Chart usGOLD   Chart usSILVER  
 
Food for thought
We all enjoy the comfort of opinion without the discomfort of thought
John. F. Kennedy  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1359.60-27.44
Silver 22.25-0.41
Platinum 1451.52-31.48
Palladium 735.25-1.25
WORLD MARKETS
DOWJONES 15354120
NASDAQ 349934
NIKKEI 15138101
ASX 516016
CAC 40 400122
DAX 839828
HUI 246-10
XAU 97-3
CURRENCIES (€)
AUS $ 1.3162
CAN $ 1.3189
US $ 1.2824
GBP (£) 0.8458
Sw Fr 1.2478
YEN 132.1900
CURRENCIES ($)
AUS $ 1.0268
CAN $ 1.0283
Euro 0.7798
GBP (£) 0.6596
Sw Fr 0.9722
YEN 103.0500
RATIOS & INDEXES
Gold / Silver61.11
Gold / Oil14.16
Dowjones / Gold11.29
COMMODITIES
Copper 3.320.02
WTI Oil 96.020.86
Nat. Gas 4.060.13
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
Development Drilling at Pinson Returns 60 feet of 1.38 oz/ton Au
Published : November 06, 2012
( 0 vote, 0/5 ) Print article
     
Tweet

Development Drilling at Pinson Returns 60 feet of 1.38 oz/ton Au

GOLDEN, Colo., Nov. 6, 2012 /CNW/ - Atna Resources Ltd. ("Atna" or the "Company") (TSX:ATN/OTCQB:ATNAF) is pleased to provide initial results of development drilling at its Pinson Mine near Winnemucca, Nevada. Underground ore stope definition drilling commenced in early October with one reverse circulation rotary drill. Drilling is focused on the definition of individual mine stopes to maximize ore extraction, minimize dilution, and optimize ore zone access.

Highlights from the drill results include:

  • 45 feet (13.7 m) grading 0.583 oz/ton gold (20.0 g/t gold) in hole PRC-12-004
  • 60 feet (18.3 m) grading 1.382 oz/ton gold (47.4 g/t gold) in hole PRC-12-006
  • 35 feet (10.7 m) grading 0.879 oz/ton gold (30.1 g/t gold) in hole PRC-12-008

"These initial drill results confirm the continuity and high grade of the upper Ogee zone where we are developing the mine's first oxide ore stopes. Development drilling will be central to the design and engineering of the safest and most efficient ore stopes; minimizing costs while maximizing gold recovery, grade, cash-flow and profitability of the project. Two ore stopes are now developed and two additional stoping areas are under development. Ore is being stockpiled on the surface and the first shipments are expected to occur in December," states Atna's President & CEO, James Hesketh.

Significant drill hole results are shown in the table below. The development drill holes were collared within the oxide bulk sample stope and were designed to evaluate the upper margins and internal continuity of the upper Ogee gold zone both along strike and dip. Holes were completed principally down the plunge of the karst breccia-hosted mineralized zone and therefore the intercept lengths do not represent true widths of mineralization. To better understand the results, readers are urged to view the expanded version of this release available on the Company's web site at www.atna.com which includes a long section and cross section displaying the drilling results in more detail.

Hole ID

From-feet (m)

To-feet (m)

Length-feet (m)

oz/ton Au (g/t Au)

PRC-12-001

80 (24.4)

90 (27.4)

10 (3.0)

0.412 (14.1)

PRC-12-002

85 (25.9)

100 (30.5)

15 (4.6)

0.458 (15.7)

PRC-12-003

60 (18.3)

80 (24.4)

20 (6.1)

0.205 (7.0)

PRC-12-004

35 (10.7)

80 (24.4)

45 (13.7)

0.583 (20.0)

PRC-12-005

75 (22.9)

90 (27.4)

15 (4.6)

0.337 (11.6)

PRC-12-006

5 (1.5)

65 (19.8)

60 (18.3)

1.382 (47.4)

PRC-12-007

0 (0)

10 (3.0)

10 (3.0)

0.595 (20.4)

PRC-12-007

45 (13.7)

55 (16.8)

10 (3.0)

0.251 (8.6)

PRC-12-008

15 (4.6)

50 (15.2)

35 (10.7)

0.879 (30.1)

PRC-12-009

0 (0)

5 (1.5)

5 (1.5)

0.243 (8.3)

PRC-12-010

0 (0)

15 (4.6)

15 (4.6)

0.148 (5.1)

PRC-12-011

15 (4.6)

35 (10.7)

20 (6.1)

0.919 (31.5)

PRC-12-017




ASSAYS PENDING

PRC-12-018




ASSAYS PENDING

PRC-12-019




ASSAYS PENDING

PRC-12-020

0 (0)

30 (9.1)

30 (9.1)

0.328 (11.2)

PRC-12-021

0 (0)

25 (7.6)

25 (7.6)

0.425 (14.6)

Analytical results contained within this press release were completed by standard fire assay methods with an atomic absorption or gravimetric finish by Inspectorate America Corporation, an independent, ISO certified, analytical laboratory located in Sparks, Nevada. Atna maintains a rigorous Quality Assurance - Quality Control (QA/QC) program utilizing both certified gold standards and blanks to augment Inspectorate's internal QA/QC program.

This press release was prepared under the supervision and review of William Stanley, V.P. Exploration of Atna, a Registered Member of the Society for Mining, Metallurgy, and Exploration, a Licensed Geologist and Qualified Person, as defined in NI 43-101, and has verified the authenticity and validity of the technical information contained within this news release.

For additional information on Atna Resources and the Pinson Gold Mine, please visit our website at www.atna.com or our filings with Canadian securities regulators on SEDAR or U.S. regulators on EDGAR.

This press release contains certain "forward-looking statements," as defined in the United States Private Securities Litigation Reform Act of 1995, and within the meaning of Canadian securities legislation relating to the Pinson Mine. Forward-looking statements are statements that are not historical facts. They are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made and they involve a number of risks and uncertainties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change, unless required by law. Factors that could cause future results to differ materially from those anticipated in these forward-looking statements include: gold production, deposit modeling, development, future operating costs or profitability at the Pinson Mine, the Company might encounter problems such as the significant depreciation of metals prices; accidents and other risks associated with mining exploration and development operations; the risk that the Company will encounter unanticipated geological factors; the Company's need for and ability to obtain additional financing; the possibility that the Company may not be able to secure permitting and other governmental clearances necessary to carry out the Company's exploration and development programs; and the other risk factors discussed in greater detail in the Company's various filings on SEDAR (www.sedar.com) with Canadian securities regulators and its filings with the U.S. Securities and Exchange Commission, including the Company's 2011 Form 20-F dated March 26, 2012.

Cautionary Note to U.S. Investors --- The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this report, such as "measured", "indicated", "inferred", and "resources" that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.

FOR FURTHER INFORMATION, CONTACT:

James Hesketh, President and CEO - (303) 278-8464
Valerie Kimball, Investor Relations - toll free (877) 692-8182
www.atna.com

SOURCE: Atna Resources Ltd.

For further information:

http://www.atna.com

Tweet

Atna Resources Ltd

PRODUCER
CODE : ATN.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Atna Resources Ltd
7/5/2010Gold Participating Bond Offering
5/25/2010Positive Preliminary Economic Assessment for the Columbia Go...
12/9/2009Atna Announces Closing of Gold Participating Bond Offering
Annual reports of Atna Resources Ltd
2008 Annual report
Annual Report 2007
Nominations of Atna Resources Ltd
1/8/2013Mr. Daniel Saint Don Joins Atna as Vice President and Chief ...
8/16/2011Douglas Stewart Joins Atna As Chief Operating Officer
4/5/2011Paul H. Zink Joins Atna's Board of Directors
Financials of Atna Resources Ltd
11/13/2012Announces Third Quarter 2012 Earnings and Operations
10/15/2012(Pinson)Reports Third Quarter Development Progress at Pinson
11/14/2011Reports Third Quarter Earnings of $2.5 Million
8/16/2011Reports Second Quarter Earnings of $1.1 Million
5/24/2011Reports First Quarter 2011 Results
3/25/2011Reports Fourth Quarter and 2010 Fiscal Year End Results
11/15/2010Reports Third Quarter 2010 Results and Update of Operations
8/12/2010Reports Second Quarter 2010 Results
3/26/2010Reports Fourth Quarter and Year End 2009 Results
8/14/2009Reports Second Quarter 2009 Results
5/15/2009Reports First Quarter 2009 Results
3/31/2009Reports Year End and Fourth Quarter 2008 Results
11/14/2008Reports Third Quarter 2008 Results
10/31/2008(Pinson)Reports Third Quarter Progress at Pinson Gold Project, Nevad...
8/14/2008Reports Second Quarter 2008 Results
5/29/2008REPORTS FIRST QUARTER 2008 RESULTS
11/14/2007 Reports Third Quarter Results
8/13/2007Reports Second Quarter Results
5/15/2007Reports First Quarter Results
Project news of Atna Resources Ltd
3/18/2013(Ty)Extends $17.5 Million Credit Facility
11/6/2012(Pinson)Development Drilling at Pinson Returns 60 feet of 1.38 oz/to...
10/13/2011(Briggs)Completes Briggs Drilling with Strong Gold Intercepts
5/25/2011(Briggs)Drills 100 feet (30.5 m) grading 0.058 oz/ton gold (1.97 g/t...
5/2/2011(Briggs)Expands New Reserve Area
4/7/2011(Briggs)Announces Expansion of Deep Briggs Zone
3/23/2011(Briggs)Reports Additional Positive Drill Results at Briggs Mine
3/3/2011(Reward Property)Reports Updated Gold Reserves at Briggs and Reward Mines
3/3/2011(Briggs)Reports Updated Gold Reserves at Briggs and Reward Mines
2/28/2011(Briggs)Reports Initial Drill Results at Briggs Mine
1/27/2011(Briggs)Commences Briggs Mine Exploration
1/24/2011(Briggs)Reports Increased Gold Production and Lower Costs at Briggs ...
10/6/2010(Briggs)Reports Strong Production at Briggs Mine
5/25/2010(Columbia Property)Announces Positive Preliminary Economic Assessment for the C...
3/2/2010Provides NI-43-101 Resource Estimate for Cecil R Project
2/26/2010(Briggs)Reaches Commercial Production Levels at the Briggs Mine
2/22/2010(Briggs)Updates Reserve Estimates for Briggs and Reward
9/10/2009(Columbia Property)Reports Significant Gold Resource for its Columbia Gold Proj...
8/24/2009(Reward Property)Receives Approval for Development of Reward Gold Mine
8/11/2009(Briggs)Increases Gold Resources at Briggs Mine
6/8/2009(Briggs)Expands Mineralization at Briggs Mine
6/4/2009(Pinson)Reports Additional Pinson Drill Results
5/13/2009(Briggs)Makes First Gold Pour at Briggs Mine
5/1/2009(Ty)Receives Final Payment in Marg Property Sale
4/9/2009(Pinson)Signs Pinson Joint Venture Agreement
2/27/2009(Briggs)Confirms New Gold Zone at Briggs Mine
2/18/2009(Briggs)Reports Reserve Increase and Updated Mine Plan for the Brigg...
2/4/2009(Clover)Provides Update on Exploration Venture Properties
1/28/2009(Briggs)Commences Mining Gold Ore at Briggs
1/15/2009(Pinson)Receives Notice of Completion of $30 Million Expenditure at ...
10/9/2008(Clover)Drilling Commences at Atna's Clover Project
10/8/2008(Seven-up Pete Gold)After 17 years of fighting, Atna finally throws in the towel...
7/22/2008(Mcdonald): Mountain States Legal Foundation Files Petition With US Su...
6/16/2008(Ty)COMPLETES CONSOLIDATION OF SEVEN-UP PETE GOLD PROPERTY
5/9/2008TECHNICAL REPORT RECOMMENDS RE-START OF BRIGGS MINE IN CALIF...
4/23/2008(Mcdonald)RECEIVES COURT OPINION ON ITS MCDONALD TAKINGS CLAIM
4/16/2008(Briggs)Drilling Extends Gold Mineralization At Briggs Mine
4/3/2008ATNA TECHNICAL REPORT RECOMMENDS DEVELOPMENT OF REWARD GOLD ...
3/11/2008(Jarbridge)Terminates Option Agreement at Jarbidge, Nevada
1/8/2008(Pinson)Reports Progress at Pinson Gold Mine, Nevada
12/21/2007(Jarbridge) Completes First Phase of Drilling at Jarbidge, Nevada
11/16/2007(Clover) Meridian Gold Commences Drilling Atna's Clover Project
9/18/2007(Pinson)Reports Work Underway at Pinson Project
7/11/2007(Pinson)Increases Resource at Pinson
7/3/2007(Pinson)Reports Pinson Mining Company to Begin Work at Pinson Gold P...
6/14/2007(Jarbridge)Commences Drilling at Jarbidge, Nevada
Corporate news of Atna Resources Ltd
5/6/2013(Pinson)Increases Productivity at its Pinson Mine
4/25/2013Replaces Duplicated Table in its 2012 Annual MD&A
10/11/2012Drills 305 Feet Grading 0.074 oz/ton Gold at Columbia Gold P...
5/9/2011Announces Results of AGM
9/30/2010Identifies Potential to Increase Reserves at Reward Project
8/6/2010Announces Resignation of Director
7/5/2010Announces Gold Participating Bond Offering
5/18/2010To Our Shareholders...
4/15/2010Presents at European Gold Forum!
1/28/2010Provides Update on Exploration and Venture Projects
12/9/2009Announces Closing of Gold Participating Bond Offering
11/23/2009Announces Gold Participating Bond Offering
10/7/2009John Theobald Joins Atna's Board of Directors
8/7/2009Announces Changes to Board of Directors
6/2/2009Enters Into New Agreement in the Sand Creek Uranium Joint Ve...
4/7/2009Extends Gold Mineralization at Cecil R Project
12/19/2008Announces Management Changes and Option Grants
10/8/2008Commences Drilling at Briggs Gold Mine
10/7/2008Denied Grant of Certiorari in the McDonald Takings Case
9/9/2008Accelerates Briggs Gold Mine Re-Start
9/4/2008Agrees to Sell Royalty Portfolio for US$20 Million
8/5/2008Reports 2nd Quarter Progress at Pinson Gold Project, Nevada
5/15/2008Reports AGM Results
5/14/2008Delays Filing Interim Financial Statements Due To Recent Mer...
5/6/2008Reminds Shareholders of its Annual General Meeting and Web C...
3/19/2008 and Canyon Announce Closing of Merger
3/13/2008Canyon Stockholders Approve Agreement and Plan of Merger wit...
3/7/2008Announces Postponement of Canyon Shareholders Meeting Relati...
3/3/2008Underground Drifting Commences at Pinson Mine, Nevada
2/28/2008President and CEO Interview
1/23/2008Advances Towards Merging With Canyon Resources
11/19/2007Correction - Atna and Canyon Agree to Merge
11/19/2007 Agree to Merge
6/6/2007Completes Drilling at Beowawe Project, Nevada
4/28/2007Reports AGM Results
4/18/2006Financials
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ATN.TO)Other OTC (ATNAF.PK)
0.430-4.44%0.420-8.70%
TORONTO
CA$ 0.430
05/17 15:58 -0.020
-4.44%
Prev close Open
0.450 0.470
Low High
0.430 0.470
Year l/h YTD var.
0.430 -  1.28 -63.25%
52 week l/h 52 week var.
0.430 -  1.35 -53.76%
Volume 1 month var.
341,453 -25.86%
24hGold TrendPower© : -44
Produces Gold
Develops Copper - Gold - Lead - Silver - Zinc
Explores for Copper - Gold - Lead - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-66.41%
201247.13%1.540.76
201142.62%1.020.52
2010-8.96%0.770.43
200921.82%0.990.48
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Get Investor Information
High Desert Gold
Select
& click