In the same category
First Quarter Results 2013 & Operational Highlights
Published : December 20, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

LONDON, UNITED KINGDOM and BAIE VERTE, NEWFOUNDLAND AND LABRADOR--(Marketwire - Dec. 20, 2012) - Rambler Metals and Mining PLC (News - Market indicators)(AIM:RMM) ("Rambler" or the "Company") is pleased to report its financial results and operational highlights for the three months ended 31 October 2012. This was a significant period for the Company as Management successfully completed commissioning the Ming Copper-Gold Mine leading to the declaration of commercial production commencing on 1 November 2012. Testing and commissioning continued throughout the first quarter of fiscal 2013 returning revenue of $9.5 million from the provisional sale of 4,797 wet metric tonnes ('wmt') of copper concentrate.

Highlights of the first quarter of the 2013 fiscal year included:

Capital Development and Operational Achievements

  • Produced a total of 4,955 wmt of concentrate during the quarter for a total of 7,450 wmt since the start of commissioning in May 2012. Concentrate produced averaged 27% copper with 6 g/t gold and 49 g/t silver with milling recoveries for copper and gold consistently averaging 90% and 65% respectively.

  • Development into the high grade 1807 copper zone continued with ore being stockpiled as development progressed. With the majority of tonnes for the 2013 fiscal year coming from this zone, ore access on multiple levels was the main focus for underground development crews. 

  • During a scheduled 10-day shutdown in September, the Company finalized preparations to begin re-processing floatation tailings through the carbon-in-pulp circuit to try and improve gold recovery to 85%. In plant testing is expected to begin before the end of the calendar year.

  • Provided its customer, Transamine Trading S.A. ('Transamine'), with notice of "Load Readiness" for the first shipment of copper/gold/silver concentrate from Goodyear's Cove. Subsequent to quarter end, the vessel arrived at port and loaded 8,873 wmt of concentrate destined for a European smelter. 

Financial Highlights (All expressed in CAD$)

Revenue

  • A total of 4,797 wmt of concentrate were provisionally invoiced to Transamine during the period at an average price of $3.49 per pound copper, $1,668 gold per ounce gold and $31.16 per ounce silver, generating $9.5 million in revenue.

Loss

  • The net loss for the quarter ended 31 October 2012 was $718,000 or $0.005 per share; which compares with a loss of $845,000 or $0.007 per share for the quarter ended 31 October 2011. 

Cash flow and cash resources

  • Cash flows utilized for operating activities for the quarter ended 31 October 2012 were $1,157,000 compared with $1,211,000 in the quarter ended 31 July 2012 and cash generated from operations of $1,284,000 in the quarter ended 31 October 2011. Cash was generated in the quarter ended 31 October 2011 from gold sales from the Company's satellite deposits.

  • Cash resources (including short-term investments) at 31 October 2012, were $4.9 million and as of 20 December 2012 had increased to $6.6 million after a $500,000 repayment on the Company's credit facility. Operating cash flows are anticipated to build throughout the balance of the fiscal year in line with the move to commercial production effective 1 November 2012.

Financing, Royalty and Investment

  • During the period a repayment of US$379,101 (project to date US$8,234,542) was made on the Company's gold loan from the delivery of 214 ounces (project to date 4,988 ounces) of gold representing the payable portion of gold contained within the first six lots of concentrate provisionally invoiced to Transamine. 

  • On 9 October 2012 the Company announced the purchase of a 1% net smelter royalty held over the mine for a total consideration of $500,000. This is the second royalty Rambler purchased since starting commissioning leaving a combined net smelter royalty of 1.5% on the Ming Mine.

Exploration and evaluation

  • Development into the 1806 zone via the 107L drift continued and will be used to explore the possible down dip extension of the 1806 zone in fiscal 2Q. In addition, planning continued for further exploration of the 1807 zone, both across strike and down plunge. This work is expected to begin later in the fiscal year as development access is made available.

Outlook

Management continue to pursue the following objectives:

  • Continue mining and milling the exposed 1807 workplaces for the generation of copper concentrate revenue from the Ming Mine. Place additional development focus into preparing this high-grade zone for further exploration, both up-dip and down-dip, for inclusion in future resource and reserve estimates.

  • Focus immediate exploration on the down-dip extension of the 1806 zone over the next quarter.

  • Optimize the mining and processing of ores from the Ming Mine in addition to continuing to evaluate opportunities for a possible future expansion into the Lower Footwall Zone.

  • Become a strategic long-term low-cost producer on the Baie Verte Peninsula, and throughout Atlantic Canada, by selectively pursuing growth opportunities including joint ventures, mergers and acquisitions, including the Company's investment in Maritime Resources Corp.

  • Explore how the Company may better leverage its venture listing on the Toronto Stock Exchange.

George Ogilvie, President and CEO of Rambler, commented:

"With the commissioning of the Ming Mine, and the subsequent declaration of commercial production of copper concentrate on 1 November 2012, comes the culmination of a lot of hard work by the Rambler team. Over the next year, we will continue that track-record and focus our efforts on optimising the mining and processing at the Ming Mine while continuing to evaluate opportunities for a possible expansion into the Lower Footwall Zone."

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining plc.

Tonnes referenced are dry metric tonnes unless otherwise indicated.

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable securities law.

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Rambler Metals and Mining
George Ogilvie, P.Eng.
President and CEO
709-800-1929
709-800-1921
or
Rambler Metals & Mining Plc.
Corporate Office
+44 (0) 20 8652-2700
+44 (0) 20 8652-2719 (FAX)
www.ramblermines.com
or
Seymour Pierce Limited
Stewart Dickson / Jeremy Stephenson
+44 (0) 20-7107-8000
or
Pelham Bell Pottinger
Charles Vivian / Daniel Thole
+44 (0) 20 7861 3921
or
Ocean Equities Limited
Guy Wilkes
+44 (0) 20-7786-4370
Data and Statistics for these countries : Canada | United Kingdom | All
Gold and Silver Prices for these countries : Canada | United Kingdom | All

Rambler Metals & Mining Plc

EXPLORATION STAGE
CODE : RMM.L
ISIN : GB00B06Y3F14
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Rambler Metals & Mining is a zinc and gold exploration company based in United kingdom.

Rambler Metals & Mining holds various exploration projects in Canada.

Its main exploration properties are BIG BEAR and MING MINE in Canada.

Rambler Metals & Mining is listed in Canada and in United Kingdom. Its market capitalisation is GBX 1.1 billions as of today (US$ 1.3 billions, € 1.2 billions).

Its stock quote reached its highest recent level on February 17, 2017 at GBX 9.99, and its lowest recent point on December 30, 2022 at GBX 0.05.

Rambler Metals & Mining has 549 739 702 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Rambler Metals & Mining Plc
4/23/2007Announces Private Placement
Nominations of Rambler Metals & Mining Plc
9/24/2012-Board Appointment
8/11/2008 Appoints General Manager
Financials of Rambler Metals & Mining Plc
12/9/2013Rambler Reports Financial Results for Quarter Ended 31 Octob...
11/20/2013Rambler Provides a Summary of its First Quarter 2014 Operati...
10/29/2013Rambler Reports Financial Results for the Year Ended July 31...
10/22/2012and Mining plc Financial Results Year Ended 31 July 2012
3/21/2011Financial Results Quarter Ended January 31, 2011
12/8/2009First Quarter Results 2010 & Operational Highlights
Project news of Rambler Metals & Mining Plc
9/2/2015Rambler Enters Into Purchase Agreement with its Off-take Par...
9/2/2015Rambler Enters Into Purchase Agreement with its Off-take Par...
1/14/2014Rambler Ships More High Grade Copper Concentrate to Internat...
11/13/2013Rambler Provides Diamond Drilling Update at its Ming Mine
10/1/2013Rambler Ships More High Grade Copper Concentrate; 26,000 Wet...
5/29/2013Rambler Ships More High Grade Copper Concentrate, Over 18,00...
5/28/2013Strategic Partner Releases Its First NI43-101
5/1/2013Rambler Makes Further Repayment to Sprott Resource Lending P...
4/16/2013Rambler Completes Property Arrangement to Explore for New Go...
10/9/2012(Ming Mine)Buys Out 1% Net Smelter Royalty on the Ming Mine Property
9/4/2012Rambler Continues to Optimize Copper and Gold Production Whi...
2/15/2012and Mining Aligns Itself With Maritime Resources Through 17%...
6/1/2011Rambler Signs Exploration and Development Alliance with Mari...
5/10/2011Rambler Develops Through High Grade Gold Zone Returning 227....
5/10/2011Develops Through High Grade Gold Zone Returning 227.15 g/t G...
4/26/2011Production Approval Received for Nugget Pond Crown Pillar Al...
3/2/2011(Ming Mine) Updated Footwall Zone Resource Estimate
3/2/2011Realizes a 21% Increase in Contained Metal by Updating its F...
2/16/2011(Ming Mine)Progresses in Bringing Its Copper and Gold Projects Into Pro...
6/1/2010(Ming Mine)Environmental Approval Received
4/12/2010(Ming Mine)Environmental Project Registration and Project Update for th...
2/26/2009(Ming Mine)NI43-101 Resource Estimate for the Ming Mine
2/10/2009(Ming Mine)and Mining Reports Positive Results From Its Lock Cycle Metu...
7/9/2008(Ming Mine)Ming Mine Dewatered and Project Update
6/16/2008Files NI43-101 Technical Report
6/2/2008Completes Scoping Study and Moves Ahead to Pre-Feasibility
5/15/2008(Ming Mine) Drills 5.10 metres of 3.68 g/T Gold and 15.77% Copper
4/30/2008Publishes Its NI43-101 Resource Estimate for the Ming Mine
3/26/2008Underground Footwall Program Drills 11.7 Metres of 2.25% Cop...
2/19/2008Directional Drilling Returns 5.37% copper over 3.0 metres
12/12/2007(Ming Mine)Drills 60.7 Feet of 4.26% Copper, 4.3 g/T Gold and 1.25% Zin...
Corporate news of Rambler Metals & Mining Plc
7/28/2016Director / PDMR Shareholding
7/28/2016Director / PDMR Shareholding
6/29/2016UNAUDITED CONSOLIDATED FINANCIAL INFORMATION FOR THE THIRD Q...
6/29/2016UNAUDITED CONSOLIDATED FINANCIAL INFORMATION FOR THE THIRD Q...
6/13/2016Notification of Major Interests in Shares - Correction
6/13/2016Notification of Major Interests in Shares - Correction
6/9/2016Notification of Major Interest in Shares
6/9/2016Notification of Major Interest in Shares
6/7/2016Notification of Major Interest in Shares
6/6/2016Transaction Close
6/6/2016Transaction Close
6/6/2016Holdings in Company
6/6/2016Holdings in Company
5/27/2016Result of General Meeting
5/27/2016Result of General Meeting
5/20/2016Notification of Major Interests in Shares
2/2/2016Rambler Metals & Mining PLC: Issuance of Share
2/2/2016Rambler Metals & Mining PLC: Issuance of Share
2/2/2016Rambler Metals & Mining PLC: 12th Shipment of High Grade Cop...
2/2/2016Rambler Metals & Mining PLC: 12th Shipment of High Grade Cop...
1/13/2016Rambler Metals and Mining Plc Completes Acquisition of Thund...
1/13/2016Rambler Metals and Mining Plc Completes Acquisition of Thund...
1/13/2016Acquisition of Thundermin Resources Inc.
1/13/2016Acquisition of Thundermin Resources Inc.
12/22/2015Rambler Metals & Mining PLC: Thundermin Resources Shareholde...
12/22/2015Rambler Metals & Mining PLC: Thundermin Resources Shareholde...
12/22/2015Thundermin Resources Inc. Shareholders Approve Merger with R...
12/22/2015Thundermin Resources Inc. Shareholders Approve Merger with R...
12/14/2015Unaudited Consolidated Financial Information for the Quarter...
12/14/2015Unaudited Consolidated Financial Information for the Quarter...
12/14/2015Rambler Metals & Mining PLC Announces Unaudited Consolidated...
12/14/2015Rambler Metals & Mining PLC Announces Unaudited Consolidated...
10/26/2015Rambler Metals and Mining PLC: Financial Results for year en...
10/26/2015Rambler Metals and Mining PLC: Financial Results for year en...
10/26/2015Financial Results Year End July 31, 2015
9/9/2015Rambler Files Lower Footwall Zone Prefeasibility Technical R...
9/9/2015Rambler Files Lower Footwall Zone Prefeasibility Technical R...
9/8/2015Fiscal 2015 Q4 and Yearend Production Results
9/8/2015Fiscal 2015 Q4 and Yearend Production Results
9/3/2015Rambler and Thundermin Enter Into a Letter of intent Outlini...
9/3/2015Rambler and Thundermin Enter Into a Letter of intent Outlini...
9/2/2015Rambler Completes its 11th Shipment of High Grade Copper Con...
9/2/2015Rambler Completes its 11th Shipment of High Grade Copper Con...
9/2/2015Rambler Metals & Mining PLC: Purchase Agreement With Off-Tak...
9/2/2015Rambler Metals & Mining PLC: Purchase Agreement With Off-Tak...
8/19/2015Rambler Metals & Mining PLC: 11th Shipment of High Grade Cop...
7/31/2015Rambler Metals & Mining PLC: TR-1: Notification of Major Int...
7/31/2015Rambler Metals & Mining PLC: TR-1: Notification of Major Int...
7/31/2015TR-1: Notification of Major Interest in Shares
7/31/2015TR-1: Notification of Major Interest in Shares
7/20/2015Prefeasibility Study
7/20/2015Rambler Metals & Mining PLC Announces Prefeasibility Study O...
7/20/2015Rambler Metals & Mining PLC Announces Prefeasibility Study O...
6/22/2015Financial Results for the Third Quarter 2015
6/22/2015Rambler Metals & Mining PLC: Financial Results for the Third...
6/22/2015Rambler Metals & Mining PLC: Financial Results for the Third...
3/19/2015Rambler Metals and Mining PLC: Second Quarter & Interim Fina...
3/19/2015Rambler Metals and Mining PLC: Second Quarter & Interim Fina...
3/19/2015Rambler Management Discussion and Analysis for the Quarter e...
3/19/2015Rambler Management Discussion and Analysis for the Quarter e...
3/19/2015Financial Results for the Second Quarter & Interim Six Month...
2/23/2015Second Quarter 2015 Production Results
2/23/2015Rambler Metals and Mining plc: Second Quarter 2015 Productio...
2/23/2015Rambler Metals and Mining plc: Second Quarter 2015 Productio...
2/23/2015and Mining plc: Second Quarter 2015 Production Results
2/9/2015Progress Update on the Lower Footwall Zone
2/9/2015Rambler Metals & Mining PLC Announces Progress Update on the...
2/9/2015Rambler Metals & Mining PLC Announces Progress Update on the...
1/30/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
1/30/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
1/30/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
1/30/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
12/29/2014Holdings in Company
12/29/2014Holdings in Company
12/29/2014Rambler Metals & Mining PLC: Holdings in Company
12/29/2014Rambler Metals & Mining PLC: Holdings in Company
12/23/2014Fifth High Grade Copper Concentrate Shipment Delivered in th...
12/23/2014Fifth High Grade Copper Concentrate Shipment Delivered in th...
12/9/2014First Quarter 2015 Unaudited Financial Results
12/9/2014First Quarter 2015 Unaudited Financial Results
12/9/2014Rambler Metals & Mining PLC Unaudited Consolidated Financial...
12/9/2014Rambler Metals & Mining PLC Unaudited Consolidated Financial...
12/4/2014Rambler Metals & Mining PLC: Result of Annual General Meetin...
12/4/2014Rambler Metals & Mining PLC: Result of Annual General Meetin...
12/2/2014Resource and Technical Update and Update on DMS Project
12/2/2014Resource and Technical Update and Update on DMS Project
12/2/2014Rambler Provides Resource and Technical Update, Reporting a ...
12/2/2014Rambler Provides Resource and Technical Update, Reporting a ...
11/27/2014First Quarter 2015 Production Results
11/27/2014First Quarter 2015 Production Results
11/27/2014Rambler Metals & Mining PLC: First Quarter 2015 Production R...
11/27/2014Rambler Metals & Mining PLC: First Quarter 2015 Production R...
11/26/2014Rambler Provides Reminder of Upcoming Events
11/26/2014Rambler Provides Reminder of Upcoming Events
11/26/2014Rambler Provides Reminder of Upcoming Events
11/26/2014Rambler Metals & Mining PLC: Holding(s) in Company
11/17/2014Hammerdown Gold Mine Update
11/17/2014Rambler and Maritime Agree to Evaluate the Viability of Rest...
10/29/2014Proposed Change to its Board of Directors
10/29/2014Rambler Metals & Mining PLC Announces Proposed Change to Boa...
10/27/2014Financial Results Year Ended July 31, 2014
10/27/2014Rambler Metals & Mining PLC Announces Financial Results Year...
9/23/2014Fourth High Grade Copper Concentrate Shipment Delivered in t...
9/9/2014CORRECTION - Rambler Metals and Mining plc: Rambler Provides...
8/21/2014Rambler Metals & Mining PLC Announces Fourth Quarter and Yea...
8/5/2014Rambler Continues Its Investment in Marathon Gold
7/3/2014Rambler Continues to Ship High Grade Copper Concentrate
6/19/2014Rambler Metals & Mining PLC: TR-1: Notification of Major Int...
6/19/2014Financial Results for Quarter Ended 30 April 2014 Debt Free ...
6/19/2014Rambler Metals & Mining PLC: Financial Results for Quarter E...
1/27/2014Rambler Updates the Reserve and Resource Estimates at its Mi...
1/15/2014Rambler Senior Management Changes
12/4/2013Marathon Gold Enters into an Agreement With Rambler Metals a...
12/3/2013Rambler Reduces Debt Facility with Sprott Lending Partnershi...
10/29/2013and Mining PLC: Report of the Directors and Audited Financia...
10/15/2013Completes Purchase of 50% Interest in the Little Deer Projec...
10/1/2013Ships More High Grade Copper Concentrate
9/17/2013Enters Conditional Agreement to Purchase Cornerstone's 50% I...
9/9/2013TR-1: Notification of Major Interest in Shares
9/3/2013Rambler Makes a $500,000 Debt Re-Payment to Sprott Lending P...
9/3/2013Makes a $500,000 Debt Re-Payment to Sprott Lending Partnersh...
8/23/2013Announces Options Exercising
7/18/2013Exercises Warrants in Support of Maritime's Work Program on ...
7/11/2013Strategic Partner Maritime Files Technical Report
6/27/2013and Mining Releases Its Q3 2013 Results
6/24/2013Rambler Provides Diamond Drilling Update - Intersected 13.18...
6/24/2013Provides Diamond Drilling Update
6/24/2013Provides Diamond Drilling Update
6/3/2013Rambler Pays a Further $600,000 in Debt Re-Payment to Sprott...
6/3/2013Pays a Further $600,000 in Debt Re-Payment To Sprott Lending...
5/1/2013Makes Further Repayment to Sprott Resource Lending Partnersh...
4/16/2013Completes Property Arrangement to Explore for New Gold & Cop...
4/15/2013and Mining - Novation of Nominated Advisor and Brokerage Agr...
3/27/2013Extends Loan Arrangement With Sprott Resource Lending Partne...
2/21/2013Non-Executive Board Member Resigns
1/28/2013TR-1: Notification of Major Interest in Shares
11/13/2012Appoints New General Manager at the Ming Copper-Gold Mine; F...
10/29/2012(Ming Mine)and Mining Plc, Rambler's Ming Mine Moves into Commercial Pr...
5/30/2012Rambler Begins Trucking Copper Concentrate Following Start-u...
5/2/2012Rambler Completes Record Gold Pour of 1935 Ounces
4/11/2012Rambler Produces Over 9,700 Ounces of Gold While Exploration...
2/22/2012and Mining Produces Over 5,000 Ounces of Gold and Intersects...
1/9/2012Rambler Signs Commercial Off-take Agreement with Transamine ...
6/28/2011Significant Progress Being Made at Rambler's Copper Gold Pro...
6/17/2011Notification of Major Interest in Shares
6/1/2011Signs Exploration and Development Alliance With Maritime and...
5/5/2011Holding In Company
5/3/2011Results of EGM, Closing of Announced Placing and Admission o...
4/20/2011and Mining Presenting and the Proactive Investors One2One Fo...
4/7/2011Notice of General Meeting
3/14/2011Receives Final Permitting For the Ming Copper-Gold Mine
3/2/2011and Mining plc: Updated Footwall Zone Resource Estimate
12/1/2010VP Corporate Development Assumes Corporate Secretary Role
8/10/2010Construction Permits Received for Nugget Pond and Ming Mine ...
4/26/2010Financial Controller Promoted to Chief Financial Officer
3/26/2010Proposed Placing of £2.7 Million to Support Bringing Min
2/15/2010Apointment of Joint Broker
2/8/2010Hires Key Mine Engineering Staff
12/8/2009Features on CEO Clips airing on BNN
11/23/2009Notice of AGM
10/27/2009Completes Purchase of the Nugget Pond Processing Facility
10/22/2009Confirms Closing of Previously Announced Placing
9/29/2009Proposed Placing
9/25/2009NOTICE OF EGM CIRCULAR
9/21/2009Explores for New Gold
9/9/2009COMPLETES NEGOIATIONS FOR THE SALE AND PURCHASE OF THE NUGGE...
8/13/2009BEGINS NEGOTIATING THE DETAILS OF A SALE AND PURCHASE AGREEM...
5/27/2009Q3 2009 Results
1/21/2009REPORTS POSITIVE RESULTS FROM ITS TITAN 24 GEOPHYSICAL SURVE...
1/8/2009Implements Cost Reduction Programme
11/10/2008and Mining Drills 9.50 metres of 20.31 g/t Gold, 4.21 % Copp...
9/23/2008Drills 4.00 metres of 0.25 g/T Gold and 4.48 % Copper
9/9/2008Drills 2.9 metres of 3.05 g/T Gold and 5.19% Copper
8/27/2008Drills 7.4 metres of 2.22 % Copper in the Lower Footwall Zon...
6/18/2008ootwall Zone
5/7/2008Drills 6.00 metres of 2.86% Copper
4/15/2008Underground Gold Exploration Continues to Develop: Drills 5....
2/28/20081807 Zone Returns 4.0 Metres of 6.3% Copper New 200 Metre St...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
LSE (RMM.L)TSX-V (RAB.V)
2.00+3603.70%0.030+20.00%
LSE
GBX 2.00
04/27 12:21 1.95
3603.7%
Prev close Open
0.054 2.00
Low High
2.00 2.00
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
2.00 -  2.00 3,603.70%
Volume 1 month var.
256,931 -%
24hGold TrendPower© : -8
Produces
Develops
Explores for Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/14/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56+3.70%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.92-0.81%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.12+1.34%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :