Mustang Provides Update on Mayville Drilling
Published : November 07, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Cobalt |

TORONTO, ONTARIO--(Marketwire - Nov. 7, 2012) - Mustang Minerals Corp. (News - Market indicators)(FRANKFURT:NJF) ("Mustang" or the "Company") today announced that it has completed the drill program that was announced on September 12, 2012. The nine drill holes totalled 3,177 meters. Drilling was designed to test the known copper nickel horizon beneath previous holes and in addition up to 250 meters along strike east of previous drilling. Assay results from the initial holes of the current program are now pending. Following compilation of drill data an updated NI-43-101 resource estimate is planned.

Resource Drilling

Five of the drill holes in the current program (MAY-12-135 to MAY-12-139) were designed to provide additional data for an updated resource estimate. The strike length covered by these holes was 720 meters. Several of the holes intersected intercepts of disseminated to net textured pyrrhotite - chalcopyrite mineralization typical of the Mayville Deposit. MAY12-140 was targeted at a strong BHEM target 66 meters west of MAY-12-57 which previously intersected a strong zone of mineralization (43.1m @ 0.76% Cu and 0.32% Ni which included a sub-interval of 25.0m @ 1.04% Cu and 0.45% Ni). 

Logging and splitting of these holes is now substantially completed with assay results expected during the month of November. Half split core has been submitted for assay analysis at Accurassay Laboratories in Thunder Bay, Ontario. 

East Extension Drilling

Three holes in the program MAY-12-141 to 143 were drilled to test the eastward strike extension potential of the Mayville Ni-Cu deposit. Drill hole MAY-12-143 was collared 250 meters to the east of the last fence of drilling (2005-2006) at the Mayville Deposit and intersected approximately a 17 metre zone of sulfide mineralization starting at 174 m down hole. Mineralization was near the favourable mafic volcanic/gabbro geological contact typical of many drill holes into the Mayville Deposit. MAY-12-141 (50m east of previous drilling had a sulfide zone proximal to the volcanic/gabbro contact). MAY-12-142 was collared into gabbro and did not intersect the volcanic/gabbro contact.

This drilling shows that the potential exists for additional mineralization and potential resource tonnage along the favourable contact on strike to the east of the known Mayville Deposit. The zone remains open to the east and appears to coincide with a magnetic and EM geophysical trend that extends approximately 1 kilometre further to the east. The area will be a priority target for the next phase of drilling pending receipt of favourable assays. The favourable volcanic/gabbro also extends to the west of the Mayville Deposit for several kilometres with only inconclusive sporadic shallow drilling previously completed in this area. 

"The objective of the 2012 Mayville Deposit drilling has been to expand the potential bulk mineable resource at Mayville targeting an enhanced resource update. We believe there is excellent potential for mineralization along strike of the Mayville Deposit and that there is upside for more resource to be defined at depth and along strike to Mayville in the future," said Robin Dunbar, President of Mustang.

Resource Estimate Update

Mustang has engaged Roscoe Postle Associates Inc. to complete a resource estimate update for the Mayville Deposit which is expected to commence in December 2012. The resource update will incorporate the results of the 2012 drilling at the Mayville Deposit along with historical drill information. 

A long section showing the approximate location of recently drilled holes at Mayville and a geophysical compilation map showing the prospective geophysical trend at Mayville along with the recent drill hole locations has been posted on the Mustang website at www.mustangminerals.com.

Mayville is located 35 km by road from the Company's Makwa Nickel Deposit. Currently, the outlined mineralization at the two properties is detailed below.

  1. The Makwa Ni-Cu Deposit has a NI 43-101 outlined reserve estimate completed in February 2010 by Micon International Limited of 9.86 million tonnes in the Probable Ore Reserve category containing 0.541% nickel, 0.113% copper 0.433 g/t PGM at the Makwa Project. 
  2. The Mayville Cu-Ni Deposit has a present NI 43-101 Indicated Resource of 9.227 million tonnes containing 0.61% copper, 0.23% nickel and 0.174 g/t palladium.

QA/QC Program

All core samples are sent to Accurassay Laboratories in Thunder Bay, Ontario. Analysis is completed for nickel, copper, cobalt and silver using an Aqua Regia digestion followed by AAS/ICP finish. For gold, platinum and palladium, fire assay of 30g aliquots followed by combination fire assay and AAS finish is employed. Drill core is logged and split on the Makwa site by Mustang personnel with half the core retained and stored. Mustang implements a QA/QC program on drill core including inserting blanks, duplicates and commercial standards at regular intervals with all sample submissions to the laboratory.

Carey Galeschuk P.Geo. is the National Instrument 43-101 Qualified Person for Mustang Minerals Corp.

Western Areas NL (ASX:WSA), an Australian based nickel producer, owns 19% of the common shares of Mustang.

To find out more about Mustang Minerals Corp. (News - Market indicators) visit our website at www.mustangminerals.com.

We seek safe harbour.

This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Securities Act (Ontario) (together, "forward-looking statements"). Such forward-looking statements may include the Company's plans for its mineral projects in Manitoba, the overall economic potential of its properties, the availability of adequate financing and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or implied by such forward-looking statements to be materially different. Such factors include, among others, risks and uncertainties relating to potential political risk, uncertainty of production and capital costs estimates and the potential for unexpected costs and expenses, physical risks inherent in mining operations, currency fluctuations, fluctuations in the price of nickel and other metals, completion of economic evaluations, changes in project parameters as plans continue to be refined, the inability or failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those described in the Company's Management Discussion and Analysis for the most recent financial period and Material Change Reports filed with the Canadian Securities Administrators and available at www.sedar.com.

Shares Outstanding: 198,160,658



Mustang Minerals Corp.
David Black
Investor Relations
416-955-4773
info@mustangminerals.com
www.mustangminerals.com

Mustang Minerals Corp

DEVELOPMENT STAGE
CODE : MUM.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Mustang is a nickel and copper exploration company based in Canada.

Mustang develops nickel, copper, cobalt, palladium and platinum in Canada, and holds various exploration projects in Canada.

Its main asset in development is MAKWA in Canada and its main exploration properties are RIVER VALLEY PGM, EAST BULL LAKE, TILLICUM CLAIMS, RIVER VALLEY PGM and MAYVILLE in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Mustang Minerals Corp
1/24/2013Announces Completion of Additional Financing and 2013 Strate...
1/23/2012Completes Financing With Western Areas 7500m Drill Program U...
1/6/2012Completes Flow Through Financing
1/11/2010Completes Private Placement
12/8/2009Increases Private Placement Financing and Closes First Tranc...
11/6/2009Announces Non-Brokered Private Placement
Project news of Mustang Minerals Corp
2/20/2013(Mayville)Announces Increase to Mayville Resource
11/7/2012(Mayville)Provides Update on Mayville Drilling
9/12/2012(Mayville)Drilling at Mayville Property
6/14/2012(Mayville)Intersects Higher Grade Zone of Copper-Nickel-PGM Mineraliza...
5/17/2012(Mayville)Drilling Update-Mayville Project
6/2/2011(Mayville)Drill Program Resumes at Mayville Property
5/5/2011Drills 9=2E1 Meters of 3=2E9 g/t Platinum-Palladium Strike L...
4/6/2011(Mayville)Completes Additional Holes at New PGM Zone
3/23/2011MUSTANG MINERALS ANNOUNCES NEW PLATINUM AND PALLADIUM DISCOV...
3/22/2011Announces New Platinum and Palladium Discovery in Manitoba
12/1/2010(Mayville)s Exploration at Mayville/Tanco Properties
7/13/2010(Mayville)Exploration Deal With Tantalum Mining Corporation of Canada
3/22/2010(Makwa)Updates Project Economics at Makwa Nickel Project
2/17/2010(Makwa)Makwa Nickel Project Update
9/1/2009(Makwa)Advances its Maskwa Nickel Project
6/22/2009(East Bull Lake)Western Areas-Mustang JV Commences Drilling at East Bull Lak...
3/2/2009(Makwa)Completing Drilling at Manitoba Nickel Project
1/22/2009(Makwa)Provides Update on Maskwa Nickel Project Feasibility Study
12/1/2008(Makwa)Provides Update at Maskwa Nickel Project Feasibility Study
9/12/2008(East Bull Lake)and Western Areas Sign Agreement for Joint Venture at East B...
7/3/2008(East Bull Lake)New PGM+Ni+Cu Mineralization Drilled at East Bull Lake, Onta...
6/26/2008(Makwa)Mustang Tables Positive Prefeasibility for Maskwa Nickel Pro...
5/12/2008(East Bull Lake Pgm)Drilling at East Bull
5/9/2008(Makwa) Reports Positive Results From Prefeasibility Study at Maskw...
4/23/2008(Makwa)Tests Chromite Horizon at Maskwa Property
3/3/2008(Makwa)Drill Update at Maskwa North and Maskwa West
Corporate news of Mustang Minerals Corp
10/20/2015Board Resignation
12/10/2012(Mayville)Extends Mayville Cu-Ni Deposit Mineralization to the East
7/17/2012(Mayville)Drilling Extends Copper Nickel Mineralization to Depth at Ma...
3/5/2012Provides Exploration Update Continuesto Intersect PGM Minera...
12/1/2011(Mayville)Announces Mayville Exploration-Financing
9/9/2011: Corporate Update
3/3/2011(Mayville)Drills New Surface Zone of CopperNickel Mineralization at th...
4/15/2010Expands Resources in Project Area
11/19/2009and Sagkeeng First Nation Conclude Memorandum of Understandi...
9/18/2009AGM, September 22
10/1/2008Visit Our Booth This Weekend
8/5/2008Builds Project Development Team
7/17/2008 Closing of Oversubscribed, Increased Financing
7/16/2008Announces Increase to Brokered Financing
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MUM.V)Other OTC (MSMGF)
0.175-2.78%0.053-8.62%
TSX-V
CA$ 0.175
06/07 13:54 -0.010
-2.78%
Prev close Open
0.180 0.180
Low High
0.175 0.195
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.175 -%
Volume 1 month var.
24,600 -%
24hGold TrendPower© : -31
Produces
Develops Cobalt - Copper - Nickel - Palladium - Platinum
Explores for Cobalt - Copper - Gold - Nickel - Palladium - Platinum - Rhodium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :