Positive Drill Results Support Further Growth at Bombore
Published : November 13, 2012

Work continues on the Definitive Feasibility Study for an oxide-only CIL plant

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

OTTAWA, ONTARIO--(Marketwire - Nov. 13, 2012) - Orezone Gold Corporation (News - Market indicators) is pleased to announce additional positive results from an ongoing 125,000 m infill and expansion drill program at its wholly owned Bomboré Gold Project in Burkina Faso, West Africa. The program is designed to upgrade and expand the resources, especially the softer near surface oxide and semi-oxidized resources (total oxide resource of 1.76 Moz M&I and 0.26 Moz Inferred, plus the sulphide resource of 2.37 Moz M&I and 0.78 Moz Inferred). In parallel the company is completing a definitive feasibility study ("DFS") for a phase one, oxide-only CIL plant, and the drill results to date should improve the economics and life of the project. Deeper drill results also indicate further upgrading and expansion of the underlying sulphide (fresh-rock) resource. The Company envisions expanding the CIL plant from the project cash flows to accommodate the fresh rock that would result in a larger operation and a longer mine life. The Company expects to complete an internal resource update on Bomboré in Q1 2013, which will be included in the DFS to be released by Q3 2013.

Highlights

- Results include 179 reverse circulation (RC) holes (12,479 m) and 42 core (DD) holes (9,424 m). For all results see the following Table;

- These results are from the northern area of the project where inferred resources and some new oxide targets have been drilled;

- The new core holes were drilled over a strike of 2,500 m in the Maga area and intersected gold mineralization at an average vertical depth of 126 m;

- The Company has now released a total of 55,000 m of drilling (683 holes) subsequent to the August 2012 Bomboré resource statement. These results, along with results received through the end of November 2012, will be included in the next resource update on which the DFS reserves will be based;

- Work continues on the DFS with various trade-off studies to finalize the plant site location, the grinding circuit, water storage system, tailings design, geotechnical drilling and environmental studies. All of these items are expected to be completed by Q1 2013 along with the release of the detailed variability metallurgical results.

"These results further confirm that there is excellent potential for additional expansion of the oxide and sulphide resources at Bomboré." said Pascal Marquis, SVP Exploration for Orezone. "More importantly, the additional 55,000 m drilled to date support further improvement in project economics and validation of our two-phased approach to mining Bomboré which will be reflected in the upcoming DFS"

Table 1. Cumulative Results Excluded from the August 2012 Resource Reported to Date

Total Drilling to Date Grade g/t
Zone # of Holes Total m Uncut Cut(1)
KT - RC 14 1,036 1.06 1.06
CFU - RC 4 293 NSA NSA
Maga - RC 181 11,743 1.03 0.95
Maga - DD 45 9,811 1.26 1.16
P8P9 - RC 30 1,665 0.92 0.91
P8P9 - DD 25 4,631 1.04 0.99
P11 - RC 24 1,308 1.30 1.12
P11- DD 3 496 1.70 1.14
Siga E - RC 45 2,294 0.93 0.88
Siga E - DD 15 1,920 1.59 1.03
Siga W - RC 45 2,284 1.34 0.99
Siga W - DD 17 2,129 0.94 0.88
Siga S - RC 177 8,879 0.94 0.87
Siga S - DD 36 5,424 0.95 0.90
P17 N - RC 5 250 1.51 1.26
P17 S - DD 3 414 3.09 2.59
North - RC 229 14,737 1.01 0.94
North - DD 70 14,442 1.15 1.07
South - RC 291 14,765 1.00 0.89
South- DD 71 9,968 1.04 0.92
SE - RC 6 250 1.51 1.26
SE - DD 3 414 3.09 2.59
All - RC 525 29,752 1.01 0.92
All - DD 144 24,824 1.11 1.01

Table 2. Breakdown of Drilling Meterage for this Release

Zone Core Drilling RC Drilling
# of holes Total m # of holes Total m
KT 0 0 14 1,036
Maga 42 9,424 161 11,150
CFU 0 0 4 293
TOTAL 42 9,424 179 12,479

Table 3. Highlights of Diamond Drill Hole Results for this Release

        From To Length   Uncut Grade(2) Cut Grade(3) Total
Zone Section   Hole # (m) (m) (m)   (g/t) (g/t) Assay(4)
Maga 4500   BBD0841 192.00 202.00 10.00   1.40 1.40  
Maga 4450   BBD0866 202.00 230.00 28.00   1.14 1.14  
Maga 4400   BBD0842 207.00 228.00 21.00   0.90 0.90  
Maga 4400   BBD0842 235.00 277.00 42.00   1.10 1.10  
Maga 4350   BBD0843 170.00 181.00 11.00   1.26 1.26  
Maga 4350   BBD0843 188.00 198.00 10.00   1.62 1.62  
Maga 4350   BBD0843 212.00 226.00 14.00   1.14 1.14  
Maga 4300   BBD0867 204.00 217.00 13.00   0.85 0.85 Pending
Maga 4100   BBD0868 87.00 95.00 8.00   1.63 1.63  
Maga 4000   BBD0869 239.00 256.00 17.00   1.84 1.49  
Maga 3950   BBD0846 282.00 294.00 12.00   1.44 1.44  
Maga 3900   BBD0872 224.00 242.00 18.00   1.60 1.60  
Maga 3850   BBD0873 237.00 248.00 11.00   1.00 1.00  
Maga 3800   BBD0847 147.00 152.00 5.00   2.68 1.48 Pending
Maga 3700   BBD0904 174.00 187.00 13.00   1.56 1.56 Pending
Maga 3650   BBD0849 84.00 95.00 11.00   1.24 1.24  
Maga 3650   BBD0849 158.00 167.00 9.00   1.80 1.80  
Maga 3600   BBD0911 75.00 81.00 6.00   2.46 2.32  
Maga 3600   BBD0911 108.00 112.00 4.00   3.38 3.15  
Maga 3600   BBD0911 153.00 160.00 7.00   6.04 3.21  
Maga 3600   BBD0912 150.00 160.00 10.00   3.24 1.74  
Maga 3550   BBD0879 215.00 223.00 8.00   2.41 2.19 Pending
Maga 3550   BBD0903 83.00 94.00 11.00   1.12 1.04  
Maga 3550   BBD0903 112.00 120.00 8.00   5.06 2.70  
Maga 3450   BBD0878 65.00 75.00 10.00   2.09 1.92 Pending
Maga 3400   BBD0885 269.00 275.00 6.00   1.72 1.72 Pending

Table 4. Highlights of Reverse Circulation Results for this Release

        From To Length   Uncut Grade(5)   Cut Grade(6)   Total
Zone Section   Hole (m) (m) (m)   (g/t)   (g/t)   Assay(7)
KT 6550   BBC3618 36.00 42.00 6.00   1.97   1.97    
Maga 4900   BBC3645 45.00 58.00 13.00   1.19   1.19    
Maga 4800   BBC3690 53.00 64.00 11.00   2.19   2.07    
Maga 4700   BBC3650 10.00 16.00 6.00   1.91   1.25    
Maga 4700   BBC3653 21.00 34.00 13.00   1.05   1.05    
Maga 4675   BBC3694 13.00 21.00 8.00   1.27   1.27    
Maga 4650   BBC3655 26.00 38.00 12.00   2.20   1.40    
Maga 4450   BBC3699 41.00 65.00 24.00   1.08   1.08    
Maga 4350   BBC3657 39.00 47.00 8.00   1.34   1.34    
Maga 4300   BBC3713 29.00 36.00 7.00   2.56   1.49    
Maga 4200   BBC3710 22.00 30.00 8.00   1.94   1.59    
Maga 4150   BBC3717 5.00 20.00 15.00   0.71   0.71   Pending
Maga 4050   BBC3723 8.00 13.00 5.00   2.04   2.04   Pending
Maga 3950   BBC3674 54.00 64.00 10.00   1.63   1.63   Pending
Maga 3750   BBC3685 5.00 8.00 3.00   9.56   3.65    
Maga 3650   BBC3743 45.00 51.00 6.00   3.74   2.41   Pending
Maga 3050   BBC3771 33.00 42.00 9.00   1.20   1.20   Pending

The mineralized intervals are based on a lower cut-off grade of 0.5 g/t, a minimal width of 3 m and up to a maximum of two consecutive meters of dilution being included. The true width of the mineralization is approximately 85% of the drill length intervals in KT, Maga, P16, P17 and P8P9 areas, and 95% of the drill length intervals in the Siga area.

The half-core samples were collected by Orezone employees using a Diamond saw. The core samples were prepared by SGS Burkina Faso s.a.r.l. at the Bomboré site facility and then split by Orezone to 1 kg using Rotary Sample Dividers (RSDs). A 1 kg aliquot was analyzed for leachable gold at BIGS Global Burkina s.a.r.l in Ouagadougou, by bottle-roll cyanidation using a LeachWell catalyst.

The RC drilling samples were divided by Orezone employees using Rotary Sample Dividers (RSDs). A 2 kg split was prepared by SGS Burkina Faso s.a.r.l. at the Bomboré site facility and then split by Orezone to 1 kg using Rotary Sample Dividers (RSDs). A 1 kg aliquot was analyzed for leachable gold at BIGS Global Burkina s.a.r.l in Ouagadougou, by bottle-roll cyanidation using a LeachWell catalyst.

The leach residues from all samples with a leach grade in excess of 0.2 g/t were prepared by BIGS Global Burkina s.a.r.l. and then split by Orezone to 50 g using Rotary Sample Dividers (RSDs). A 50 g aliquot was analyzed by fire assay at SGS Burkina Faso s.a.r.l.

Orezone employs a rigorous Quality Control Program (QCP) including a minimum of 10% standards, blanks and duplicates. This program was executed under the supervision of Pascal Marquis, SVP Exploration for Orezone, who is a Qualified Person under National Instrument 43-101 and approved the technical information in this release. A complete table of results and the NI 43-101 Bomboré Resource Report that describes the Bomboré resource model can be found at www.orezone.com.

About Orezone Gold Corporation

Orezone is a Canadian company with a gold discovery track record of +12 M oz and recent mine development experience in Burkina Faso, West Africa. The company owns a 100% interest in Bomboré, the largest undeveloped gold deposit in the country that is situated 85 km east of the capital city, adjacent to an international highway. Mineral resources are constrained within optimized open pit shells that span 11 km, and include 4.13 Moz of measured and indicated (125 Mt @ 1.03 g/t) and 1.03 Moz of inferred resources (35 Mt @ 1.00 g/t) with an average depth of drilling to only 120 meters. The Company is working to further expand the resources at Bomboré while it completes a DFS for an oxide-only CIL plant by Q3 2013 and becomes a mid-tier gold producer by 2015.

FORWARD-LOOKING STATEMENTS AND FORWARD-LOOKING INFORMATION: This news release contains certain "forward-looking statements" within the meaning of applicable Canadian securities laws. Forward-looking statements and forward-looking information are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements in this release include statements regarding, among others; capital and operating cost estimates; gold production for the project; completion of a DFS in Q3 2013; completion of an internal resource update in Q1 2013; commencement of production at the Bomboré Project in 2015.

FORWARD-LOOKING STATEMENTS are based on certain assumptions, the opinions and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses, the ability of contracted parties (including laboratories and drill companies to provide services as contracted); uncertainties relating to the availability and costs of financing needed in the future and other factors. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on forward-looking statements. Comparisons between any resource model or estimates with the subsequent drill results are preliminary in nature and should not be relied upon as potential qualified changes to any future resource updates or estimates.

Readers are advised that National Instrument 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral resources be reported separately. Readers should refer to the annual information form of Orezone for the year ended December 31, 2011 and other continuous disclosure documents filed by Orezone since January 1, 2012 available at www.sedar.com, for this detailed information, which is subject to the qualifications and notes set forth therein.

(1) Weighted average grade of individual assays, cut to 5 g/t. NSA: No Significant Assay.

(2) Weighted average grade of uncut individual assays

(3) Weighted average grade of individual assays cut to 5 g/t

(4) Composite width and grade are preliminary where leach residue fire assay results are pending.

(5) Weighted average grade of uncut individual assays

(6) Weighted average grade of individual assays cut to 5 g/t

(7) Composite width and grade are preliminary where leach residue fire assay results are pending



Ron Little, CEO
(613) 241-3699
Toll Free: (888) 673-0663
rlittle@orezone.com
or
Pascal Marquis,
SVP Exploration
(613) 241-3699
Toll Free: (888) 673-0663
pmarquis@orezone.com
Data and Statistics for these countries : Burkina Faso | All
Gold and Silver Prices for these countries : Burkina Faso | All

Orezone Gold Corp.

EXPLORATION STAGE
CODE : ORE.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Orezone Gold is a gold exploration company based in Canada.

Its main exploration properties are ZELINE 1 & ZELINE 4 and KOSSA in Niger and BOMBORE, SEGA and BONDI in Burkina Faso.

Orezone Gold is listed in Canada. Its market capitalisation is CA$ 98.6 millions as of today (US$ 71.6 millions, € 67.2 millions).

Its stock quote reached its highest recent level on April 08, 2011 at CA$ 5.26, and its lowest recent point on November 27, 2015 at CA$ 0.22.

Orezone Gold has 117 350 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Orezone Gold Corp.
2009 Annual Report
2008 Annual Report
Annual report 2006
Financings of Orezone Gold Corp.
11/13/2013Closes C$5M Non-Brokered Private Placement
10/30/2013Arranges C$5M Non-Brokered Private Placement
6/23/2010Arranges C$5M Private Placement for Brighton Energy
1/2/2009 Closes Private Placement, Updates Timing of Transaction wit...
Financials of Orezone Gold Corp.
11/15/2008 Third Quarter Update
Project news of Orezone Gold Corp.
3/27/2013(Bombore)Positive Progress Report for Bombore Feasibility Study and R...
11/13/2012(Bombore)Positive Drill Results Support Further Growth at Bombore
9/4/2012(Bombore)35,000 m of Positive Drill Results Support Further Growth at...
8/27/2012(Bombore)Bombore Gold Project Reaches World Class Size
2/22/2012(Bombore)Provides Positive Update on its Bombore Gold Project
2/3/2012(Sega)Sells Sega Project to Cluff Gold for $29.6M
1/10/2012(Bombore)Reports Continued Positive Results at Bombore Gold Project
11/28/2011Brighton Expands Niger Uranium Discovery to 14 km2 of Minera...
8/18/2011Orezone Confirms Heap Leach Potential of Sulphide Resources ...
8/18/2011(Sega)Confirms Heap Leach Potential of Sulphide Resources at Sega
8/8/2011Orezone Expands Bombor\303\251 Gold Project ...
8/8/2011(Bombore)Expands Bombore Gold Project Area 60% With New Permit
7/26/2011(Bombore)Reports Higher Gold Grades and Improved Continuity at Bombor...
6/21/2011(Bombore)Bombor=E9 Gold Project Has PositivePreliminary Economic Asse...
6/20/2011Orezone Bombor\303\251 Gold Project ...
4/11/2011(Sega)Confirms Positive Metallurgical Results for Sega Gold Deposi...
3/24/2011(Bombore)Positive Drill Results at Bombore Continue to Confirm Model
3/23/2011(Bombore)Positive Drill Results at Bombore Continue to Confirm Model
2/24/2011(Zeline 1 & Zeline 4)/Brighton Makes Significant New Uranium Discovery in Niger: ...
7/6/2010(Bombore)Fourth Round of Positive Drill Results at Bombore
6/16/2010(Bombore)Positive Results Continue From Bombore Infill and Expansion ...
5/13/2010Additional PositiveInfill and Expansion Drilling Results at ...
3/25/2010(Bombore)Bombore Auger Drilling Results Indicate Possible 2.5km of Ex...
1/28/2010(Bombore)Commences $2 Million Drill Program at Bombore
1/5/2010(Sega)Increases Sega Project Gold Resources
12/8/2009(Bombore)Improves on Final Bombore Metallurgical Results
10/14/2009(Bombore)Confirms Bombore Gold Deposit is Amenable to Heap Leaching
7/29/2009(Bombore)Completes Drilling Below Surface Resources at Bombore
6/24/2009(Bombore)Orezone Confirms Mineralization at Bombore Below Surface Res...
11/10/2008(Bombore)Almost Triples Gold Resource at Bombore Project
6/30/2008(Essakane)2008 Technical report
Corporate news of Orezone Gold Corp.
12/4/2015Orezone Approved to Move from TSX to TSX-V
9/16/2015Orezone Provides Update on Bomboré Permitting and Bondi Proj...
9/16/2015Orezone Provides Update on Bombore Permitting and Bondi Proj...
7/21/2015Orezone Closes C$6.5M Investment
7/6/2015Orezone Arranges C$6.5M Investment that Includes Ross Beaty
1/27/2015Sandstorm Gold Announces 10 Royalty Agreements
1/27/2015Orezone Closes US$3 Million Financing and Secures an Additio...
1/27/2015Sandstorm Gold Announces 10 Royalty Agreements
1/27/2015Orezone Closes US$3Million Financing
11/24/2014Bombore Gold Project Feasibility Study Update
11/10/2014Orezone update on Operations in Burkina Faso
11/10/2014Orezone Update on Operations in Burkina Faso
11/3/2014Orezone update on Bomboré and Burkina Faso
11/3/2014Orezone Update on Bombore and Burkina Faso
10/14/2014Bombore Gold Project Feasibility Study Update
9/8/2014Bombore Gold Project Feasibility Study Update
7/10/2014Positive Metallurgical and Drilling Results at Bombore
6/4/2014Positive Metallurgical Test Results at Bombore
5/23/2014Orezone Gold Corporation: Results of Annual General Meeting
5/21/2014Orezone Appoints Chief Operating Officer
6/20/2013News Release
6/20/2013(Bombore)Shifts Focus of Bombore Study to Heap Leach Scenario
6/4/2013(Bondi)Positive Metallurgical and Drill Results from the Bondi Proj...
5/24/2013Results of Annual General Meeting
5/24/2013Results of Annual General Meeting
4/29/2013(Bombore)Increases and Upgrades the Bombore Gold Project Resource
2/4/2013(Bombore)Bombore FS and Resource Update Will Include +400,000m of Dri...
5/31/2012(Bombore)Bombore Drill Program Continues with Positive Results
5/23/2012(Sega)Completes the Sale of Sega to Cluff Gold for $26.5M
3/30/2012(Bombore)Completes 215,000 Drill Program at Bombore
2/7/2012to Consolidate Brighton Energy Corporation
12/7/2011Brighton Energy Makes Another Near-Surface Uranium Discovery...
9/12/2011(Bombore)Positive Results Continue at Bombore With Seven Drills Opera...
5/26/2011(Bombore)Reports Additional Positive Drill Results at Bombore Gold Pr...
5/16/2011.: Brighton Energy Discovers Additional Uranium Mineralizati...
4/6/2011Expands Board and Management Team
3/7/2011Burkina Faso is Ra
2/17/2010Brighton Energy Limited Receives Niger Uranium Permit Approv...
7/8/2009Ron Little named Ernst & Young Entrepreneur of the Year Fina...
2/25/2009IAMGOLD Completes Acquisition of Orezone
2/20/2009Obtains Final Court Approval for IAMGOLD Transaction
2/19/2009Shareholders Approve Arrangement with IAMGOLD
2/13/2009 Updates Status of Shareholder Vote
9/29/2005An emerging producer in Burkina Faso, West Africa
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ORE.TO)
0.840+0.00%
TORONTO
CA$ 0.840
04/18 16:31 -
0%
Prev close Open
0.840 0.840
Low High
0.820 0.840
Year l/h YTD var.
0.690 -  0.900 -1.18%
52 week l/h 52 week var.
0.690 -  1.61 -46.84%
Volume 1 month var.
188,770 -%
24hGold TrendPower© : -19
Produces
Develops
Explores for Copper - Gold - Molybdenum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/10/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-15.15%
2023-21.43%1.650.82
20222.44%1.811.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.95+3.38%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-2.44%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :