Monument Mining Limited

Published : May 29th, 2011

REPORTS NI43-101 RESOURCES AT BUFFALLO REEF PROPERTY

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Gold Mine | Malaysia |

http://spincaster.com/MailChimp/Doxa/force.gif

 

MONUMENT REPORTS NI43-101 RESOURCES AT BUFFALLO REEF PROPERTY
20% Increase in Gold Deposit to Historical Estimates


Vancouver, B.C., Monument Mining Limited: Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) (�Monument� or the �Company�) is pleased to announce that a National Instrument 43-101 (�NI 43-101�) complaint resources has been prepared on its 100% owned Buffalo Reef Property, located in Pahang State, Malaysia. The resource estimate, prepared by independent qualified persons Jean-Pierre Graindorge, BSc at Snowden Mining Industry Consultants Pty Limited and Frank Wright, P. Eng. in May 2011, represents a 20% increase in gold deposit compared to historical estimates.
The NI43-101 report estimates the resources based on the RC drilling drill through 2008 to November 2010 totaling 11,880 meters from 165 holes. At a block cut-off grade of 0.5 g/t Au, the currently defined Buffalo Reef Indicated Mineral Resource is 2.30 million tonnes grading 2.24 g/t Au for a total of 165,500 ounces of Au. At the same Au block cut-off grade, the currently defined Inferred Mineral Resource is 1.36 million tonnes grading 1.31 g/t Au for a total of 57,300 ounces of Au. The Mineral Resource is summarized in Table 1.1.

 Table 1.1 Buffalo Reef Mineral Resources report, as at May 2011, reported above a 0.5 g/t Au cut-off grade:
 

Classification

Oxidation

Zone

Tonnes

Au

Au

 

State

 

Kt

g/t

Oz

Indicated

Oxide

South

272

2.35

20,500

 

 

Central

32

1.62

1,700

 

 

North

159

1.57

8,000

 

Sulphide

South

1,298

2.66

111,300

 

 

Central

246

1.36

10,700

 

 

North

291

1.42

13,300

 

Total (Indicated)

2,298

2.24

165,500

Inferred

Oxide

South

125

1.23

4,900

 

 

Central

52

1.44

2,400

 

 

North

26

2.79

2,400

 

Sulphide

South

411

1.36

17,900

 

 

Central

548

1.07

18,800

 

 

North

201

1.69

10,900

 

Total (Inferred)

1,363

1.31

57,300


 
An historic estimate undertaken in accordance with the JORC code reported the Buffalo Reef property contains a Indicated Resource of 1,944,000 tonnes grading 2.49 gpt Au and an Inferred Resource of 568,000 tonnes grading 1.62 gpt Au in oxide + transitional and sulphide materials, using a 0.5 gpt Au cut-off. A NI-43-101 Summary Report on the Buffalo Reef Project written by Orequest Consultants and filed on SEDAR on 19th June 2007 confirms the merits of the Buffalo Reef Project. Comparing to the historical estimates, the NI43-101 report represents 6.36% increase in gold content for Indicated Resource and 93.58% increase for Inferred Resource.  The increase in the Inferred Resource is mostly located across the boundary into the Felda Block 7 where no drilling work has been carried out as yet. The Company has since reached agreement with the owners to be able to access and carry out further exploration.

Snowden considers that this resource estimate is appropriate for use in a Scoping Study or a Pre-Feasibility Study or a
Preliminary Assessment.

Robert Baldock, the President and CEO of the Company said: �Buffalo Reef is an extension of the mineralized trend that commences at the Selinsing deposit south of Buffalo Reef and extends for at least 4.2 kilometers along trend.  These results are the first phase of our exploration programs that are designed to increase our resource base along trend.  We have secured agreement with local farmers to be able to extend our exploration program to the East.  This entire resource area is within economic haulage distance of the Selinsing treatment plant.

At the same time, the NI43-101 report contains preliminary metallurgical test work results.  Historic test work conducted by Avocet Mining PLC, the previous owner of Buffalo Reef, indicated that the oxide zone showed reasonable metallurgical recovery rates for gold by direct cyanidation. However the sulphide mineralization at Buffalo Reef was classified as refractory to direct cyanidation procedures.  This prompted the Company to commence test work programs in 2010 and preliminary metallurgical studies completed by Monument in 2011 have shown promising results using roasting or bioleaching to pre-treat material from Buffalo Reef.  These test work programs are ongoing and the Company is encouraged with results to date; and oxide ore is expected to be treated with the existing Selinsing processing plant.�  

Giving the advanced state of exploration at the Buffalo Reef deposit, future activities will focus on infill drilling to increase the level of confidence in the geological interpretation and resource estimation. To facilitate this, Monument is securing additional land for further resources definition drilling. Additionally, diamond core drilling will be required to provide material for bulk density measurement and metallurgical test work, along with geotechnical data.
 
Information in this report that relates to in-situ Mineral Resource estimates is reported under the CIM Standards on Mineral Resources and Reserves Definitions and Guidelines. The May 2011 estimate was carried out under the supervision Mr. Michael Andrew who is a full time employee of Snowden Mining Industry Consultants Pty Ltd. Mr. Andrew is a Member of the Australian Institute of Mining and Metallurgy (MAusIMM), and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Qualified Person as defined by the Code. Mr. Andrew consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
 
About Monument Mining Limited                                        

Canadian based Monument Mining Limited has two wholly-owned principal properties: Selinsing Gold Mine Project (�Selinsing�); and Damar Buffalo Reef Prospect (�Buffalo Reef�); which are located in Pahang State in the Central Gold Belt District of Malaysia. In addition, the Company recently acquired the Famehub properties comprising 32,000 acres of prospective exploration land.
 
In conjunction with extensive exploration programs at Selinsing, Buffalo Reef and the Famehub properties, the Selinsing Gold Mine is on track to produce its scheduled 40,000 ounces of gold in its first full year of commercial production at an estimated average operating cash cost of approximately $317 per ounce with an initial five year mine life in the first pit. The gold treatment plant has a current capacity of 400,000 tpa with a proposed capacity expansion through the addition of an additional milling circuit to the existing plant.
 
Please visit our website at
www.monumentmining.com for more information.
 
Robert F. Baldock, President and CEO
Monument Mining Limited
Suite 910- 688 West Hastings Street
Vancouver B.C. Canada V6B 1P1
 
For further information contact:
 
Monument Mining Limited:                            Richard Cushing, Investor Relations
                                                                                T: + 1 604 638 1661 x 102
                                                                                E:
rcushing@monumentmining.com
 
CHF Investor Relations:                                  Robin Cook, Senior Account Manager
                                                                                T: + 1 416 868 1079 x 228
                                                                                E:
robin@chfir.com
 
Axino AG � Europe:                                          Wolfgang Seybold, President and CEO
                                                                                T: + 49 711 25 35 92 40
                                                                                E:
wolfgang.seybold@axino.de
 
 
"Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX VentureExchange) accepts responsibility for the adequacy or accuracy of this release."
 
Forward-Looking Statement
This news release contains forward-looking information about Monument Mining Limited (�Monument�), its business and future plans. The use of words such as "would", "estimate", "expect", "may", "will", "project", "should", "believe" and similar expressions are intended to identify forward-looking information.   Forward-looking information in this news release includes statements with respect to the completion and the timing of the Summary Report, the financing,, the results of due diligence and the Summary Report, the entering into of a definitive agreement and the closing of the proposed acquisition of the Project.  The following are some of the assumptions upon which forward-looking information is based:  that general business and economic conditions remain stable; continuing demand for, and stable or improving prices of gold; receipt of regulatory and government approvals in a timely manner; the availability of financing; Monument's ability to procure equipment and operating supplies in sufficient quantities and on a timely basis; Monument's ability to attract and retain skilled personnel; the accuracy of the company's resources estimates and the accuracy of the historical estimates in the Study; the estimated cash cost per ounce of gold production and the estimated cash flows which may be generated from the operations.  Actual results could differ materially from those anticipated in this forward-looking information as a result of risks and uncertainties, including: volatility in the price of gold; risk inherent in mineral exploration and development; uncertainties associated with the estimating of mineral resources, and in particular the historical estimates in the Study; competition for capital and skilled personnel; geological technical and drilling problems; general business, economic, competitive, geopolitical and social uncertainties; the actual results of current exploration activities; foreign operations risks; other risks inherent in the mining industry and other risks described in the annual information form of the Company, which is available under the profile of the Company on SEDAR at www.sedar.com.. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward- looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

http://spincaster.com/MailChimp/MonumentMining/fade.jpg

Copyright � 2007 Monument Mining Limited
Monument Mining Limited - 490-688 West Hastings Street, Vancouver BC

http://monumentmining.us2.list-manage.com/track/open.php?u=016f8ca9d605c08aebe85bf54&id=e01db73925&e=2f71079f98

Data and Statistics for these countries : Malaysia | All
Gold and Silver Prices for these countries : Malaysia | All

Monument Mining Limited

PRODUCER
CODE : MMY.V
ISIN : CA61531Y1051
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Monument Mining is a gold producing company based in Canada.

Its main asset in production is SELINSING in Malaysia and its main exploration properties are MENGAPUR and BUFFALO REEF in Malaysia.

Monument Mining is listed in Canada and in Germany. Its market capitalisation is CA$ 51.6 millions as of today (US$ 37.5 millions, € 35.2 millions).

Its stock quote reached its highest recent level on January 21, 2011 at CA$ 0.74, and its lowest recent point on April 09, 2020 at CA$ 0.04.

Monument Mining has 322 720 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Monument Mining Limited
2/13/2013Announces Closing of First Tranche of Brokered Private Place...
10/17/2012Announces Private Placement
10/12/2011Announces Private Placement of up to $70=2C000=2C000
8/12/2010Closes $13.0 Million Financing
7/22/2008Closes $38.1 M Private Placement and Convertible Note Financ...
Nominations of Monument Mining Limited
1/8/2014Receives Notice of Nominations for Election of Directors
1/8/2014Receives Notice of Nominations for Election of Directors
10/28/2013Appoints Executive General Manager, Monument Malaysia Group
9/20/2012Appoints Chief Operating Officer
6/29/2012Appoints Gerald Ruth to Board
1/25/2012Grants Share Purchase Options to its Directors
12/21/2011Appoints Graham Dickson as Chairman of the Board
6/9/2010Engages CHF in Investor Relations and Updates $12 Million Fi...
6/9/2010Grants 1,600,000 options to CHF investor relation firm
6/30/2009Appoints New Director
12/17/2008Appoints New Directors and Names George Brazier Chairman of ...
8/25/2008Appoints General Manager and Mine Manager
6/20/2008Appoints AXINO AG to provide Investor Relation Services (Rev...
Financials of Monument Mining Limited
11/29/2013Reports First Quarter Fiscal 2014 Results
5/30/2013Reports Third Quarter Fiscal 2013 Results
6/1/2012=E2??s 2012 Third Quarter Results
3/1/20122012 Second Quarter Results
1/5/2012=E2??s 2012 First Quarter Results
5/30/2011 2011 Third Quarter Results
5/9/2011 Third Quarter Production and Sales Results
3/1/2011 2011 Second Quarter Results
Project news of Monument Mining Limited
5/15/2013Central Australian Phosphate and Monument Mining to Establi...
5/1/2013s Its Interest In Central Australian Phosphate Limited
4/30/2013(Selinsing)s Selinsing and Buffalo Reef Resources
3/19/2013Abandons Earn=2DIn on Mersing Project
10/26/2012Attending Singapore and German Resource Conferences
10/25/2012(Selinsing)to Vigorously Defend Opportunistic Claim Filed Against Seli...
10/9/2012(Mengapur)Signs Harmonization Agreement on Mengapur Project
3/26/2012(Selinsing)Exposes Gold Thieves at Selinsing Gold Mine
2/21/2012(Mengapur)Closes Acquisition of 70% of the Mengapur Polymetalic Projec...
2/2/2012(Mengapur)Receives Final Acceptance from the TSX=2DV to Close the Meng...
12/3/2011(Mengapur)Enters into Definitive Agreement for Acquisition of 70% of ...
9/15/2011Grows Gold Project Pipeline
7/26/2011(Selinsing)Releases Positive Drill Results from Selinsing Property in M...
7/22/2011(Selinsing)to Expand Tailings Storage Facility at Selinsing Gold Mine i...
6/1/2011(Mengapur)Agrees to Acquire a 70% interest in the Mengapur Polymetalic...
5/29/2011(Buffalo Reef)REPORTS NI43-101 RESOURCES AT BUFFALLO REEF PROPERTY
3/3/2011(Selinsing)to Increase Gold Production
2/21/2010(Selinsing)Starts Commissioning CIL Circuit While Gravity Circuit is in...
11/4/2009(Selinsing)Pours First Gold From Gravity Circuit
9/1/2009(Selinsing)Obtains Power Connection at the Selinsing Gold Project and
7/20/2009(Selinsing)Commences Open-Pit Mining at the Selinsing Gold Project
2/11/2009(Buffalo Reef)Confirms Amended Plan for Gold Production from Phase I Gravi...
2/2/2009(Buffalo Reef)Releases Drill Results, Selinsing Developments and Director’...
3/7/2008(Buffalo Reef)Releases Positive Drill Results?Phase II Program at Buffalo ...
3/4/2008(Buffalo Reef)Positive Drill Results?Phase II Program at Buffalo Reef
2/7/2008(Buffalo Reef)'s Phase I Drill Program Confirms Previous Drill Results on ...
Corporate news of Monument Mining Limited
7/11/2016Monument Announces Significant Intercepts Assay Results at N...
6/13/2016Monument Collects Judgment and Adds Peter Kestel Personally ...
5/31/2016Monument Reports Third Quarter Fiscal 2016 Results
5/9/2016Monument Announces Not to Proceed with Matala
5/2/2016Monument Withdraws Technical Disclosure regarding Matala Pro...
4/11/2016Monument Announces Significant Intercepts Assay Results at B...
3/24/2016Monument Comments on Unusual Trading Activity
3/23/2016Monument files NI43-101Technical Report for Resource Estimat...
11/30/2015Monument Reports First Quarter Fiscal 2016 Results
11/21/2015Monument Mining Announces Results of Annual General Meeting ...
9/30/2015Monument Commissions Intec Pilot Plant at Selinsing
9/30/2015Monument's Fiscal 2015 Results
9/28/2015Monument Progresses Mine Development at Burnakura Site
8/17/2015Monument Murchison Gold Project Update
8/12/2015Monument Files Amended Technical Report for Murchison Gold P...
7/31/2015Monument Litigation Update
4/2/2015Monument files NI43-101Technical Report for Resource Estimat...
4/2/2015Monument files NI43-101 Technical Report for Resource Estima...
3/23/2015Monument Mining Announces Results of Annual General Meeting ...
3/8/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Delays Start-up of Iron and Copper Project at Menga...
2/18/2015Monument Announces Mineral Resource on Alliance/New Alliance...
2/16/2015Monument Files Claim Against Summer Empire Sdn. Bhd. and Kes...
2/13/2015Monument Announces Adjournment of Shah Alam High Court Trial...
2/7/2015Monument Issues Shares for Intec Transaction
2/6/2015Monument Issues Shares for Intec Transaction
2/2/2015Monument Secures Intec License to Exploit Sulphide Gold and ...
1/21/2015Monument Update Selinsing Litigation
1/20/2015Monument Update Selinsing Litigation
1/19/2015Monument Announce RC Assay Results from Federal City Drillin...
12/23/2014Monument Announces Termination of Proposed Transaction with ...
12/1/2014Monument Reports First Quarter Fiscal 2015 Results - Gold Pr...
11/30/2014Monument Reports First Quarter Fiscal 2015 Results
11/18/2014Monument Receives Order to Extend Time for Holding Annual Ge...
11/18/2014Monument Announces Second Round of RC Assay Results at Murch...
11/18/2014Extension of Closing Date for Proposed Transaction, 189 KB
11/17/2014Monument Extends Closing Date of Proposed Transaction with G...
11/12/2014Monument Completes Tuckanarra Gold Project Acquisition in We...
11/8/2014Monument to Extend Time for Holding Annual General Meeting
10/27/2014Monument Extends Close Date of Tuckanurra Acquisition
10/20/2014Monument Updates Selinsing Litigation
10/6/2014Monument Updates Selinsing Litigation
9/30/2014Monument's Fiscal 2014 Results
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/20/2014Warns Shareholders to Be Wary of the Dissident Group Attempt...
5/23/2013(Selinsing)Files Technical Report for Selinsing and Buffalo Reef
5/1/2013Reports Third Quarter Gold Production of 13=2C255 Ounces
4/24/2013Confirms Indicative Non=2DBinding Conditional Proposal to ac...
4/15/2013(Buffalo Reef)Starts Mining and Processing Oxide Materials at Buffalo Reef
4/2/2013Announces Results of Annual General Meeting of Shareholders
3/13/2013President and CEO to Speak at Hong Kong Conference
2/22/2013Settles Legal Disagreement
2/21/2013Welcomes Support from Major Shareholder
2/8/2013Further Comments on GoldMet Disclosure
2/8/2013Comments on GoldMet Disclosure=3A No Agreement Reached
1/17/2013Provides Update to Shareholders
1/11/2013Reports Record Second Quarter Gold Production of 15=2C902 Ou...
11/14/2012Has Engaged Mackie Research Capital Corporation as Financial...
11/10/2012to Extend Time for Holding Annual General Meeting
10/2/2012=E2??s 2012 Annual Results=3A Gross Revenue of $61.7 M with ...
8/24/2012(Mengapur)Confirms Historic Drilling Results at Mengapur Polymetalic P...
8/16/2012(Selinsing)Completed Selinsing Gold Plant Expansion
8/7/2012(Mengapur)Provides Updates on Mengapur Project and Private Placement
7/30/2012=E2??s 2012 Fourth Quarter Production Result
7/24/2012Received $12 Million through Exercise of Stock Purchase Warr...
6/19/2012and PLSB Working Together Harmonizing Oxide Magnetite Iron O...
5/14/2012=E2??s 2012 Third Quarter Production
5/9/2012Announces Senior Management Appointments
4/25/2012to Attend The INVEST 2012 Conference in Stuttgart
1/25/2012=E2??s 2012 Second Quarter Production
1/4/2012Announces Results of Annual and Special General Meeting of S...
12/20/2011Reminds Shareholders to Vote
12/16/2011(Mengapur)Discusses Mengapur Property Iron Ore Production Information
12/15/2011Provides Details of Annual General and Special Meeting
12/13/2011Annual General and Special Meeting Important Reminder
10/26/2011=E2??s 2012 First Quarter Production
9/29/2011=E2??s 2011 Annual Results
8/8/2011=E2??s 2011 Fourth Quarter Production and Sales Results
1/15/2010Fundamental Research Report Update #2
12/21/2009to Raise $12.0 M in Convertible Debenture and Forward Gold S...
9/18/2009to Issue Shares for Debt to Avocet Mining PLC
7/8/2009Moves to New Office
5/13/2009Releases Selinsing Gold Project Update
2/13/2009 Grants Stock Purchase Options to its Key Staff and Consulta...
12/24/2008Amends Selinsing Gold Project Construction Plan
9/24/2008Fundametal Initial Research Report
8/20/2008Announces TSXV’s Acceptance of its Ball Mill Acquisition fro...
8/15/2008Grants Stock Purchase Options to its Directors Officers unde...
8/8/2008Commences Action for Injunction and Damages
7/28/2008Closes Avocet Mill Transaction For Future Plant Upgrade
7/8/2008Acquires Package of Additional Adjacent Land - Update
6/20/2008Notice of Change of Business Address
5/26/2008Acquires Second Mill for Future Production Plant Upgrade
5/13/2008Monument Announces $38.0 M Capital Raising to Commence Plant...
1/21/2008Acquires Package of Additional Adjacent Land
10/25/2007 Q1 Project Development Update
9/13/2007Commences Exploration Program
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MMY.V)FRANKFURT (D7Q1.F)
0.160+6.67%0.100-6.54%
TSX-V
CA$ 0.160
04/18 16:59 0.010
6.67%
Prev close Open
0.150 0.150
Low High
0.150 0.160
Year l/h YTD var.
0.130 -  0.195 -5.88%
52 week l/h 52 week var.
0.080 -  0.195 52.38%
Volume 1 month var.
166,704 14.29%
24hGold TrendPower© : -40
Produces Gold
Develops
Explores for Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/19/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202418.52%
202392.86%0.150.07
2022-41.67%0.130.06
202133.33%0.210.09
2020125.00%0.120.04
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.90+2.73%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :