Chart usGOLD   Chart usSILVER  
 
Food for thought
The nail that sticks out is the one that gets hammered
Anonymous  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1231.850.39
Silver 17.16-0.02
Platinum 1251.502.50
Palladium 777.201.40
WORLD MARKETS
DOWJONES 16678210
NASDAQ 445370
NIKKEI 15139-57
ASX 5370-3
CAC 40 415853
DAX 9047107
HUI 1850
XAU 760
CURRENCIES (€)
AUS $ 1.4434
CAN $ 1.4204
US $ 1.2647
GBP (£) 0.7889
Sw Fr 1.2066
YEN 136.9240
CURRENCIES ($)
AUS $ 1.1413
CAN $ 1.1231
Euro 0.7907
GBP (£) 0.6238
Sw Fr 0.9539
YEN 108.2530
RATIOS & INDEXES
Gold / Silver71.79
Gold / Oil15.08
Dowjones / Gold13.54
COMMODITIES
Copper 3.060.03
WTI Oil 81.671.54
Nat. Gas 3.65-0.01
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
Temex Intersects 2.13 g/t gold over 47.69 metres and Discovers Additional High Grade Gold at Juby Gold Project, Matachewan, Ontario
Published : January 15, 2013
( 0 vote, 0/5 ) Print article
     
Tweet

Temex Intersects 2.13 g/t gold over 47.69 metres and Discovers Additional High Grade Gold at Juby Gold Project, Matachewan, Ontario

TORONTO, Jan. 15, 2013 /CNW/ - Temex Resources Corp. (TSXV: TME), (FWB: TQ1) ("Temex" or "the Company") announces it has received the first set of assays from its drilling program at the Company's Juby Gold Project near Matachewan, Ontario. Results for drill holes GL12-09 to GL12-14 on the Golden Lake portion of the project continue to rapidly expand the Juby Main Zone gold zone to depth and demonstrate excellent continuity for 1 kilometre along strike to the west, intersect new zones of high grade gold mineralization, and confirm previous drilling results in this new area of the project.

All six holes reported today successfully intersected gold mineralization that is typical of the Juby Main Zone ("JMZ") over extensive and increasing widths. Importantly, there is an increasing incidence of narrow, but high grade, intervals including new discoveries in the hanging wall Timiskaming sediments and feldspar porphyry units containing visible gold, with assays of 31.39 g/t gold over 0.50 metres, 24.71 g/t gold over 0.53 metres, and 75.86 g/t gold over 0.50 metres; the latter is the highest individual gold assay recorded to date by Temex on the Juby Project.  Diamond Drilling continues with two rigs.

Highlights of the drill results are shown below and detailed in the following table.

  • GL12-10: 1.00 g/t gold over 166.98 metres including 2.13 g/t gold over 47.69 metres which includes 3.79 g/t gold over 14.22 metres and 24.71 g/t gold over 0.53 metres
  • GL12-12: 1.03 g/t gold over 18.50 metres and 1.65 g/t gold over 33.40 metres including 14.41 g/t gold over 0.65 metres and another interval of 1.76 g/t gold over 23.10 metres
  • GL12-13: 75.86 g/t gold over 0.50 metres; 0.51 g/t gold over 38.00 metres and 1.14 g/t gold over 45.00 metres including 2.92 g/t gold over 14.50 metres including 4.83 g/t gold over 7.88 metres and another interval of 31.39 g/t gold over 0.50 metres

"We are extremely pleased with the results reported today which continue to demonstrate the Juby Main Zone is a very large gold system that is wide open at depth and along strike. Our current drilling on the Golden Lake portion of the project is testing only a fraction of the Juby Main Zone trend, acquired in late 2012 through our recent consolidation of the Goldeye properties which expanded our landholdings ten-fold on this outstanding project," commented Ian Campbell, President and CEO.

The six holes reported today were drilled on three sections which, combined with the Company's first eight holes drilled on the Golden Lake Property (news release July 23, 2012), extend the known gold mineralized trend a further 750 metres to the west and demonstrate excellent continuity of gold mineralization from the current western extent of the Juby Main Zone NI 43-101 gold resources. The current drill pattern consists of a minimum of two holes drilled per section, with sections spaced 75 to 100 metres apart.

The Juby Main Zone (news releases January 16 and February 28, 2012) contains a National Instrument 43-101 ("NI 43-101") compliant resource of 22.3 million tonnes at a grade of 1.30 g/t gold for 934,645 ounces of gold in the Indicated category and 28.2 million tonnes at a grade of 1.00 g/t gold for 905,621 ounces of gold in the Inferred category, both at a cut-off grade of 0.40 g/t gold. This resource was defined from surface along a strike length of 2,800 metres and is hosted in altered Timiskaming sediments and felsic intrusive rocks.

The Juby Gold Project is located 100 kilometres south of Timmins, Canada's largest gold camp, and is situated along the southwestern extension of the Larder Lake-Cadillac Fault Zone between AuRico Gold Inc.'s Young Davidson gold mine at Matachewan and IAMGOLD Corporation's Côté Lake gold deposit to the west. Temex is well financed with $9 million in cash.

Work Program

The drill program commenced with two rigs on the projected western portion of the Juby Main Zone on the Golden Lake Property where drilling of eight holes in spring 2012 intersected widespread gold mineralization typical of the Juby Main Zone a further 750 metres west where it remains wide open.  Between late November and late December, 14 holes were completed for a total of 4,262 metres and approximately 4,600 samples sent for analysis; the two rigs resumed drilling on January 8, 2013.

Golden Lake Option Agreement

Pursuant to the option agreement on the Golden Lake Property, Temex has satisfied the obligations under the agreement due on or before the first anniversary by making cash payments to the optionors totalling $100,000 and completing exploration expenditures of a minimum of $250,000 on the claims.  In addition, the Company has issued an aggregate of 100,000 common shares of Temex Resources Corp. to the optionors.  The securities issued are subject to a hold period expiring on May 12, 2013.  The option agreement was previously announced on January 18, 2012.

Karen Rees, P.Geo., Vice President, Exploration of Temex Resources Corp., is the designated qualified person responsible for the preparation of this news release.

Table 1. Significant results from drill holes reported in this release

Hole From (m) To (m) Core Length (m) Au (g/t)
GL12-09 299.00 325.60 26.60 1.19
Including 299.00 306.00 7.00 1.89
Including 300.00 301.00 1.00 3.31
And 304.00 305.00 1.00 3.32
  321.00 325.60 4.60 1.23
  336.68 341.00 4.32 0.91
         
GL12-10 16.00 182.98 166.98 1.00
Including 42.00 51.00 9.00 1.75
And 77.00 80.00 3.00 2.54
And 97.00 106.00 9.00 1.34
And 135.29 182.98 47.69 2.13
Including 139.60 140.30 0.70 4.87
And 140.30 141.00 0.70 5.71
And 144.65 158.87 14.22 3.79
Including 144.65 145.47 0.82 12.56
And 145.47 146.00 0.53 24.71
And 153.00 154.00 1.00 5.25
And 154.84 155.68 0.84 14.13
And 163.00 182.98 19.98 1.89
Including 168.00 182.00 14.00 2.40
Including 174.00 174.72 0.72 12.55
         
GL12-11 38.00 53.00 15.00 0.78
Including 50.90 51.50 0.60 4.40
  95.00 107.00 12.00 1.20
  119.00 126.00 7.00 1.07
  219.00 257.00 38.00 0.98
Including 219.00 243.13 24.13 1.06
  270.00 284.00 14.00 0.77
  338.67 347.00 8.33 1.43

Hole From (m) To (m) Core Length (m) Au (g/t)
GL12-12 41.00 59.50 18.50 1.03
Including 47.00 52.00 5.00 1.86
  76.00 101.00 25.00 0.57
  111.00 127.00 16.00 0.56
  131.97 144.00 12.03 1.03
  183.00 216.40 33.40 1.65
Including 183.00 187.00 4.00 3.44
Including 184.70 185.35 0.65 14.41
And 193.30 216.40 23.10 1.76
Including 193.90 197.00 3.10 3.63
Including 196.00 197.00 1.00 4.90
And 209.00 210.00 1.00 3.55
And 212.00 213.00 1.00 3.37
And 213.00 213.60 0.60 5.55
         
GL12-13 121.50 122.00 0.50 75.86
  192.00 204.75 12.75 0.55
  259.00 297.00 38.00 0.51
  323.00 368.00 45.00 1.14
Including 323.00 353.00 30.00 1.49
Including 338.50 353.00 14.50 2.92
Including 342.00 349.88 7.88 4.83
Including 348.00 348.50 0.50 3.93
And 348.50 349.00 0.50 31.39
And 349.00 349.88 0.88 9.76
         
GL12-14 74.00 100.00 26.00 0.75
  163.04 196.00 32.96 0.77
Including 179.00 196.00 17.00 1.21
Including 179.00 182.00 3.00 4.40
  179.75 180.38 0.63 9.53
  180.38 181.00 0.62 5.17

Note: Temex implemented a quality control (QA/QC) program to ensure best practice in sampling and analysis.  Drill core samples are cut at Temex facilities using a Diamond saw with the samples transported by Temex personnel in securely sealed bags to a freighting company and from there directly to facilities operated by SGS Canada in Sudbury and Mississauga, Ontario for preparation and analysis.  Core samples are analyzed for gold using fire assay on a 30 gram split with an ICP finish.  Where initial results exceed 3 g/t gold, a second assay is completed on another 30 gram split with a gravimetric finish.  Intervals reported are core lengths.  True widths are unknown at this time but are estimated to be 65 to 75% of the drilled width, depending on the angle of the drill hole.

About Temex Resources Corp.

Temex is a Canadian based exploration company focusing on its portfolio of precious metals properties in Northeastern Ontario, a world class mining district.  Temex (60% interest) is exploring the Timmins Whitney Property, in partnership with Goldcorp (40% joint venture interest; no back-in rights), and the Juby Gold Project.

The Whitney Property has NI 43-101 compliant resources on the Upper Hallnor of 3.0 million tonnes at a grade of 2.44 g/t gold for 234,300 ounces of gold in the Measured category, 8.8 million tonnes at a grade of 1.97 g/t gold for 555,900 ounces of gold in the Indicated category, and 4.1 million tonnes at a grade of 1.82 g/t gold for 241,000 ounces of gold in the Inferred category, all at a cut-off grade of 0.30 g/t gold (Note 1).

The Juby Main Zone has NI 43-101 compliant resources of 22.3 million tonnes at a grade of 1.30 g/t gold for 934,645 ounces of gold in the Indicated category and 28.2 million tonnes at a grade of 1.00 g/t gold for 905,621 ounces of gold in the Inferred category, both at a cut-off grade of 0.40 g/t gold (Note 2).

Notes:

  1. Information regarding the mineral resource estimate on the Upper Hallnor is in the Company's news release dated September 5, 2012 and the technical report filed on SEDAR October 19, 2012.  The Mineral Resource Statement was prepared for Temex by P&E Mining Consultants Inc. of Brampton, Ontario in accordance with NI 43-101 by Richard Sutcliffe, PhD, P.Geo., Eugene Puritch, P.Eng., David Burga, P.Geo., Yungang Wu, P.Geo., Tracy Armstrong, P.Geo., and Antoine Yassa, P.Geo., "independent qualified persons" as defined by NI 43-101.
  2. Information regarding the mineral resource estimate on the Juby Main Zone is in the Company's news release dated January 16, 2012 and the technical report filed on SEDAR February 28, 2012.  The Mineral Resource Statement was prepared for Temex by GeoVector Management Inc., Ottawa, Ontario in accordance with NI 43-101 by Joe Campbell, BSc, P.Geo., Alan Sexton, MSc, P.Geol., and Allan Armitage, PhD, P.Geol., "independent qualified persons" as defined by NI 43-101.

Forward Looking Statements:
This news release includes certain "forward-looking statements".  Such forward-looking statements involve risks and uncertainties.  The results or events predicted in these forward-looking statements may differ materially from actual results or events.  The Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

 

 

 

SOURCE: Temex Resources Corp.

For further information:

visit www.temexcorp.com or email: info@temexcorp.com or phone: 416-862-2246   toll free: 866-373-6287

Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All
Tweet

Temex Resources Corp

EXPLORATION STAGE
CODE : TME.V
ISIN : CA87971U1057
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Temex Resources Corp
2008 Annual Report
Financings of Temex Resources Corp
10/14/2011Raises $2.66 Million Pursuant to Non-Brokered Private Placem...
Nominations of Temex Resources Corp
1/24/2014Appoints Derrick Weyrauch as Chief Financial Officer
3/14/2013Appoints René Marion, P.Eng., to Board of Directors
Project news of Temex Resources Corp
4/29/2013(Juby)Red Cloud Mining Capital Congratulates Temex Resources Corp....
1/15/2013(Juby)Intersects 2.13 g/t gold over 47.69 metres and Discovers Add...
11/23/2012(Juby)Completes Major Land Consolidation, Juby Gold Project, Ontar...
9/5/2012Red Cloud Mining Capital Congratulates Temex Resources Corp.
4/29/2011(Gowganda)LAUNCHES SILVER EXPLORATION PROGRAM - NEW DRILL TARGETS DEFI...
4/12/2011(Juby)DISCOVERS NEW GOLD ZONE, JUBY GOLD PROJECT
2/3/2011(Juby)INTERSECTS 47.0 METRES GRADING 1.36 G/T GOLD; JUBY GOLD DEPO...
9/15/2010(Juby)Begins Drilling on NI 43-101 614,000 Oz Juby Gold Deposit
2/27/2009(Hallnor (pamour))Reports High Grade Gold Results Hallnor Property, Timmins Go...
9/19/2007and MacDONALD MINES AGRESSIVELY ACQUIRE SIGNIFICANT LAND POS...
9/11/2007(Juby)Announces Commencement of Diamond Drilling on Juby North Gol...
5/8/2007(Timmins - Whitney Township)Initiates 2007 Program On Whitney Gold Property 5000 Metre D...
Corporate news of Temex Resources Corp
6/17/2014Reports Exceptional Near Surface Drill Results on Whitney Go...
2/26/2014(Juby)Files NI 43-101 Technical Report on Juby Gold Project, Ontar...
3/26/2013(Juby)Extends Mineralization at the Juby Gold Project in Northeast...
2/12/2013Intersects 60.40 g/t Gold over 0.50 Metres Near Surface at W...
12/3/2012to Attend Mines and Money London Conference
11/15/2012Congratulations to Temex Resources Corp. On Their Major Land...
10/23/2012Files NI 43-101 Technical Report for the Upper Hallnor Depos...
6/27/2011(Latchford)SET TO DRILL LATCHFORD HIGH GRADE GOLD PROJECT
6/8/2011(Gowganda)ANNOUNCES NI 43-101 RESOURCE ESTIMATE GOWGANDA SILVER PR...
5/12/2010Provides update on precious metals portfolio
11/4/2008and Nuinsco Commence Exploration on Uranium Project
10/22/2008Provides Exploration Update
9/26/2007announces Uranium Star to spend $1 million on Merico Ethel a...
7/17/2007Acquires Uranium Exploration Properties in Northwestern Onta...
6/19/2007Acquires Additional Nickel Exploration Property Adjacent To ...
6/12/2007Acquires Nickel Exploration Property Adjacent To Gold Chalic...
5/24/2007Bruce Durham Joins Temex as Executive Chaiman
2/21/2007Silver Tailings Project Update Gowganda Silver Project
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (TME.V)BERLIN (TQ1.BE)
0.055+0.00%0.0000
TSX-V
CA$ 0.055
10/23 15:39 -
0%
Prev close Open
0.055 0.055
Low High
0.050 0.055
Year l/h YTD var.
0.050 -  0.120 -38.89%
52 week l/h 52 week var.
0.050 -  0.120 -45.00%
Volume 1 month var.
28,000 -21.43%
24hGold TrendPower© : -13
Produces
Develops
Explores for Copper - Diamonds - Gold - Nickel - Palladium - Platinum - Silver - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2014-38.89%0.130.08
2013-66.67%0.310.08
201235.00%0.360.10
2011-45.95%0.440.16
201048.00%0.480.17
 
5 years chart
 
3 months chart
 
3 months volume chart