00    116.75       0.75    2.46            
                            218.00    219.10       1.10    2.61        VG  
HWY-11-10        6900N      451.25    480.60      29.35    0.67            
                 incl.      466.25    468.00       1.75    3.49            
                 incl.      480.00    480.60       0.60    4.68        VG  
                            495.00    495.50       0.50    3.60        VG  
HWY-11-11        7775N       97.50     98.30       0.80    2.59        VG  
                            202.50    205.80       3.30    1.02            
                            212.80    217.90       5.10    4.03            
                 incl.      212.80    215.20       2.40    7.02            
                            371.00    372.50       1.50    4.87            
HWY-11-12         7775      155.50    156.30       0.80    4.25            
                            168.30    187.30      19.00    2.41            
                 incl.      168.30    178.40      10.10    3.16            
                 incl.      170.80    173.00       2.20    6.61            
                 incl.      171.70    172.00       0.30   24.40            
                            219.10    224.50       5.40    4.96            
                 incl.      219.70    221.15       1.45   15.18        VG  
                            285.50    286.45       0.95   14.42            
---------------------------------------------------------------------------
Notes:                                                      
1) Hole HWY-10-4 had no significant assays.                  
2) Assays are reported uncut.                               
3) True widths are not reported at this time.

 

To view Figure 1 - Location Map, please visit the following link: http://media3.marketwire.com/docs/lsg228_fig_1.pdf

To view Figure 2 - Cross Section, please visit the following link:
http://media3.marketwire.com/docs/lsg228b_fig_2.pdf

To view Figure 3 - Plan View, please visit the following link:
http://media3.marketwire.com/docs/lsg228b_fig_3.pdf

 

CONTACT INFORMATION:

Lake Shore Gold Corp.
Tony Makuch
President & CEO
(416) 703-6298
info@lsgold.com

or

Lake Shore Gold Corp.
Mark Utting
Vice-President, Investor Relations
(416) 703-6298
info@lsgold.com
www.lsgold.com



Tweet

Lake Shore Gold Corporation

PRODUCER
CODE : LSG.TO
ISIN : CA5107281084
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Lake Shore Gold Corporation
1/12/2013Haywood paints rosier picture for Lake Shore Gold in 2013
4/12/2012Lake Shore Gold underpins mill expansion with Sprott debt
4/3/2012Employee killed at Lake Shore Gold's Ontario mine
7/19/2011Lake Shore Gold hammered on lacklustre quarterly production
1/7/2010BRIEF-Lake Shore Gold says acquires interest in RT Minerals
3/27/2009UPDATE 1-Lake Shore Gold starts ore processing at Timmins Mi...
3/26/2009Lake Shore Gold starts processing ore from Timmins mine
Financings of Lake Shore Gold Corporation
2/28/2011Completes US$50 Million Corporate Revolving Credit Facility
10/26/2010Exercises Warrants in Northern Superior Resources
7/28/2010Secures US$50m credit facility
7/28/2010Signs Term Sheet for Corporate Revolving Credit Facility of ...
2/16/2010Closing of Second Tranche of Flow-Through Financing
12/31/2009Announces Closing of First Tranche of Flow-Through Financing
12/4/2009Announces Closing of Private Placement Financing
2/19/2008 Announces Private Placement of $64.5 Million at 30% Premium...
Nominations of Lake Shore Gold Corporation
3/13/2009Announces Appointment of Ignacio Bustamante to Board of Dire...
5/30/2008Announces Management Appointments
2/27/2007Appoints Hannu Virtanen as VP, Project Development
Financials of Lake Shore Gold Corporation
8/9/2012Lake Shore Gold Reports Strong Second Quarter Results
1/12/2012Reports 2011 Operating Results, Pours 26,550 Ounces in Fourt...
11/10/2011Announces Third Quarter 2011 =?ISO-8859-1?Q?=20Financial=20R...
8/10/2011Announces Second Quarter 201 =?ISO-8859-1?Q?1=20Financial=20...
5/26/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Results,=20In...
5/4/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Production=20...
8/11/2010Continued Progress During Second Quarter 2010
5/15/2008Announces First Quarter 2008 Results
Project news of Lake Shore Gold Corporation
10/14/2011(Timmins Mine)Reports Higher Commercial Production from Timmins Mine in Th...
8/16/2011(Bell Creek)Reports 400 Metre Extension of Gold Mineralization at Bell C...
3/29/2011(Band Ore)to Acquire 19% of Golden Share Through Sale of 100% Interest
3/4/2011(Thunder Creek)Reports Wide Intersections With High-Grade Sections Within P...
2/28/2011(Timmins Mine)Lake Shore Gold Discovers Significant New Gold Zone at 144 P...
2/24/2011(Timmins Mine)Intersects Wide, High-Grade Mineralization at Timmins Mine, ...
1/25/2011(Timmins Mine)Lake Shore Gold to Nearly Triple Gold Production in 2011
1/25/2011(Thunder Creek)Confirms Broad Mineralized Envelope With High-Grade Sections...
1/11/2011(Thorne)Demonstrates Near Surface Resource Potential and Extends Min...
1/6/2011(Timmins Mine)Declares Commercial Production =?ISO-8859-1?Q?=20at=20Timmin...
12/1/2010(Bell Creek)Announces Initial Resource a Bell Creek Mine, Large Deposit ...
11/24/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Por...
11/24/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Porp...
11/11/2010(West Timmins)Announces New High-Grade Intercepts, Major Extension of Main...
11/3/2010(Bell Creek)Extends High-Grade Core to Depth at Bell Creek
11/3/2010(Bell Creek)=?ISO-8859-1?Q?Lake=20Shore=20Gold=20Reaches=202,000=20Tonne...
11/1/2010(Thunder Creek)Continues to Confirm and Expand Thunder Creek Rusk Horizon
8/30/2010Expands Thunder Creek Rusk =?ISO-8859-1?Q?=20Zone,=20Announc...
8/30/2010Lake Shore Gold Expands Thunder Creek Rusk Zone, Announces A...
6/29/2010(Thunder Creek)Ramp Reaches & Intersects High-Grade Gold Mineralization
6/29/2010Ramp Reaches Thunder Creek Deposit, Intersects High-Grade Go...
6/23/2010Intersects High-Grade Mineralization at Thorne...
5/4/2010(West Timmins)Advances Third Major Gold Target
4/1/2010(Ti-pa-haa-kaa-ning (tpk))Agrees to Sell 50% Interest in Ti-pa-haa-kaa-ning Gold Prope...
2/18/2010(Timmins Mine)Major Extensions to Timmins Mine Mineralization, Thunder Cre...
2/17/2010(Timmins Mine)Reports Results of Underground Exploration at 650-Level Test...
2/17/2010(Casa Berardi)Extends Casa Berardi "G Zone"
1/26/2010(Thunder Creek)Extends Thunder Creek to Depth, Confirms High-Grade Core and...
1/18/2010(Bell Creek)Continues to Define and Extend Large New Gold System at Bell...
11/6/2009(Bell Creek)Confirms Presence of Large New Gold System
10/29/2009(Timmins Mine)Results of Underground Drilling and Development at Timmins M...
10/7/2009Releases Updated National Instrument 43-101 Report for Timmi...
10/1/2009(Bell Creek)Reports Extension to High grade mineralization at Bell Creek
8/25/2009(Thunder Creek)Continues to Establish Large Gold System at Thunder Creek
8/24/2009Reports High-Grade Intercepts From Underground Drilling at T...
7/21/2009(Bell Creek)Discovers Substantial New High-Grade Extension at Bell Creek
7/21/2009Lake Shore Gold discovers substantial new high-grade extensi...
7/7/2009(Bell Creek)Confirms Deep Extensions of Gold Mineralization at Bell Cree...
5/5/2009(Thunder Creek) Reports Additional High-Grade intercepts at Thunder Creek
4/28/2009(Bell Creek)Commences Advanced Underground Exploration Program at the Be...
3/31/2009(Thunder Creek)Discovery of Second Mineralized Horizon in Porphyry
3/26/2009(Bell Creek)Commences Processing at Bell Creek Mill
12/16/2008Significantly Extends Rusk Zone and Announces New High-Grade...
12/10/2008(Bell Creek)Significantly Extends Bell Creek Mineralization
7/10/2008(Bell Creek)Intersects New Gold Zone and Extends Mineralization at Bell ...
3/31/2008(Thunder Creek)Intersects 8.57 Grams Gold Per Tonne Over 9.00 Metres at the...
Corporate news of Lake Shore Gold Corporation
5/7/2013Announces Details of First Quarter 2013 Conference Call and ...
3/12/2013Announces Details of Full Year and Fourth Quarter 2012 Confe...
1/10/2013Achieves 2012 Production Target, Company Poised for Sharply ...
12/11/2012on Track for Strong Finish to 2012, Processing Capacity Incr...
10/25/2012Announces Details of Third Quarter 2012 Conference Call and ...
9/18/2012Announces Exercise of Underwriters' Over-Allotment Option fo...
9/7/2012Completes C$90 Million Convertible Senior Unsecured Debentur...
8/16/2012Announces C$75 Million Convertible Senior Unsecured Debentur...
7/13/2012Announces Details of Second Quarter 2012 Conference Call and...
7/4/2012Reports Strong Second Quarter Production of 24,426 Ounces of...
5/10/2012Exceeds Targets and Achieves Continued Operating Improvement...
3/23/2012Announces Details of Fourth Quarter and Full-Year 2011 Confe...
11/2/2011Announces Details of Third Quarter 2011 Conference Call and ...
8/5/2011Announces Details of Second Quarter 2011 Conference Call and...
7/19/2011Releases Production Resultsfor Second Quarter and First Six-...
4/1/2011Announces Adoption of Shareholder Rights Plan
3/14/2011Lake Shore Gold Achieves Major Milestones in 2010, on Track ...
2/1/2011Increases Interest in Northern Superior Resources Inc.
12/3/2010Disposal of remaining 6% stake in Lake Shore Gold by Hoschil...
10/14/2010Hochschild reduces stake in Lake Shore Gold to 6%
7/22/2010Confirms & Expands Mineral
5/27/2010Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV
5/12/2010Changes to Board of Directors
5/5/2010Announces Continued Progress
4/27/2010Expands Resource Potential at Timmins Mine
3/11/20102009 Year End Results
12/17/2009Completes Acquisition of "Bell Creek West" Properties
12/15/2009Announces Management Changes
12/15/2009Added to S&P/TSX Composite Index
11/24/2009Announces Changes to Board of Directors
11/6/2009and West Timmins Mining Complete Business Combination
8/27/2009and West Timmins Agree to Business Combination
8/6/2009Advances Projects on Schedule and Budget and Achieves Explor...
6/24/2009Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C...
5/5/2009Continues to Expand Mineralion at Bell Creek
5/5/2009Continues to Advance Projects on Schedule and Budget and to ...
3/12/2009Completes 2008 on Schedule and Under Budget
5/20/2008Provides 2008/2009 Budget Plan
5/16/2008Announces Approval of Special Resolutions at Annual and Spec...
5/5/2008Comments on May 15, 2008 Shareholder Vote
4/16/2008Announces Revised Agreement With Hochschild Mining; Second P...
4/16/2008 Announces Management Changes
3/28/2008Announces 2007 Year End Results and Provides 2008 Outlook
3/24/2008Announces Management Changes
3/18/2008Announces Annual Meeting and Revised Date for Special Meetin...
2/25/2008 Completes Financing and Enters Into Strategic Alliance With...
7/17/2007Commences Drilling at Blakelock and Expands its Property Pos...
4/23/2007Completes Due Diligence on Bell Creek Acquisition
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (LSG.TO)Other OTC (LSGGF.PK)
0.300+3.45%2.29-0.87%
TORONTO
CA$ 0.300
05/21 14:39 0.010
3.45%
Prev close Open
0.290 0.300
Low High
0.290 0.320
Year l/h YTD var.
0.290 -  0.910 -61.04%
52 week l/h 52 week var.
0.290 -  1.15 -66.67%
Volume 1 month var.
646,351 -34.78%
24hGold TrendPower© : -34
Produces Gold
Develops
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-67.74%
2012-23.77%1.730.74
2011-70.46%4.421.10
2010-1.20%4.322.48
2009266.67%4.371.10
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Get Investor Information
High Desert Gold
Select
& click